TxDOT contract A00207978 bid tabulation
Surfacing/Roadway Restoration, US 59 (0.5 Mi S of FM 2148 to Sulphur River). Let by Texas DOT on January 8, 2025, Bowie, Atlanta District. 4 bids received; low bid $2,402,680 by O. Trevino Construction, LLC, -20% against the engineer's estimate of $3,000,440.
- Owner
- Texas DOT
- Letting
- 08 JAN 2025
- Pay items
- 40
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | O. Trevino Construction, LLC | $2,402,680 | Low | -20% |
| 2 | Winding Road Construction, Inc. | $2,438,635 | +1.0% | -19% |
| 3 | STX Civil | $3,234,348 | +35% | +8.0% |
| 4 | Built Right Construction of Oklahoma, LLC | $3,965,764 | +65% | +32% |
Engineer's estimate: $3,000,440.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. O. Trevino Construction, LLC | 2. Winding Road Construction, Inc. | 3. STX Civil | 4. Built Right Construction of Oklahoma, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 38 | $5,500.00 | $3,100.00 | $2,760.00 | $4,025.00 | $11,000 |
| 2 | Removing concrete (mowstrip) (104-7005) | LF | 400 | $30.00 | $26.00 | $25.00 | $40.25 | $200.00 |
| 3 | Embankment (vehicle)(OC)(type A) (132-7013) | CY | 35 | $95.00 | $91.00 | $250.00 | $287.50 | $200.00 |
| 4 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 667 | $0.50 | $3.00 | $10.00 | $0.60 | $3.00 |
| 5 | Full depth concrete repair CPCD (12") (361-7054) | SY | 5,681 | $375.00 | $295.00 | $274.00 | $397.00 | $450.00 |
| 6 | Flowable backfill (401-7001) | CY | 10 | $300.00 | $440.00 | $1,000.00 | $2,415.00 | $500.00 |
| 7 | Riprap (mow strip)(4 in) (432-7013) | CY | 34 | $740.00 | $670.00 | $1,000.00 | $715.00 | $1,000.00 |
| 8 | Mobilization (500-7001) | LS | 1 | $270,000 | $240,000 | $210,000 | $230,000 | $390,000 |
| 9 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $6,000.00 | $5,000.00 | $15,000 | $8,625.00 | $4,000.00 |
| 10 | Portable changeable message sign (503-7002) | EACH | 2 | $25,000 | $5,000.00 | $25,000 | $17,250 | $5,000.00 |
| 11 | TMA (stationary) (505-7001) | DAY | 65 | $250.00 | $500.00 | $1,500.00 | $402.50 | $350.00 |
| 12 | TMA (mobile operation) (505-7003) | DAY | 14 | $300.00 | $500.00 | $500.00 | $517.50 | $350.00 |
| 13 | Mill rumble strips (concrete) (shoulder) (533-7003) | LF | 500 | $0.50 | $20.00 | $20.00 | $0.80 | $20.00 |
| 14 | Metal W-beam guard fence (timber post) (540-7001) | LF | 300 | $25.50 | $32.00 | $30.00 | $37.00 | $35.00 |
| 15 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 2 | $1,800.00 | $2,680.00 | $3,000.00 | $2,702.50 | $3,000.00 |
| 16 | Remove metal beam guard fence (542-7001) | LF | 300 | $4.00 | $1.60 | $5.00 | $6.00 | $5.00 |
| 17 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,500.00 | $3,750.00 | $4,000.00 | $4,200.00 | $4,000.00 |
| 18 | Guardrail end treatment (remove) (544-7003) | EACH | 2 | $225.00 | $530.00 | $500.00 | $402.50 | $500.00 |
| 19 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 7 | $975.00 | $925.00 | $825.00 | $977.50 | $1,200.00 |
| 20 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 12 | $1,100.00 | $1,100.00 | $1,000.00 | $1,202.90 | $1,200.00 |
| 21 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 20 | $500.00 | $490.00 | $605.00 | $585.00 | $1,000.00 |
| 22 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 2 | $550.00 | $570.00 | $1,000.00 | $819.00 | $1,000.00 |
| 23 | Remove SM RD SN sup&AM (644-7073) | EACH | 42 | $120.00 | $105.00 | $85.00 | $133.50 | $200.00 |
| 24 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 6 | $50.00 | $32.00 | $100.00 | $56.00 | $50.00 |
| 25 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 600 | $2.00 | $1.10 | $1.25 | $2.75 | $2.00 |
| 26 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 5,821 | $1.25 | $1.84 | $2.00 | $4.55 | $3.00 |
| 27 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 23,281 | $0.95 | $0.74 | $1.00 | $0.85 | $2.00 |
| 28 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 5,821 | $1.25 | $0.74 | $2.00 | $1.07 | $2.00 |
| 29 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 25,559 | $0.90 | $0.74 | $1.00 | $0.95 | $2.00 |
| 30 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 108 | $16.50 | $14.00 | $20.00 | $21.00 | $20.00 |
| 31 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 60 | $105.00 | $53.00 | $60.00 | $56.50 | $75.00 |
| 32 | Reflectorized pavement marker type I-C (672-7002) | EACH | 36 | $5.00 | $6.60 | $10.00 | $6.50 | $10.00 |
| 33 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 44 | $5.50 | $6.60 | $10.00 | $5.85 | $10.00 |
| 34 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 286 | $5.50 | $6.60 | $10.00 | $8.85 | $10.00 |
| 35 | Eliminating existing PM & markers (6") (677-7002) | LF | 60,482 | $0.58 | $0.58 | $0.70 | $1.75 | $1.00 |
| 36 | Eliminating existing PM & markers (8") (677-7004) | LF | 600 | $1.00 | $1.05 | $2.00 | $1.95 | $2.00 |
| 37 | Eliminating existing PM & markers (24") (677-7008) | LF | 108 | $5.00 | $2.65 | $10.00 | $6.50 | $3.00 |
| 38 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 60 | $50.00 | $3.30 | $35.00 | $30.50 | $4.00 |
| 39 | Pavement surface preparation for marking (6") (678-7002) | LF | 58,424 | $0.50 | $0.05 | $0.20 | $0.60 | $0.50 |
| 40 | Spalling repair (hydraulic cement) (720-7001) | CF | 284 | $200.00 | $315.00 | $250.00 | $417.00 | $350.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.