TxDOT contract A00193006 bid tabulation
Surfacing/Roadway Restoration, US 87 (AMARILLO CREEK to 11 TH STREET IN AMARILLO). Let by Texas DOT on August 6, 2026, Potter, Amarillo District. 3 bids received; low bid $30,085,056 by J. Lee Milligan, Inc., -3.5% against the engineer's estimate of $31,174,130.
- Owner
- Texas DOT
- Letting
- 06 AUG 2026
- Pay items
- 171
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | J. Lee Milligan, Inc. | $30,085,056 | Low | -3.0% |
| 2 | RK Hall, LLC | $30,964,796 | +3.0% | -1.0% |
| 3 | Gilvin-Terrill, LTD. | $33,654,544 | +12% | +8.0% |
Engineer's estimate: $31,174,130.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. J. Lee Milligan, Inc. | 2. RK Hall, LLC | 3. Gilvin-Terrill, LTD. |
|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 37 | $10,000 | $300.00 | $340.18 | $1,000.00 |
| 2 | Preparation row (tree remove) (0"-12" diameter) (100-7003) | EACH | 23 | $1,100.00 | $235.00 | $1,027.56 | $2,000.00 |
| 3 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 14 | $2,000.00 | $2,050.00 | $1,834.92 | $2,200.00 |
| 4 | Preparation row (tree remove) (24"-36" diameter) (100-7005) | EACH | 2 | $4,000.00 | $4,300.00 | $5,137.79 | $2,500.00 |
| 5 | Removing concrete (mowstrip) (104-7005) | LF | 12,242 | $7.00 | $8.00 | $8.83 | $10.00 |
| 6 | Removing concrete (riprap) (104-7007) | CY | 37 | $130.00 | $12.60 | $30.00 | |
| 7 | Removing concrete (curb & gutter) (104-7017) | LF | 1,464 | $28.00 | $4.50 | $8.40 | $10.00 |
| 8 | Removing concrete (flume) (104-7041) | SY | 337 | $15.00 | $31.50 | $12.60 | $25.00 |
| 9 | Remove (12"-16") TRT/untrt base & asphalt pavement (105-7012) | SY | 6,980 | $10.00 | $10.00 | $18.88 | $15.00 |
| 10 | Excavation (roadway) (110-7001) | CY | 5,977 | $30.00 | $18.50 | $18.42 | $30.00 |
| 11 | Subgr widen (DC) (112-7002) | STA | 9 | $2,500.00 | $1,350.00 | $1,904.41 | $1,000.00 |
| 12 | Embankment (final)(DC)(type B) (132-7004) | CY | 2,887 | $20.00 | $35.00 | $24.61 | $25.00 |
| 13 | Backfill (type A) (134-7001) | STA | 886 | $190.00 | $365.00 | $251.39 | $250.00 |
| 14 | Blading (150-7002) | HR | 25 | $220.00 | $500.00 | $399.25 | $150.00 |
| 15 | Drill seed (permanent_rural_clay) (164-7042) | ACRE | 37 | $800.00 | $600.00 | $588.00 | $560.00 |
| 16 | Drill seed (temporary_warm_cool) (164-7047) | ACRE | 37 | $800.00 | $450.00 | $441.90 | $425.00 |
| 17 | Hydro mulch seed (permanent_urban_clay) (164-7052) | ACRE | 3 | $4,050.00 | $3,956.75 | $4,000.00 | |
| 18 | Soil ret BLKT(SL_mod_clay_long_roll) (169-7010) | SY | 1,487 | $3.10 | $3.05 | $3.00 | |
| 19 | FL BS (compacted in place)(type A or B GR 4)(12") (247-7133) | SY | 13,252 | $39.00 | $31.25 | $41.50 | $30.00 |
| 20 | Cement (275-7001) | TON | 142 | $320.00 | $256.40 | $249.40 | $250.00 |
| 21 | Cement TRT (subgrade) (8") (275-7018) | SY | 13,252 | $6.00 | $7.50 | $7.17 | $10.00 |
| 22 | Prime coat (MC-30) (310-7004) | GAL | 7,785 | $4.50 | $5.00 | $4.96 | $5.00 |
| 23 | Emuls asphalt (erosion control)(multi) (314-7018) | GAL | 45,050 | $3.00 | $3.75 | $7.75 | $4.50 |
| 24 | Aggregate (type-B, GR-4)(sac-A) (316-7099) | CY | 121 | $200.00 | $430.00 | $474.91 | $300.00 |
| 25 | Asphalt (multi option) (316-7263) | GAL | 5,037 | $5.00 | $4.85 | $4.89 | $10.00 |
| 26 | Stone-MTRX-asphalt SMA-D sac-A PG76-28 (346-7010) | TON | 78,909 | $188.00 | $174.00 | $197.50 | $205.00 |
| 27 | Tack coat (346-7028) | GAL | 173,238 | $6.50 | $6.05 | $6.41 | $6.00 |
| 28 | Flexible pavement structure repair(4") (351-7003) | SY | 15,606 | $51.00 | $45.85 | $54.01 | $60.00 |
| 29 | Planing asphalt concrete pavement(0" to 3") (354-7033) | SY | 47,254 | $4.00 | $6.10 | $3.41 | $7.00 |
| 30 | Planing asphalt concrete pavement(2" to 4") (354-7039) | SY | 2,500 | $6.00 | $8.20 | $12.58 | $7.00 |
| 31 | Planing asphalt concrete pavement(3") (354-7052) | SY | 23,894 | $4.00 | $5.05 | $3.41 | $7.00 |
| 32 | Hir (surface)(2.5") (358-7003) | SY | 256,294 | $5.20 | $8.35 | $8.21 | $8.00 |
| 33 | Hir (recycling agent) (358-7004) | GAL | 153,597 | $3.20 | $4.65 | $4.73 | $4.50 |
| 34 | Cut & restoring pavement (400-7006) | SY | 18 | $175.00 | $198.78 | $100.00 | |
| 35 | Temporary special shoring (403-7001) | SF | 9,828 | $100.00 | $5.50 | $78.23 | $50.00 |
| 36 | Drilled shaft (non - reinforced) (12 in) (416-7024) | LF | 126 | $220.00 | $160.00 | $99.75 | $140.00 |
| 37 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 325 | $275.00 | $187.00 | $267.75 | $220.00 |
| 38 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 23 | $750.00 | $735.00 | $400.00 | |
| 39 | Class C concrete (collar) (420-7061) | EACH | 3 | $650.00 | $1,620.00 | $630.00 | $3,500.00 |
| 40 | Retaining wall (MSE) (423-7001) | SF | 6,955 | $92.25 | $106.52 | $150.00 | |
| 41 | Concrete paint finish (427-7002) | SF | 36,816 | $1.00 | $0.55 | $2.10 | $1.00 |
| 42 | Riprap (concrete)(4 in) (432-7001) | CY | 1,062 | $725.00 | $685.00 | $735.00 | $650.00 |
| 43 | Riprap (mow strip)(4 in) (432-7013) | CY | 627 | $750.00 | $693.00 | $735.00 | $700.00 |
| 44 | Cleaning existing joints (438-7008) | LF | 1,742 | $5.00 | $27.00 | $37.73 | $35.00 |
| 45 | Rail (type SSTR) (450-7024) | LF | 1,075 | $128.25 | $125.90 | $150.00 | |
| 46 | Concrete box culvert (4 FT X 2 FT)(extend) (462-7058) | LF | 8 | $500.00 | $1,030.00 | $1,050.00 | $3,000.00 |
| 47 | Concrete box culvert (3 FT X 2.5 FT)(extend) (462-7122) | LF | 8 | $500.00 | $1,085.00 | $1,050.00 | $3,000.00 |
| 48 | RC pipe (CL III)(24 in) (464-7005) | LF | 100 | $205.00 | $147.00 | $300.00 | |
| 49 | RC pipe (CL III)(30 in) (464-7007) | LF | 10 | $400.00 | $325.00 | $210.00 | $325.00 |
| 50 | RC pipe (CL III)(36 in) (464-7009) | LF | 12 | $530.00 | $294.00 | $400.00 | |
| 51 | RC pipe (CL III)(54 in) (464-7012) | LF | 16 | $560.00 | $656.25 | $600.00 | |
| 52 | Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126) | EACH | 2 | $6,400.00 | $6,300.00 | $8,000.00 | |
| 53 | Inlet (complete)(PSL)(FG)(5FTX6FT-4FTX4FT) (465-7138) | EACH | 1 | $9,300.00 | $11,550 | $11,000 | |
| 54 | Inl(CMP)(pazd-CZ)(FG)(5FTX5FT-4FTX4FT) (465-7167) | EACH | 3 | $9,200.00 | $10,500 | $11,000 | |
| 55 | Set (type I)(S= 3 FT)(HW= 4 FT)(6:1)(C) (467-7046) | EACH | 1 | $10,000 | $12,600 | $11,550 | $10,000 |
| 56 | Set (type I)(S= 4 FT)(HW= 4 FT)(6:1)(C) (467-7073) | EACH | 2 | $11,000 | $12,800 | $14,700 | $10,000 |
| 57 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 2 | $3,700.00 | $3,150.00 | $5,000.00 | |
| 58 | Set (type II) (30 in) (RCP) (6: 1) (C) (467-7347) | EACH | 1 | $3,000.00 | $6,000.00 | $7,875.00 | $7,500.00 |
| 59 | Adjusting inlets (cap) (479-7006) | EACH | 2 | $4,300.00 | $5,250.00 | $3,500.00 | |
| 60 | Clean existing culverts (480-7001) | EACH | 2 | $3,000.00 | $10,400 | $2,100.00 | $11,000 |
| 61 | Removing structure (set) (496-7004) | EACH | 5 | $1,000.00 | $1,740.00 | $262.50 | $1,500.00 |
| 62 | Removing structure (pipe) (496-7007) | LF | 12 | $30.00 | $250.00 | $21.00 | $200.00 |
| 63 | Removing structure (box culvert) (496-7008) | LF | 6 | $150.00 | $290.00 | $105.00 | $700.00 |
| 64 | Removing structure (ret wall) (496-7019) | LF | 335 | $70.00 | $52.50 | $40.00 | |
| 65 | Mobilization (500-7001) | LS | 1 | $2,550,000 | $3,305,620 | $1,000,000 | $3,300,000 |
