TxDOT contract A00196613 bid tabulation
Hazard Elimination & Safety, Various (DISTRICT WIDE to .). Let by Texas DOT on January 8, 2025, Jefferson, Beaumont District. 5 bids received; low bid $1,798,959 by TRP Infrastructure Services, LLC, -41% against the engineer's estimate of $3,063,065.
- Owner
- Texas DOT
- Letting
- 08 JAN 2025
- Pay items
- 31
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | TRP Infrastructure Services, LLC | $1,798,959 | Low | -41% |
| 2 | Interstate Barricades & Markings, Inc. | $1,886,148 | +5.0% | -38% |
| 3 | Stripe-A-Zone, LLC | $1,998,191 | +11% | -35% |
| 4 | Professional Traffic Control LLC | $2,775,527 | +54% | -9.0% |
| 5 | Stripe Lines, Inc. | $2,992,088 | +66% | -2.0% |
Engineer's estimate: $3,063,065.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. TRP Infrastructure Services, LLC | 2. Interstate Barricades & Markings, Inc. | 3. Stripe-A-Zone, LLC | 4. Professional Traffic Control LLC | 5. Stripe Lines, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (500-7001) | LS | 1 | $260,000 | $25,000 | $50,000 | $10,000 | $35,000 | $38,500 |
| 2 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $9,000.00 | $800.00 | $1.00 | $500.00 | $5,000.00 | $1,500.00 |
| 3 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 7,830 | $0.25 | $1.07 | $0.95 | $0.95 | $1.10 | $0.54 |
| 4 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 14,375 | $1.50 | $1.20 | $0.95 | $0.95 | $1.30 | $0.80 |
| 5 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 42,640 | $3.50 | $1.70 | $4.00 | $2.75 | $1.90 | $3.22 |
| 6 | RE PV marking type I(black)6"(shadow)(090MIL) (666-7137) | LF | 297,750 | $0.80 | $0.61 | $0.75 | $0.60 | $0.90 | $0.53 |
| 7 | Reflectorized pavement marking type II (W) 12" (DOT) (666-7180) | LF | 26,130 | $1.75 | $0.45 | $1.50 | $0.30 | $1.80 | $1.99 |
| 8 | Pavement sler 6" (666-7347) | LF | 1,204,630 | $0.23 | $0.10 | $0.15 | $0.16 | $0.20 | $0.23 |
| 9 | Pavement sler 8" (666-7348) | LF | 14,375 | $0.35 | $0.13 | $0.30 | $0.25 | $0.50 | $0.84 |
| 10 | Pavement sler 12" (666-7350) | LF | 68,770 | $1.00 | $0.22 | $1.00 | $1.00 | $0.70 | $3.27 |
| 11 | Pavement sler 24" (666-7352) | LF | 14,155 | $2.00 | $0.40 | $1.00 | $1.25 | $1.50 | $5.06 |
| 12 | Pavement sler (arrow) (666-7353) | EACH | 235 | $30.00 | $3.50 | $25.00 | $50.00 | $40.00 | $115.00 |
| 13 | Pavement sler (word) (666-7354) | EACH | 113 | $35.00 | $5.20 | $25.00 | $50.00 | $50.00 | $115.77 |
| 14 | Pavement sler (yld tri) (666-7365) | EACH | 400 | $15.00 | $0.51 | $10.00 | $8.00 | $12.00 | $102.28 |
| 15 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 297,750 | $0.70 | $0.65 | $0.52 | $0.51 | $0.70 | $0.65 |
| 16 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 446,400 | $0.60 | $0.55 | $0.52 | $0.50 | $0.75 | $0.65 |
| 17 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 6,250 | $0.75 | $0.65 | $0.52 | $0.52 | $1.50 | $0.65 |
| 18 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 446,400 | $0.60 | $0.55 | $0.52 | $0.51 | $0.75 | $0.65 |
| 19 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 14,155 | $17.00 | $12.52 | $10.00 | $9.00 | $15.00 | $12.74 |
| 20 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 235 | $220.00 | $222.30 | $175.00 | $170.00 | $200.00 | $233.09 |
| 21 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 113 | $280.00 | $295.20 | $200.00 | $205.00 | $300.00 | $277.57 |
| 22 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 400 | $65.00 | $57.26 | $25.00 | $50.00 | $40.00 | $116.48 |
| 23 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 7,445 | $5.00 | $4.50 | $5.00 | $5.75 | $6.00 | $6.22 |
| 24 | Eliminating existing PM & markers (4") (677-7001) | LF | 111,600 | $0.40 | $0.17 | $0.10 | $0.32 | $0.30 | $0.32 |
| 25 | Eliminating existing PM & markers (6") (677-7002) | LF | 1,204,630 | $0.40 | $0.17 | $0.11 | $0.27 | $0.40 | $0.36 |
| 26 | Eliminating existing PM & markers (8") (677-7004) | LF | 14,375 | $0.50 | $0.39 | $0.30 | $0.50 | $0.80 | $0.48 |
| 27 | Eliminating existing PM & markers (12") (677-7006) | LF | 68,770 | $1.20 | $0.48 | $0.50 | $1.00 | $1.20 | $2.00 |
| 28 | Eliminating existing PM & markers (24") (677-7008) | LF | 14,155 | $5.00 | $2.40 | $2.00 | $2.50 | $3.00 | $3.58 |
| 29 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 235 | $45.00 | $35.15 | $25.00 | $60.00 | $65.00 | $172.51 |
| 30 | Eliminating existing PM & markers (word) (677-7015) | EACH | 113 | $50.00 | $41.02 | $35.00 | $60.00 | $75.00 | $172.51 |
| 31 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 400 | $30.00 | $29.53 | $15.00 | $20.00 | $20.00 | $114.42 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.