TxDOT contract A00188551 bid tabulation
Bridge Replacement, IRWIN RD (IRWIN RD @ EAST AMARILLO CREEK to .). Let by Texas DOT on February 4, 2026, Potter, Amarillo District. 7 bids received; low bid $1,996,761 by L A Fuller & Sons Construction, LTD., -19% against the engineer's estimate of $2,472,867.
- Owner
- Texas DOT
- Letting
- 04 FEB 2026
- Pay items
- 86
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | L A Fuller & Sons Construction, LTD. | $1,996,761 | Low | -19% |
| 2 | Texas Steel Industrial Placing, LLC | $2,154,519 | +8.0% | -13% |
| 3 | Earth Builders, L.P. | $2,520,955 | +26% | +2.0% |
| 4 | Coppell Construction Co., Inc. | $2,529,275 | +27% | +2.0% |
| 5 | J. Lee Milligan, Inc. | $2,769,350 | +39% | +12% |
| 6 | Gilvin-Terrill, LTD. | $3,077,686 | +54% | +24% |
| 7 | C. E. Barker, LTD. | $3,171,289 | +59% | +28% |
Engineer's estimate: $2,472,867.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. L A Fuller & Sons Construction, LTD. | 2. Texas Steel Industrial Placing, LLC | 3. Earth Builders, L.P. | 4. Coppell Construction Co., Inc. | 5. J. Lee Milligan, Inc. | 6. Gilvin-Terrill, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparation row (tree remove) (0"-12" diameter) (100-7003) | EACH | 10 | $596.95 | $1,800.00 | $800.00 | $1,300.00 | $450.00 | $2,000.00 | |
| 2 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 6 | $1,500.00 | $866.45 | $1,800.00 | $5,000.00 | $1,400.00 | $3,400.00 | $2,000.00 |
| 3 | Preparation row (hand clearing) (100-7011) | ACRE | 0.05 | $40,000 | $82,825 | $40,000 | $200,000 | $140,000 | $26,500 | $500,000 |
| 4 | Removing concrete (pavement) (104-7001) | SY | 55 | $30.00 | $34.40 | $50.00 | $20.00 | $60.00 | $68.00 | $50.00 |
| 5 | Removing concrete (riprap) (104-7006) | SY | 122 | $408.00 | $65.20 | $30.00 | $20.00 | $60.00 | $77.50 | $50.00 |
| 6 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 61 | $50.00 | $31.80 | $25.00 | $25.00 | $60.00 | $60.25 | $50.00 |
| 7 | Removing concrete (curb & gutter) (104-7017) | LF | 457 | $25.00 | $9.35 | $13.00 | $20.00 | $15.00 | $13.75 | $25.00 |
| 8 | Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004) | SY | 621 | $13.90 | $15.00 | $30.00 | $35.00 | $17.00 | $50.00 | |
| 9 | Remove (12"-16") TRT/untrt base & asphalt pavement (105-7012) | SY | 986 | $30.00 | $9.75 | $30.00 | $35.00 | $37.00 | $14.25 | $50.00 |
| 10 | Excavation (roadway) (110-7001) | CY | 566 | $65.00 | $29.50 | $20.00 | $25.00 | $16.00 | $64.00 | $100.00 |
| 11 | Embankment (final)(DC)(type B) (132-7004) | CY | 533 | $55.00 | $29.30 | $35.00 | $25.00 | $41.00 | $46.25 | $100.00 |
| 12 | Hydro mulch seed (permanent_rural_sandy) (164-7017) | SY | 678 | $4.00 | $5.15 | $4.00 | $5.00 | $4.00 | $4.85 | $5.00 |
| 13 | Hydro mulch seed (temporary_cool) (164-7022) | SY | 678 | $5.00 | $5.15 | $4.00 | $5.00 | $4.00 | $4.85 | $5.00 |
| 14 | Vegetative watering (168-7001) | TGL | 36 | $6.00 | $117.65 | $50.00 | $50.00 | $50.00 | $37.50 | $360.00 |
