TxDOT contract A00212503 bid tabulation
TRAFFIC SIGNAL MAINTENANCE, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS). Let by Texas DOT on January 8, 2025, Bowie, Atlanta District. 3 bids received; low bid $1,391,848 by Texas Traffic Control Systems, Inc., -4.9% against the engineer's estimate of $1,463,712.
- Owner
- Texas DOT
- Letting
- 08 JAN 2025
- Pay items
- 136
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Traffic Control Systems, Inc. | $1,391,848 | Low | -5.0% |
| 2 | Striping Technology, L.P. | $1,777,689 | +28% | +21% |
| 3 | 3LW Civil LLC | $2,500,830 | +80% | +71% |
Engineer's estimate: $1,463,712.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Traffic Control Systems, Inc. | 2. Striping Technology, L.P. | 3. 3LW Civil LLC |
|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 1 | $24,000 | $2,500.00 | $40,000 | $6,000.00 |
| 2 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 10 | $186.00 | $225.00 | $170.00 | $6,600.00 |
| 3 | Drilled shaft (sign mounts) (48 in) (416-7032) | LF | 50 | $840.00 | $785.00 | $1,425.00 | $780.00 |
| 4 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 300 | $270.00 | $285.00 | $375.00 | $360.00 |
| 5 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 45 | $270.00 | $285.00 | $400.00 | $360.00 |
| 6 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 27 | $300.00 | $350.00 | $500.00 | $480.00 |
| 7 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 44 | $840.00 | $785.00 | $1,425.00 | $600.00 |
| 8 | Riprap (concrete)(CL B) (432-7005) | CY | 10 | $360.00 | $500.00 | $2,500.00 | $900.00 |
| 9 | Mobilization (callout) (500-7002) | EACH | 19 | $3,000.00 | $3,000.00 | $7,150.00 | $12,000 |
| 10 | Portable changeable message sign (503-7001) | DAY | 135 | $180.00 | $200.00 | $220.00 | $150.00 |
| 11 | TMA (stationary) (505-7001) | DAY | 100 | $240.00 | $200.00 | $310.00 | $600.00 |
| 12 | Concrete curb (type II) (529-7002) | LF | 30 | $54.00 | $75.00 | $260.00 | $120.00 |
| 13 | Concrete sidewalks (4") (531-7001) | SY | 30 | $90.00 | $150.00 | $550.00 | $300.00 |
| 14 | Curb ramps (type 1) (531-7005) | EACH | 2 | $6,000.00 | $3,500.00 | $9,000.00 | $6,300.00 |
| 15 | Curb ramps (type 2) (531-7006) | EACH | 2 | $6,000.00 | $3,500.00 | $10,000 | $6,300.00 |
| 16 | Curb ramps (type 5) (531-7008) | EACH | 2 | $6,600.00 | $4,500.00 | $10,000 | $6,300.00 |
| 17 | Curb ramps (type 7) (531-7010) | EACH | 2 | $6,000.00 | $4,000.00 | $9,000.00 | $6,300.00 |
| 18 | Curb ramps (type 10) (531-7011) | EACH | 1 | $6,000.00 | $4,000.00 | $10,000 | $6,300.00 |
| 19 | Curb ramps (type 20) (531-7012) | EACH | 1 | $6,600.00 | $4,250.00 | $13,000 | $6,300.00 |
| 20 | Curb ramps (type 21) (531-7013) | EACH | 1 | $6,000.00 | $4,250.00 | $10,000 | $6,300.00 |
| 21 | Curb ramps (type 22) (531-7014) | EACH | 1 | $6,600.00 | $4,000.00 | $13,000 | $6,300.00 |
| 22 | Relocate RD IL asm (trans-base) (610-7004) | EACH | 3 | $1,200.00 | $1,500.00 | $1,700.00 | $6,000.00 |
| 23 | Remove RD IL asm (trans-base) (610-7009) | EACH | 1 | $960.00 | $750.00 | $1,700.00 | $4,200.00 |
| 24 | Replace luminaire W/(250W EQ) LED (610-7012) | EACH | 15 | $840.00 | $725.00 | $800.00 | $720.00 |
| 25 | Replace luminaire W/(400W EQ) LED (610-7013) | EACH | 30 | $840.00 | $725.00 | $800.00 | $780.00 |
| 26 | In RD IL(tysa)40T-10(250W)LED-inst (610-7236) | EACH | 5 | $1,440.00 | $1,500.00 | $1,150.00 | $5,400.00 |
| 27 | In RD IL(tysa)50T-10(400W)LED-inst (610-7237) | EACH | 20 | $1,440.00 | $1,500.00 | $1,150.00 | $5,400.00 |
| 28 | In RD IL(tysa)50T-10-10(400W)LED-inst (610-7238) | EACH | 5 | $1,440.00 | $1,750.00 | $1,250.00 | $5,400.00 |
| 29 | Replace LED HI MST IL(6 fixt) (type A) (614-7006) | EACH | 3 | $12,000 | $9,000.00 | $9,000.00 | $9,000.00 |
| 30 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 3,500 | $7.20 | $8.00 | $7.00 | $18.00 |
| 31 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 700 | $26.40 | $25.00 | $25.00 | $30.00 |
| 32 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 800 | $18.00 | $12.00 | $27.00 | $24.00 |
| 33 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 300 | $34.80 | $30.00 | $35.00 | $42.00 |
| 34 | Conduit (RM) (1 1/2") (618-7076) | LF | 50 | $14.40 | $15.00 | $30.00 | $30.00 |
| 35 | Conduit (RM) (2") (618-7078) | LF | 50 | $24.00 | $20.00 | $37.00 | $42.00 |
| 36 | Electrical conductor (no.12) insulated (620-7004) | LF | 500 | $1.20 | $1.50 | $2.00 | $2.40 |
| 37 | Electrical conductor (no.8) bare (620-7007) | LF | 500 | $2.40 | $2.50 | $2.00 | $2.70 |
| 38 | Electrical conductor (no.8) insulated (620-7008) | LF | 2,500 | $2.40 | $2.50 | $2.50 | $2.82 |
| 39 | Electrical conductor (no.6) bare (620-7009) | LF | 8,500 | $2.40 | $2.50 | $2.50 | $3.60 |
| 40 | Electrical conductor (no.6) insulated (620-7010) | LF | 11,000 | $2.40 | $2.50 | $3.00 | $3.90 |
| 41 | Electrical conductor (no.4) insulated (620-7012) | LF | 300 | $3.60 | $3.50 | $4.00 | $4.80 |
| 42 | Electrical conductor (no.2) insulated (620-7016) | LF | 100 | $4.80 | $5.00 | $5.00 | $7.20 |
| 43 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 500 | $2.40 | $2.00 | $3.00 | $3.60 |
| 44 | Ground box type A (122311)W/apron (624-7002) | EACH | 20 | $720.00 | $1,000.00 | $770.00 | $1,500.00 |
| 45 | Ground box type D (162922) (624-7007) | EACH | 2 | $480.00 | $850.00 | $1,200.00 | $1,800.00 |
| 46 | Ground box type D (162922)W/apron (624-7008) | EACH | 5 | $1,020.00 | $1,250.00 | $1,750.00 | $2,100.00 |
| 47 | Remove electrical services (628-7002) | EACH | 10 | $900.00 | $800.00 | $800.00 | $1,200.00 |
| 48 | Elc SRV type A 120/240 060(NS)AL(E)PS(U) (628-7003) | EACH | 1 | $5,400.00 | $5,000.00 | $7,200.00 | $14,400 |
| 49 | Elc SRV type A 120/240 060(NS)AL(E)SP(O) (628-7004) | EACH | 2 | $6,000.00 | $5,800.00 | $8,000.00 | $12,000 |
| 50 | Elc SRV type A 120/240 100(NS)AL(E)PS(U) (628-7019) | EACH | 1 | $6,000.00 | $5,000.00 | $7,500.00 | $14,400 |
| 51 | Elc SRV type A 120/240 100(NS)AL(E)SP(O) (628-7021) | EACH | 1 | $6,000.00 | $5,800.00 | $8,000.00 | $12,000 |
| 52 | Elc SRV type A 240/480 100(NS)AL(E)PS(U) (628-7068) | EACH | 1 | $4,800.00 | $5,000.00 | $7,600.00 | $14,400 |
| 53 | Elc SRV type A 240/480 100(NS)AL(E)SP(O) (628-7070) | EACH | 1 | $5,400.00 | $5,800.00 | $8,000.00 | $12,000 |
| 54 | Elc SRV type A 240/480 100(SS)SS(E)PS(U) (628-7089) | EACH | 1 | $6,000.00 | $7,600.00 | $8,750.00 | $14,400 |
| 55 | Elc SRV type A 240/480 100(SS)SS(E)SP(O) (628-7091) | EACH | 1 | $7,800.00 | $5,800.00 | $7,250.00 | $12,000 |
| 56 | Elc SRV type D 120/240 060(NS)AL(E)PS(U) (628-7120) | EACH | 1 | $6,000.00 | $5,000.00 | $6,500.00 | $14,400 |
| 57 | Elc SRV type D 120/240 060(NS)AL(E)SP(O) (628-7121) | EACH | 1 | $6,000.00 | $5,800.00 | $6,850.00 | $12,000 |
| 58 | Elc SRV type D 120/240 060(NS)AL(E)TS(O) (628-7124) | EACH | 1 | $4,200.00 | $5,000.00 | $5,200.00 | $7,800.00 |
| 59 | Elc SRV type T 120/240 000(NS)GS(L)TS(O) (628-7322) | EACH | 1 | $3,600.00 | $3,500.00 | $3,000.00 | $7,800.00 |
| 60 | Elc SRV type T 120/240 000(NS)GS(N)SP(O) (628-7326) | EACH | 13 | $4,200.00 | $3,500.00 | $4,200.00 | $7,800.00 |
| 61 | Aluminum signs (type A) (636-7007) | EACH | 3 | $600.00 | $550.00 | $800.00 | $1,200.00 |
| 62 | Replace existing aluminum signs (type A) (636-7008) | EACH | 5 | $1,080.00 | $350.00 | $850.00 | $900.00 |
| 63 | Aluminum signs (type G) (636-7009) | EACH | 3 | $700.00 | $450.00 | $1,050.00 | $5,400.00 |
| 64 | Replace existing aluminum signs (type G) (636-7010) | EACH | 5 | $1,200.00 | $450.00 | $1,150.00 | $4,200.00 |
| 65 | Install overhead sign support(30 FT bal tee) (650-7028) | EACH | 2 | $64,800 | $75,000 | $67,475 | $66,000 |
| 66 | Remove overhd sign sup (650-7193) | EACH | 1 | $18,000 | $5,000.00 | $10,000 | $12,000 |
| 67 | Prefabricated PM type C (W)(8")(solid) (668-7084) | LF | 50 | $6.00 | $10.25 | $5.00 | $30.00 |
| 68 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 200 | $18.00 | $19.50 | $15.00 | $30.00 |
| 69 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 6 | $252.00 | $315.00 | $225.00 | $1,200.00 |
| 70 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 3 | $312.00 | $445.00 | $350.00 | $1,200.00 |
| 71 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 6 | $276.00 | $345.00 | $275.00 | $1,200.00 |
| 72 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 20 | $90.00 | $60.00 | $65.00 | $1,200.00 |
| 73 | Eliminating existing PM & markers (8") (677-7004) | LF | 50 | $6.00 | $4.00 | $2.00 | $300.00 |
| 74 | Eliminating existing PM & markers (24") (677-7008) | LF | 50 | $6.00 | $8.00 | $4.00 | $300.00 |
| 75 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 5 | $120.00 | $130.00 | $100.00 | $300.00 |
| 76 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 5 | $180.00 | $170.00 | $100.00 | $300.00 |
| 77 | Eliminating existing PM & markers (word) (677-7015) | EACH | 10 | $240.00 | $130.00 | $100.00 | $300.00 |
| 78 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 10 | $66.00 | $20.00 | $50.00 | $300.00 |
| 79 | Pavement surface preparation for marking (8") (678-7004) | LF | 50 | $6.00 | $1.50 | $1.00 | $12.00 |
| 80 | Pavement surface preparation for marking (24") (678-7008) | LF | 200 | $6.00 | $3.00 | $1.00 | $12.00 |
| 81 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 6 | $120.00 | $65.00 | $50.00 | $12.00 |
| 82 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 3 | $120.00 | $65.00 | $50.00 | $12.00 |
| 83 | Pavement surface preparation for marking (word) (678-7016) | EACH | 6 | $120.00 | $65.00 | $50.00 | $12.00 |
| 84 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 20 | $60.00 | $10.00 | $25.00 | $12.00 |
| 85 | Install highway traffic signal (flash beacon) (680-7001) | EACH | 1 | $1,800.00 | $7,300.00 | $2,000.00 | $18,000 |
| 86 | Install highway traffic signal (isolated) (680-7002) | EACH | 2 | $6,600.00 | $10,400 | $6,500.00 | $36,000 |
| 87 | Install highway traffic signal (system) (680-7003) | EACH | 1 | $6,600.00 | $10,500 | $6,850.00 | $36,000 |
| 88 | Removing traffic signals (680-7004) | EACH | 2 | $3,600.00 | $2,500.00 | $7,750.00 | $7,800.00 |
| 89 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 15 | $300.00 | $325.00 | $300.00 | $390.00 |
| 90 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 10 | $300.00 | $325.00 | $300.00 | $390.00 |
| 91 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 40 | $300.00 | $325.00 | $300.00 | $390.00 |
| 92 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 6 | $300.00 | $325.00 | $300.00 | $390.00 |
| 93 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 15 | $300.00 | $325.00 | $300.00 | $390.00 |
| 94 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 6 | $300.00 | $325.00 | $300.00 | $390.00 |
| 95 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 5 | $540.00 | $550.00 | $750.00 | $900.00 |
| 96 | Back plate (12")(1 sec) (682-7021) | EACH | 10 | $90.00 | $150.00 | $155.00 | $300.00 |
| 97 | Back plate (12")(2 sec)aluminum (682-7024) | EACH | 2 | $90.00 | $250.00 | $350.00 | $600.00 |
| 98 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 6 | $168.00 | $150.00 | $275.00 | $360.00 |
| 99 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 8 | $180.00 | $150.00 | $358.00 | $360.00 |
| 100 | Backplate W/ref border(5 sec)(vent)aluminum (682-7044) | EACH | 2 | $192.00 | $250.00 | $365.00 | $360.00 |
| 101 | Back plate (12")(3 sect) (682-7052) | EACH | 6 | $216.00 | $150.00 | $275.00 | $360.00 |
| 102 | Back plate (12")(4 sect) (682-7053) | EACH | 2 | $252.00 | $150.00 | $350.00 | $360.00 |
| 103 | Traffic signal CBL (type A)(12 AWG)(3 conductor) (684-7008) | LF | 1,100 | $1.86 | $2.00 | $2.65 | $2.70 |
| 104 | Traffic signal CBL (type A)(12 AWG)(4 conductor) (684-7009) | LF | 200 | $3.00 | $2.00 | $3.30 | $3.00 |
| 105 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 1,500 | $3.00 | $3.00 | $3.45 | $3.30 |
| 106 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 500 | $3.60 | $3.50 | $4.20 | $3.60 |
| 107 | Install RDSD flash beacon assembly (685-7001) | EACH | 10 | $3,600.00 | $2,500.00 | $6,400.00 | $5,400.00 |
| 108 | Relocate RDSD flash beacon assembly (685-7002) | EACH | 2 | $3,000.00 | $3,000.00 | $6,000.00 | $4,200.00 |
| 109 | Remove RDSD flash beacon assembly (685-7003) | EACH | 9 | $840.00 | $850.00 | $1,050.00 | $1,500.00 |
| 110 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 2 | $7,800.00 | $6,500.00 | $9,500.00 | $10,200 |
| 111 | Ins traffic signal PL AM (mast)(install only) (686-7292) | EACH | 4 | $1,800.00 | $1,750.00 | $2,000.00 | $6,000.00 |
| 112 | Ins traffic signal PL AM (stran)(install only) (686-7293) | EACH | 2 | $1,440.00 | $1,750.00 | $1,500.00 | $6,000.00 |
| 113 | Pedestrian pole assembly (687-7001) | EACH | 4 | $1,800.00 | $2,500.00 | $3,750.00 | $4,200.00 |
| 114 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $1,800.00 | $3,250.00 | $1,520.00 | $1,800.00 |
| 115 | Pedestrian detect push button (standard) (688-7002) | EACH | 1 | $3,000.00 | $950.00 | $1,500.00 | $300.00 |
| 116 | Removal of ground boxes (690-7006) | EACH | 2 | $480.00 | $500.00 | $445.00 | $1,200.00 |
| 117 | Replace of ground boxes (690-7007) | EACH | 2 | $1,020.00 | $800.00 | $1,785.00 | $1,800.00 |
| 118 | Removal of signal related signs (690-7027) | EACH | 5 | $120.00 | $150.00 | $200.00 | $300.00 |
| 119 | Replace of signal related signs (690-7028) | EACH | 10 | $360.00 | $550.00 | $490.00 | $600.00 |
| 120 | Install of FND for ground MNT cabinets (690-7036) | EACH | 1 | $3,600.00 | $3,500.00 | $3,000.00 | $4,200.00 |
| 121 | Replace of control cabinet(GRND MNT) (690-7039) | EACH | 1 | $1,800.00 | $1,750.00 | $4,000.00 | $18,000 |
| 122 | Replace of control cabinet(pole MNT) (690-7042) | EACH | 1 | $1,200.00 | $1,200.00 | $3,000.00 | $18,000 |
| 123 | Install of FND for RDSD FLSH bea assembly (690-7047) | EACH | 1 | $1,080.00 | $950.00 | $5,325.00 | $4,200.00 |
| 124 | Removal of signal pole assembly (690-7051) | EACH | 7 | $960.00 | $900.00 | $2,200.00 | $3,000.00 |
| 125 | Removal of concrete foundations (690-7063) | EACH | 5 | $960.00 | $500.00 | $1,100.00 | $3,000.00 |
| 126 | Install DMS (pole MTD cabinet) (6004-7001) | EACH | 2 | $12,000 | $12,500 | $7,000.00 | $18,000 |
| 127 | ITS com CBL (ethernet) (6005-7001) | LF | 1,000 | $6.00 | $3.00 | $4.00 | $3.60 |
| 128 | VIVDS cabling (6006-7007) | LF | 1,000 | $3.60 | $5.00 | $3.75 | $3.60 |
| 129 | VIVDS video recording (6006-7008) | EACH | 9 | $480.00 | $2,500.00 | $2,500.00 | $9,000.00 |
| 130 | VIVDS cable (cat 6) (6006-7026) | LF | 1,000 | $3.00 | $6.00 | $4.00 | $3.60 |
| 131 | Bbu system (external battery cabinet) (6007-7001) | EACH | 3 | $7,440.00 | $9,500.00 | $11,500 | $12,000 |
| 132 | ITS pole (50 FT) (90 MPH) (6011-7005) | EACH | 2 | $40,800 | $35,000 | $28,000 | $33,000 |
| 133 | Remove high mast lighting assembly (6019-7001) | EACH | 1 | $27,000 | $15,000 | $25,000 | $24,000 |
| 134 | Remove and replace DMS (6054-7001) | EACH | 1 | $44,400 | $35,000 | $17,000 | $24,000 |
| 135 | Remove and relocate DMS (6054-7002) | EACH | 1 | $50,400 | $35,000 | $20,000 | $18,000 |
| 136 | Remove DMS (6054-7003) | EACH | 1 | $14,400 | $15,000 | $7,000.00 | $12,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 8, 2025. Compiled by Mirage Metrics.