| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Earth Builders, L.P. | $18,726,656 | Low | -2.0% |
| 2 | Coppell Construction Co., Inc. | $21,093,134 | +13% | +10% |
| 3 | Webber, LLC | $22,991,545 | +23% | +20% |
| 4 | Kiewit Infrastructure South Co. | $23,149,076 | +24% | +21% |
| 5 | C. E. Barker, LTD. | $31,672,541 | +69% | +66% |
Engineer's estimate: $19,101,996.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Earth Builders, L.P. | 2. Coppell Construction Co., Inc. | 3. Webber, LLC | 4. Kiewit Infrastructure South Co. | 5. C. E. Barker, LTD. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparation row (tree remove) (0"-12" diameter) (100-7003) | EACH | 126 | $100.00 | $1,000.00 | $160.00 | $500.00 | $928.21 | $498.44 |
| 2 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 13 | $1,000.00 | $1,500.00 | $300.00 | $2,000.00 | $1,856.43 | $712.05 |
| 3 | Preparation row (tree remove) (24"-36" diameter) (100-7005) | EACH | 4 | $1,600.00 | $2,000.00 | $2,000.00 | $4,000.00 | $2,784.64 | $925.67 |
| 4 | Removing concrete (riprap) (104-7006) | SY | 849 | $60.00 | $10.00 | $40.00 | $19.55 | $47.66 | $54.61 |
| 5 | Removing concrete (miscellaneous) (104-7046) | SY | 307 | $20.00 | $111.00 | $61.33 | $95.64 | $76.53 | |
| 6 | Remove (7"-11") TRT/untrt base & asphalt pavement (105-7007) | SY | 2,010 | $14.00 | $20.00 | $21.00 | $26.88 | $19.41 | $43.06 |
| 7 | Excavation (roadway) (110-7001) | CY | 6,828 | $22.00 | $30.00 | $21.00 | $46.77 | $28.58 | $45.46 |
| 8 | Embankment (final)(DC)(type B) (132-7004) | CY | 4,569 | $44.00 | $30.00 | $46.00 | $41.57 | $47.31 | $71.92 |
| 9 | Drill seed (permanent_rural_sand) (164-7041) | ACRE | 3.50 | $625.00 | $2,200.00 | $2,080.00 | $2,080.00 | $3,064.58 | $2,136.15 |
| 10 | Drill seed (temporary_warm_cool) (164-7047) | ACRE | 3.50 | $500.00 | $2,200.00 | $1,940.00 | $1,940.00 | $2,858.31 | $2,136.15 |
| 11 | Soil ret BLKT(SL_mod_clay_short) (169-7001) | SY | 1,049 | $5.00 | $6.00 | $2.25 | $3.00 | $2.90 | $21.36 |
| 12 | SP mixes SP-B PG64-22 (344-7001) | TON | 1,472 | $195.00 | $280.00 | $160.00 | $355.00 | $354.23 | $448.59 |
| 13 | SP mixes SP-D sac-A PG70-28 (344-7057) | TON | 1,155 | $220.00 | $300.00 | $500.00 | $390.00 | $350.93 | $534.04 |
| 14 | Tack coat (344-7077) | GAL | 1,799 | $6.00 | $8.00 | $15.00 | $15.00 | $11.61 | $18.51 |
| 15 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 1,973 | $10.00 | $8.00 | $15.00 | $14.76 | $28.71 | $56.96 |
| 16 | Cem stabil BKFL (400-7010) | CY | 369 | $320.00 | $450.00 | $310.00 | $488.36 | $265.38 | $347.12 |
| 17 | Sheet piling (PZ - 22) (407-7001) | SF | 5,650 | $100.00 | $70.00 | $59.20 | $56.01 | $227.05 | |
| 18 | Drilled shaft (18 in) (416-7002) | LF | 438 | $300.00 | $200.00 | $750.00 | $678.04 | $139.33 | $280.92 |
| 19 | Drilled shaft (36 in) (416-7006) | LF | 976 | $500.00 | $550.00 | $950.00 | $989.27 | $530.37 | $733.07 |
| 20 | Drilled shaft (48 in) (416-7008) | LF | 1,740 | $700.00 | $700.00 | $1,200.00 | $1,628.17 | $900.00 | $2,262.55 |
| 21 | Class C concrete (abutment) (420-7012) | CY | 119 | $2,250.00 | $3,000.00 | $5,500.00 | $5,614.90 | $4,380.19 | $5,005.76 |
| 22 | Class C concrete (cap) (420-7022) | CY | 536.40 | $2,250.00 | $3,000.00 | $3,000.00 | $4,596.54 | $2,652.67 | $3,345.10 |
| 23 | Class C concrete (column) (420-7038) | CY | 110.90 | $1,800.00 | $3,000.00 | $2,200.00 | $3,739.23 | $2,208.86 | $2,690.14 |
| 24 | Class K concrete (miscellaneous) (420-7148) | CY | 37.20 | $4,000.00 | $3,000.00 | $1,300.00 | $5,767.09 | $9,664.73 | $3,083.18 |
| 25 | Approach slab (422-7013) | CY | 217.80 | $1,150.00 | $1,500.00 | $1,100.00 | $1,918.49 | $1,315.26 | $1,409.45 |
| 26 | Reinforced concrete slab (precast super assem) (422-7023) | SF | 54,740 | $66.00 | $60.00 | $73.00 | $12.55 | $0.01 | $133.43 |
| 27 | Prestressed concrete girder (TX28) (425-7001) | LF | 9,452 | $350.00 | $250.00 | $277.00 | $225.00 | $750.00 | $215.00 |
| 28 | Epoxy waterproof finish (type X) (427-7005) | SF | 2,985 | $13.50 | $10.00 | $8.00 | $14.71 | $21.32 | $17.80 |
| 29 | Riprap (concrete)(4 in) (432-7001) | CY | 472 | $760.00 | $850.00 | $800.00 | $817.65 | $1,304.48 | $762.06 |
| 30 | Riprap (concrete)(flume) (432-7012) | CY | 14 | $850.00 | $950.00 | $1,055.35 | $2,059.70 | $867.88 | |
| 31 | Riprap (mow strip)(4 in) (432-7013) | CY | 140 | $760.00 | $850.00 | $800.00 | $794.07 | $1,270.15 | $771.01 |
| 32 | Riprap (stone protection)(12 in) (432-7041) | CY | 992 | $300.00 | $200.00 | $275.00 | $283.20 | $236.74 | $276.85 |
| 33 | Riprap (stone protection)(24 in) (432-7045) | CY | 988 | $200.00 | $330.00 | $291.17 | $205.23 | $269.38 | |
| 34 | Rail (type T223) (450-7008) | LF | 2,524 | $150.00 | $200.00 | $185.00 | $365.32 | $245.23 | $249.17 |
| 35 | Header type expansion joint (454-7009) | CF | 61.60 | $440.00 | $400.00 | $470.00 | $528.65 | $780.95 | $689.26 |
| 36 | Joint sealant (454-7010) | LF | 368 | $35.00 | $45.00 | $52.00 | $125.92 | $104.42 | $115.35 |
| 37 | Diamond grinding slab (abc) (483-7019) | SY | 6,084 | $36.00 | $10.00 | $8.50 | $10.10 | $10.58 | $9.48 |
| 38 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 3 | $300,000 | $450,000 | $200,000 | $777,661 | $89,169 | $138,019 |
| 39 | Mobilization (500-7001) | LS | 1 | $1,650,000 | $2,000,000 | $2,000,000 | $2,250,000 | $2,263,393 | $2,834,595 |
| 40 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $17,500 | $15,000 | $40,000 | $95,000 | $160,000 | $246,905 |
| 41 | Portable changeable message sign (503-7002) | EACH | 5 | $15,000 | $20,000 | $9,500.00 | $22,500 | $27,792 | $42,723 |
| 42 | TMA (stationary) (505-7001) | DAY | 70 | $400.00 | $350.00 | $550.00 | $421.76 | $588.55 | $1,708.92 |
| 43 | TMA (mobile operation) (505-7002) | HR | 24 | $150.00 | $150.00 | $250.00 | $104.17 | $121.04 | $1,068.08 |
| 44 | Construction exits (install) (type 1) (506-7020) | SY | 468 | $40.00 | $70.00 | $60.00 | $36.77 | $15.97 | $49.84 |
| 45 | Construction exits (remove) (506-7024) | SY | 468 | $20.00 | $20.00 | $22.00 | $14.12 | $44.77 | $28.48 |
| 46 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 9,575 | $6.00 | $10.00 | $3.00 | $2.95 | $3.80 | $71.21 |
| 47 | Biodegradable erosion control logs (remove) (506-7046) | LF | 9,575 | $3.00 | $2.00 | $0.60 | $0.60 | $0.77 | $28.48 |
| 48 | Portable concrete traffic barrier (des source)(F-shape)(type 1) (512-7017) | LF | 1,560 | $28.00 | $0.01 | $30.00 | $30.29 | $100.00 | $58.97 |
| 49 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 8,160 | $15.00 | $0.01 | $12.00 | $12.45 | $7.82 | $49.84 |
| 50 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 1,560 | $0.01 | $25.00 | $13.77 | $17.54 | $58.97 | |
| 51 | Portable concrete traffic barrier (connection hardware) (512-7070) | EACH | 104 | $44.00 | $0.01 | $65.00 | $360.59 | $96.08 | $149.53 |
| 52 | Intersections (ACP) (530-7002) | SY | 103 | $165.00 | $250.00 | $162.50 | $95.01 | $213.62 | |
| 53 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 4,590 | $0.20 | $3.00 | $3.00 | $1.17 | $0.42 | $0.47 |
| 54 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 2,180 | $0.20 | $3.00 | $3.00 | $2.21 | $0.67 | $0.73 |
| 55 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,875 | $36.00 | $35.00 | $30.00 | $40.01 | $46.04 | $71.21 |
| 56 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 11 | $3,100.00 | $2,500.00 | $2,500.00 | $2,652.00 | $3,071.54 | $3,560.25 |
| 57 | Remove metal beam guard fence (542-7001) | LF | 4,196 | $3.00 | $4.00 | $3.00 | $4.08 | $9.05 | $14.24 |
| 58 | Guardrail end treatment (install) (544-7001) | EACH | 11 | $3,750.00 | $3,400.00 | $7,100.00 | $3,366.00 | $4,238.31 | $4,984.35 |
| 59 | Guardrail end treatment (remove) (544-7003) | EACH | 12 | $500.00 | $300.00 | $200.00 | $408.00 | $738.01 | $1,068.08 |
| 60 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 26 | $3,000.00 | $0.01 | $2,500.00 | $4,182.00 | $885.77 | $7,120.50 |
| 61 | Crash cushion attenuator (remove) (545-7004) | EACH | 4 | $0.01 | $1,000.00 | $2,550.00 | $505.82 | $2,136.15 | |
| 62 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 1 | $25,000 | $25,000 | $30,294 | $46,621 | $42,723 | |
| 63 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 4 | $0.01 | $10,000 | $10,455 | $13,591 | $9,256.65 | |
| 64 | Remove and install existing gate (550-7017) | EACH | 1 | $1,000.00 | $1,500.00 | $4,000.00 | $4,500.00 | $1,630.66 | $7,476.53 |
| 65 | Wire fence (type C) (552-7003) | LF | 2,320 | $16.00 | $25.00 | $35.00 | $55.16 | $36.90 | $58.39 |
| 66 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 7 | $1,000.00 | $1,200.00 | $1,000.00 | $1,893.51 | $1,082.42 | $1,780.13 |
| 67 | Remove SM RD SN sup&AM (644-7073) | EACH | 14 | $150.00 | $150.00 | $100.00 | $210.39 | $140.57 | $925.67 |
| 68 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 28 | $35.00 | $30.00 | $20.00 | $35.70 | $65.37 | $106.81 |
| 69 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 31 | $35.00 | $35.00 | $25.00 | $41.82 | $65.37 | $106.81 |
| 70 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 7,460 | $0.70 | $3.00 | $2.50 | $2.50 | $3.22 | $2.85 |
| 71 | Pavement sler 6" (666-7347) | LF | 4,680 | $0.20 | $1.00 | $1.00 | $0.75 | $0.97 | $1.42 |
| 72 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 7,120 | $0.85 | $3.50 | $3.00 | $3.00 | $3.87 | $2.85 |
| 73 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 190 | $3.50 | $3.00 | $3.00 | $3.87 | $2.85 | |
| 74 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 5,480 | $0.85 | $3.50 | $3.00 | $3.00 | $3.87 | $2.85 |
| 75 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 30 | $30.00 | $25.00 | $25.00 | $32.23 | $28.48 | |
| 76 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 89 | $7.00 | $12.00 | $10.00 | $10.00 | $12.89 | $71.21 |
| 77 | Pavement surface preparation for marking (6") (678-7002) | LF | 4,680 | $0.20 | $1.00 | $0.50 | $0.50 | $0.64 | $1.42 |
| 78 | Tip testing(drilled shaft) (4003-7001) | EACH | 40 | $8,000.00 | $4,200.00 | $4,500.00 | $8,500.00 | $5,363.01 | $7,120.50 |
| 79 | Install bridge identification numbers (4019-7001) | EACH | 6 | $300.00 | $1,000.00 | $500.00 | $356.09 | $408.86 | $890.06 |
| 80 | Ultra-high performance concrete (4024-7001) | CY | 86.20 | $12,500 | $6,000.00 | $8,000.00 | $6,419.18 | $17,000 | $498.44 |
| 81 | Install bat house medium (5001-7002) | EACH | 2 | $1,500.00 | $5,000.00 | $7,327.35 | $4,604.81 | $2,171.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.