TxDOT contract A00193385 bid tabulation
Traffic Signal Improvements, SH 342 (at SL 12 (Ledbetter) to in the City of Dallas). Let by Texas DOT on November 6, 2025, Dallas, Dallas District. 8 bids received; low bid $2,607,221 by Elecnor Belco Electric, Inc., -37% against the engineer's estimate of $4,118,397.
- Owner
- Texas DOT
- Letting
- 06 NOV 2025
- Pay items
- 135
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Elecnor Belco Electric, Inc. | $2,607,221 | Low | -37% |
| 2 | Sice, Inc. | $3,493,240 | +34% | -15% |
| 3 | American Lighting and Signalization, LLC | $3,780,000 | +45% | -8.0% |
| 4 | WG Engineering & Construction, LLC | $3,944,589 | +51% | -4.0% |
| 5 | Durable Specialties, Inc. | $4,058,453 | +56% | -1.0% |
| 6 | Highway Intelligent Traffic Solutions, Inc. | $4,084,641 | +57% | -1.0% |
| 7 | Grey Sky Construction LLC | $4,348,892 | +67% | +6.0% |
| 8 | Yunex LLC | $4,439,071 | +70% | +8.0% |
Engineer's estimate: $4,118,397.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Elecnor Belco Electric, Inc. | 2. Sice, Inc. | 3. American Lighting and Signalization, LLC | 4. WG Engineering & Construction, LLC | 5. Durable Specialties, Inc. | 6. Highway Intelligent Traffic Solutions, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pavement) (104-7001) | SY | 172 | $90.00 | $17.00 | $226.42 | $91.00 | $60.00 | $64.00 | $120.00 |
| 2 | Removing concrete (medians) (104-7008) | SY | 172 | $80.00 | $35.00 | $219.86 | $95.00 | $65.00 | $67.00 | $120.00 |
| 3 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 86 | $75.00 | $23.00 | $298.57 | $94.00 | $65.00 | $66.00 | $120.00 |
| 4 | Removing concrete (curb & gutter) (104-7017) | LF | 623 | $50.00 | $22.00 | $37.64 | $59.00 | $40.00 | $42.00 | $54.00 |
| 5 | Remove (10") TRT/untrt base & asphalt pavement (105-7030) | SY | 205 | $55.00 | $11.00 | $204.99 | $50.00 | $35.00 | $35.00 | $120.00 |
| 6 | Embankment (final)(OC)(type D) (132-7011) | CY | 86 | $120.00 | $92.00 | $418.75 | $134.00 | $90.00 | $95.00 | $120.00 |
| 7 | Compost manuf topsoil (6") (161-7003) | SY | 172 | $25.00 | $23.00 | $24.91 | $38.00 | $18.00 | $15.00 | $23.40 |
| 8 | Block sodding (162-7002) | SY | 163 | $35.00 | $11.00 | $11.50 | $89.00 | $20.00 | $40.00 | $10.80 |
| 9 | Vegetative watering (168-7001) | TGL | 7 | $450.00 | $456.00 | $511.03 | $8.00 | $1,000.00 | $200.00 | $480.00 |
| 10 | FL BS (compacted in place)(type D GR 1-2) (10") (247-7102) | SY | 69 | $80.00 | $114.00 | $472.65 | $156.00 | $110.00 | $110.00 | $240.00 |
| 11 | Concrete pavement (CRCP) (8") (360-7002) | SY | 69 | $150.00 | $342.00 | $302.39 | $423.00 | $300.00 | $298.00 | $300.00 |
| 12 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 88 | $342.00 | $317.33 | $335.00 | $598.00 | $715.00 | $629.03 | |
| 13 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 24 | $342.00 | $275.77 | $366.00 | $625.00 | $775.00 | $696.26 | |
| 14 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 266 | $725.00 | $286.00 | $743.91 | $403.00 | $785.00 | $840.00 | $818.06 |
| 15 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 110 | $950.00 | $521.00 | $893.58 | $826.00 | $998.00 | $975.00 | $883.24 |
