TxDOT contract A00210890 bid tabulation
MOWING HIGHWAY RIGHT OF WAY, IH0610 (Various Hwys in Houston Metro Area to Various Hwys in Houston Metro Area). Let by Texas DOT on January 8, 2025, Harris, Houston District. 4 bids received; low bid $12,667,795 by Central North Construction, LLC, +3.7% against the engineer's estimate of $12,218,920.
- Owner
- Texas DOT
- Letting
- 08 JAN 2025
- Pay items
- 19
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Central North Construction, LLC | $12,667,795 | Low | +4.0% |
| 2 | Yellowstone Landscape - Central, Inc. | $14,351,648 | +13% | +17% |
| 3 | Roy Jorgensen Associates, Inc. | $17,484,739 | +38% | +43% |
| 4 | Isi Contracting, Inc. | $23,632,438 | +87% | +93% |
Engineer's estimate: $12,218,920.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Central North Construction, LLC | 2. Yellowstone Landscape - Central, Inc. | 3. Roy Jorgensen Associates, Inc. | 4. Isi Contracting, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Landscape treat (193-7022) | CYC | 4 | $142,800 | $47,369 | $134,835 | $130,894 | $176,317 |
| 2 | Landscape treat (type I) (193-7025) | CYC | 16 | $135,200 | $167,760 | $174,734 | $218,417 | $186,422 |
| 3 | Landscape treat (type II) (193-7026) | CYC | 16 | $176,880 | $296,280 | $170,705 | $213,381 | $182,124 |
| 4 | Landscape treat (type III) (193-7036) | CYC | 32 | $22,880 | $41,898 | $38,198 | $47,747 | $40,753 |
| 5 | Landscape treat (type IV) (193-7037) | CYC | 32 | $48,642 | $73,996 | $67,488 | $84,360 | $72,002 |
| 6 | Landscape treat (type V) (193-7038) | CYC | 3 | $253,300 | $32,396 | $192,107 | $242,879 | $821,600 |
| 7 | Landscape treat (type VI) (193-7039) | CYC | 3 | $308,500 | $38,802 | $242,108 | $214,186 | $808,399 |
| 8 | Landscape treat (type VII) (193-7040) | CYC | 4 | $86,500 | $41,789 | $84,835 | $156,548 | $233,776 |
| 9 | Landscape treatment (type IX) (193-7042) | CYC | 4 | $53,328 | $22,171 | $57,547 | $71,934 | $61,397 |
| 10 | Landscape treatment (type X) (193-7043) | CYC | 4 | $53,856 | $31,965 | $61,126 | $76,408 | $65,215 |
| 11 | Landscape treatment (type XI) (193-7044) | CYC | 1 | $419,950 | $150,000 | $944,554 | $550,000 | $2,830,036 |
| 12 | Landscape treatment (type XII) (193-7045) | CYC | 1 | $502,750 | $125,000 | $1,044,555 | $335,959 | $2,830,036 |
| 13 | Landscape treatment (type xiii) (193-7046) | CYC | 1 | $35,000 | $69,872 | $54,750 | $68,437 | $58,412 |
| 14 | Landscape treatment (type xiv) (193-7047) | CYC | 1 | $58,400 | $123,401 | $57,579 | $71,974 | $61,431 |
| 15 | Mobilization (callout) (500-7002) | EACH | 122 | $1,500.00 | $10.00 | $2,500.00 | $12,908 | $1,000.00 |
| 16 | TMA (stationary) (505-7001) | DAY | 535 | $200.00 | $120.00 | $282.00 | $500.00 | $2,000.00 |
| 17 | TMA (mobile operation) (505-7003) | DAY | 535 | $200.00 | $260.00 | $282.00 | $500.00 | $66.00 |
| 18 | Spot mowing (730-7021) | ACRE | 500 | $565.00 | $120.00 | $125.00 | $156.25 | $133.00 |
| 19 | Litter removal (spot) (734-7003) | ACRE | 500 | $420.00 | $29.97 | $32.00 | $40.00 | $34.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.