TxDOT contract A00049652 bid tabulation

Widen Road - Add Lanes, FM 2275 (FM 3272 IN WHITE OAK, E to FM 1845 (PINE TREE RD) IN LONGVIEW). Let by Texas DOT on August 7, 2025, Gregg, Tyler District. 4 bids received; low bid $22,863,768 by Longview Bridge and Road, LTD., -12% against the engineer's estimate of $25,999,390.

Owner
Texas DOT
Letting
07 AUG 2025
Pay items
167
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Longview Bridge and Road, LTD.$22,863,768Low-12%
2True Roads Construction, LLC$23,813,256+4.0%-8.0%
3East Texas Bridge, Inc.$24,260,514+6.0%-7.0%
4James Construction Group, LLC$30,235,495+32%+16%
TxDOT contract A00049652: bids by rank

Engineer's estimate: $25,999,390.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Longview Bridge and Road, LTD.2. True Roads Construction, LLC3. East Texas Bridge, Inc.4. James Construction Group, LLC
1Preparing row (100-7002)STA107$6,000.00$8,500.00$3,350.00$7,000.00$28,037
2Removing concrete (driveways) (104-7011)SY1,986$25.00$16.00$12.00$16.00$12.42
3Removing concrete (miscellaneous) (104-7046)SY236$25.00$30.00$16.00$16.00$13.58
4Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002)SY31,202$10.00$5.75$4.25$5.40$3.07
5Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046)SY2,383$12.00$8.50$5.50$6.50$3.07
6Excavation (roadway) (110-7001)CY86,171$10.00$6.00$12.50$10.00$15.55
7Embankment (final)(DC)(type C) (132-7006)CY29,672$18.00$11.00$16.50$15.00$15.23
8Furn & place topsoil (4") (160-7002)SY46,173$2.50$2.60$2.75$2.00$1.24
9Block sodding (162-7002)SY14,772$10.00$6.30$5.60$5.75$5.12
10Broadcast seed (permanent_rural_sand) (164-7001)SY23,087$0.50$0.25$0.14$0.15$0.13
11Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073)SY46,173$1.00$0.95$0.58$0.59$0.53
12Bonded fiber MTRX seed (temporary)(warm) (164-7074)SY23,087$0.75$0.92$0.57$0.58$0.52
13Bonded fiber MTRX seed (temporary)(cool) (164-7075)SY23,087$0.75$0.92$0.57$0.58$0.52
14Vegetative watering (168-7001)TGL1,083$10.00$14.50$12.00$5.00$35.00
15FL BS (compacted in place)(type A GR 1-2) (8") (247-7067)SY77,406$28.00$29.00$30.50$28.00$33.92
16Lime (quicklime (dry)) (260-7002)TON673$300.00$390.00$360.00$375.00$380.36
17Lime TRT (existing material)(8") (260-7007)SY37,395$8.00$2.25$5.25$4.25$5.82
18Cement (275-7001)TON673$275.00$290.00$265.00$285.00$283.79
19Cement TRT (existing material)(8") (275-7003)SY37,395$5.00$2.25$3.75$3.25$2.34
20Prime coat & blotter (MC-30) (310-7010)GAL21,817$7.00$6.75$7.00$5.75$7.00
21Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) (316-7068)GAL66,951$6.00$4.50$5.25$5.00$6.00
22Aggregate (type-PD or PL, GR-3)(sac-A) (316-7243)CY74$200.00$210.00$320.00$195.00$300.00
23Aggregate (type-PD or PL, GR-4) (316-7258)CY1,383$200.00$185.00$225.00$185.00$200.00
24SP mixes SP-B PG64-22 (344-7001)TON864$220.00$185.00$190.00$177.00$230.00
25SP mixes SP-C PG64-22 (344-7009)TON14,556$160.00$162.00$172.00$176.00$188.00
26SP mixes SP-C sac-A PG70-22 (344-7020)TON8,735$170.00$178.00$178.00$182.00$205.00
27SP mixes SP-D sac-A PG64-22 (exempt) (344-7072)TON266$200.00$200.00$235.00$180.00$267.00