| 16 | Riprap (concrete)(4 in) (432-7001) | CY | 7 | $1,138.00 | $1,423.59 | $1,563.00 | $1,100.00 | $1,100.00 | $1,200.00 | |
| 17 | Mobilization (500-7001) | LS | 1 | $350,000 | $185,000 | $331,289 | $197,057 | $429,290 | $170,000 | $252,960 |
| 18 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $20,000 | $3,983.00 | $9,787.96 | $5,469.00 | $7,025.00 | $14,000 | $4,289.95 |
| 19 | Portable changeable message sign (503-7001) | DAY | 60 | $175.00 | $196.00 | $302.75 | $47.00 | $150.00 | $165.00 | $66.00 |
| 20 | TMA (stationary) (505-7001) | DAY | 200 | $275.00 | $168.00 | $449.90 | $420.00 | $425.00 | $275.00 | $234.00 |
| 21 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 450 | $6.00 | $8.00 | $8.41 | $19.00 | $3.00 | $2.00 | $7.80 |
| 22 | Biodegradable erosion control logs (remove) (506-7046) | LF | 450 | $3.00 | $2.00 | $1.60 | $8.00 | $1.00 | $1.00 | $1.50 |
| 23 | Remove and relay pavers (528-7003) | SY | 83 | $1,714.00 | $199.68 | $172.00 | $120.00 | $502.00 | $120.00 | |
| 24 | Concrete curb (type II) (529-7002) | LF | 70 | $25.00 | $67.56 | $63.00 | $45.00 | $44.00 | $66.00 | |
| 25 | Concrete curb & gutter (type II) (529-7009) | LF | 549 | $100.00 | $45.00 | $63.38 | $108.00 | $75.00 | $76.00 | $66.00 |
| 26 | Concrete sidewalks (6") (531-7003) | SY | 116 | $180.00 | $124.00 | $252.31 | $172.00 | $120.00 | $121.00 | $120.00 |
| 27 | Curb ramps (type 1) (531-7005) | EACH | 6 | $2,635.00 | $3,718.94 | $6,100.00 | $4,300.00 | $4,290.00 | $4,800.00 | |
| 28 | Curb ramps (type 3) (531-7007) | EACH | 1 | $3,298.50 | $4,579.08 | $6,800.00 | $4,800.00 | $4,840.00 | $4,800.00 | |
| 29 | Curb ramps (type 5) (531-7008) | EACH | 8 | $5,000.00 | $3,537.00 | $5,993.59 | $7,500.00 | $5,300.00 | $5,280.00 | $4,800.00 |
| 30 | Curb ramps (type 7) (531-7010) | EACH | 11 | $2,877.00 | $3,290.36 | $5,300.00 | $3,750.00 | $3,740.00 | $4,800.00 | |
| 31 | Curb ramps (type 21) (531-7013) | EACH | 1 | $3,343.00 | $6,441.24 | $7,100.00 | $5,050.00 | $5,060.00 | $4,800.00 | |
| 32 | Curb ramps (type 22) (531-7014) | EACH | 4 | $3,947.00 | $6,769.86 | $7,500.00 | $5,250.00 | $5,280.00 | $4,800.00 | |
| 33 | Remove RD IL asm (shoe-base) (610-7007) | EACH | 3 | $918.00 | $1,689.71 | $1,400.00 | $1,100.00 | $450.00 | $1,484.40 | |
| 34 | Remove RD IL asm (trans-base) (610-7009) | EACH | 5 | $918.00 | $1,761.13 | $1,400.00 | $500.00 | $450.00 | $2,019.60 | |
| 35 | In RD IL (type SA) 20T-4 (150W EQ) LED (610-7034) | EACH | 11 | $5,260.00 | $5,224.49 | $6,300.00 | $4,887.00 | $6,400.00 | $5,630.40 | |
| 36 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 685 | $30.00 | $16.00 | $21.70 | $24.00 | $24.00 | $30.00 | $23.16 |
| 37 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 395 | $21.00 | $26.11 | $34.00 | $32.00 | $63.00 | $36.84 | |
| 38 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 1,940 | $32.00 | $21.00 | $21.41 | $37.00 | $29.00 | $32.00 | $26.16 |
| 39 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 3,260 | $40.00 | $28.00 | $31.77 | $41.00 | $65.00 | $65.00 | $43.08 |
