TxDOT contract A00212242 bid tabulation
Total Maintenance, IH0045 (Southern Street to SH 87). Let by Texas DOT on January 8, 2025, Harris, Houston District. 2 bids received; low bid $4,290,486 by Isi Contracting, Inc., -8.6% against the engineer's estimate of $4,692,797.
- Owner
- Texas DOT
- Letting
- 08 JAN 2025
- Pay items
- 173
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Isi Contracting, Inc. | $4,290,486 | Low | -9.0% |
| 2 | Roy Jorgensen Associates, Inc. | $4,410,005 | +3.0% | -6.0% |
Engineer's estimate: $4,692,797.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Isi Contracting, Inc. | 2. Roy Jorgensen Associates, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7007) | CY | 50 | $50.00 | $10.44 | $50.00 |
| 2 | Removing concrete (traffic barrier) (104-7035) | LF | 60 | $10.00 | $2.00 | $75.00 |
| 3 | Blading (150-7003) | LF | 1,500 | $10.00 | $1.87 | $15.00 |
| 4 | Full - depth repair CRCP (10") (361-7005) | CY | 100 | $2,100.00 | $1,327.00 | $900.00 |
| 5 | Full - depth repair CRCP (12") (361-7007) | CY | 50 | $1,800.00 | $1,306.00 | $1,000.00 |
| 6 | Full - depth repair CRCP (14") (361-7009) | CY | 80 | $1,700.00 | $1,234.00 | $1,000.00 |
| 7 | Full-depth rep(BR appr slab)(9"-13") (361-7047) | CY | 40 | $2,100.00 | $520.00 | $1,500.00 |
| 8 | Drilled shaft (sign mounts) (12 in) (416-7027) | LF | 25 | $88.00 | $25.00 | $250.00 |
| 9 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 12 | $158.00 | $25.00 | $400.00 |
| 10 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 200 | $160.00 | $175.00 | $175.00 |
| 11 | Concrete structure repair(deck rep (full depth)) (429-7005) | SF | 50 | $210.00 | $175.00 | $350.00 |
| 12 | Concrete structure repair(rapid vert and overhead) (429-7008) | SF | 200 | $174.00 | $71.61 | $250.00 |
| 13 | Concrete structure repair (standard) (429-7009) | SF | 600 | $150.00 | $113.85 | $150.00 |
| 14 | Riprap (concrete)(5 in) (432-7002) | CY | 50 | $550.00 | $455.00 | $650.00 |
| 15 | Riprap (mow strip)(5 in) (432-7014) | CY | 50 | $550.00 | $250.00 | $650.00 |
| 16 | Cleaning and sealing existing joints (438-7001) | LF | 300 | $49.00 | $40.34 | $100.00 |
| 17 | Mobilization (callout) (500-7002) | EACH | 24 | $500.00 | $3,000.00 | $250.00 |
| 18 | Mobilization (emergency) (500-7033) | EACH | 20 | $2,000.00 | $5,000.00 | $2,000.00 |
| 19 | Portable changeable message sign (503-7001) | DAY | 50 | $150.00 | $208.78 | $150.00 |
| 20 | TMA (stationary) (505-7001) | DAY | 200 | $400.00 | $500.00 | $400.00 |
| 21 | TMA (mobile operation) (505-7002) | HR | 2,000 | $68.00 | $81.52 | $80.00 |
| 22 | Portable concrete traffic barrier (des source) (safety SH)(type 2) (512-7062) | LF | 30 | $10.00 | $8.68 | $50.00 |
| 23 | Portable concrete traffic barrier (move)(safety SH)(type 2) (512-7063) | LF | 120 | $15.00 | $2.14 | $50.00 |
| 24 | Portable concrete traffic barrier (remove)(safety SH)(type 2) (512-7065) | LF | 30 | $15.00 | $1.03 | $50.00 |
| 25 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,100.00 | $3,396.44 | $1,200.00 |
| 26 | Downstream anchor terminal section (540-7015) | EACH | 10 | $1,500.00 | $2,000.73 | $800.00 |
| 27 | Crash cushion attenuator (des source) (545-7001) | EACH | 1 | $2,000.00 | $1,392.61 | $2,000.00 |
| 28 | Crash cushion attenuator (stockpile) (545-7003) | EACH | 1 | $2,000.00 | $567.03 | $2,000.00 |
| 29 | Crash cushion attenuator (remove) (545-7004) | EACH | 10 | $2,000.00 | $567.03 | $3,500.00 |
| 30 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 10 | $26,500 | $24,250 | $23,000 |
| 31 | Crash cushion attenuator (install)(L)(W)(TL3) (545-7008) | EACH | 6 | $37,000 | $34,150 | $30,000 |
| 32 | Aluminum signs (type A) (636-7001) | SF | 700 | $41.00 | $34.67 | $35.00 |
| 33 | Aluminum signs (type G) (636-7002) | SF | 350 | $32.00 | $100.03 | $50.00 |
| 34 | Replace existing aluminum signs(type A) (636-7004) | SF | 300 | $35.00 | $34.67 | $50.00 |
| 35 | In bridge MNT clearance sign assembly(type N) (644-7061) | EACH | 5 | $1,800.00 | $3,824.00 | $3,000.00 |
| 36 | In bridge MNT clearance sign assembly(type S) (644-7062) | EACH | 5 | $1,900.00 | $3,858.00 | $3,000.00 |
| 37 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 100 | $950.00 | $626.14 | $650.00 |
| 38 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 2,000 | $17.00 | $11.00 | $10.00 |
| 39 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 300 | $32.00 | $18.03 | $20.00 |
| 40 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 2,000 | $15.00 | $13.89 | $10.00 |
| 41 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 300 | $3.09 | $3.10 | $2.35 |
| 42 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 5,000 | $1.30 | $2.02 | $1.50 |
| 43 | Reflectorized pavement marking type I (W)18"(solid)(090MIL) (666-7032) | LF | 1,000 | $3.81 | $6.98 | $6.00 |
| 44 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 5,000 | $7.10 | $8.22 | $5.50 |
| 45 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 20 | $165.00 | $258.46 | $170.00 |
| 46 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 20 | $196.00 | $284.30 | $205.00 |
| 47 | Reflectorized pavement marking type I(W)(TPL arrw)(100MIL) (666-7048) | EACH | 1 | $265.00 | $465.23 | $305.00 |
| 48 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 20 | $185.00 | $258.46 | $205.00 |
| 49 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 25 | $205.00 | $284.30 | $205.00 |
| 50 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 20 | $669.50 | $723.68 | $645.00 |
| 51 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 20 | $669.50 | $723.68 | $695.00 |
| 52 | Reflectorized pavement marking type I (W) (island) (100MIL) (666-7075) | SF | 1 | $10.30 | $15.51 | $500.00 |
| 53 | Ref pavement marking type I (W)(med nose)(100MIL) (666-7078) | EACH | 20 | $360.50 | $465.23 | $200.00 |
| 54 | Reflectorized pavement marking type I (W)(symbol)(100MIL) (666-7084) | EACH | 1 | $262.00 | $723.68 | $180.00 |
| 55 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 1,000 | $1.25 | $2.02 | $0.95 |
| 56 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 100 | $4.64 | $4.14 | $3.00 |
| 57 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 50 | $9.27 | $8.27 | $6.00 |
| 58 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 5 | $515.00 | $594.45 | $205.00 |
| 59 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 5,000 | $0.79 | $1.91 | $0.75 |
| 60 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 2,500 | $0.87 | $2.12 | $0.75 |
| 61 | Reflectorized pavement marking type III (W)(12")(solid) (666-7242) | LF | 500 | $6.65 | $8.27 | $4.00 |
| 62 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 5,000 | $0.87 | $1.91 | $0.75 |
| 63 | Reflectorized pavement marking type III (Y)(6")(broken) (666-7249) | LF | 100 | $1.10 | $2.58 | $1.50 |
| 64 | Reflectorized pavement marking type III (BLK)(6")(shadow) (666-7262) | LF | 2,500 | $0.90 | $2.58 | $1.00 |
| 65 | Pavement sler 6" (666-7347) | LF | 1,300 | $0.25 | $0.52 | $1.00 |
| 66 | Pavement sler 8" (666-7348) | LF | 5,000 | $0.25 | $0.83 | $1.25 |
| 67 | Pavement sler 12" (666-7350) | LF | 1,000 | $0.77 | $1.03 | $1.50 |
| 68 | Pavement sler 24" (666-7352) | LF | 5,000 | $1.55 | $2.48 | $2.00 |
| 69 | Pavement sler (arrow) (666-7353) | EACH | 20 | $41.20 | $25.85 | $40.00 |
| 70 | Pavement sler (word) (666-7354) | EACH | 25 | $41.20 | $25.85 | $40.00 |
| 71 | Pavement sler (med nose) (666-7355) | EACH | 20 | $103.00 | $129.23 | $100.00 |
| 72 | Pavement sler (double arrow) (666-7356) | EACH | 20 | $77.25 | $25.85 | $60.00 |
| 73 | Pavement sler (TPL arrow) (666-7357) | EACH | 1 | $82.40 | $103.38 | $500.00 |
| 74 | Pavement sler (uturn arrow) (666-7358) | EACH | 20 | $82.40 | $25.85 | $40.00 |
| 75 | Pavement sler (entr gore) (666-7361) | EACH | 20 | $154.50 | $258.46 | $130.00 |
| 76 | Pavement sler (exit gore) (666-7362) | EACH | 20 | $154.50 | $258.46 | $130.00 |
| 77 | Pavement sler (symbol) (666-7363) | EACH | 1 | $180.25 | $51.69 | $50.00 |
| 78 | Pavement sler (island) (666-7366) | SF | 1 | $30.90 | $5.17 | $300.00 |
| 79 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 500 | $1.00 | $1.14 | $1.10 |
| 80 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 500 | $1.00 | $1.14 | $1.10 |
| 81 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 2 | $318.00 | $356.67 | $305.00 |
| 82 | Reflectorized pavement marker type I-A (672-7001) | EACH | 25 | $6.53 | $8.27 | $8.00 |
| 83 | Reflectorized pavement marker type I-C (672-7002) | EACH | 100 | $6.00 | $8.27 | $8.00 |
| 84 | Reflectorized pavement marker type I-R (672-7003) | EACH | 100 | $6.96 | $10.34 | $12.00 |
| 85 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 200 | $6.07 | $8.27 | $8.00 |
| 86 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,000 | $10.00 | $7.24 | $10.00 |
| 87 | Eliminating existing PM & markers (6") (677-7002) | LF | 1,300 | $0.52 | $0.98 | $1.00 |
| 88 | Eliminating existing PM & markers (8") (677-7004) | LF | 5,000 | $1.03 | $1.55 | $1.50 |
| 89 | Eliminating existing PM & markers (12") (677-7006) | LF | 1,000 | $2.06 | $2.07 | $3.00 |
| 90 | Eliminating existing PM & markers (24") (677-7008) | LF | 5,000 | $4.00 | $4.14 | $4.25 |
| 91 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 20 | $80.00 | $103.38 | $60.00 |
| 92 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 20 | $80.00 | $129.23 | $70.00 |
| 93 | Eliminating existing PM & markers (TPL arrow) (677-7011) | EACH | 1 | $79.00 | $129.23 | $80.00 |
| 94 | Eliminating existing PM & markers (uturn arrow) (677-7012) | EACH | 20 | $72.10 | $77.54 | $80.00 |
| 95 | Eliminating existing PM & markers (word) (677-7015) | EACH | 25 | $79.00 | $129.23 | $60.00 |
| 96 | Eliminating existing PM & markers (entr gore) (677-7016) | EACH | 20 | $654.05 | $465.23 | $255.00 |
| 97 | Eliminating existing PM & markers (exit gore) (677-7017) | EACH | 20 | $654.05 | $465.23 | $255.00 |
| 98 | Eliminating existing PM & markers (symbol) (677-7020) | EACH | 1 | $79.00 | $129.23 | $300.00 |
| 99 | Eliminating existing PM & markers (med nose) (677-7021) | EACH | 20 | $283.25 | $258.46 | $105.00 |
| 100 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,300 | $0.10 | $0.02 | $1.00 |
| 101 | Pavement surface preparation for marking (8") (678-7004) | LF | 5,000 | $0.02 | $0.04 | $1.25 |
| 102 | Pavement surface preparation for marking (12") (678-7006) | LF | 1,000 | $0.52 | $0.06 | $1.50 |
| 103 | Pavement surface preparation for marking (24") (678-7008) | LF | 5,000 | $0.08 | $0.12 | $2.50 |
| 104 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 20 | $6.56 | $5.17 | $20.00 |
| 105 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 20 | $7.18 | $10.34 | $20.00 |
| 106 | Pavement surface preparation for marking (TPL arrow) (678-7011) | EACH | 1 | $7.18 | $15.51 | $20.00 |
| 107 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 20 | $7.18 | $10.34 | $20.00 |
| 108 | Pavement surface preparation for marking (word) (678-7016) | EACH | 25 | $7.18 | $10.34 | $20.00 |
| 109 | Pavement surface preparation for marking (entr gore) (678-7017) | EACH | 20 | $15.00 | $51.69 | $30.00 |
| 110 | Pavement surface preparation for marking (exit gore) (678-7018) | EACH | 20 | $15.00 | $51.69 | $30.00 |
| 111 | Pavement surface preparation for marking (symbol) (678-7021) | EACH | 1 | $7.18 | $10.34 | $30.00 |
| 112 | Pavement surface preparation for marking (med nose) (678-7024) | EACH | 20 | $7.18 | $51.69 | $30.00 |
| 113 | Fiber reinforced polymer patching materials (721-7001) | LB | 500 | $13.00 | $2.30 | $10.00 |
| 114 | Spot mowing (730-7021) | ACRE | 300 | $133.00 | $10.00 | $75.00 |
| 115 | Pavement edges, structures & fixtures (731-7003) | MI | 75 | $350.00 | $100.00 | $650.00 |
| 116 | Litter removal (spot) (734-7003) | ACRE | 4 | $100.00 | $117.50 | $1,500.00 |
| 117 | Litter removal - tract (1) (734-7054) | CYC | 48 | $5,600.00 | $7,200.00 | $5,500.00 |
| 118 | Debris-CNTR medians/mainlanes-area (1) (735-7015) | CYC | 48 | $1,500.00 | $80.00 | $2,500.00 |
| 119 | Debris-entrance/exit ramps - area (1) (735-7039) | CYC | 36 | $1,000.00 | $80.00 | $2,500.00 |
| 120 | Debris-direct connector - area (1) (735-7050) | CYC | 36 | $800.00 | $80.00 | $1,500.00 |
| 121 | Debris-direct connector - area (2) (735-7051) | CYC | 36 | $750.00 | $80.00 | $1,500.00 |
| 122 | Clean / sweep - center median - area(1) (738-7005) | CYC | 48 | $3,500.00 | $187.00 | $3,600.00 |
| 123 | Clean / sweep-outside main lane-area(1) (738-7029) | CYC | 48 | $3,500.00 | $187.00 | $3,600.00 |
| 124 | Clean / sweep - frontage road - area(1) (738-7051) | CYC | 36 | $4,750.00 | $187.00 | $4,900.00 |
| 125 | Clean / sweep - (entr /ext RMP)(area 1) (738-7072) | CYC | 48 | $2,650.00 | $187.00 | $2,900.00 |
| 126 | Clean/sweeping-direct connect-area(1) (738-7093) | CYC | 48 | $1,350.00 | $187.00 | $1,400.00 |
| 127 | Clean/sweeping-direct connect-area(2) (738-7094) | CYC | 48 | $1,650.00 | $187.00 | $1,400.00 |
| 128 | Cleaning / sweeping (handwork) (738-7105) | SY | 20,000 | $0.97 | $1.05 | $1.00 |
| 129 | Drain inlet cleaning (764-7001) | EACH | 300 | $50.00 | $53.32 | $65.00 |
| 130 | Downspout cleaning (764-7004) | EACH | 75 | $50.00 | $79.99 | $75.00 |
| 131 | Storm sewer cleaning (pipe) (<12" diameter) (764-7006) | LF | 50 | $5.00 | $2.67 | $3.50 |
| 132 | Storm sewer cleaning (pipe)(12"-18"diameter) (764-7007) | LF | 3,000 | $5.00 | $3.20 | $4.50 |
| 133 | Storm sewer cleaning (pipe)(19"-24"diameter) (764-7008) | LF | 5,000 | $7.00 | $3.73 | $4.50 |
| 134 | Storm sewer cleaning (pipe)(25"-30"diameter) (764-7009) | LF | 10,000 | $8.00 | $5.07 | $5.25 |
| 135 | Storm sewer cleaning (pipe)(31"-36"diameter) (764-7010) | LF | 10,000 | $10.00 | $6.13 | $6.25 |
| 136 | Storm sewer cleaning (pipe)(37"-42"diameter) (764-7011) | LF | 5,000 | $11.50 | $7.20 | $7.50 |