28Tack coat (344-7077)GAL15,213$2.50$4.00$0.10$5.00$1.00
29Flexible pavement structure repair(6") (351-7005)SY600$65.00$95.00$135.00$75.00$67.30
30Planing asphalt concrete pavement(2") (354-7051)SY13,241$2.50$4.50$2.95$2.75$1.72
31Cut & restore asphalt paving (400-7008)SY125$135.00$170.00$160.00$135.00$141.32
32Cem stabil BKFL (400-7010)CY651$325.00$218.00$300.00$225.00$166.18
33Flowable backfill (401-7001)CY3$415.00$1,000.00$465.00$300.00$393.12
34Trench excavation protection (402-7001)LF3,349$10.00$9.50$6.00$10.00$1.13
35Temporary special shoring (403-7001)SF880$50.00$65.00$44.00$48.00$51.88
36Soil nail anchors (410-7001)LF7,917$37.00$33.00$28.00$32.00$24.79
37Drilled shaft (18 in) (416-7002)LF56$200.00$275.00$84.00$70.00$62.61
38Drilled shaft (36 in) (416-7006)LF1,712$375.00$320.00$260.00$270.00$246.51
39Class A concrete (miscellaneous) (420-7002)CY47$900.00$675.00$875.00$1,000.00$980.59
40Class C concrete (abutment) (420-7012)CY101.70$1,250.00$1,125.00$1,125.00$1,200.00$1,600.00
41Class C concrete (cap) (420-7022)CY140.80$1,500.00$1,200.00$1,000.00$1,125.00$1,700.00
42Class C concrete (column) (420-7038)CY39.20$1,600.00$1,700.00$2,000.00$1,200.00$2,500.00
43Reinforced concrete slab (422-7001)SF41,854$30.00$26.50$27.50$30.00$50.00
44Approach slab (422-7013)CY163$660.00$815.00$740.00$900.00$800.00
45Retaining wall (soil nail) (fascia) (423-7023)SF8,034$90.00$105.00$90.00$85.00$101.00
46Prestressed concrete girder (TX54) (425-7005)LF5,150.24$230.00$240.00$280.00$255.00$240.86
47Riprap (mow strip)(4 in) (432-7013)CY40$725.00$650.00$700.00$750.00$735.00
48Riprap (stone type R)(dry)(18 in) (432-7024)CY649$250.00$280.00$190.00$205.00$224.24
49Riprap (stone common)(dry)(12 in) (432-7031)CY1,789$210.00$210.00$185.00$205.00$252.62
50STR steel (miscellaneous non-bridge) (442-7007)LB293$30.00$55.00$25.00$40.00$28.19
51Rail (type T223) (450-7008)LF544$180.00$210.00$120.00$125.00$124.00
52Rail (type C223) (450-7034)LF568.40$250.00$230.00$185.00$175.00$164.84
53Rail (type PR11) (450-7044)LF874.10$200.00$135.00$110.00$140.00$110.74
54Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF245$200.00$220.00$225.00$200.00$195.27
55RC pipe (CL III)(24 in) (464-7005)LF6,894$75.00$75.00$74.00$87.00$99.50
56RC pipe (CL III)(30 in) (464-7007)LF802$90.00$100.00$110.00$115.00$120.58
57RC pipe (CL III)(36 in) (464-7009)LF406$150.00$150.00$145.00$155.00$148.50
58RC pipe (CL IV)(24 in) (464-7021)LF108$135.00$90.00$95.00$110.00$100.95
59RC pipe (CL IV)(36 in) (464-7024)LF272$265.00$180.00$170.00$185.00$159.51
60Manh (complete)(PRM)(48IN) (465-7002)EACH1$5,500.00$7,500.00$6,500.00$8,500.00$8,937.51
61Manh (complete)(PRM)(60IN) (465-7003)EACH2$9,200.00$9,900.00$8,000.00$10,000$9,289.31
62Manh (complete)(PRM)(72IN) (465-7004)EACH4$16,000$13,850$12,000$13,500$10,777
63Inlet (complete)(PSL)(RC)(3FTX3FT) (465-7070)EACH2$6,700.00$7,000.00$6,000.00$7,700.00$5,729.36
64Inlet (complete)(PSL)(RC)(4FTX4FT) (465-7071)EACH1$8,000.00$8,000.00$6,500.00$8,500.00$6,106.88
65Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126)EACH4$8,500.00$7,400.00$6,500.00$8,200.00$8,604.11
66Inlet (complete)(PSL)(FG)(3FTX5FT-3FTX5FT) (465-7130)EACH6$8,500.00$9,400.00$8,500.00$10,500$8,507.30
67Inlet (complete)(cco)(3FT)(both) (465-7171)EACH39$5,000.00$6,700.00$7,800.00$7,400.00$5,430.24
68Inlet (complete)(cco)(4FT)(both) (465-7175)EACH7$8,000.00$6,900.00$8,200.00$7,600.00$6,363.24
69Headwall (CH - FW - 0) (diameter= 36 in) (466-7009)EACH2$8,500.00$9,500.00$9,500.00$8,500.00$9,833.83
70Headwall (CH - FW - 15) (diameter= 36 in) (466-7024)EACH3$8,000.00$9,200.00$10,000$7,000.00$9,348.31
71Headwall (CH - FW - 45) (diameter= 24 in) (466-7050)EACH2$6,500.00$9,000.00$9,000.00$6,500.00$9,479.20
72Headwall (CH - FW - 45) (diameter= 36 in) (466-7054)EACH2$14,000$10,750$11,000$10,500$14,667
73Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH4$1,400.00$1,450.00$1,200.00$1,150.00$2,194.53
74Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH8$1,500.00$1,650.00$1,400.00$1,375.00$2,293.61
75Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366)EACH1$3,000.00$4,500.00$3,500.00$4,200.00$4,707.62
76Removing structure (set) (496-7004)EACH22$400.00$545.00$325.00$250.00$622.48
77Removing structure (pipe) (496-7007)LF1,000$16.00$13.00$14.00$12.00$13.94
78Removing structure (bridge 100 - 499 FT length) (496-7010)EACH1$175,000$25,000$30,000$35,000$44,304
79Mobilization (500-7001)LS1$2,200,000$2,150,000$1,750,000$2,000,000$3,000,000
80Barricades, signs and traffic handling (502-7001)MO31$7,500.00$5,000.00$2,500.00$5,000.00$27,000
81Portable changeable message sign (503-7001)DAY100$140.00$135.00$50.00$100.00$69.16
82TMA (stationary) (505-7001)DAY60$350.00$250.00$200.00$150.00$743.15
83TMA (mobile operation) (505-7003)DAY30$560.00$375.00$50.00$150.00$1,139.64
84Rock filter dams (install) (type 2) (506-7002)LF667$35.00$39.00$40.00$40.00$37.00
85Rock filter dams (remove) (506-7011)LF667$12.00$11.00$11.00$11.00$10.00
86Construction exits (install) (type 1) (506-7020)SY111$45.00$50.00$38.50$40.00$35.00
87Construction exits (remove) (506-7024)SY111$9.00$11.00$12.00$13.00$12.00
88Excavation (erosion & sediment control, in vehicle) (506-7027)CY200$40.00$25.00$20.00$25.00$28.84
89Backhoe work (erosion & sediment control) (506-7030)HR300$163.00$50.00$75.00$75.00$95.14
90Temporary sediment control fence (install) (506-7039)LF18,366$4.00$3.75$4.00$4.05$3.68
91Temporary sediment control fence (remove) (506-7041)LF18,366$1.00$1.25$0.30$0.35$0.30
92Biodegradable erosion control logs (install) (8") (506-7043)LF1,250$6.00$5.50$5.35$5.40$4.88
93Biodegradable erosion control logs (remove) (506-7046)LF1,250$1.00$1.25$1.10$1.10$1.00
94Trackhoe work (erosion & sediment control) (506-7051)HR300$110.00$95.00$75.00$85.00$207.87
95Constructing detours (508-7001)SY9,095$110.00$81.00$84.00$115.00$100.88
96Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF8,820$95.00$12.00$90.00$80.00$40.38
97Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF1,080$90.00$14.00$90.00$85.00$42.85
98Portable concrete traffic barrier (des source)(F-shape)(type 1) (512-7017)LF700$35.00$23.00$18.00$25.00$23.94
99Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF8,646$36.00$8.00$14.00$12.00$10.20
100Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF800$26.00$10.00$14.00$14.00$10.91
101Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041)LF700$25.00$22.00$18.00$20.00$19.08
102Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF8,820$16.00$11.00$15.00$10.00$14.52
103Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF1,080$60.00$13.00$15.00$10.00$19.82
104Concrete curb & gutter (type II) (529-7009)LF19,463$35.00$25.00$32.00$28.00$32.42
105Concrete curb (doweled) (529-7012)LF142$80.00$28.00$46.00$26.00$11.14
106Driveways (concrete) (530-7006)SY1,561$175.00$105.00$100.00$110.00$115.00
107Driveways (concrete) (hes) (530-7007)SY1,078$135.00$115.00$125.00$120.00$135.00
108Driveways (ACP) (530-7010)SY1,825$85.00$55.00$70.00$45.00$91.01
109Concrete sidewalks (5") (531-7002)SY9,775$67.00$75.00$78.00$75.00
110Curb ramps (type 1) (531-7005)EACH4$2,300.00$2,200.00$3,000.00$2,550.00
111Curb ramps (type 7) (531-7010)EACH5$2,300.00$2,200.00$3,000.00$2,550.00
112Curb ramps (type 22) (531-7014)EACH1$3,000.00$4,500.00$3,800.00$4,500.00
113Concrete directional island (536-7004)SY109$200.00$130.00$120.00$135.00$130.00
114Metal W-beam guard fence (steel post) (540-7002)LF388$35.00$31.00$30.00$30.00$27.50
115Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$2,200.00$2,200.00$2,150.00$2,200.00$1,950.00
116Downstream anchor terminal section (540-7015)EACH2$2,000.00$1,500.00$1,450.00$1,450.00$1,325.00
117Remove metal beam guard fence (542-7001)LF550$4.00$2.25$2.20$2.20$2.00
118Remove downstream anchor terminal (542-7003)EACH4$190.00$165.00$165.00$165.00$150.00
119Guardrail end treatment (install) (544-7001)EACH2$3,050.00$3,300.00$3,300.00$3,250.00$3,000.00
120Guardrail end treatment (remove) (544-7003)EACH2$325.00$225.00$220.00$220.00$200.00
121Mailbox install-M (TWG-post) type 1 (560-7001)EACH4$500.00$740.00$700.00$740.00$775.00
122Mailbox install-S (TWG-post) type 2 (560-7002)EACH19$375.00$350.00$250.00$350.00$275.00
123Mailbox install-D (TWG-post) type 2 (560-7003)EACH5$325.00$400.00$300.00$400.00$315.00
124Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH7$800.00$720.00$740.00$720.00$625.00
125Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH13$800.00$890.00$940.00$900.00$715.00
126Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH2$850.00$1,125.00$1,250.00$1,125.00$1,190.00
127Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH5$1,260.00$1,350.00$1,200.00$1,350.00$1,395.00
128Remove SM RD SN sup&AM (644-7073)EACH33$80.00$110.00$110.00$110.00$79.00
129Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH16$30.00$17.00$16.50$20.00$15.00
130Install delineator assembly (D-SW)SZ 1(BRF)GF1 (658-7015)EACH3$30.00$17.00$16.50$20.00$15.00
131Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH6$30.00$28.00$27.50$30.00$25.00
132Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH1$125.00$73.00$62.00$75.00$55.00
133Install object marker assembly (OM-3L)(TWT)GND (658-7066)EACH2$165.00$330.00$220.00$325.00$295.00