| 40 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 995 | $45.00 | $32.00 | $24.27 | $40.00 | $32.00 | $34.00 | $30.48 |
| 41 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 3,170 | $50.00 | $41.00 | $33.28 | $50.00 | $49.00 | $67.00 | $47.88 |
| 42 | Electrical conductor (no.12) insulated (620-7004) | LF | 2,960 | $2.50 | $2.00 | $1.33 | $3.00 | $2.00 | $2.00 | $2.16 |
| 43 | Electrical conductor (no.8) insulated (620-7008) | LF | 7,290 | $2.75 | $2.70 | $1.88 | $4.00 | $3.00 | $3.00 | $3.24 |
| 44 | Electrical conductor (no.6) bare (620-7009) | LF | 10,345 | $3.00 | $2.20 | $1.93 | $4.00 | $3.00 | $4.00 | $3.36 |
| 45 | Electrical conductor (no.6) insulated (620-7010) | LF | 620 | $3.50 | $2.80 | $2.32 | $4.00 | $3.00 | $4.00 | $3.72 |
| 46 | Electrical conductor (no.4) insulated (620-7012) | LF | 820 | $3.30 | $3.13 | $6.00 | $3.00 | $5.00 | $5.88 | |
| 47 | ITS GND box (poly) type 1 (243624)W/aprn (623-7014) | EACH | 6 | $4,750.00 | $6,622.00 | $3,434.69 | $4,475.00 | $4,485.00 | $6,000.00 | $4,149.60 |
| 48 | Ground box type A (122311)W/apron (624-7002) | EACH | 1 | $1,385.00 | $1,845.31 | $1,915.00 | $1,458.00 | $2,300.00 | $2,090.40 | |
| 49 | Ground box type D (162922) (624-7007) | EACH | 10 | $1,640.00 | $1,703.46 | $2,285.00 | $1,100.00 | $2,650.00 | $1,987.20 | |
| 50 | Ground box type D (162922)W/apron (624-7008) | EACH | 32 | $2,500.00 | $1,491.00 | $2,018.57 | $2,961.00 | $2,114.00 | $3,100.00 | $2,212.80 |
| 51 | Remove ground box (624-7013) | EACH | 43 | $450.00 | $406.00 | $894.30 | $675.00 | $235.00 | $225.00 | $1,393.20 |
| 52 | Elc SRV type D 120/240 125(NS)SS(E)PS(U) (628-7274) | EACH | 6 | $11,500 | $11,086 | $10,308 | $10,724 | $9,698.00 | $12,000 | $13,927 |
| 53 | Aluminum signs (type A) (636-7001) | SF | 653 | $50.00 | $37.00 | $40.69 | $60.00 | $52.00 | $42.00 | $56.40 |
| 54 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 6 | $882.00 | $990.11 | $1,346.00 | $1,420.00 | $850.00 | $1,228.94 | |
| 55 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 3 | $928.00 | $1,041.22 | $1,978.00 | $1,420.00 | $850.00 | $1,173.55 | |
| 56 | Remove SM RD SN sup&AM (644-7073) | EACH | 4 | $113.00 | $126.48 | $843.00 | $250.00 | $850.00 | $286.86 | |
| 57 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 206 | $2.50 | $1.00 | $0.64 | $1.00 | $1.50 | $1.20 | $3.00 |
| 58 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 4,205 | $2.75 | $1.00 | $0.72 | $1.00 | $2.00 | $1.60 | $1.07 |
| 59 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 5,112 | $12.50 | $4.00 | $4.03 | $5.00 | $9.00 | $8.00 | $7.14 |
| 60 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 33 | $40.00 | $44.72 | $55.00 | $38.00 | $39.00 | $6.30 | |
| 61 | Pavement sler 6" (666-7347) | LF | 17,236 | $0.75 | $0.30 | $0.32 | $0.50 | $1.00 | $0.20 | $0.20 |
| 62 | Pavement sler 8" (666-7348) | LF | 4,205 | $1.50 | $0.30 | $0.32 | $0.50 | $1.00 | $0.20 | $0.20 |
| 63 | Pavement sler 24" (666-7352) | LF | 5,112 | $3.00 | $0.30 | $0.32 | $0.50 | $2.50 | $2.20 | $0.82 |
| 64 | Pavement sler (arrow) (666-7353) | EACH | 40 | $55.00 | $46.00 | $51.10 | $63.00 | $25.00 | $16.50 | $24.00 |
