Texway Wastewater Services, LLC: TxDOT bid record

Texway Wastewater Services, LLC submitted 26 bids on Texas DOT contracts in the data, from 31 OCT 2025 to 28 SEP 2026, and was the low bidder on 10 of them (38%). When it was not low, its total sat a median +33% above the low bid.

Owner
Texas DOT
Low bid volume
$1,626,059
Latest bid
28 SEP 2026
Data through
19 NOV 2026
26Bids
10Low bids
38Win rate, percent
+33%Median gap to the low bid when not low, 16 bids

By year

YearBidsLow bidsWin rate
20258563%
202618528%
Texway Wastewater Services, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District12542%
Austin District500%
Maintenance Division District44100%
Fort Worth District3133%
Corpus Christi District100%
Lufkin District100%
Texway Wastewater Services, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Tree trimming / brush removal752-7001MI143 (21%)$1,900.00$2,300.00
Tree removal (4" - 12" diameter)752-7005EACH133 (23%)$100.00$150.00
Tree removal (30" - 36" diameter)752-7009EACH113 (27%)$400.00$500.00
Tree removal (42" - 48" diameter)752-7011EACH63 (50%)$375.00$550.00
Tree removal (12" - 18" diameter)752-7006EACH122 (17%)$100.00$193.43
Tree removal (18" - 24" diameter)752-7007EACH122 (17%)$400.00$250.00
Tree removal (24" - 30" diameter)752-7008EACH102 (20%)$400.00$350.00
Tree removal (36" - 42" diameter)752-7010EACH72 (29%)$250.00$500.00
Texway Wastewater Services, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Texway Wastewater Services, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 SEP 2026A00223925Fort Worth DistrictREHABILITATION OF EXISTING ROADWAY, SH 114 (SH 114 frontage road to at FM 1938)1 of 2$198,280Low, 3.0% under the second
25 SEP 2026A00221952Dallas DistrictCABLE BARRIER REPAIR, IH0045 (Various Roadways in the to Ellis County Maintenance Section)2 of 2$998,300+112%
09 SEP 2026A00222180Dallas DistrictMETAL BEAM GUARD FENCE REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section)2 of 3$530,501+30%
09 SEP 2026A00222233Dallas DistrictCABLE BARRIER REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section)2 of 2$451,700+66%
09 SEP 2026A00221598Dallas DistrictCABLE BARRIER REPAIR, IH0035W (VARIOUS ROADWAYS to DENTON COUNTY MAINTENANCE SECTION)4 of 4$197,300+86%
09 SEP 2026A00218652Dallas DistrictBRIDGE PREVENTATIVE MAINTENANCE, FM0055 (FM 55 to At Mill Creek)3 of 5$67,000+54%
09 SEP 2026A00219985Dallas DistrictEROSION REPAIR, FM1378 (FM 1378 to AT SLOAN CREEK)3 of 3$93,850+18%
08 JUL 2026A00220146Lufkin DistrictTREE TRIMMING AND BRUSH REMOVAL, US0059 (Nacogdoches County to VARIOUS LOCATIONS)4 of 7$350,460+11%
08 JUL 2026A00220346Dallas DistrictTREE TRIMMING AND BRUSH REMOVAL, SH0034 (Various Roadways in the Kaufman - to Rockwall Maintenance Section)1 of 8$281,657Low, 10% under the second
08 JUL 2026A00218108Dallas DistrictTREE TRIMMING AND BRUSH REMOVAL, FM0156 (VARIOUS ROADWAYS IN DENTON to DENTON COUNTY MAINTENANCE SECTION)1 of 9$101,186Low, 15% under the second
08 JUL 2026A00219975Dallas DistrictTREE TRIMMING AND BRUSH REMOVAL, IH0045 (Various Roadways in to Navarro County Maintenance Section)1 of 8$24,772Low, 65% under the second
08 JUL 2026A00219978Dallas DistrictTREE TRIMMING AND BRUSH REMOVAL, US0075 (VARIOUS ROADWAYS IN THE to COLLIN COUNTY MAINTENANCE SECTION)1 of 10$63,884Low, 20% under the second
10 JUN 2026A00216585Austin DistrictTREE TRIMMING AND BRUSH REMOVAL, US0281 (VARIOUS LOCATIONS IN BURNET, BLANCO, to GILLESPIE, LLANO, AND MASON COUNTIES)2 of 6$171,790+19%
10 JUN 2026A00216587Austin DistrictTREE TRIMMING AND BRUSH REMOVAL, FM0969 (VARIOUS LOCATIONS IN to TRAVIS COUNTY)2 of 7$102,193+5.0%
10 JUN 2026A00216589Austin DistrictTREE TRIMMING AND BRUSH REMOVAL, RM0012 (VARIOUS LOCATIONS IN to HAYS AND TRAVIS COUNTIES)3 of 7$319,466+13%
10 JUN 2026A00216590Austin DistrictTREE TRIMMING AND BRUSH REMOVAL, SH0095 (VARIOUS LOCATIONS IN to WILLIAMSON AND TRAVIS COUNTIES)2 of 7$239,306+6.0%
10 JUN 2026A00220722Austin DistrictTREE TRIMMING AND BRUSH REMOVAL, US0183 (VARIOUS LOCATIONS IN to CALDWELL COUNTY)2 of 7$197,000+8.0%
15 APR 2026A00218956Dallas DistrictSTORM SEWER AND DRAIN INLET CLEANING, US0075 (VARIOUS ROADWAYS IN THE to COLLIN COUNTY MAINTENANCE SECTION)2 of 3$124,120+122%
03 DEC 2025A00218181Maintenance Division DistrictTotal Maintenance, IH 35 (3801 N 3rd St, Temple, TX 76501 to 3801 N 3rd St, Temple, TX 76501)1 of 3$195,000Low, 64% under the second
03 DEC 2025A00218184Maintenance Division DistrictTotal Maintenance, IH0010 (30.291897, -99.527906 to 30.291897, -99.527906)1 of 3$200,000Low, 29% under the second
03 DEC 2025A00218186Maintenance Division DistrictTotal Maintenance, IH0010 (30.714483, -101.800973 to 30.714483, -101.800973)1 of 2$189,000Low, 165% under the second
19 NOV 2025A00217264Fort Worth DistrictTREE TRIMMING AND BRUSH REMOVAL, US0377 (VARIOUS LOCATIONS IN to Hood, Erath and Somervell)4 of 11$286,130+41%
13 NOV 2025A00217652Corpus Christi DistrictTREE TRIMMING, SH0286 (Various to .)6 of 6$211,950+199%
12 NOV 2025A00217350Dallas DistrictTREE TRIMMING AND BRUSH REMOVAL, IH0045 (Various Roadways in the to Ellis County Maintenance Section)1 of 9$222,280Low, 23% under the second
06 NOV 2025A00217918Maintenance Division DistrictTotal Maintenance, SH0016 (30.06477492 to -99.1212750)1 of 4$150,000Low, 36% under the second
Texway Wastewater Services, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy