TxDOT contract A00208588 bid tabulation
Widen Road - Add Shoulders, FM 104 (US 70, North to 10 Miles). Let by Texas DOT on January 7, 2026, Cottle, Childress District. 8 bids received; low bid $6,279,570 by Zack Burkett Co., +2.7% against the engineer's estimate of $6,117,160.
- Owner
- Texas DOT
- Letting
- 07 JAN 2026
- Pay items
- 60
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Zack Burkett Co. | $6,279,570 | Low | +3.0% |
| 2 | RK Hall, LLC | $6,587,854 | +5.0% | +8.0% |
| 3 | A. L. Helmcamp, Inc. | $6,868,027 | +9.0% | +12% |
| 4 | J. Lee Milligan, Inc. | $6,993,552 | +11% | +14% |
| 5 | Overland Corporation | $7,276,183 | +16% | +19% |
| 6 | Duininck, Inc. | $7,520,462 | +20% | +23% |
| 7 | L A Fuller & Sons Construction, LTD. | $8,086,445 | +29% | +32% |
| 8 | Gilvin-Terrill, LTD. | $8,114,354 | +29% | +33% |
Engineer's estimate: $6,117,160.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Zack Burkett Co. | 2. RK Hall, LLC | 3. A. L. Helmcamp, Inc. | 4. J. Lee Milligan, Inc. | 5. Overland Corporation | 6. Duininck, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 13 | $2,100.00 | $2,000.00 | $968.95 | $5,500.00 | $1,000.00 | $3,500.00 | $2,300.00 |
| 2 | Removing concrete (mowstrip) (104-7005) | LF | 450 | $15.00 | $33.00 | $25.02 | $15.00 | $13.00 | $19.00 | $27.00 |
| 3 | Excavation (channel) (110-7002) | CY | 5,550 | $30.00 | $15.00 | $23.07 | $20.00 | $8.60 | $22.25 | $23.50 |
| 4 | Subgr widen (OC) (112-7001) | STA | 533 | $375.00 | $292.00 | $219.47 | $340.00 | $300.00 | $235.00 | $350.00 |
| 5 | Subgr widen (DC) (112-7002) | STA | 26 | $292.00 | $1,459.36 | $400.00 | $620.00 | $3,960.00 | $855.00 | |
| 6 | Embankment (final)(OC)(type B) (132-7003) | CY | 3,560 | $26.75 | $15.00 | $28.81 | $31.00 | $21.75 | $38.50 | $44.00 |
| 7 | Embankment (final)(OC)(type D) (132-7011) | CY | 132 | $57.00 | $15.00 | $42.09 | $68.00 | $35.00 | $105.00 | $33.00 |
| 8 | Backfill (type A or B) (134-7004) | STA | 559 | $240.00 | $150.00 | $112.85 | $250.00 | $128.00 | $380.00 | $99.50 |
| 9 | Blading (150-7002) | HR | 10 | $127.50 | $150.00 | $394.29 | $200.00 | $200.00 | $250.00 | $170.00 |
| 10 | Drill seed (permanent_rural_sand) (164-7041) | ACRE | 25.80 | $1,818.00 | $651.20 | $615.68 | $620.00 | $640.00 | $592.00 | $605.00 |
| 11 | Vegetative watering (168-7001) | TGL | 2,101.80 | $33.00 | $15.00 | $5.00 | $10.00 | $10.00 | $2.00 | $29.00 |
| 12 | Emuls asphalt (erosion control)(CSS-1H) (314-7011) | GAL | 28,977 | $5.00 | $3.95 | $3.82 | $4.00 | $3.55 | $3.10 | $3.90 |
| 13 | D-GR HMA type-B PG70-28 (341-7009) | TON | 11,585 | $115.00 | $135.00 | $145.00 | $140.00 | $142.50 | $160.35 | $175.00 |
| 14 | D-GR HMA type D sac-A PG70-28 (341-7053) | TON | 20,499 | $115.00 | $128.00 | $146.46 | $143.00 | $143.00 | $131.35 | $140.00 |
| 15 | Tack coat (341-7082) | GAL | 18,634 | $5.00 | $4.40 | $4.64 | $5.50 | $4.60 | $1.00 | $2.55 |
| 16 | Flexible pavement structure repair(3") (351-7002) | SY | 1,000 | $37.00 | $40.00 | $38.91 | $55.00 | $55.25 | $50.00 | $76.50 |
| 17 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 4,445 | $3.50 | $3.50 | $4.33 | $3.00 | $6.30 | $8.70 | $5.60 |
| 18 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 10 | $632.50 | $598.00 | $610.00 | $620.00 | $432.00 | $445.00 | |
| 19 | Riprap (mow strip)(4 in) (432-7013) | CY | 161 | $650.00 | $825.00 | $832.00 | $1,100.00 | $835.00 | $710.00 | $845.00 |
| 20 | Clean existing culverts (480-7001) | EACH | 22 | $2,300.00 | $5,500.00 | $1,872.00 | $3,100.00 | $2,500.00 | $2,800.00 | $3,100.00 |
| 21 | Mobilization (500-7001) | LS | 1 | $556,105 | $423,500 | $329,393 | $500,000 | $695,000 | $725,615 | $750,000 |
| 22 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $5,000.00 | $8,478.00 | $9,723.84 | $13,000 | $20,000 | $40,010 | $30,000 |
| 23 | Portable changeable message sign (503-7002) | EACH | 2 | $9,995.00 | $0.01 | $2,632.21 | $10,000 | $14,000 | $12,200 | $10,500 |
| 24 | TMA (stationary) (505-7001) | DAY | 210 | $200.00 | $195.00 | $517.80 | $200.00 | $230.00 | $342.86 | $255.00 |
| 25 | TMA (mobile operation) (505-7003) | DAY | 8 | $200.00 | $0.01 | $786.37 | $200.00 | $825.00 | $480.00 | $925.00 |
| 26 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 4,020 | $8.00 | $5.23 | $4.94 | $5.00 | $8.50 | $8.50 | $4.85 |