| 65 | Pavement sler (word) (666-7354) | EACH | 31 | $70.00 | $46.00 | $51.10 | $63.00 | $25.00 | $22.00 | $24.00 |
| 66 | Pavement sler (double arrow) (666-7356) | EACH | 3 | $90.00 | $46.00 | $51.10 | $63.00 | $35.00 | $33.00 | $30.00 |
| 67 | Pavement sler (TPL arrow) (666-7357) | EACH | 1 | $46.00 | $51.10 | $63.00 | $50.00 | $50.00 | $36.00 | |
| 68 | Pavement sler (uturn arrow) (666-7358) | EACH | 1 | $46.00 | $51.10 | $63.00 | $50.00 | $55.00 | $30.00 | |
| 69 | Pavement sler (RR crossing) (666-7364) | EACH | 10 | $70.00 | $114.00 | $127.76 | $156.00 | $150.00 | $132.00 | $78.00 |
| 70 | Pavement sler (yld tri) (666-7365) | EACH | 33 | $29.00 | $31.94 | $39.00 | $12.50 | $2.20 | $6.00 | |
| 71 | Pavement sler (bike symbol) (666-7369) | EACH | 3 | $57.00 | $63.88 | $78.00 | $35.00 | $33.00 | $18.00 | |
| 72 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 2,000 | $1.50 | $0.60 | $0.59 | $0.75 | $2.00 | $1.20 | $1.08 |
| 73 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 8,665 | $1.50 | $0.60 | $0.59 | $0.75 | $2.00 | $1.20 | $0.90 |
| 74 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 6,365 | $1.75 | $0.60 | $0.59 | $0.75 | $2.00 | $1.20 | $0.90 |
| 75 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 40 | $300.00 | $342.00 | $383.27 | $469.00 | $265.00 | $231.00 | $237.60 |
| 76 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 3 | $500.00 | $400.00 | $447.15 | $547.00 | $375.00 | $358.00 | $441.60 |
| 77 | Prefabricated PM type C (W)(TPL arrow) (668-7095) | EACH | 1 | $400.00 | $447.15 | $547.00 | $550.00 | $558.00 | $546.00 | |
| 78 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 1 | $400.00 | $447.15 | $547.00 | $440.00 | $342.00 | $510.00 | |
| 79 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 31 | $325.00 | $400.00 | $447.15 | $547.00 | $350.00 | $288.00 | $261.60 |
| 80 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 10 | $600.00 | $683.00 | $766.54 | $938.00 | $570.00 | $462.00 | $900.00 |
| 81 | Prefabricated PM type C (W)(bike symbol) (668-7115) | EACH | 3 | $569.00 | $638.78 | $781.00 | $330.00 | $330.00 | $246.00 | |
| 82 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 11 | $4.60 | $5.11 | $6.00 | $6.00 | $4.35 | $6.00 | |
| 83 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 347 | $10.00 | $4.60 | $5.11 | $6.00 | $6.00 | $4.35 | $4.50 |
| 84 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,823 | $1.50 | $0.30 | $0.28 | $0.40 | $2.00 | $0.70 | $0.66 |
| 85 | Eliminating existing PM & markers (6") (677-7002) | LF | 11,940 | $1.50 | $0.30 | $0.31 | $0.40 | $2.00 | $1.10 | $0.66 |
| 86 | Eliminating existing PM & markers (8") (677-7004) | LF | 3,295 | $2.00 | $0.30 | $0.29 | $0.40 | $3.00 | $1.43 | $0.86 |
| 87 | Eliminating existing PM & markers (12") (677-7006) | LF | 2,933 | $0.30 | $0.29 | $0.40 | $3.00 | $2.20 | $1.62 | |
| 88 | Eliminating existing PM & markers (24") (677-7008) | LF | 2,000 | $6.00 | $0.30 | $0.29 | $0.40 | $5.00 | $4.40 | $3.30 |
| 89 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 29 | $115.00 | $11.00 | $12.23 | $15.00 | $70.00 | $55.00 | $60.00 |
| 90 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 2 | $200.00 | $35.00 | $38.33 | $47.00 | $120.00 | $105.00 | $72.00 |
| 91 | Eliminating existing PM & markers (word) (677-7015) | EACH | 10 | $150.00 | $35.00 | $38.33 | $47.00 | $70.00 | $61.00 | $60.00 |
| 92 | Eliminating existing PM & markers (RR crossing) (677-7019) | EACH | 10 | $175.00 | $35.00 | $38.33 | $47.00 | $190.00 | $165.00 | $150.00 |
| 93 | Eliminating existing PM & marks (bike symbol) (677-7027) | EACH | 3 | $35.00 | $38.33 | $47.00 | $50.00 | $50.00 | $54.00 | |
| 94 | Pavement surface preparation for marking (6") (678-7002) | LF | 17,236 | $0.50 | $0.30 | $0.33 | $0.40 | $1.00 | $0.10 | $0.06 |
| 95 | Pavement surface preparation for marking (8") (678-7004) | LF | 4,205 | $0.75 | $0.30 | $0.33 | $0.40 | $1.00 | $0.10 | $0.07 |
| 96 | Pavement surface preparation for marking (24") (678-7008) | LF | 5,112 | $2.00 | $0.30 | $0.33 | $0.40 | $1.00 | $0.65 | $0.24 |
| 97 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 40 | $50.00 | $40.00 | $44.72 | $55.00 | $25.00 | $11.00 | $8.40 |
| 98 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 3 | $100.00 | $40.00 | $44.72 | $55.00 | $35.00 | $22.00 | $12.00 |
| 99 | Pavement surface preparation for marking (TPL arrow) (678-7011) | EACH | 1 | $57.00 | $63.88 | $78.00 | $45.00 | $33.00 | $18.00 | |
| 100 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 1 | $38.00 | $42.16 | $52.00 | $55.00 | $39.00 | $12.00 | |
| 101 | Pavement surface preparation for marking (word) (678-7016) | EACH | 31 | $30.00 | $40.00 | $44.72 | $55.00 | $25.00 | $17.00 | $8.40 |
| 102 | Pavement surface preparation for marking (RR crossing) (678-7020) | EACH | 10 | $50.00 | $65.00 | $72.82 | $89.00 | $100.00 | $88.00 | $42.00 |
| 103 | Pavement surface preparation for marking (18")(yld tri) (678-7022) | EACH | 33 | $20.00 | $21.72 | $27.00 | $15.00 | $1.10 | $6.00 | |
| 104 | Pavement surface preparation for marking (bike symbol) (678-7028) | EACH | 3 | $57.00 | $63.88 | $78.00 | $25.00 | $22.00 | $8.40 | |
| 105 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 358 | $4.00 | $1.20 | $1.28 | $2.00 | $2.00 | $0.10 | $0.60 |
| 106 | Removing traffic signals (680-7004) | EACH | 6 | $18,000 | $10,000 | $11,041 | $16,675 | $9,850.00 | $6,500.00 | $29,155 |
| 107 | Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005) | EACH | 6 | $47,000 | $4,500.00 | $17,684 | $35,228 | $48,478 | $35,000 | $35,820 |
| 108 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 64 | $450.00 | $260.00 | $342.24 | $426.00 | $405.00 | $850.00 | $469.20 |
| 109 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 30 | $450.00 | $260.00 | $338.32 | $426.00 | $405.00 | $850.00 | $469.20 |
| 110 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 70 | $450.00 | $260.00 | $342.00 | $426.00 | $405.00 | $850.00 | $469.20 |
| 111 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 35 | $450.00 | $260.00 | $339.43 | $426.00 | $405.00 | $850.00 | $469.20 |
| 112 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 76 | $450.00 | $260.00 | $341.85 | $426.00 | $405.00 | $850.00 | $469.20 |
| 113 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 34 | $450.00 | $260.00 | $337.26 | $426.00 | $405.00 | $850.00 | $469.20 |
| 114 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 60 | $1,000.00 | $488.00 | $1,037.24 | $873.00 | $840.00 | $1,250.00 | $1,393.20 |
| 115 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 69 | $250.00 | $253.00 | $528.41 | $279.00 | $210.00 | $225.00 | $261.60 |
| 116 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 20 | $300.00 | $412.00 | $579.75 | $365.00 | $280.00 | $250.00 | $349.20 |
| 117 | Backplate W/reflectorized border(5 sec)aluminum (682-7041) | EACH | 4 | $7,220.00 | $613.19 | $381.00 | $340.00 | $275.00 | $366.00 | |
| 118 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 3,630 | $3.00 | $3.50 | $4.37 | $5.00 | $4.00 | $4.00 | $4.68 |
| 119 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 975 | $3.50 | $4.25 | $4.55 | $7.00 | $4.00 | $4.00 | $5.04 |
| 120 | Traffic signal CBL (type A)(14 AWG)(12 conductor) (684-7038) | LF | 8,450 | $6.00 | $5.20 | $5.43 | $8.00 | $4.00 | $5.00 | $6.96 |
| 121 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 5,285 | $9.50 | $7.05 | $7.50 | $12.50 | $8.00 | $8.00 | $8.40 |
| 122 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 12,165 | $3.00 | $3.00 | $3.57 | $5.00 | $3.00 | $4.00 | $3.24 |
| 123 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 2 | $12,869 | $14,874 | $17,500 | $14,873 | $15,400 | $19,561 | |
| 124 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 2 | $14,092 | $15,956 | $19,000 | $16,088 | $16,700 | $21,084 | |
| 125 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 5 | $14,506 | $16,522 | $21,500 | $17,237 | $17,200 | $21,599 | |
| 126 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 4 | $14,988 | $17,033 | $22,250 | $17,971 | $17,700 | $22,200 | |
| 127 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 8 | $21,000 | $17,137 | $19,172 | $24,000 | $18,895 | $20,200 | $25,037 |
| 128 | Ins traffic signal PL AM(S)1 arm(50')lum (686-7055) | EACH | 1 | $37,648 | $39,547 | $41,000 | $30,135 | $43,400 | $50,417 | |
| 129 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 1 | $39,304 | $41,325 | $42,750 | $31,472 | $44,300 | $52,231 | |
| 130 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 3 | $42,000 | $40,015 | $41,674 | $46,000 | $33,218 | $45,900 | $53,365 |
| 131 | Pedestrian pole assembly (687-7001) | EACH | 32 | $3,500.00 | $383.00 | $1,728.22 | $2,850.00 | $4,685.00 | $7,100.00 | $5,106.00 |
| 132 | Pedestrian detect push button (APS) (688-7001) | EACH | 60 | $1,300.00 | $922.00 | $1,197.20 | $1,200.00 | $1,504.00 | $1,050.00 | $1,752.00 |
| 133 | Pedestrian detector controller unit (688-7003) | EACH | 10 | $5,000.00 | $3,838.00 | $5,988.44 | $4,880.00 | $4,285.00 | $5,500.00 | $5,438.40 |
| 134 | RVDS (presence det)(install only) (6008-7004) | EACH | 10 | $850.00 | $1,852.06 | $1,700.00 | $2,385.00 | $1,500.00 | $3,507.60 | |
| 135 | RVDS (pres and adv)(install only) (6008-7006) | EACH | 16 | $2,400.00 | $850.00 | $1,768.68 | $1,700.00 | $2,385.00 | $1,500.00 | $3,507.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 6, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.