| 66 | Barricades, signs and traffic handling (502-7001) | MO | 13 | $20,000 | $25,000 | $36,937 | $50,000 |
| 67 | Portable changeable message sign (503-7002) | EACH | 2 | $14,500 | $26,200 | $9,836.34 | $18,500 |
| 68 | TMA (stationary) (505-7001) | DAY | 300 | $200.00 | $320.00 | $524.31 | $375.00 |
| 69 | TMA (mobile operation) (505-7002) | HR | 112 | $100.00 | $88.00 | $99.53 | $50.00 |
| 70 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 150 | $6.25 | $8.00 | $8.40 | $8.00 |
| 71 | Biodegradable erosion control logs (remove) (506-7046) | LF | 150 | $2.00 | $3.00 | $4.20 | $4.00 |
| 72 | Portable concrete traffic barrier (des source)(single slope)(type 1) (512-7013) | LF | 3,720 | $16.00 | $16.85 | $10.00 | |
| 73 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 3,980 | $11.75 | $12.36 | $5.00 | |
| 74 | Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037) | LF | 3,720 | $20.00 | $20.79 | $10.00 | |
| 75 | Portable concrete traffic barrier (connection hardware) (512-7070) | EACH | 124 | $90.00 | $95.50 | $50.00 | |
| 76 | Concrete curb & gutter (type II) (529-7009) | LF | 600 | $32.00 | $42.00 | $30.00 | |
| 77 | Driveways (ACP) (530-7010) | SY | 105 | $57.50 | $122.15 | $35.00 | |
| 78 | Concrete directional island (536-7004) | SY | 47 | $173.25 | $84.00 | $170.00 | |
| 79 | Metal W-beam guard fence (steel post) (540-7002) | LF | 16,150 | $32.00 | $32.60 | $32.55 | $31.00 |
| 80 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 25 | $1,800.00 | $2,780.00 | $2,937.95 | $2,300.00 |
| 81 | Metal beam guard fence trans (T101) (540-7007) | EACH | 2 | $50.00 | $2,245.00 | $2,100.00 | $2,000.00 |
| 82 | Downstream anchor terminal section (540-7015) | EACH | 21 | $1,150.00 | $1,875.00 | $1,575.00 | $1,500.00 |
| 83 | Remove metal beam guard fence (542-7001) | LF | 16,606 | $4.00 | $1.05 | $3.15 | $3.00 |
| 84 | Remove terminal anchor section (542-7002) | EACH | 13 | $250.00 | $105.00 | $315.00 | $300.00 |
| 85 | Remove downstream anchor terminal (542-7003) | EACH | 13 | $150.00 | $105.00 | $210.00 | $200.00 |
| 86 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 25 | $260.00 | $105.00 | $210.00 | $200.00 |
| 87 | RM metal beam guard fence trans (T101) (542-7005) | EACH | 2 | $20.00 | $105.00 | $210.00 | $200.00 |
| 88 | Guardrail end treatment (install) (544-7001) | EACH | 37 | $3,200.00 | $3,750.00 | $3,543.75 | $3,375.00 |
| 89 | Guardrail end treatment (remove) (544-7003) | EACH | 39 | $250.00 | $105.00 | $315.00 | $300.00 |
| 90 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 4 | $1,600.00 | $1,685.25 | $3,250.00 | |
| 91 | Crash cushion attenuator (remove) (545-7004) | EACH | 3 | $1,175.00 | $1,235.85 | $1,150.00 | |
| 92 | Crash cushion attenuator (install)(R)(N)(TL3) (545-7010) | EACH | 1 | $37,400 | $39,323 | $30,000 | |
| 93 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 3 | $9,600.00 | $10,112 | $10,000 | |
| 94 | Conduit (PVC) (schedule 40) (1 1/2") (618-7027) | LF | 20 | $26.75 | $26.25 | $15.00 | |
| 95 | Conduit (PVC) (schedule 40) (1 1/2") (bore) (618-7028) | LF | 180 | $26.75 | $26.25 | $15.00 | |
| 96 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 20 | $32.00 | $31.50 | $15.00 | |
| 97 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 180 | $42.75 | $42.00 | $18.00 | |
| 98 | Electrical conductor (no.8) bare (620-7007) | LF | 1,660 | $3.15 | $3.10 | $3.00 | |
| 99 | Tray cable (3 conductor) (12 AWG) (621-7002) | LF | 915 | $4.00 | $3.94 | $3.00 | |
| 100 | Ground box type A (122311)W/apron (624-7002) | EACH | 2 | $1,815.00 | $1,785.00 | $1,250.00 | |
| 101 | Ground box type B (122322)W/apron (624-7004) | EACH | 1 | $2,030.00 | $1,995.00 | $1,800.00 | |
| 102 | Ground box type D (162922)W/apron (624-7008) | EACH | 1 | $2,620.00 | $2,574.60 | $1,500.00 | |
| 103 | Remove ground box (624-7013) | EACH | 5 | $425.00 | $420.00 | $500.00 | |
| 104 | Aluminum signs (type A) (636-7001) | SF | 63.25 | $40.00 | $32.00 | $126.00 | $36.00 |
| 105 | Aluminum signs (type G) (636-7002) | SF | 3,491 | $50.00 | $37.40 | $34.65 | $30.00 |
| 106 | Replace existing aluminum signs(type O) (636-7006) | SF | 4,816 | $50.00 | $53.45 | $40.32 | $34.00 |
| 107 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $850.00 | $1,050.00 | $772.80 | $700.00 |
| 108 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 11 | $950.00 | $1,230.00 | $966.00 | $850.00 |
| 109 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 83 | $950.00 | $1,175.00 | $869.40 | $775.00 |
| 110 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 1 | $1,100.00 | $1,255.00 | $958.65 | $755.00 |
| 111 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 15 | $1,200.00 | $1,470.00 | $4,237.46 | $900.00 |
| 112 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 3 | $1,200.00 | $1,550.00 | $1,873.88 | $1,300.00 |
| 113 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 1 | $1,400.00 | $1,815.00 | $1,492.05 | $1,500.00 |
| 114 | Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049) | EACH | 2 | $2,200.00 | $2,085.00 | $1,620.15 | $2,300.00 |
| 115 | Install small roadside sign support and assembly (inst sign only) (644-7064) | EACH | 10 | $500.00 | $1,070.00 | $462.00 | $325.00 |
| 116 | Remove SM RD SN sup&AM (644-7073) | EACH | 112 | $125.00 | $105.00 | $112.35 | $100.00 |
| 117 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 10 | $100.00 | $535.00 | $561.75 | $25.00 |
| 118 | Install LRSS (struct steel) (647-7001) | LB | 24,026 | $9.00 | $10.10 | $8.09 | $6.75 |
| 119 | Remove lrsa (647-7003) | EACH | 46 | $900.00 | $1,070.00 | $735.00 | $1,500.00 |
| 120 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 162 | $45.00 | $48.00 | $43.05 | $45.00 |
| 121 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 54 | $45.00 | $48.00 | $43.05 | $45.00 |
| 122 | Install OM SM RD sign (1-OM-con)R (658-7080) | EACH | 1 | $10.00 | $285.00 | $151.20 | $200.00 |
| 123 | Install delineator assembly (D-DW)SZ 1(WFLX)GNDLL (658-7138) | EACH | 10 | $150.00 | $145.00 | $110.25 | $75.00 |
| 124 | Install delineator assembly (D-DY)SZ 1(yflx)GNDLL (658-7145) | EACH | 6 | $120.00 | $145.00 | $110.25 | $75.00 |
| 125 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 77 | $1.00 | $37.00 | $13.65 | $13.00 |
| 126 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 9 | $1.00 | $37.00 | $13.65 | $15.00 |
| 127 | Install OM SM RD sign (2-OM-PW)Y (658-7319) | EACH | 1 | $1.00 | $43.00 | $17.85 | $13.00 |
| 128 | Install OM LG RD sign (2-OM-PW)Y (658-7321) | EACH | 23 | $1.00 | $43.00 | $17.85 | $18.00 |
| 129 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 36,693 | $0.35 | $0.30 | $0.28 | $0.27 |
| 130 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 143,656 | $0.35 | $0.30 | $0.26 | $0.25 |
| 131 | Work zone pavement marking non-removing (W)8"(DOT) (662-7010) | LF | 250 | $0.37 | $0.37 | $0.35 | |
| 132 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 63 | $17.00 | $16.80 | $16.00 | |
| 133 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 132,628 | $0.35 | $0.27 | $0.26 | $0.25 |
| 134 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 11,424 | $1.00 | $1.45 | $2.15 | $1.50 |
| 135 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 2,904 | $1.00 | $1.50 | $2.15 | $1.50 |
| 136 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 8,165 | $1.00 | $1.35 | $1.31 | $1.25 |
| 137 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 63 | $1.60 | $1.58 | $1.50 | |
| 138 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 28,151 | $1.00 | $1.10 | $1.10 | $1.05 |
| 139 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 450 | $5.85 | $5.78 | $5.50 | |
| 140 | Type I high perf PM (W)6"(broken)(100MIL) (666-7290) | LF | 34,343 | $0.75 | $0.75 | $0.74 | $0.70 |
| 141 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 131,234 | $0.70 | $0.70 | $0.68 | $0.65 |
| 142 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 129,751 | $0.70 | $0.70 | $0.68 | $0.65 |
| 143 | Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424) | LF | 198 | $4.00 | $2.65 | $2.63 | $2.50 |
| 144 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 237 | $14.00 | $16.00 | $15.75 | $15.00 |
| 145 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 12 | $300.00 | $267.00 | $262.50 | $250.00 |
| 146 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 1 | $480.00 | $472.50 | $450.00 | |
| 147 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 8 | $300.00 | $425.00 | $420.00 | $400.00 |
| 148 | Reflectorized pavement marker type I-A (672-7001) | EACH | 24 | $7.00 | $7.60 | $7.43 | $7.08 |
| 149 | Recessed reflectorized pavement marker type II-C-R (672-7027) | EACH | 2,904 | $39.00 | $42.75 | $42.00 | $40.00 |
| 150 | Eliminating existing PM & markers (6") (677-7002) | LF | 13,611 | $1.05 | $1.05 | $1.00 | |
| 151 | Eliminating existing PM & markers (8") (677-7004) | LF | 500 | $1.35 | $1.31 | $1.25 | |
| 152 | Eliminating existing PM & markers (24") (677-7008) | LF | 24 | $5.35 | $5.25 | $5.00 | |
| 153 | Removing traffic signals (680-7004) | EACH | 1 | $8,900.00 | $8,741.25 | $2,000.00 | |
| 154 | Install highway traffic signal (upgrade) (680-7011) | EACH | 1 | $42,690 | $41,921 | $34,500 | |
| 155 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 2 | $510.00 | $498.75 | $375.00 | |
| 156 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 3 | $510.00 | $498.75 | $375.00 | |
| 157 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 2 | $510.00 | $498.75 | $375.00 | |
| 158 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 5 | $510.00 | $498.75 | $375.00 | |
| 159 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 4 | $510.00 | $498.75 | $375.00 | |
| 160 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 1 | $510.00 | $498.75 | $375.00 | |
| 161 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 3 | $345.00 | $341.25 | $200.00 | |
| 162 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 2 | $410.00 | $404.25 | $225.00 | |
| 163 | Retrofit reflectorized border sheeting (3 sec) (682-7045) | EACH | 2 | $320.00 | $315.00 | $200.00 | |
| 164 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 140 | $3.75 | $3.68 | $3.00 | |
| 165 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 110 | $4.80 | $4.73 | $5.00 | |
| 166 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 1,305 | $7.75 | $7.61 | $9.00 | |
| 167 | Remove traffic signal CBL (684-7085) | LF | 2,680 | $1.60 | $1.58 | $1.25 | |
| 168 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 1 | $46,800 | $45,938 | $45,000 | |
| 169 | Reinformt grid for asphalt pavement overla (3011-7001) | SY | 127,751 | $7.40 | $5.60 | $5.51 | $6.00 |
| 170 | RVDS (presence detection only) (6008-7001) | EACH | 2 | $9,500.00 | $9,318.75 | $6,000.00 | |
| 171 | RVDS (presence and advance detection) (6008-7003) | EACH | 4 | $10,500 | $10,369 | $7,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.