| 27 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 106,497 | $0.25 | $0.25 | $0.16 | $0.22 | $0.30 | $0.16 | $0.16 |
| 28 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 53,248 | $0.25 | $0.29 | $0.16 | $0.22 | $0.30 | $0.16 | $0.19 |
| 29 | Metal W-beam guard fence (steel post) (540-7002) | LF | 450 | $33.50 | $44.00 | $27.04 | $28.00 | $43.15 | $29.95 | $26.50 |
| 30 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,350.00 | $3,300.00 | $2,338.46 | $2,200.00 | $3,235.00 | $2,469.00 | $2,900.00 |
| 31 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 200 | $105.00 | $148.50 | $88.40 | $90.00 | $145.00 | $130.00 | $87.00 |
| 32 | Metal beam guard fence (long span system) (540-7027) | EACH | 18 | $1,290.00 | $1,650.00 | $1,237.60 | $1,250.00 | $1,620.00 | $875.00 | $1,200.00 |
| 33 | Remove metal beam guard fence (542-7001) | LF | 450 | $3.30 | $5.50 | $3.12 | $3.20 | $5.40 | $3.00 | $3.10 |
| 34 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $269.00 | $440.00 | $312.00 | $320.00 | $435.00 | $275.00 | $310.00 |
| 35 | Guardrail end treatment (install) (544-7001) | EACH | 48 | $3,356.00 | $3,850.00 | $2,953.60 | $3,000.00 | $3,775.00 | $3,190.00 | $2,900.00 |
| 36 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $300.00 | $440.00 | $312.00 | $320.00 | $435.00 | $275.00 | $310.00 |
| 37 | Relocate existing mailbox (560-7012) | EACH | 1 | $403.00 | $825.00 | $544.96 | $530.00 | $810.00 | $275.00 | $540.00 |
| 38 | In RD IL (type SA) 40T-10 (250W EQ) LED (610-7126) | EACH | 1 | $9,900.00 | $9,360.00 | $9,500.00 | $9,700.00 | $10,980 | $11,500 | |
| 39 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 150 | $41.80 | $39.52 | $40.00 | $41.00 | $38.50 | $39.50 | |
| 40 | Electrical conductor (no.8) bare (620-7007) | LF | 150 | $3.30 | $3.12 | $3.20 | $3.25 | $7.00 | $7.20 | |
| 41 | Electrical conductor (no.8) insulated (620-7008) | LF | 300 | $5.50 | $5.20 | $5.30 | $5.40 | $7.42 | $7.60 | |
| 42 | Ground box type A (122311)W/apron (624-7002) | EACH | 1 | $3,025.00 | $2,860.00 | $2,900.00 | $3,000.00 | $3,260.00 | $3,300.00 | |
| 43 | Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048) | EACH | 1 | $13,200 | $12,480 | $13,000 | $13,000 | $10,140 | $10,500 | |
| 44 | Replace existing aluminum signs(type A) (636-7004) | SF | 84 | $39.95 | $110.00 | $40.56 | $45.00 | $110.00 | $39.00 | $40.00 |
| 45 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 15 | $1,100.00 | $834.08 | $800.00 | $1,100.00 | $625.00 | $825.00 | |
| 46 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2(BI) (658-7002) | EACH | 87 | $43.50 | $44.00 | $37.44 | $32.00 | $45.00 | $25.00 | $37.00 |
| 47 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 28 | $75.00 | $220.00 | $63.44 | $65.00 | $215.00 | $65.00 | $62.50 |
| 48 | Remove delin & object marker assms (658-7078) | EACH | 73 | $23.00 | $55.00 | $20.80 | $19.00 | $55.00 | $25.00 | $25.50 |
| 49 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 277 | $1.40 | $1.59 | $0.70 | $1.45 | $0.75 | $1.55 | |
| 50 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 5,848 | $1.65 | $1.40 | $1.59 | $0.70 | $1.45 | $0.75 | $1.55 |
| 51 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 450 | $1.10 | $1.04 | $1.05 | $1.10 | $1.00 | $1.05 | |
| 52 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,530 | $1.10 | $0.94 | $0.90 | $1.10 | $0.80 | $0.87 | |
| 53 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 36 | $9.00 | $13.60 | $20.80 | $13.70 | $13.35 | $15.00 | $13.50 |
| 54 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 6 | $247.50 | $312.00 | $170.00 | $245.00 | $180.00 | $165.00 | |
| 55 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 6 | $346.50 | $332.80 | $185.00 | $340.00 | $180.00 | $180.00 | |
| 56 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 112,227 | $0.80 | $0.66 | $0.54 | $0.51 | $0.65 | $0.50 | $0.50 |
| 57 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 37,248 | $0.80 | $0.66 | $0.54 | $0.58 | $0.65 | $0.52 | $0.56 |
| 58 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 54,470 | $0.80 | $0.66 | $0.54 | $0.51 | $0.65 | $0.50 | $0.50 |
| 59 | Reflectorized pavement marker type I-C (672-7002) | EACH | 127 | $6.60 | $5.20 | $4.00 | $6.50 | $4.00 | $3.85 | |
| 60 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,342 | $0.80 | $4.95 | $5.20 | $4.00 | $4.85 | $3.69 | $3.85 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.