TxDOT letting results, March 11, 2026
13 contracts let by Texas DOT on March 11, 2026, $3,567,372 in low bids, a median of 2 bidders per contract. On the 13 with an engineer's estimate, the low bid came in under it 11 times; median low bid -14% against the estimate.
- Owner
- Texas DOT
- Contracts
- 13
- Low bids, total
- $3,567,372
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00214998 | LIMESTONE ROCK ASPHALT, SH0029 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | Austin District | 2 | Martin Marietta Materials, Inc. | $791,678 | $799,524 | +1.0% | 0.0% | TxDOT |
| A00218767 | TRAFFIC CONTROL SERVICES, IH0030 (VARIOUS LOCATIONS WITHIN to WEST DALLAS COUNTY MAINTENANCE SECTIONS) | Dallas District | 2 | Barricades Unlimited | $626,700 | $827,430 | +32% | -4.0% | TxDOT |
| A00218809 | BRIDGE PREVENTATIVE MAINTENANCE, IH0045 (Various Roadways in the to Ellis County Maintenance Section) | Dallas District | 12 | Garret Shields Infrastructure | $369,500 | $376,090 | +2.0% | -29% | TxDOT |
| A00214999 | ROCK/RIPRAP, SH0021 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | Austin District | 2 | Touchstone Resources, LLC | $278,570 | $363,000 | +30% | -14% | TxDOT |
| A00219938 | MOWING HIGHWAY RIGHT OF WAY, FM0060 (Various to Various) | Bryan District | 4 | Cedar Hill Services, LLC | $274,801 | $290,903 | +6.0% | +16% | TxDOT |
| A00212041 | MOWING HIGHWAY RIGHT OF WAY, US0087 (VARIOUS LOCATIONS IN GILLESPIE, to BLANCO, AND LLANO COUNTIES) | Austin District | 2 | P-Ville, Incorporated | $247,903 | $310,038 | +25% | -14% | TxDOT |
| A00212042 | MOWING HIGHWAY RIGHT OF WAY, US0087 (VARIOUS LOCATIONS IN MASON to LLANO AND GILLESPIE COUNTIES) | Austin District | 2 | P-Ville, Incorporated | $242,501 | $324,106 | +34% | -16% | TxDOT |
| A00214537 | RAISED PAVEMENT MARKERS, US0075 (VARIOUS ROADWAYS IN THE to COLLIN COUNTY MAINTENANCE SECTION) | Dallas District | 2 | The Confidence Group, Inc | $214,195 | $256,639 | +20% | -41% | TxDOT |
| A00217349 | RAISED PAVEMENT MARKERS, IH0035E (Various Roadways in the to Ellis County Maintenance Section) | Dallas District | 2 | The Confidence Group, Inc | $176,686 | $196,040 | +11% | -22% | TxDOT |
| A00218532 | HYDRAULIC CEMENT, SH0005 (Collin County to Maintenance Section) | Dallas District | 2 | Touchstone Resources, LLC | $123,000 | $123,000 | 0.0% | -5.0% | TxDOT |
| A00218287 | SPECIALTY MARKINGS, IH0045 (Various Roadways to Navarro County Maintenance Section) | Dallas District | 3 | The Confidence Group, Inc | $108,905 | $227,255 | +109% | -31% | TxDOT |
| A00219624 | TREE REMOVAL, SH0036 (Various to Various) | Bryan District | 4 | Rhino Equity, LLC | $69,354 | $124,550 | +80% | -23% | TxDOT |
| A00217374 | MISCELLANEOUS CONCRETE REPAIR, US0075 (VARIOUS ROADWAYS IN THE to COLLIN COUNTY MAINTENANCE SECTION) | Dallas District | 6 | BK Field Operations LLC | $43,579 | $45,345 | +4.0% | -6.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.