TxDOT contract A00124561 bid tabulation
Surfacing/Roadway Restoration, BU 59S (US 59 EL CAMPO to 1.19 Mi SOUTHWEST of US 59). Let by Texas DOT on January 8, 2025, Wharton, Yoakum District. 5 bids received; low bid $6,366,588 by Cornerstone Paving and Construction, L.L.C., -13% against the engineer's estimate of $7,348,061.
- Owner
- Texas DOT
- Letting
- 08 JAN 2025
- Pay items
- 56
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cornerstone Paving and Construction, L.L.C. | $6,366,588 | Low | -13% |
| 2 | Vulcan Materials Asphalt and Construction, LLC | $6,507,459 | +2.0% | -11% |
| 3 | Hunter Industries, LTD. | $7,078,976 | +11% | -4.0% |
| 4 | CK Newberry, LLC | $7,994,954 | +26% | +9.0% |
| 5 | Texas Materials Group, Inc. | $8,696,400 | +37% | +18% |
Engineer's estimate: $7,348,061.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Cornerstone Paving and Construction, L.L.C. | 2. Vulcan Materials Asphalt and Construction, LLC | 3. Hunter Industries, LTD. | 4. CK Newberry, LLC | 5. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 134 | $75.00 | $180.00 | $210.00 | $48.40 | $125.00 | $345.00 |
| 2 | Backfill (type B) (134-7002) | STA | 225.69 | $200.00 | $206.00 | $258.00 | $132.00 | $175.00 | $300.00 |
| 3 | Blading (150-7002) | HR | 30 | $150.00 | $150.00 | $126.25 | $112.20 | $180.00 | $230.00 |
| 4 | FL BS (compacted in place)(tye GR1-2)(final pos) (247-7193) | CY | 239 | $120.00 | $305.00 | $198.00 | $198.70 | $130.00 | $230.00 |
| 5 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 1,982 | $145.00 | $161.50 | $171.00 | $134.62 | $160.00 | $245.00 |
| 6 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 87,610 | $7.50 | $3.90 | $3.20 | $4.26 | $4.50 | $5.05 |
| 7 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 30,342 | $125.00 | $124.65 | $116.00 | $122.12 | $135.00 | $161.25 |
| 8 | Flexible pavement structure repair(8") (351-7007) | SY | 2,000 | $75.00 | $74.00 | $57.00 | $58.74 | $90.00 | $153.00 |
| 9 | Planing asphalt concrete pavement(2") (354-7051) | SY | 257,677 | $2.50 | $1.40 | $2.40 | $1.65 | $2.00 | $3.50 |
| 10 | Full-depth repair CRCP (12")(special) (361-7056) | CY | 668 | $500.00 | $670.00 | $380.00 | $1,200.00 | $785.00 | $805.00 |
| 11 | Mobilization (500-7001) | LS | 1 | $668,270 | $200,000 | $431,000 | $541,175 | $700,000 | $228,220 |
| 12 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $3,500.00 | $6,000.00 | $17,500 | $16,548 | $35,000 | $950.00 |
| 13 | Portable changeable message sign (503-7002) | EACH | 4 | $11,000 | $13,000 | $14,160 | $7,500.00 | $10,000 | $13,300 |
| 14 | TMA (stationary) (505-7001) | DAY | 40 | $300.00 | $75.00 | $257.00 | $250.00 | $300.00 | $360.00 |
| 15 | TMA (mobile operation) (505-7003) | DAY | 40 | $300.00 | $75.00 | $257.00 | $500.00 | $700.00 | $650.00 |
| 16 | Temporary sediment control fence (install) (506-7039) | LF | 200 | $5.00 | $6.00 | $21.00 | $10.00 | $20.00 | $13.00 |
| 17 | Temporary sediment control fence (remove) (506-7041) | LF | 200 | $1.00 | $3.00 | $20.00 | $5.00 | $10.00 | $6.00 |
| 18 | Turnouts (ACP) (530-7018) | SY | 440 | $85.00 | $88.00 | $120.00 | $39.60 | $60.00 | $70.00 |
| 19 | Metal W-beam guard fence (timber post) (540-7001) | LF | 2,327 | $26.00 | $21.25 | $24.50 | $23.00 | $25.00 | $27.00 |
| 20 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 6 | $2,400.00 | $1,500.00 | $2,085.00 | $2,450.00 | $3,000.00 | $2,600.00 |
| 21 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 148 | $87.00 | $75.32 | $85.00 | $80.50 | $150.00 | $95.00 |
| 22 | Remove metal beam guard fence (542-7001) | LF | 2,397 | $3.25 | $2.25 | $3.00 | $2.50 | $3.00 | $3.00 |
| 23 | Remove terminal anchor section (542-7002) | EACH | 8 | $400.00 | $150.00 | $350.00 | $250.00 | $300.00 | $190.00 |
| 24 | Guardrail end treatment (install) (544-7001) | EACH | 18 | $3,400.00 | $2,985.00 | $3,000.00 | $3,000.00 | $4,000.00 | $3,800.00 |
| 25 | Guardrail end treatment (remove) (544-7003) | EACH | 10 | $425.00 | $180.00 | $250.00 | $250.00 | $350.00 | $230.00 |
| 26 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 12 | $55.00 | $18.00 | $25.00 | $22.45 | $18.00 | $34.00 |
| 27 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 80 | $55.00 | $32.00 | $35.00 | $24.59 | $30.00 | $160.00 |
| 28 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 27,657 | $0.35 | $0.26 | $0.39 | $0.39 | $0.79 | $0.30 |
| 29 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 146,541 | $0.35 | $0.26 | $0.39 | $0.39 | $0.70 | $0.30 |
| 30 | Work zone pavement marking non-removing (W)8"(DOT) (662-7010) | LF | 120 | $0.39 | $0.72 | $0.72 | $1.10 | $0.40 | |
| 31 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 2,922 | $0.73 | $0.36 | $0.66 | $0.66 | $1.10 | $0.40 |
| 32 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 330 | $1.50 | $2.00 | $1.50 | $1.50 | $4.00 | $2.00 |
| 33 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 6,897 | $10.36 | $3.65 | $3.00 | $3.00 | $10.00 | $3.75 |
| 34 | Work zone pavement marking non-removing (W)(RR crossing) (662-7024) | EACH | 6 | $165.00 | $250.00 | $250.00 | $500.00 | $170.00 | |
| 35 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 35,889 | $0.35 | $0.26 | $0.39 | $0.39 | $0.79 | $0.30 |
| 36 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 205,266 | $0.35 | $0.26 | $0.39 | $0.39 | $0.70 | $0.30 |
| 37 | Work zone pavement marking non-removing (Y)24"(solid) (662-7042) | LF | 270 | $5.00 | $3.65 | $3.00 | $3.00 | $15.00 | $3.75 |
| 38 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 3,226 | $1.50 | $1.00 | $0.45 | $1.63 | $0.80 | $1.50 |
| 39 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 16,010 | $1.50 | $1.00 | $0.45 | $1.63 | $0.55 | $1.50 |
| 40 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 40 | $1.25 | $2.00 | $2.00 | $1.10 | $1.50 | |
| 41 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 974 | $1.00 | $1.15 | $0.95 | $0.95 | $1.10 | $1.50 |
| 42 | Type I high perf PM (W)6"(broken)(100MIL) (666-7290) | LF | 9,219 | $0.85 | $0.82 | $0.85 | $0.85 | $1.10 | $0.95 |
| 43 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 48,847 | $0.85 | $0.82 | $0.85 | $0.85 | $1.00 | $1.00 |
| 44 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 11,963 | $0.85 | $0.82 | $0.85 | $0.85 | $1.10 | $1.05 |
| 45 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 68,422 | $0.85 | $0.82 | $0.85 | $0.85 | $1.00 | $1.05 |
| 46 | Prefabricated PM type C (W)(12")(solid) (668-7087) | LF | 110 | $7.00 | $9.15 | $13.00 | $13.00 | $8.00 | $12.00 |
| 47 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 2,299 | $13.00 | $15.00 | $16.00 | $16.00 | $16.00 | $20.00 |
| 48 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 5 | $235.00 | $250.00 | $250.00 | $200.00 | $300.00 | |
| 49 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 7 | $245.00 | $300.00 | $300.00 | $250.00 | $300.00 | |
| 50 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 2 | $550.00 | $600.00 | $600.00 | $500.00 | $700.00 | |
| 51 | Prefabricated PM type C (Y)(24")(solid) (668-7127) | LF | 140 | $13.00 | $15.00 | $16.00 | $16.00 | $18.00 | $20.00 |
| 52 | Reflectorized pavement marker type I-C (672-7002) | EACH | 301 | $5.00 | $6.15 | $5.75 | $5.75 | $5.00 | $8.00 |
| 53 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,951 | $5.00 | $6.15 | $5.75 | $5.75 | $5.00 | $8.00 |
| 54 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 16 | $5.00 | $6.15 | $5.75 | $5.75 | $5.00 | $8.00 |
| 55 | Long channel mount curb sys (install) (6039-7001) | LF | 70 | $150.00 | $150.00 | $71.64 | $150.00 | $14.00 | |
| 56 | Long channel mount curb sys (remove) (6039-7003) | LF | 70 | $7.00 | $7.00 | $10.69 | $7.00 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.