TxDOT contract A00130684 bid tabulation
Surfacing/Roadway Restoration, FM 526 (North of US 90 to BU 90). Let by Texas DOT on January 8, 2025, Harris, Houston District. 6 bids received; low bid $1,067,872 by Durwood Greene Construction Co., -43% against the engineer's estimate of $1,858,367.
- Owner
- Texas DOT
- Letting
- 08 JAN 2025
- Pay items
- 36
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Durwood Greene Construction Co. | $1,067,872 | Low | -43% |
| 2 | Cornerstone Paving and Construction, L.L.C. | $1,169,016 | +9.0% | -37% |
| 3 | Texas Materials Group, Inc. | $1,210,806 | +13% | -35% |
| 4 | Vulcan Materials Asphalt and Construction, LLC | $1,216,866 | +14% | -35% |
| 5 | Hayden Paving, Inc. | $1,378,851 | +29% | -26% |
| 6 | Forde Construction Company, Inc. | $1,525,097 | +43% | -18% |
Engineer's estimate: $1,858,367.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Durwood Greene Construction Co. | 2. Cornerstone Paving and Construction, L.L.C. | 3. Texas Materials Group, Inc. | 4. Vulcan Materials Asphalt and Construction, LLC | 5. Hayden Paving, Inc. | 6. Forde Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type A or B) (134-7004) | STA | 52 | $415.00 | $200.00 | $350.00 | $416.00 | $481.67 | $250.00 | $525.00 |
| 2 | Asphalt (AC-20-5TR) (316-7007) | GAL | 17,403 | $5.50 | $3.85 | $3.90 | $3.45 | $3.53 | $5.00 | $5.00 |
| 3 | Aggregate (type-PL, GR-4)(sac-B) (316-7238) | CY | 387 | $200.00 | $150.00 | $180.00 | $276.00 | $260.51 | $450.00 | $300.00 |
| 4 | SP mixes SP-D sac-A PG76-22 (344-7064) | TON | 3,626 | $181.75 | $153.00 | $123.50 | $145.25 | $136.50 | $140.00 | $155.00 |
| 5 | Tack coat (344-7077) | GAL | 2,900 | $6.50 | $3.50 | $4.00 | $2.70 | $5.25 | $4.75 | $5.00 |
| 6 | Flexible pavement structure repair(19") (351-7018) | SY | 1,500 | $250.00 | $97.00 | $155.00 | $147.50 | $131.19 | $210.00 | $200.00 |
| 7 | Planing asphalt concrete pavement(2") (354-7051) | SY | 48,341 | $5.30 | $1.00 | $1.80 | $1.90 | $1.89 | $0.75 | $2.75 |
| 8 | Mobilization (500-7001) | LS | 1 | $170,000 | $55,000 | $50,000 | $76,400 | $101,870 | $123,000 | $110,000 |
| 9 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $12,000 | $2,500.00 | $4,000.00 | $2,850.00 | $14,335 | $1,250.00 | $25,000 |
| 10 | Portable changeable message sign (503-7001) | DAY | 28 | $200.00 | $300.00 | $65.00 | $115.00 | $81.84 | $500.00 | $300.00 |
| 11 | TMA (stationary) (505-7001) | DAY | 29 | $350.00 | $300.00 | $75.00 | $260.00 | $469.64 | $250.00 | $500.00 |
| 12 | TMA (mobile operation) (505-7002) | HR | 48 | $115.00 | $50.00 | $30.00 | $64.00 | $32.21 | $125.00 | $30.00 |
| 13 | Ride payment adjustment (item 344) (585-7003) | DOL | 1 | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 | $4,500.00 | $5,000.00 |
| 14 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 4,880 | $1.50 | $0.67 | $0.48 | $0.55 | $0.48 | $0.49 | $0.60 |
| 15 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 19,760 | $0.82 | $0.65 | $0.48 | $0.55 | $0.48 | $0.49 | $0.13 |
| 16 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 1,200 | $1.25 | $1.00 | $0.96 | $1.05 | $0.96 | $0.97 | $1.10 |
| 17 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 590 | $3.53 | $5.00 | $5.00 | $5.40 | $5.00 | $5.50 | $5.50 |
| 18 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 18 | $82.50 | $95.00 | $110.00 | $118.30 | $110.00 | $150.00 | $120.00 |
| 19 | Work zone pavement marking non-removing (W)(RR crossing) (662-7024) | EACH | 4 | $270.00 | $200.00 | $355.00 | $382.00 | $355.00 | $400.00 | $385.00 |
| 20 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 2 | $92.50 | $110.00 | $130.00 | $140.00 | $130.00 | $260.00 | $140.00 |
| 21 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 4,680 | $0.84 | $0.69 | $0.48 | $0.55 | $0.48 | $0.49 | $0.60 |
| 22 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 20,012 | $0.84 | $0.66 | $0.48 | $0.55 | $0.48 | $0.49 | $0.60 |
| 23 | Work zone pavement marking removing (reflectorized) type I-C (662-7049) | EACH | 260 | $3.25 | $6.00 | $6.00 | $6.45 | $6.00 | $7.00 | $6.50 |
| 24 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 538 | $3.50 | $6.00 | $6.00 | $6.45 | $6.00 | $7.00 | $6.50 |
| 25 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 600 | $2.00 | $1.50 | $165.00 | $1.80 | $1.65 | $2.00 | $1.80 |
| 26 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 295 | $10.00 | $7.00 | $7.55 | $8.15 | $7.55 | $8.00 | $8.00 |
| 27 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 9 | $214.50 | $175.00 | $225.00 | $242.00 | $225.00 | $300.00 | $244.00 |
| 28 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 1 | $264.50 | $250.00 | $245.00 | $263.50 | $245.00 | $350.00 | $265.00 |
| 29 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 2 | $500.00 | $400.00 | $475.00 | $510.75 | $475.00 | $500.00 | $515.00 |
| 30 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 2,440 | $1.75 | $1.00 | $0.88 | $0.95 | $0.88 | $0.89 | $1.00 |
| 31 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 9,880 | $2.50 | $1.50 | $0.88 | $0.95 | $0.88 | $0.89 | $1.00 |
| 32 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 2,440 | $1.75 | $1.50 | $0.88 | $0.95 | $0.88 | $0.89 | $1.00 |
| 33 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 10,006 | $2.50 | $1.50 | $0.88 | $0.95 | $0.88 | $0.89 | $1.00 |
| 34 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 2,340 | $2.25 | $1.50 | $0.88 | $0.95 | $0.88 | $0.89 | $1.00 |
| 35 | Reflectorized pavement marker type I-C (672-7002) | EACH | 130 | $7.50 | $6.00 | $6.00 | $6.45 | $6.00 | $7.00 | $7.00 |
| 36 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 269 | $8.00 | $6.00 | $6.00 | $6.45 | $6.00 | $7.00 | $7.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 8, 2025. Compiled by Mirage Metrics.