| 137 | Storm sewer clean (box culvert) (6-<12 SF) (764-7016) | LF | 850 | $17.50 | $10.66 | $12.00 |
| 138 | Storm sewer clean (box culvert)(12-<24 SF) (764-7017) | LF | 4,000 | $18.50 | $13.60 | $13.50 |
| 139 | Storm sewer clean (box culvert)(24-<48 SF) (764-7018) | LF | 2,000 | $19.50 | $16.00 | $16.00 |
| 140 | Replace rail element (W-beam) (770-7001) | LF | 1,700 | $26.00 | $25.33 | $14.00 |
| 141 | Replace rail element (thrie-beam) (770-7002) | LF | 25 | $34.00 | $33.04 | $100.00 |
| 142 | Repl rail elmnt(thrie-BM trans to W-BM) (770-7003) | EACH | 5 | $50.00 | $1,075.82 | $300.00 |
| 143 | Replace timber post W/O concrete FND (770-7006) | EACH | 80 | $28.00 | $113.48 | $65.00 |
| 144 | Replace steel post W/O concrete FND (770-7007) | EACH | 50 | $78.50 | $147.61 | $75.00 |
| 145 | Replace timber post W/ concrete FND (770-7008) | EACH | 100 | $36.00 | $259.91 | $100.00 |
| 146 | Replace steel post W/ concrete FND (770-7009) | EACH | 150 | $105.00 | $294.03 | $75.00 |
| 147 | Realign posts (770-7010) | EACH | 100 | $15.00 | $12.37 | $75.00 |
| 148 | Rem obsolete get & repl W/ SGT (770-7013) | EACH | 10 | $3,400.00 | $2,645.14 | $2,500.00 |
| 149 | Repl single gdrail terminal impact head (770-7015) | EACH | 50 | $1,250.00 | $1,486.45 | $1,000.00 |
| 150 | Replace single gdrail terminal rail (770-7016) | LF | 2,000 | $33.00 | $37.74 | $34.00 |
| 151 | Replace single gdrail terminal post (770-7017) | EACH | 300 | $100.00 | $46.47 | $60.00 |
| 152 | Repair steel post with base plate (770-7019) | EACH | 3 | $325.00 | $202.13 | $750.00 |
| 153 | Reset SGT impact head (770-7020) | EACH | 20 | $500.00 | $579.44 | $300.00 |
| 154 | Replace SGT object marker (770-7021) | EACH | 50 | $40.00 | $29.76 | $100.00 |
| 155 | Replace SGT cable anchor (770-7022) | EACH | 50 | $100.00 | $116.72 | $100.00 |
| 156 | Replace SGT cable assembly (770-7023) | EACH | 50 | $100.00 | $181.74 | $100.00 |
| 157 | Replace SGT strut (770-7024) | EACH | 25 | $100.00 | $110.52 | $100.00 |
| 158 | Raise rail (770-7025) | LF | 500 | $11.00 | $15.12 | $15.00 |
| 159 | Repair (SMTC) narrow (774-7003) | LF | 440 | $200.00 | $148.78 | $250.00 |
| 160 | Repair (SMTC) wide (774-7006) | LF | 224 | $200.00 | $148.78 | $275.00 |
| 161 | Repair (react)(M) (774-7015) | LF | 176 | $100.00 | $148.78 | $50.00 |
| 162 | Repair (react) wide (774-7018) | LF | 88 | $450.00 | $45.36 | $50.00 |
| 163 | Repair (steel pipe pedestrian rail)(PR1) (776-7020) | LF | 15 | $200.00 | $460.61 | $300.00 |
| 164 | Bridge joint replacement (armor) (785-7010) | LF | 200 | $349.00 | $1,138.00 | $350.00 |
| 165 | Bridge joint replacement (SEJ) (785-7011) | LF | 50 | $1,200.00 | $2,247.00 | $700.00 |
| 166 | Carbon fiber reinforced polymer strengthning (786-7002) | SF | 250 | $60.00 | $155.13 | $100.00 |
| 167 | Snow and ice control (truck) (2001-7001) | HR | 100 | $110.00 | $75.00 | $200.00 |
| 168 | Snow and ice control (shadow vehicle) (2001-7002) | HR | 400 | $100.00 | $1.00 | $80.00 |
| 169 | Snow and ice control (loader) (2001-7003) | HR | 25 | $150.00 | $50.00 | $150.00 |
| 170 | Snow and ice control (season) (2001-7004) | MO | 6 | $15,000 | $100,000 | $20,000 |
| 171 | Snow and ice control (spray rig) (2001-7005) | HR | 500 | $110.00 | $175.00 | $50.00 |
| 172 | Repair large RDSD sign supt & assem (6074-7001) | EACH | 25 | $1,500.00 | $1,630.00 | $1,250.00 |
| 173 | Storm sewer (television inspection) (7000-7001) | LF | 300 | $100.00 | $1.03 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.