| 15 | Soil retention blankets (CL 1) (type B) (169-7043) | SY | 331 | $5.50 | $5.15 | $4.00 | $8.00 | $4.00 | $4.85 | $5.00 |
| 16 | FL BS (compacted in place)(type A GR 4) (12") (247-7115) | SY | 2,027 | $50.00 | $31.60 | $60.00 | $40.00 | $58.00 | $44.50 | $100.00 |
| 17 | FL BS(compacted in place)(type A,B or D GR4)(12") (247-7134) | SY | 153 | $52.00 | $34.95 | $60.00 | $50.00 | $90.00 | $79.25 | $100.00 |
| 18 | Geogrid base reinforcement (type 2) (250-7002) | SY | 147 | $13.55 | $20.00 | $8.00 | $100.00 | $36.20 | $60.00 | |
| 19 | Prime coat (MC-30) (310-7004) | GAL | 450 | $8.00 | $8.45 | $15.00 | $25.00 | $20.00 | $9.00 | $20.00 |
| 20 | D-GR HMA type D sac-A PG70-28 (341-7053) | TON | 350 | $200.00 | $234.60 | $190.00 | $350.00 | $360.00 | $230.00 | $250.00 |
| 21 | Tack coat (341-7082) | GAL | 208 | $20.00 | $10.95 | $15.00 | $25.00 | $12.00 | $7.00 | $10.00 |
| 22 | Cem stabil BKFL (400-7010) | CY | 36 | $288.25 | $250.00 | $400.00 | $550.00 | $465.00 | $750.00 | |
| 23 | Trench excavation protection (402-7001) | LF | 65 | $30.00 | $644.55 | $30.00 | $25.00 | $20.00 | $150.00 | $300.00 |
| 24 | Drilled shaft (18 in) (416-7002) | LF | 25 | $464.25 | $265.44 | $380.00 | $520.00 | $900.00 | $750.00 | |
| 25 | Drilled shaft (24 in) (416-7004) | LF | 444 | $319.80 | $288.02 | $400.00 | $350.00 | $326.00 | $265.00 | |
| 26 | Class C concrete (abutment) (420-7012) | CY | 43.80 | $2,020.85 | $2,500.00 | $2,500.00 | $1,800.00 | $2,285.00 | $2,000.00 | |
| 27 | Class C concrete (cap) (420-7022) | CY | 0.50 | $4,709.50 | $6,000.00 | $5,000.00 | $6,000.00 | $3,300.00 | $10,000 | |
| 28 | Class C concrete (column) (420-7038) | CY | 0.70 | $5,851.00 | $6,000.00 | $5,000.00 | $3,500.00 | $5,200.00 | $10,000 | |
| 29 | Class C concrete (miscellaneous) (420-7067) | CY | 1.50 | $1,700.00 | $4,508.30 | $1,500.00 | $2,000.00 | $3,500.00 | $5,200.00 | $10,000 |
| 30 | Reinforced concrete slab (slab beam) (422-7007) | SF | 1,680 | $51.35 | $34.00 | $50.00 | $47.00 | $43.50 | $70.00 | |
| 31 | Bridge sidewalk (422-7012) | SF | 1,120 | $12.70 | $15.00 | $35.00 | $13.00 | $28.65 | $25.00 | |
| 32 | Approach slab (422-7013) | CY | 67.40 | $959.10 | $850.00 | $1,500.00 | $1,300.00 | $645.00 | $2,000.00 | |
| 33 | Prestressed concrete slab beam (4SB12) (425-7016) | LF | 395 | $299.90 | $299.33 | $300.00 | $400.00 | $290.00 | $300.00 | |
| 34 | Riprap (stone protection)(12 in) (432-7041) | CY | 326 | $330.00 | $221.95 | $200.00 | $250.00 | $300.00 | $450.00 | $500.00 |
| 35 | Riprap (stone protection)(24 in) (432-7045) | CY | 145 | $238.35 | $200.00 | $250.00 | $325.00 | $465.00 | $500.00 | |
| 36 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 459 | $16.00 | $16.82 | $20.00 | $20.00 | $33.00 | $38.00 | $30.00 |
| 37 | Rail (type PR11) (450-7044) | LF | 165 | $135.00 | $164.35 | $190.00 | $160.00 | $215.00 | $190.00 | $200.00 |
| 38 | Rail (type PR22) (450-7045) | LF | 104 | $1,022.70 | $200.00 | $155.00 | $325.00 | $345.00 | $200.00 | |
| 39 | Rail (handrail)(type B) (450-7059) | LF | 120 | $132.50 | $140.00 | $125.00 | $160.00 | $155.00 | $150.00 | |
| 40 | Type A joint (454-7001) | LF | 84 | $22.30 | $250.00 | $50.00 | $185.00 | $42.50 | $20.00 | |
| 41 | Concrete box culvert (10 FT X 8 FT) (462-7036) | LF | 130 | $1,700.00 | $1,773.00 | $1,800.00 | $2,500.00 | $2,500.00 | $1,668.00 | $3,800.00 |
| 42 | RC pipe (CL III)(24 in) (464-7005) | LF | 45 | $122.35 | $165.00 | $180.00 | $200.00 | $225.00 | $200.00 | |
| 43 | Wingwall (PW - 1) (HW=10 FT) (466-7180) | EACH | 2 | $90,000 | $55,925 | $45,000 | $125,000 | $40,000 | $67,000 | $90,000 |
| 44 | Set (type I) (24 in) (6: 1) (C) (467-7007) | EACH | 1 | $2,403.45 | $3,500.00 | $3,500.00 | $15,000 | $5,550.00 | $6,600.00 | |
| 45 | Removing structure (wingwall) (496-7005) | EACH | 7 | $2,500.00 | $2,272.05 | $1,500.00 | $15,000 | $2,500.00 | $1,240.00 | $4,500.00 |
| 46 | Removing structure (headwall) (496-7006) | EACH | 3 | $1,560.00 | $5,140.90 | $3,500.00 | $10,000 | $2,500.00 | $5,900.00 | $4,500.00 |
| 47 | Removing structure (pipe) (496-7007) | LF | 261 | $75.00 | $34.15 | $150.00 | $25.00 | $30.00 | $100.00 | $50.00 |
| 48 | Remove STR (piling) (496-7023) | LF | 30 | $252.25 | $500.00 | $150.00 | $400.00 | $215.00 | $50.00 | |
| 49 | Mobilization (500-7001) | LS | 1 | $184,000 | $195,050 | $215,258 | $275,000 | $250,000 | $276,000 | $300,000 |
| 50 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $35,000 | $1,080.25 | $2,500.00 | $3,000.00 | $25,000 | $20,000 | $15,000 |
| 51 | Portable changeable message sign (503-7002) | EACH | 2 | $14,000 | $18,874 | $30,000 | $25,000 | $12,000 | $12,000 | $18,500 |
| 52 | Construction exits (install) (type 1) (506-7020) | SY | 135 | $48.60 | $40.00 | $80.00 | $23.00 | $45.00 | $30.00 | |
| 53 | Construction exits (remove) (506-7024) | SY | 135 | $34.15 | $20.00 | $15.00 | $17.00 | $13.00 | $10.00 | |
| 54 | Temporary sediment control fence (install) (506-7039) | LF | 1,104 | $6.00 | $5.15 | $5.00 | $7.00 | $4.00 | $7.25 | $4.00 |
| 55 | Temporary sediment control fence (remove) (506-7041) | LF | 1,104 | $2.00 | $1.30 | $1.00 | $2.00 | $1.00 | $3.75 | $1.00 |
| 56 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 190 | $12.00 | $5.80 | $4.50 | $12.00 | $5.00 | $10.00 | $4.50 |
| 57 | Biodegradable erosion control logs (remove) (506-7046) | LF | 190 | $3.00 | $2.55 | $2.00 | $2.00 | $2.00 | $5.00 | $2.00 |
| 58 | Concrete curb & gutter (type II) (529-7009) | LF | 1,058 | $68.00 | $34.40 | $45.00 | $35.00 | $35.00 | $30.00 | $36.08 |
| 59 | Concrete C&G (valley gutter) (529-7019) | LF | 40 | $80.00 | $192.90 | $60.00 | $65.00 | $50.00 | $145.00 | $160.00 |
| 60 | Driveways (ACP) (type 2) (530-7012) | SY | 84 | $102.95 | $80.00 | $80.00 | $150.00 | $110.00 | $100.00 | |
| 61 | Concrete sidewalks (4") (531-7001) | SY | 160 | $117.00 | $118.80 | $120.00 | $125.00 | $97.00 | $120.00 | $110.00 |
| 62 | Curb ramps (type 5) (531-7008) | EACH | 1 | $5,507.65 | $3,500.00 | $2,500.00 | $3,000.00 | $7,350.00 | $2,800.00 | |
| 63 | Concrete sidewalk (retaining wall) (531-7026) | CY | 17 | $1,039.45 | $1,250.00 | $1,000.00 | $1,300.00 | $2,200.00 | $1,450.00 | |
| 64 | Remove metal beam guard fence (542-7001) | LF | 127 | $6.00 | $58.70 | $4.00 | $8.00 | $3.00 | $3.65 | $3.00 |
| 65 | Relocate existing mailbox (560-7012) | EACH | 1 | $321.05 | $440.00 | $350.00 | $450.00 | $480.00 | $400.00 | |
| 66 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 1 | $1,000.00 | $1,926.30 | $1,100.00 | $2,000.00 | $1,000.00 | $1,200.00 | $1,000.00 |
| 67 | Install small roadside sign support and assembly (inst sign only) (644-7064) | EACH | 1 | $335.00 | $963.15 | $500.00 | $1,100.00 | $460.00 | $555.00 | $460.00 |
| 68 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $963.15 | $600.00 | $750.00 | $560.00 | $675.00 | $560.00 | |
| 69 | Remove SM RD SN sup&AM (644-7073) | EACH | 3 | $140.00 | $192.65 | $110.00 | $200.00 | $100.00 | $120.00 | $100.00 |
| 70 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 4 | $165.00 | $96.30 | $200.00 | $150.00 | $180.00 | $215.00 | $180.00 |
| 71 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 24 | $75.00 | $96.30 | $110.00 | $75.00 | $100.00 | $120.00 | $100.00 |
| 72 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 6 | $35.00 | $96.30 | $45.00 | $35.00 | $40.00 | $48.00 | $40.00 |
| 73 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 6 | $96.30 | $45.00 | $75.00 | $40.00 | $48.00 | $40.00 | |
| 74 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 1 | $5.00 | $96.30 | $13.00 | $150.00 | $12.00 | $15.00 | $12.00 |
| 75 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 10 | $10.60 | $28.75 | $25.00 | $30.00 | $25.00 | $30.00 | $25.00 |
| 76 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 240 | $2.90 | $2.50 | $3.00 | $3.00 | $3.00 | $2.50 | |
| 77 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 1,244 | $1.20 | $7.50 | $6.50 | $7.00 | $7.00 | $8.00 | $6.50 |
| 78 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,244 | $0.55 | $4.00 | $3.50 | $4.00 | $4.00 | $4.25 | $3.50 |
| 79 | Pavement surface preparation for marking (24") (678-7008) | LF | 10 | $2.00 | $11.50 | $10.00 | $10.00 | $12.00 | $12.00 | $10.00 |
| 80 | Remove existing san SWR pipe (6 in) (7069-7001) | LF | 95 | $167.10 | $82.00 | $25.00 | $120.00 | $64.00 | $65.00 | |
| 81 | San SWR connection to existing manhole (7069-7002) | EACH | 1 | $6,223.35 | $15,000 | $2,500.00 | $8,000.00 | $2,865.00 | $12,500 | |
| 82 | Bypass pumping (7069-7003) | LS | 1 | $32,054 | $150,000 | $6,500.00 | $8,000.00 | $378,000 | $14,150 | |
| 83 | Manhole (san SWR)(5FT diameter) (7069-7004) | EACH | 1 | $13,001 | $20,000 | $12,000 | $20,000 | $23,200 | $9,500.00 | |
| 84 | San sewer (6 in)(DI)(restrained JT) (7069-7005) | LF | 95 | $121.35 | $300.00 | $200.00 | $350.00 | $315.00 | $125.00 | |
| 85 | Casting (steel)(san sewer)(14 in) (7069-7006) | LF | 95 | $165.25 | $300.00 | $225.00 | $350.00 | $355.00 | $225.00 | |
| 86 | Connect to exising sewer liner (7069-7007) | EACH | 1 | $3,906.05 | $20,000 | $1,500.00 | $3,500.00 | $3,000.00 | $14,150 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.