TxDOT contract A00185405 bid tabulation

Bridge Replacement, FRANKFORD RD E (Frankford Rd WB AT Furneaux Creek to .). Let by Texas DOT on June 3, 2026, Denton, Dallas District. 5 bids received; low bid $2,342,967 by Tucan Contracting, LLC, -6.5% against the engineer's estimate of $2,505,046.

Owner
Texas DOT
Letting
03 JUN 2026
Pay items
85
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Tucan Contracting, LLC$2,342,967Low-6.0%
2Castillo Aranda LLC$2,400,102+2.0%-4.0%
3Ed Bell Construction Company$2,789,652+19%+11%
4Ibctx, LLC$2,876,413+23%+15%
5Hodges and Son Construction Company, Inc.$3,220,896+37%+29%
TxDOT contract A00185405: bids by rank

Engineer's estimate: $2,505,046.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Tucan Contracting, LLC2. Castillo Aranda LLC3. Ed Bell Construction Company4. Ibctx, LLC5. Hodges and Son Construction Company, Inc.
1Preparing row (100-7002)STA7.20$5,000.00$4,327.30$8,000.00$14,800$5,000.00$9,700.00
2Removing concrete (pavement) (104-7001)SY382$25.00$16.35$20.00$25.00$27.00$45.00
3Removing concrete (riprap) (104-7006)SY54$70.00$43.60$30.00$40.00$18.00$30.00
4Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY49$35.00$21.80$20.00$40.00$20.00$40.00
5Removing concrete (curb) (104-7016)LF431$10.00$2.18$3.00$10.00$13.00$15.00
6Remove (5"-9") TRT/untrt base & asphalt pavement (105-7005)SY824$10.88$20.00$15.00$14.00$10.00
7Excavation (roadway) (110-7001)CY426$25.00$32.70$15.00$50.00$117.00$35.00
8Excavation (channel) (110-7002)CY170$32.70$20.00$65.00$50.00$35.00
9Embankment (final)(DC)(type C1) (132-7008)CY28$32.70$20.00$25.00$400.00$100.00
10Embankment (final)(DC)(type C2) (132-7010)CY130$70.00$54.50$20.00$85.00$100.00$80.00
11Block sodding (162-7002)SY358$8.00$8.72$6.00$5.25$32.00$10.00
12Drill seed (permanent_urban_clay) (164-7012)SY919$1.64$1.00$5.25$2.00$4.00
13Vegetative watering (168-7001)TGL190$20.00$54.50$50.00$20.00$1.00$1.00
14FL BS(compacted in place)(type A,B or D GR4)(12") (247-7134)SY940$32.70$40.00$45.00$57.00$70.00
15Rework BS metal (type B)(10")(density control) (251-7030)SY261$4.00$5.45$40.00$16.00$55.00$40.00
16Prime coat(MC-30 or AE-P) (310-7013)GAL189$15.53$10.00$16.50$15.00$25.00
17SP mixes SP-C sac-B PG64-22 (344-7011)TON91$291.30$280.00$308.00$275.00$300.00
18Concrete pavement (CRCP) (9") (360-7003)SY236$120.00$185.30$70.00$160.00$262.00$200.00
19Drilled shaft (24 in) (416-7004)LF834$175.00$119.90$250.00$153.00$200.00$175.00
20Drilled shaft (36 in) (416-7006)LF222$212.55$350.00$273.00$315.00$275.00
21Class C concrete (abutment)(HPC) (420-7013)CY83.30$1,300.00$1,308.00$1,300.00$1,500.00$1,850.00$2,000.00
22Class C concrete (cap)(HPC) (420-7023)CY58.50$1,500.00$1,471.50$1,200.00$1,500.00$1,850.00$2,000.00
23Class C concrete (column)(HPC) (420-7039)CY33.60$1,300.00$1,744.00$1,000.00$2,500.00$1,850.00$2,000.00
24Reinforced concrete slab (HPC) (422-7002)SF4,200$29.43$19.00$30.00$35.00$38.00
25Reinforced concrete slab (slab beam)(HPC) (422-7008)SF6,744$25.00$23.98$16.00$19.00$21.00$25.00
26Approach slab (HPC) (422-7014)CY130.40$750.00$926.50$600.00$675.00$1,100.00$1,500.00
27Bridge sidewalk(HPC) (422-7022)SF1,315$15.00$21.80$7.00$13.00$27.00$85.00
28Prestressed concrete girder (TX28) (425-7001)LF553.92$283.40$300.00$353.00$325.00$340.00
29Prestressed concrete slab beam (4SB12) (425-7016)LF474.06$215.00$268.43$280.00$303.00$245.00$300.00
30Prestressed concrete slab beam (5SB12) (425-7017)LF948.12$200.00$236.57$280.00$303.00$245.00$300.00
31Opaque sealer finish (427-7003)SF4,026$3.00$3.27$5.00$1.38$4.00$10.00
32Riprap (concrete)(CL B)(5 in) (432-7008)CY10.30$800.00$981.00$400.00$1,000.00$800.00$800.00
33Riprap (mow strip)(4 in) (432-7013)CY28$708.50$450.00$700.00$800.00$750.00
34Riprap (stone protection)(12 in) (432-7041)CY490$174.40$325.00$180.00$165.00$200.00
35STR steel (miscellaneous non-bridge) (442-7007)LB670$20.00$27.25$30.00$20.00$40.00$10.00
36Rail (type T223)(HPC) (450-7009)LF328$174.40$220.00$150.00$175.00$150.00
37Rail (type C221)(HPC) (450-7033)LF356$160.00$196.20$220.00$200.00$200.00$200.00
38Armor joint (sealed) (454-7003)LF170$150.00$109.00$200.00$75.00$130.00$250.00
39Removing structure (bridge 100 - 499 FT length) (496-7010)EACH2$75,000$43,600$40,000$30,000$40,000$75,000