134Install object marker assembly (OM-3R)(TWT)GND (658-7070)EACH1$30.00$110.00$220.00$325.00$295.00
135Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF5,480$0.50$0.45$0.44$0.43$0.40
136Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF38,380$0.50$0.45$0.44$0.43$0.35
137Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF818$4.00$3.30$3.30$3.30$6.35
138Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF4,860$1.00$0.45$0.44$0.43$0.40
139Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF59,100$0.50$0.45$0.44$0.43$0.38
140Work zone pavement marking removing (reflectorized) type I-C (662-7050)LF116$5.00$5.50$5.50$5.50$5.50
141Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH1,970$5.00$4.75$4.70$4.75$5.50
142Work zone pavement marking removing (W)6"(solid) (662-7068)LF1,020$1.00$2.75$2.75$2.65$1.25
143Work zone pavement marking removing (W)12"(solid) (662-7075)LF50$2.00$8.80$8.80$8.75$7.00
144Work zone pavement marking removing (Y)6"(solid) (662-7100)LF1,220$1.75$1.10$2.75$2.75$1.25
145Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH1,960$2.00$1.65$1.65$1.25$3.00
146Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH1,960$1.50$1.65$1.65$1.25$3.00
147Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF668$1.50$2.20$2.20$2.20$2.25
148Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF341$2.00$2.20$2.20$2.20$3.00
149Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,500$2.50$1.50$1.40$1.40$1.50
150Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF798$8.00$7.50$7.45$7.50$11.25
151Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF4,160$1.50$1.10$1.10$1.10$0.97
152Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF3,784$1.50$1.10$1.10$1.10$0.95
153Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF3,920$4.50$1.10$1.10$1.10$0.97
154Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF22,587$1.00$0.78$0.77$0.75$0.95
155Prefabricated PM type C (W)(arrow) (668-7091)EACH17$225.00$245.00$240.00$240.00$327.00
156Prefabricated PM type C (W)(word) (668-7103)EACH5$275.00$280.00$280.00$280.00$377.00
157Reflectorized pavement marker type I-C (672-7002)EACH324$6.00$6.60$6.60$6.50$5.95
158Reflectorized pavement marker type II-A-A (672-7004)EACH718$7.00$6.60$6.60$6.50$5.95
159Eliminating existing PM & markers (4") (677-7001)LF47,867$0.50$0.55$1.00$0.75$0.65
160Eliminating existing PM & markers (8") (677-7004)LF1,700$1.50$1.10$1.25$2.00$0.65
161Eliminating existing PM & markers (24") (677-7008)LF362$8.00$5.50$2.00$4.00$6.00
162Eliminating existing PM & markers (arrow) (677-7009)EACH8$100.00$110.00$275.00$100.00$100.00
163Eliminating existing PM & markers (word) (677-7015)EACH6$100.00$110.00$275.00$100.00$120.00
164Relocate RDSD flash beacon assembly (685-7002)EACH1$4,000.00$4,500.00$5,500.00$4,500.00$4,500.00
165Full - width mowing (730-7019)CYC5$3,500.00$5,500.00$5,000.00$3,500.00$2,500.00
166Litter removal (734-7002)CYC5$4,000.00$3,300.00$1,600.00$3,500.00$911.24
167LED roadside sign (6066-7001)EACH4$4,700.00$4,400.00$2,250.00$6,500.00$2,500.00
TxDOT contract A00049652: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy