TxDOT contract A00213022 bid tabulation
MILL AND INLAY, FM2154 (FM 2818 to Rock Prairie Road). Let by Texas DOT on January 8, 2025, Brazos, Bryan District. 5 bids received; low bid $898,734 by Cornerstone Paving and Construction, L.L.C., -21% against the engineer's estimate of $1,143,824.
- Owner
- Texas DOT
- Letting
- 08 JAN 2025
- Pay items
- 40
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cornerstone Paving and Construction, L.L.C. | $898,734 | Low | -21% |
| 2 | Brazos Paving, Inc. | $1,058,062 | +18% | -7.0% |
| 3 | Knife River Corporation - South | $1,069,105 | +19% | -7.0% |
| 4 | Big Creek Construction, LTD. | $1,087,442 | +21% | -5.0% |
| 5 | Texas Materials Group, Inc. | $1,243,465 | +38% | +9.0% |
Engineer's estimate: $1,143,824.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Cornerstone Paving and Construction, L.L.C. | 2. Brazos Paving, Inc. | 3. Knife River Corporation - South | 4. Big Creek Construction, LTD. | 5. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Stone-MTRX-asphalt SMA-C sac-A PG76-22 (346-7001) | TON | 4,859 | $165.00 | $158.85 | $165.00 | $171.16 | $150.00 | $175.50 |
| 2 | Tack coat (346-7028) | GAL | 4,417 | $4.50 | $3.50 | $6.50 | $4.00 | $5.75 | $4.00 |
| 3 | Planing asphalt concrete pavement(2") (354-7051) | SY | 44,169 | $3.00 | $0.82 | $2.25 | $2.42 | $3.00 | $3.50 |
| 4 | Mobilization (500-7001) | LS | 1 | $100,000 | $20,000 | $27,600 | $29,000 | $100,000 | $154,058 |
| 5 | Barricades, signs and traffic handling (502-7001) | MO | 1 | $3,000.00 | $4,000.00 | $8,030.00 | $15,000 | $18,000 | $1,100.00 |
| 6 | Portable changeable message sign (503-7001) | DAY | 26 | $150.00 | $60.00 | $315.50 | $63.00 | $250.00 | $175.00 |
| 7 | TMA (stationary) (505-7001) | DAY | 6 | $500.00 | $75.00 | $1,774.00 | $500.00 | $350.00 | $400.00 |
| 8 | TMA (mobile operation) (505-7003) | DAY | 9 | $500.00 | $75.00 | $1,230.00 | $900.00 | $700.00 | $400.00 |
| 9 | Temporary sediment control fence (install) (506-7039) | LF | 500 | $1.00 | $6.50 | $4.75 | $7.36 | $5.00 | $3.35 |
| 10 | Temporary sediment control fence (remove) (506-7041) | LF | 500 | $1.00 | $3.00 | $1.50 | $5.00 | $1.00 | $1.00 |
| 11 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 6,140 | $0.50 | $0.42 | $0.55 | $0.46 | $0.50 | $0.50 |
| 12 | Work zone pavement marking non-removing (W)6"(DOT) (662-7006) | LF | 120 | $0.50 | $0.42 | $0.55 | $0.50 | $2.00 | $0.50 |
| 13 | Work zone pavement marking non-removing (W)8"(DOT) (662-7010) | LF | 216 | $1.00 | $0.62 | $0.80 | $0.67 | $2.00 | $0.70 |
| 14 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 5,592 | $1.00 | $0.62 | $0.80 | $0.67 | $0.50 | $0.70 |
| 15 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 102 | $8.00 | $1.98 | $2.50 | $2.15 | $5.00 | $2.20 |
| 16 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 3,011 | $2.00 | $1.00 | $1.80 | $1.09 | $1.50 | $0.90 |
| 17 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 120 | $2.00 | $1.35 | $2.00 | $1.50 | $5.00 | $1.50 |
| 18 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 216 | $2.25 | $1.65 | $2.00 | $2.00 | $5.00 | $1.80 |
| 19 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 5,807 | $2.25 | $1.65 | $2.00 | $1.79 | $2.50 | $1.80 |
| 20 | Pavement sler 6" (666-7347) | LF | 1,510 | $0.50 | $0.20 | $0.25 | $0.25 | $1.00 | $0.22 |
| 21 | Pavement sler 8" (666-7348) | LF | 2,805 | $0.50 | $0.35 | $0.50 | $0.38 | $2.00 | $0.40 |
| 22 | Pavement sler 24" (666-7352) | LF | 12 | $4.00 | $10.00 | $12.75 | $11.00 | $10.00 | $11.00 |
| 23 | Pavement sler (arrow) (666-7353) | EACH | 2 | $150.00 | $75.00 | $95.00 | $82.00 | $150.00 | $84.00 |
| 24 | Pavement sler (word) (666-7354) | EACH | 2 | $150.00 | $75.00 | $95.00 | $82.00 | $150.00 | $84.00 |
| 25 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 6,140 | $1.50 | $1.00 | $1.65 | $1.41 | $1.50 | $1.45 |
| 26 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 102 | $20.00 | $16.00 | $20.25 | $17.40 | $15.00 | $18.00 |
| 27 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 12 | $300.00 | $285.00 | $361.25 | $310.00 | $215.00 | $318.00 |
| 28 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 2 | $400.00 | $300.00 | $380.25 | $326.00 | $325.00 | $335.00 |
| 29 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 14 | $350.00 | $285.00 | $361.25 | $310.00 | $260.00 | $320.00 |
| 30 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 658 | $5.00 | $7.00 | $9.00 | $8.00 | $6.00 | $8.00 |
| 31 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,510 | $2.50 | $0.19 | $0.25 | $0.21 | $1.00 | $0.25 |
| 32 | Eliminating existing PM & markers (6") (677-7002) | LF | 3,020 | $2.50 | $0.26 | $0.40 | $0.28 | $1.00 | $0.30 |
| 33 | Eliminating existing PM & markers (24") (677-7008) | LF | 12 | $20.00 | $10.00 | $13.00 | $11.00 | $10.00 | $11.00 |
| 34 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | $500.00 | $50.00 | $64.00 | $55.00 | $100.00 | $55.00 |
| 35 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $500.00 | $50.00 | $64.00 | $55.00 | $100.00 | $55.00 |
| 36 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,510 | $1.00 | $0.08 | $0.10 | $0.10 | $0.50 | $0.10 |
| 37 | Pavement surface preparation for marking (8") (678-7004) | LF | 2,805 | $1.00 | $0.12 | $0.15 | $0.14 | $0.50 | $0.15 |
| 38 | Pavement surface preparation for marking (24") (678-7008) | LF | 12 | $1.00 | $2.00 | $2.50 | $2.17 | $10.00 | $2.25 |
| 39 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $50.00 | $65.00 | $82.50 | $71.00 | $75.00 | $73.00 |
| 40 | Pavement surface preparation for marking (word) (678-7016) | EACH | 2 | $50.00 | $65.00 | $82.50 | $71.00 | $75.00 | $73.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 8, 2025. Compiled by Mirage Metrics.