Surfacing/Roadway Restoration, SH 349 (FM 2052 to Martin County Line). Let by Texas DOT on September 5, 2025, Dawson, Lubbock District. 9 bids received; low bid $17,135,619 by RK Hall, LLC, -21% against the engineer's estimate of $21,621,141.

Owner
Texas DOT
Letting
05 SEP 2025
Pay items
63
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1RK Hall, LLC$17,135,619Low-21%
2A. L. Helmcamp, Inc.$17,912,514+5.0%-17%
3Duininck, Inc.$18,566,646+8.0%-14%
4Overland Corporation$20,514,117+20%-5.0%
5Zack Burkett Co.$21,098,030+23%-2.0%
6James Hamilton Construction Co.$21,430,036+25%-1.0%
7Ci Constructors, Inc.$21,668,945+26%0.0%
8Gilvin-Terrill, LTD.$23,443,673+37%+8.0%
9Jones Bros. Dirt & Paving Contractors, Inc.$39,739,285+132%+84%
TxDOT contract A00128981: bids by rank

Engineer's estimate: $21,621,141.

Bid tabulation

LinePay itemUnitQuantityEstimate1. RK Hall, LLC2. A. L. Helmcamp, Inc.3. Duininck, Inc.4. Overland Corporation5. Zack Burkett Co.6. James Hamilton Construction Co.
1Remove (6") TRT/untrt base & asphalt pavement (105-7026)SY353.90$10.00$11.86$20.00$20.50$18.00$9.50$42.00
2Subgr widen (DC) (112-7004)SY261.50$10.00$27.85$30.00$24.50$33.00$25.50$64.00
3Backfill (type B) (134-7002)STA659$250.00$108.89$150.00$110.00$145.00$180.00$400.00
4Blading (150-7001)STA659$125.00$139.00$50.00$49.50$86.00$74.50$400.00
5Rework BS metal (type C)(6")(density control) (251-7050)SY353.90$11.00$19.11$10.00$22.50$15.61$9.50$22.00
6Prime coat (MC-30) (310-7004)GAL123.10$7.00$24.36$50.00$12.00$18.10$10.00$8.00
7Emuls asphalt (erosion control)(CSS-1H) (314-7011)GAL97,472.30$4.30$3.21$2.00$1.75$3.24$2.00$3.60
8Fog seal (CSS-1H) (315-7004)GAL7,906.40$5.00$3.68$2.00$2.25$3.79$2.00$4.00
9D-GR HMA type-C PG 70-28 (exempt) (341-7036)TON283.10$200.00$243.44$200.00$400.00$314.55$225.00$400.00
10D-GR HMA type D sac-B PG70-28 (341-7054)TON17,263.90$150.00$112.12$140.00$144.00$150.84$163.00$154.00
11Tack coat (341-7082)GAL69,780$4.50$3.54$4.00$2.00$2.75$4.00$4.00
12Stone-MTRX-asphalt SMA-D sac-A PG76-28 (346-7010)TON58,741.90$180.00$147.19$160.00$163.00$180.00$180.50$172.00
13Tack coat (346-7028)GAL16,389.70$5.00$7.75$4.00$2.00$2.75$4.00$4.30
14Flexible pavement structure repair(2") (351-7001)SY4,978.10$30.00$28.70$29.00$28.00$31.00$40.00$26.00
15Flexible pavement structure repair(6") (351-7005)SY4,978.10$55.00$69.99$78.00$80.00$77.00$86.50$63.00
16Planing asphalt concrete pavement(0" to 3") (354-7033)SY1,511.10$30.00$13.68$4.00$18.00$13.00$5.00$8.00
17Mobilization (500-7001)LS1$1,966,000$750,254$900,000$1,275,000$1,800,000$1,500,000$2,000,000
18Barricades, signs and traffic handling (502-7001)MO9$15,000$14,380$9,100.00$22,000$5,000.00$8,200.00$30,000
19Portable changeable message sign (503-7001)DAY296$125.00$107.09$80.00$100.00$85.00$100.00$45.00
20TMA (stationary) (505-7001)DAY296$250.00$237.08$100.00$250.00$320.00$260.00$325.00
21TMA (mobile operation) (505-7003)DAY50$500.00$506.94$25.00$905.00$1,000.00$0.01$900.00
22Construction exits (install) (type 1) (506-7020)SY378$40.00$55.12$10.00$52.50$42.00$30.00$35.00
23Construction exits (remove) (506-7024)SY378$15.00$24.38$3.00$23.00$16.00$10.00$7.50
24Biodegradable erosion control logs (install) (18") (506-7045)LF5,990$7.00$6.77$6.00$6.40$9.00$20.00$7.00
25Biodegradable erosion control logs (remove) (506-7046)LF3,210$3.50$1.16$1.00$1.10$2.00$4.20$3.50
26Intersections (ACP) (530-7002)SY4,970.80$115.00$19.22$38.00$44.00$46.00$61.50$70.00
27Driveways (ACP) (530-7010)SY2,000.40$75.00$23.32$38.00$72.50$64.00$68.80$90.00
28Mill rumble strips (asphalt) (shoulder) (533-7001)LF131,774$0.16$0.19$0.25$0.12$0.16$0.21$0.30
29Mill rumble strips (asphalt) (centerline) (533-7002)LF65,887$0.18$0.22$0.25$0.14$0.16$0.25$0.40
30Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH73$750.00$636.00$620.00$605.00$590.00$714.00$660.00
31Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH36$940.00$689.00$730.00$655.00$700.00$773.50$715.00
32Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH30$910.00$742.00$730.00$705.00$700.00$833.00$770.00
33Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH10$1,150.00$901.00$890.00$855.00$850.00$1,011.50$935.00
34Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009)EACH1$700.00$636.00$730.00$605.00$700.00$714.00$660.00
35Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH6$1,100.00$954.00$940.00$905.00$900.00$1,071.00$990.00
36Install small roadside sign support and assembly TYS80(2)SA(P) (644-7048)EACH13$1,950.00$1,590.00$1,600.00$1,500.00$1,500.00$1,785.00$1,650.00
37Remove SM RD SN sup&AM (644-7073)EACH150$112.00$106.00$110.00$100.00$100.00$119.00$110.00
38Remove lrsa (647-7003)EACH1$680.00$1,060.00$1,000.00$1,000.00$950.00$1,190.00$1,100.00
39Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH40$90.00$106.00$88.00$100.00$85.00$119.00$110.00
40Remove delin & object marker assms (658-7078)EACH40$20.00$15.90$25.00$15.00$20.00$17.85$16.50
41Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF64,620$0.30$0.19$0.18$0.21$0.18$0.21$0.20
42Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF259,596$0.30$0.18$0.17$0.20$0.17$0.20$0.20
43Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF792$0.40$2.12$2.00$0.30$2.00$2.38$0.30
44Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF507,042$0.23$0.17$0.16$0.20$0.16$0.19$0.20
45Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH29,745$1.30$3.10$0.50$1.50$0.74$1.40$1.20
46Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH39,530$1.30$3.10$0.50$1.50$0.77$1.40$1.20
47Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF70$1.00$3.18$3.20$1.00$3.00$3.57$1.10
48Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF396$1.00$2.12$2.20$1.00$2.00$2.38$1.10
49Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132)EACH1$400.00$159.00$160.00$400.00$150.00$178.50$440.00
50Type I high perf PM (W)6"(broken)(100MIL) (666-7290)LF32,310$0.70$0.69$0.66$0.60$0.65$0.77$0.65
51Type I high perf PM (W)6"(solid)(100MIL) (666-7293)LF129,798$0.70$0.65$0.62$0.59$0.61$0.73$0.65
52Type I high perf PM (Y)6"(solid)(100MIL) (666-7305)LF253,521$0.65$0.69$0.66$0.59$0.65$0.77$0.65
53Prefabricated PM type C (W)(24")(solid) (668-7089)LF651$20.00$13.78$13.50$12.00$13.00$15.47$13.00
54Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH12$70.00$53.00$55.00$50.50$50.00$59.50$55.00
55Reflectorized pavement marker type I-C (672-7002)EACH1,617$3.00$4.24$4.50$4.25$4.00$4.76$4.70
56Reflectorized pavement marker type II-A-A (672-7004)EACH6,390$4.00$4.24$4.50$4.25$4.00$4.76$4.70
57Eliminating existing PM & markers (6") (677-7002)LF81,054$0.75$0.80$0.60$0.65$0.75$0.89$0.70
58Eliminating existing PM & markers (8") (677-7004)LF198$1.25$2.12$0.75$0.75$2.00$2.38$0.80
59Full - width mowing (730-7019)CYC2$20,000$19,080$4,000.00$7,000.00$15,000$21,420$15,400
60Litter removal (734-7002)CYC2$5,000.00$20,935$2,000.00$3,500.00$8,500.00$23,503$5,000.00
61Reinforced fab for asphalt PVMNT overlays (3002-7001)SY387,459.20$6.50$6.32$6.20$5.90$6.25$7.02$6.60
62Asphalt for reinforced fab (PG76-28) (3002-7002)GAL58,118.90$5.00$6.09$4.60$3.00$4.50$3.75$5.00
63Temporary speed monitor sys (6016-7001)EACH2$12,500$10,987$12,000$10,000$7,000.00$15,000$21,000
TxDOT contract A00128981: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of September 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy