TxDOT contract A00066969 bid tabulation

Rehabilitate Existing Roadway, FM 1777 (FM 6 to CR 677). Let by Texas DOT on November 6, 2025, Collin, Dallas District. 5 bids received; low bid $6,601,558 by D. L. Lennon Incorporated - Contractor, -33% against the engineer's estimate of $9,890,108.

Owner
Texas DOT
Letting
06 NOV 2025
Pay items
86
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1D. L. Lennon Incorporated - Contractor$6,601,558Low-33%
2Ed Bell Construction Company$8,194,616+24%-17%
3Overland Corporation$8,369,102+27%-15%
4A. K. Gillis & Sons, LLC$8,448,572+28%-15%
5Grey Sky Construction LLC$9,398,451+42%-5.0%
TxDOT contract A00066969: bids by rank

Engineer's estimate: $9,890,108.

Bid tabulation

LinePay itemUnitQuantityEstimate1. D. L. Lennon Incorporated - Contractor2. Ed Bell Construction Company3. Overland Corporation4. A. K. Gillis & Sons, LLC5. Grey Sky Construction LLC
1Preparing row (100-7002)STA173.37$500.00$375.00$1,200.00$2,500.00$525.00$5,500.00
2Removing concrete (riprap) (104-7006)SY30$30.00$15.00$45.00$9.50$15.00$50.00
3Removing concrete (driveways) (104-7011)SY1,297$25.00$12.00$15.00$9.50$12.00$20.00
4Excavation (roadway) (110-7001)CY11,254$22.00$16.00$8.00$9.50$25.00$15.00
5Embankment (final)(OC)(type C) (132-7005)CY13,445$35.00$19.30$20.00$21.43$25.00$30.00
6Backfill (type A or B) (134-7004)STA173.37$350.00$268.00$600.00$410.07$500.00$250.00
7Blading (150-7001)STA173.37$350.00$300.00$800.00$160.76$500.00$250.00
8Drill seed (permanent_rural_clay) (164-7010)SY110,536$0.50$0.12$0.10$0.37$0.18$0.50
9Drill seed (temporary_warm_cool) (164-7015)SY110,536$0.25$0.10$0.10$0.34$0.16$0.50
10Vegetative watering (168-7001)TGL32,886$5.00$0.01$0.50$2.22$1.00$1.00
11FL BS (compacted in place)(type D GR 1-2) (12") (247-7125)SY63,050$40.00$29.00$33.50$29.22$34.35$28.00
12FL BS (roadway del) (type D GR 1-2) (247-7209)TON15,765$50.00$43.00$40.00$35.04$55.99$60.00
13Rework BS metal (type C)(12")(ord comp) (251-7055)SY49,398$4.50$2.40$3.00$2.67$3.10$6.00
14Cement (275-7001)TON328$300.00$255.00$240.00$359.75$220.00$300.00
15Cement TRT (existing material & new base)(6") (275-7006)SY64,981$4.00$1.55$3.00$4.95$3.10$6.00
16Prime coat(MC-30 or AE-P) (310-7013)GAL9,465$10.00$5.42$5.38$6.05$6.23$4.00
17Emuls asphalt (BS or subgr TRT)(SS-1) (314-7001)GAL9,465$10.00$4.22$6.15$6.05$5.01$4.00
18Asphalt (CRS-2P) (316-7012)GAL11,824$6.51$4.57$4.74$5.00$5.36$4.00
19Asphalt (RC-250) (316-7016)GAL4,417$10.00$5.33$6.55$8.00$6.00$4.00
20Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071)GAL9,933$15.00$4.14$4.79$5.00$5.28$6.00
21Aggregate (type-B or L, GR-3)(sac-B) (316-7244)CY404$320.00$136.78$272.64$200.00$170.79$250.00
22Aggregate (type-B or L, GR-5) (316-7251)CY171$500.00$125.00$276.90$300.00$158.59$250.00
23SP mixes SP-C sac-B PG64-22 (344-7011)TON7,610$135.00$139.30$136.00$163.20$137.61$135.00
24Plane & text asphalt concrete pavement(0" to 6") (354-7005)SY49,398$7.00$3.60$5.25$3.41$2.99$5.00
25Riprap (mow strip)(4 in) (432-7013)CY65$620.00$700.00$850.00$871.05$700.00$550.00
26Riprap (stone protection)(12 in) (432-7041)CY128$125.00$220.00$225.00$400.00$400.27$155.00
27RC pipe (CL III)(18 in) (464-7003)LF2,064$90.00$52.00$70.00$54.00$52.00$80.00
28RC pipe (CL III)(24 in) (464-7005)LF629$130.00$85.00$80.00$74.00$85.00$105.00
29RC pipe (CL III)(30 in) (464-7007)LF97$170.00$125.00$105.00$118.00$125.00$125.00
30RC pipe (CL III)(36 in) (464-7009)LF84$200.00$175.00$155.00$135.00$175.00$150.00
31Headwall (CH - PW - 0) (diameter= 24 in) (466-7101)EACH1$10,000$8,000.00$8,000.00$12,000$8,000.00$6,500.00
32Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH126$1,500.00$800.00$650.00$850.00$800.00$1,250.00
33Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH30$2,000.00$1,400.00$1,000.00$1,500.00$1,400.00$1,850.00
34Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348)EACH4$4,700.00$2,800.00$1,800.00$4,500.00$2,800.00$5,000.00
35Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368)EACH4$7,325.00$7,000.00$5,000.00$8,000.00$7,000.00$6,000.00
36Clean existing culverts (480-7001)EACH6$3,000.00$1,200.00$4,000.00$850.00$1,200.00$1,500.00
37Removing structure (set) (496-7004)EACH43$540.00$100.00$200.00$200.00$100.00$500.00
38Removing structure (headwall) (496-7006)EACH2$1,300.00$800.00$3,000.00$880.00$800.00$2,500.00
39Removing structure (pipe) (496-7007)LF1,823$30.00$8.00$15.00$7.00$8.00$50.00
40Mobilization (500-7001)LS1$899,100$295,855$827,000$821,020$789,228$900,000
41Barricades, signs and traffic handling (502-7001)MO12$15,000$6,667.00$31,500$34,000$31,037$12,500
42Portable changeable message sign (503-7002)EACH2$17,500$21,000$10,000$3,760.00$19,000$20,000
43TMA (stationary) (505-7001)DAY188$250.00$150.00$100.00$106.25$250.00$250.00
44TMA (mobile operation) (505-7002)HR40$150.00$150.00$100.00$106.25$250.00$55.00
45Rock filter dams (install) (type 3) (506-7003)LF427$61.00$60.00$89.25$85.00$65.00$30.00
46Rock filter dams (remove) (506-7011)LF527$18.00$12.00$47.25$13.00$10.00$15.00
47Construction exits (install) (type 1) (506-7020)SY308$27.00$33.00$33.60$35.00$25.00$40.00
48Construction exits (remove) (506-7024)SY308$11.00$10.00$18.38$10.00$15.00$20.00
49Temporary sediment control fence (install) (506-7039)LF1,458$4.00$4.00$3.15$3.60$6.00$4.00
50Temporary sediment control fence (remove) (506-7041)LF1,458$1.00$1.00$1.58$1.10$2.00$2.00
51Biodegradable erosion control logs (install) (12") (506-7044)LF550$4.00$5.50$5.25$5.85$10.00$12.00
52Biodegradable erosion control logs (install) (18") (506-7045)LF2,644$12.00$7.50$5.78$6.25$10.00$15.00
53Biodegradable erosion control logs (remove) (506-7046)LF3,194$2.00$1.00$2.89$1.25$2.00$5.00
54Rock filter dams (install) (type 2) 6:1 (506-7048)LF100$102.00$60.00$99.75$48.00$75.00$30.00
55Driveways (concrete) (530-7006)SY1,343$140.00$110.00$95.00$93.00$95.00$85.00
56Driveways (ACP) (530-7010)SY3,416$85.00$76.30$80.00$99.04$91.73$45.00
57Mill rumble strips (asphalt) (shoulder) (533-7001)LF26,477$0.13$1.16$0.15$0.22$0.14$0.30
58Mill rumble strips (asphalt) (centerline) (533-7002)LF12,233$0.20$1.16$0.15$0.22$0.14$0.30
59Metal W-beam guard fence (timber post) (540-7001)LF1,000$26.00$21.20$25.04$20.25$21.20$25.00
60Remove metal beam guard fence (542-7001)LF1,005$4.00$2.00$2.99$1.50$2.00$3.00
61Guardrail end treatment (install) (544-7001)EACH10$3,800.00$2,900.00$3,244.50$2,770.00$2,900.00$2,850.00
62Guardrail end treatment (remove) (544-7003)EACH9$300.00$200.00$299.25$150.00$200.00$1,500.00
63Mailbox install-S (TWW-post) type 4 (560-7008)EACH41$350.00$230.00$309.75$220.00$230.00$1,150.00
64Mailbox install-D (TWW-post) type 4 (560-7009)EACH4$350.00$260.00$387.45$250.00$250.00$1,150.00
65Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH47$800.00$665.00$672.00$650.00$700.00$1,150.00
66Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH1$1,200.00$745.00$756.00$650.00$750.00$1,150.00
67Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH3$900.00$830.00$782.25$685.00$800.00$1,150.00
68Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH1$1,100.00$1,370.00$838.95$685.00$990.00$1,150.00
69Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH6$50.00$25.00$15.75$40.00$25.00$100.00
70Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH33$27.00$31.00$26.25$30.00$31.00$100.00
71Install object marker assembly (OM-2Z)(WFLX)GNDHH (658-7249)EACH12$73.00$173.00$267.75$50.00$200.00$100.00
72Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF17,337$0.30$0.23$0.25$0.20$0.23$0.50
73Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF17,337$0.30$0.23$0.25$0.20$0.23$0.50
74Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH243$3.00$1.50$3.00$1.99$2.45$6.00
75Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH444$3.00$1.50$3.00$1.99$2.45$6.00
76Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF30$3.50$2.00$2.16$1.55$2.00$3.00
77Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF2,261$2.00$0.97$1.05$0.95$0.97$6.00
78Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF130$8.00$7.00$12.00$6.40$7.00$20.00
79Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF34,630$1.00$0.49$0.53$0.58$0.49$0.50
80Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF2,814$1.10$0.55$0.59$0.58$0.55$0.50
81Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF24,055$1.00$0.49$0.53$0.58$0.49$0.50
82Prefabricated PM type C (W)(arrow) (668-7091)EACH12$311.00$190.00$205.20$225.00$190.00$250.00
83Prefabricated PM type C (W)(double arrow) (668-7093)EACH1$445.00$357.00$385.56$375.00$357.00$500.00
84Prefabricated PM type C (W)(word) (668-7103)EACH12$400.00$250.00$270.00$300.00$250.00$250.00
85Reflectorized pavement marker type I-C (672-7002)EACH116$7.00$3.75$4.05$4.25$3.75$6.00
86Reflectorized pavement marker type II-A-A (672-7004)EACH841$6.00$3.75$4.05$4.25$3.75$6.00
TxDOT contract A00066969: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of November 6, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy