TxDOT contract A00194392 bid tabulation
Bridge Replacement, CR 1170 (At Sikes Creek to .). Let by Texas DOT on August 6, 2026, Houston, Lufkin District. 6 bids received; low bid $2,809,388 by THK Construction LLC, +14% against the engineer's estimate of $2,474,314.
- Owner
- Texas DOT
- Letting
- 06 AUG 2026
- Pay items
- 49
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | THK Construction LLC | $2,809,388 | Low | +14% |
| 2 | Garret Shields Infrastructure | $2,983,618 | +6.0% | +21% |
| 3 | Skyline Bridge LLC | $3,029,411 | +8.0% | +22% |
| 4 | Longview Bridge and Road, LTD. | $3,105,504 | +11% | +26% |
| 5 | A. L. Helmcamp, Inc. | $3,320,376 | +18% | +34% |
| 6 | Hodges and Son Construction Company, Inc. | $3,422,483 | +22% | +38% |
Engineer's estimate: $2,474,314.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. THK Construction LLC | 2. Garret Shields Infrastructure | 3. Skyline Bridge LLC | 4. Longview Bridge and Road, LTD. | 5. A. L. Helmcamp, Inc. | 6. Hodges and Son Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 19.22 | $1,200.00 | $1,500.00 | $1,000.00 | $2,500.00 | $1,000.00 | $3,500.00 | $2,800.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 3,030 | $10.00 | $18.00 | $30.00 | $18.00 | $8.00 | $37.00 | $6.00 |
| 3 | Embankment (final)(OC)(type B) (132-7003) | CY | 1,331 | $15.00 | $18.00 | $40.00 | $35.00 | $10.00 | $27.00 | $20.00 |
| 4 | Block sodding (162-7002) | SY | 500 | $6.00 | $7.35 | $8.00 | $10.00 | $8.75 | $8.00 | $8.00 |
| 5 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 4,715 | $0.60 | $0.63 | $0.15 | $2.50 | $2.30 | $0.75 | $1.00 |
| 6 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 2,358 | $0.15 | $0.53 | $0.50 | $2.50 | $2.30 | $0.60 | $1.00 |
| 7 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 2,358 | $0.15 | $0.53 | $0.50 | $2.50 | $2.30 | $0.60 | $1.00 |
| 8 | Vegetative watering (168-7001) | TGL | 198.80 | $5.00 | $1.00 | $25.00 | $1.00 | $16.50 | $70.00 | $1.00 |
| 9 | FL BS (compacted in place)(type D GR 1-2) (6") (247-7056) | SY | 3,503 | $25.00 | $45.00 | $30.00 | $45.00 | $21.00 | $40.00 | $45.00 |
| 10 | Cem stabil BKFL (400-7010) | CY | 322 | $210.00 | $275.00 | $200.00 | $300.00 | $253.00 | $220.00 | $275.00 |
| 11 | Drilled shaft (24 in) (416-7004) | LF | 555 | $178.65 | $200.00 | $235.00 | $330.00 | $150.00 | $245.00 | |
| 12 | Drilled shaft (30 in) (416-7005) | LF | 930 | $250.00 | $268.09 | $300.00 | $245.00 | $370.00 | $170.00 | $275.00 |
| 13 | Class C concrete (abutment) (420-7012) | CY | 130.20 | $950.00 | $975.00 | $100.00 | $1,350.00 | $1,185.00 | $1,700.00 | $1,800.00 |
| 14 | Reinforced concrete slab (box beam) (422-7005) | SF | 5,626 | $20.00 | $24.00 | $25.00 | $25.00 | $25.00 | $38.00 | $28.00 |
| 15 | Reinforced concrete slab (slab beam) (422-7007) | SF | 2,600 | $28.00 | $20.00 | $28.00 | $30.00 | $48.00 | $28.00 | |
| 16 | Shear key (422-7020) | CY | 40.70 | $600.00 | $800.00 | $300.00 | $900.00 | $450.00 | $650.00 | $600.00 |
| 17 | Prestressed concrete slab beam (5SB15) (425-7019) | LF | 500 | $259.05 | $300.00 | $375.00 | $368.00 | $330.00 | $360.00 | |
| 18 | Prestressed concrete box beam (4B20) (425-7026) | LF | 496 | $310.80 | $340.00 | $410.00 | $368.00 | $330.00 | $350.00 | |
| 19 | Prestressed concrete box beam (5B20) (425-7027) | LF | 248 | $326.26 | $340.00 | $325.00 | $720.00 | $370.00 | $350.00 | |
| 20 | Prestressed concrete box beam (4B34) (425-7030) | LF | 358 | $240.00 | $307.83 | $400.00 | $440.00 | $330.00 | $350.00 | $415.00 |
| 21 | Prestressed concrete box beam (5B34) (425-7031) | LF | 179 | $240.00 | $332.50 | $400.00 | $370.00 | $655.00 | $410.00 | $415.00 |
| 22 | Riprap (stone protection)(24 in) (432-7045) | CY | 2,246 | $150.00 | $160.00 | $230.00 | $150.00 | $220.00 | $160.00 | $200.00 |
| 23 | Rail (type T223) (450-7008) | LF | 786 | $150.00 | $175.00 | $100.00 | $125.00 | $164.00 | $250.00 | $200.00 |
| 24 | Type A joint (454-7001) | LF | 267 | $50.00 | $200.00 | $30.00 | $75.00 | $43.00 | $55.00 | $10.00 |
| 25 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 5 | $10,000 | $40,000 | $25,000 | $12,000 | $12,000 | $23,000 | $10,000 |
| 26 | Mobilization (500-7001) | LS | 1 | $250,000 | $210,000 | $250,000 | $250,000 | $100,000 | $330,000 | $305,000 |
| 27 | Barricades, signs and traffic handling (502-7001) | MO | 22 | $1,500.00 | $1,614.53 | $10,000 | $2,000.00 | $1,600.00 | $4,000.00 | $2,000.00 |
| 28 | Portable changeable message sign (503-7002) | EACH | 10 | $7,500.00 | $2,000.00 | $1,000.00 | $5,000.00 | $6,600.00 | $9,700.00 | $35,000 |
| 29 | Rock filter dams (install) (type 2) (506-7002) | LF | 195 | $40.00 | $30.00 | $25.00 | $50.00 | $37.40 | $42.00 | $1.00 |
| 30 | Rock filter dams (remove) (506-7011) | LF | 195 | $10.00 | $1.00 | $5.00 | $10.00 | $17.60 | $9.00 | $1.00 |
| 31 | Construction exits (install) (type 1) (506-7020) | SY | 560 | $35.00 | $1.00 | $20.00 | $10.00 | $44.00 | $39.00 | $1.00 |
| 32 | Construction exits (remove) (506-7024) | SY | 560 | $10.00 | $1.00 | $5.00 | $1.00 | $17.60 | $10.00 | $1.00 |
| 33 | Construction perimeter fence (506-7034) | LF | 198 | $6.00 | $10.00 | $6.00 | $12.50 | $5.50 | $5.00 | $1.00 |
| 34 | Temporary sediment control fence (install) (506-7039) | LF | 4,100 | $4.00 | $3.50 | $5.00 | $4.00 | $4.00 | $4.00 | $1.00 |
| 35 | Temporary sediment control fence (remove) (506-7041) | LF | 4,100 | $1.00 | $1.00 | $1.00 | $2.00 | $0.80 | $0.85 | $1.00 |
| 36 | Driveways (base) (530-7015) | SY | 35 | $50.00 | $40.00 | $120.00 | $60.00 | $21.00 | $135.00 | $120.00 |
| 37 | Metal W-beam guard fence (timber post) (540-7001) | LF | 425 | $22.00 | $30.44 | $35.00 | $28.00 | $32.00 | $26.50 | $26.00 |
| 38 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 10 | $1,200.00 | $1,785.00 | $1,500.00 | $1,900.00 | $2,035.00 | $1,750.00 | $1,800.00 |
| 39 | Downstream anchor terminal section (540-7015) | EACH | 10 | $1,100.00 | $1,417.50 | $1,200.00 | $1,500.00 | $1,485.00 | $1,350.00 | $1,500.00 |
| 40 | Metal beam guard fence trans (non - sym) (540-7016) | EACH | 10 | $625.00 | $997.50 | $1,000.00 | $1,200.00 | $1,050.00 | $795.00 | $1,000.00 |
| 41 | Guardrail end treatment (install) (544-7001) | EACH | 10 | $2,500.00 | $3,360.00 | $3,500.00 | $3,600.00 | $3,520.00 | $3,400.00 | $3,200.00 |
| 42 | Gate (remove) (550-7016) | EACH | 1 | $815.00 | $250.00 | $500.00 | $500.00 | $265.00 | $775.00 | $500.00 |
| 43 | Wire fence (type A) (552-7001) | LF | 406 | $32.00 | $25.00 | $15.00 | $30.00 | $26.50 | $30.00 | $20.00 |
| 44 | Wire fence (type C) (552-7003) | LF | 1,908 | $20.00 | $15.00 | $25.00 | $27.75 | $28.00 | $20.00 | |
| 45 | Gate (type 1) (552-7006) | EACH | 1 | $1,400.00 | $500.00 | $1,000.00 | $5,000.00 | $2,500.00 | $2,300.00 | $2,000.00 |
| 46 | Wire fence (water gap) (552-7010) | LF | 493 | $60.00 | $20.00 | $60.00 | $100.00 | $79.00 | $3.50 | $22.00 |
| 47 | Remove SM RD SN sup&AM (644-7073) | EACH | 10 | $100.00 | $250.00 | $100.00 | $100.00 | $132.00 | $270.00 | $50.00 |
| 48 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 28 | $50.00 | $18.90 | $20.00 | $30.00 | $20.00 | $26.50 | $20.00 |
| 49 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 42 | $25.00 | $26.25 | $20.00 | $30.00 | $27.50 | $32.50 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.