40Remove STR (rail) (496-7017)LF260$27.25$10.00$25.00$50.00$25.00
41Mobilization (500-7001)LS1$225,000$100,000$100,000$273,000$287,000$290,000
42Barricades, signs and traffic handling (502-7001)MO12$8,500.00$2,725.00$4,500.00$12,500$4,000.00$6,000.00
43TMA (stationary) (505-7001)DAY100$250.00$239.80$200.00$75.00$25.00$300.00
44TMA (mobile operation) (505-7003)DAY7$400.00$953.75$550.00$1,000.00$50.00$300.00
45Rock filter dams (install) (type 3) (506-7003)LF299$50.00$92.65$30.00$93.00$90.00$1.00
46Rock filter dams (remove) (506-7011)LF299$20.00$13.08$5.00$12.00$13.00$1.00
47Construction exits (install) (type 1) (506-7020)SY267$36.00$37.06$30.00$37.40$36.00$1.00
48Construction exits (remove) (506-7024)SY267$14.00$11.99$5.00$11.00$12.00$1.00
49Temporary sediment control fence (install) (506-7039)LF1,006$5.00$3.87$4.00$3.90$8.00$1.00
50Temporary sediment control fence (remove) (506-7041)LF1,006$1.50$1.20$1.00$1.10$4.00$1.00
51Constructing detours (508-7001)SY218$110.00$196.20$55.00$250.00$185.00$200.00
52Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF200$50.00$103.55$60.00$40.00$50.00$90.00
53Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF200$15.00$38.15$10.00$20.00$50.00$50.00
54Remove and relay pavers (528-7003)SY39$325.00$545.00$50.00$275.00$500.00$50.00
55Concrete curb (type II) (529-7002)LF381$55.00$32.70$6.00$15.00$45.00$30.00
56Concrete curb & gutter (type II) (529-7009)LF57$60.00$32.70$13.00$60.00$68.00$35.00
57Concrete sidewalks (4") (531-7001)SY39$100.00$76.30$65.00$100.00$100.00$80.00
58Right of way markers (538-7001)EACH11$463.25$20.00$467.50$500.00$250.00
59Metal W-beam guard fence (timber post) (540-7001)LF300$35.00$24.53$40.00$24.75$32.00$25.00
60Metal beam guard fence trans (TL2) (540-7006)EACH8$1,200.00$1,308.00$3,500.00$1,320.00$1,650.00$1,200.00
61Remove metal beam guard fence (542-7001)LF223$5.00$3.00$10.00$9.65$3.00$2.00
62Guardrail end treatment (install) (544-7001)EACH7$3,000.00$3,215.50$1,500.00$3,245.00$3,400.00$3,200.00
63Guardrail end treatment (remove) (544-7003)EACH3$250.00$272.50$500.00$275.00$300.00$500.00
64Crash cushion attenuator (install)(S)(N)(TL2) (545-7013)EACH2$20,000$9,646.50$24,500$9,950.00$10,000$10,000
65Wire fence (type C) (552-7003)LF345$15.53$20.00$15.68$25.00$25.00
66Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH2$25.00$21.80$20.00$22.00$16.00$20.00
67Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH4$21.80$500.00$22.00$16.00$20.00
68Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH2$45.00$27.25$500.00$27.50$26.00$30.00
69Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH4$27.25$500.00$27.50$26.00$30.00
70Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH3$25.00$21.80$300.00$22.00$16.00$30.00
71Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH4$25.00$27.25$500.00$27.50$26.00$30.00
72Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF1,969$0.50$0.95$1.00$1.25$1.00$4.00
73Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF527$0.80$1.47$2.00$2.50$2.00$4.00
74Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF2,916$0.50$0.95$1.00$1.25$1.00$4.00
75Pavement sler 6" (666-7347)LF1,588$0.50$0.38$1.00$0.60$0.50$1.00
76Pavement sler 8" (666-7348)LF280$6.00$0.55$1.00$0.80$0.75$2.00
77Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF1,690$1.00$1.08$1.00$1.25$1.25$4.00
78Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF920$1.08$1.00$1.35$1.25$4.00
79Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF920$1.08$1.00$1.25$1.25$4.00
80Prefabricated PM type C (W)(8")(solid) (668-7084)LF410$6.00$7.50$7.00$8.00$7.00$10.00
81Reflectorized pavement marker type II-A-A (672-7004)EACH12$5.45$6.00$6.00$6.00$10.00
82Reflectorized pavement marker type II-C-R (672-7006)EACH115$8.00$5.45$6.00$6.00$6.00$10.00
83Eliminating existing PM & markers (6") (677-7002)LF5,412$1.50$0.81$1.00$1.00$1.00$2.00
84Pavement surface preparation for marking (6") (678-7002)LF1,588$0.50$0.27$0.50$0.60$0.30$1.00
85Pavement surface preparation for marking (8") (678-7004)LF280$0.75$0.55$1.00$0.80$0.55$1.00
TxDOT contract A00185405: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of June 3, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy