TxDOT contract A00127796 bid tabulation
Construct New Road, US 87 (EAST OF US 385/US 87 INTERCHANGE to MOORE COUNTY LINE). Let by Texas DOT on September 4, 2025, Hartley, Amarillo District. 6 bids received; low bid $99,678,127 by FNF Construction, Inc., -41% against the engineer's estimate of $168,723,070.
- Owner
- Texas DOT
- Letting
- 04 SEP 2025
- Pay items
- 203
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | FNF Construction, Inc. | $99,678,127 | Low | -41% |
| 2 | A. L. Helmcamp, Inc. | $128,810,290 | +29% | -24% |
| 3 | Duininck, Inc. | $131,938,195 | +32% | -22% |
| 4 | Webber, LLC | $137,619,509 | +38% | -18% |
| 5 | Pulice Construction, Inc. | $150,709,099 | +51% | -11% |
| 6 | Kiewit Infrastructure South Co. | $182,077,390 | +83% | +8.0% |
Engineer's estimate: $168,723,070.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. FNF Construction, Inc. | 2. A. L. Helmcamp, Inc. | 3. Duininck, Inc. | 4. Webber, LLC | 5. Pulice Construction, Inc. | 6. Kiewit Infrastructure South Co. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 21.69 | $5,000.00 | $3,100.00 | $10,000 | $62,500 | $250,000 | $694,861 | $1,873.93 |
| 2 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 11 | $1,600.00 | $2,100.00 | $1,200.00 | $960.00 | $950.00 | $982.59 | $2,020.28 |
| 3 | Preparation row (tree remove) (24"-36" diameter) (100-7005) | EACH | 5 | $2,000.00 | $5,200.00 | $2,400.00 | $3,500.00 | $3,500.00 | $3,620.05 | $3,030.42 |
| 4 | Preparation row (tree remove) (36"-48" diameter) (100-7006) | EACH | 3 | $4,000.00 | $7,600.00 | $3,900.00 | $5,500.00 | $5,000.00 | $5,688.64 | $4,040.56 |
| 5 | Removing concrete (foundations) (104-7023) | SY | 81 | $175.00 | $35.00 | $60.00 | $150.00 | $250.00 | $962.93 | $82.71 |
| 6 | Remove (10") TRT/untrt base & asphalt pavement (105-7030) | SY | 4,623 | $10.00 | $6.00 | $10.00 | $17.00 | $7.00 | $3.91 | $9.13 |
| 7 | Remove (13") TRT/untrt base & asphalt pavement (105-7033) | SY | 134,465 | $12.00 | $4.00 | $12.00 | $9.45 | $8.50 | $4.24 | $11.22 |
| 8 | Remove (16") TRT/untrt base & asphalt pavement (105-7036) | SY | 11,768 | $20.00 | $5.00 | $15.00 | $11.50 | $11.00 | $4.75 | $14.13 |
| 9 | Excavation (roadway) (110-7001) | CY | 263,404 | $23.00 | $7.00 | $10.00 | $17.50 | $24.00 | $2.30 | $12.00 |
| 10 | Excavation (special) (110-7003) | CY | 89,780 | $28.00 | $9.50 | $11.00 | $6.95 | $24.00 | $2.30 | $15.00 |
| 11 | Embankment (final)(DC)(type B) (132-7004) | CY | 358,999 | $26.00 | $3.65 | $14.00 | $27.50 | $25.00 | $1.96 | $25.00 |
| 12 | Drill seed (permanent_urban_clay) (164-7012) | SY | 1,752,436 | $0.70 | $0.15 | $0.14 | $0.11 | $0.10 | $0.11 | $0.15 |
| 13 | Drill seed (temporary_warm) (164-7013) | SY | 876,218 | $0.30 | $0.10 | $0.11 | $0.10 | $0.10 | $0.10 | $0.14 |
| 14 | Drill seed (temporary_cool) (164-7014) | SY | 876,218 | $0.30 | $0.10 | $0.09 | $0.10 | $0.10 | $0.10 | $0.14 |
| 15 | Soil ret BLKT(SL_mod_clay_long) (169-7002) | SY | 109,708 | $3.00 | $2.25 | $2.50 | $2.90 | $2.85 | $2.96 | $4.01 |
| 16 | FL BS(compacted in place)(type A,B or D GR4)(8") (247-7088) | SY | 83,547 | $24.00 | $17.00 | $22.00 | $25.50 | $20.40 | $23.23 | $46.78 |
| 17 | FL BS(compacted in place)(type A,B or D GR4)(12") (247-7134) | SY | 580,662 | $34.00 | $23.50 | $30.00 | $30.00 | $28.50 | $31.25 | $52.31 |
| 18 | Rework BS metal (type C)(15")(density control) (251-7094) | SY | 29,245 | $20.00 | $1.00 | $6.30 | $16.50 | $15.50 | $48.57 | $12.08 |
| 19 | Rework BS metal (type C)(18")(density control) (251-7095) | SY | 13,013 | $24.00 | $1.75 | $7.00 | $21.50 | $16.70 | $48.74 | $15.85 |
| 20 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 6,431 | $330.00 | $470.00 | $410.00 | $400.00 | $425.00 | $425.29 | $569.10 |
| 21 | Lime TRT (subgrade) (8") (260-7020) | SY | 596,014 | $5.00 | $2.70 | $3.70 | $5.40 | $3.70 | $4.14 | $4.50 |
| 22 | Cement (290-7001) | TON | 1,618 | $330.00 | $272.00 | $250.00 | $310.00 | $320.00 | $207.54 | $430.87 |
| 23 | Emulsion (standard yield) (290-7002) | GAL | 1,242,301 | $4.00 | $2.25 | $4.75 | $3.00 | $2.75 | $3.19 | $4.10 |
| 24 | Emul TRT (existing matrl)(12") (290-7013) | SY | 289,581 | $5.70 | $1.75 | $8.00 | $5.25 | $4.85 | $5.93 | $4.40 |
| 25 | Prime coat (MC-30) (310-7004) | GAL | 166,058 | $4.70 | $5.00 | $5.00 | $4.40 | $4.45 | $10.14 | $5.79 |
| 26 | Emuls asphalt (erosion control)(MS-2) (314-7012) | GAL | 118,431 | $4.00 | $4.00 | $4.00 | $3.75 | $3.40 | $6.08 | $2.09 |
| 27 | Aggregate (type-B, GR-4)(sac-B) (316-7173) | CY | 6,038 | $250.00 | $111.65 | $160.00 | $145.00 | $100.00 | $270.63 | $235.47 |
| 28 | Asphalt (multi option) (316-7263) | GAL | 252,401 | $4.40 | $2.75 | $3.40 | $3.85 | $3.50 | $6.08 | $5.37 |
| 29 | D-GR HMA type-B PG64-22 (341-7001) | TON | 157,288 | $160.00 | $102.00 | $141.00 | $128.00 | $118.00 | $163.92 | $164.22 |
| 30 | SP mixes SP-D sac-A PG70-28 (344-7057) | TON | 169,312 | $180.00 | $121.00 | $161.00 | $145.00 | $141.00 | $190.55 | $196.94 |
| 31 | Tack coat (344-7077) | GAL | 74,949 | $6.00 | $4.50 | $5.00 | $7.65 | $7.60 | $12.39 | $9.01 |
| 32 | Planing asphalt concrete pavement(2") (354-7051) | SY | 2,668 | $4.00 | $3.50 | $3.60 | $3.15 | $1.95 | $1.11 | $2.69 |
| 33 | Planing asphalt concrete pavement(3") (354-7052) | SY | 433,104 | $3.30 | $2.50 | $1.50 | $2.95 | $1.80 | $1.28 | $3.48 |
| 34 | Planing asphalt concrete pavement(4") (354-7053) | SY | 1,333 | $6.00 | $5.00 | $5.00 | $28.00 | $3.85 | $1.44 | $5.18 |
| 35 | Planing asphalt concrete pavement (0" to 5") (354-7089) | SY | 4,117 | $5.00 | $4.00 | $2.50 | $12.00 | $2.25 | $1.61 | $5.68 |
| 36 | Concrete pavement (CRCP) (11") (360-7005) | SY | 14,778 | $200.00 | $150.00 | $140.00 | $120.00 | $110.00 | $98.05 | $188.12 |
| 37 | Cut & restore asphalt paving (400-7008) | SY | 1,666 | $250.00 | $260.00 | $150.00 | $250.00 | $6.70 | $123.97 | $356.08 |
| 38 | Flowable backfill (401-7001) | CY | 5,655 | $220.00 | $270.00 | $215.00 | $175.00 | $120.00 | $181.00 | $214.22 |
| 39 | Trench excavation protection (402-7001) | LF | 1,144 | $6.00 | $30.00 | $5.50 | $25.00 | $10.00 | $25.86 | $32.33 |
| 40 | Temporary special shoring (403-7001) | SF | 5,311 | $65.00 | $65.00 | $30.00 | $50.00 | $31.03 | $166.48 | |
| 41 | Drilled shaft (42 in) (416-7007) | LF | 76 | $700.00 | $590.00 | $630.00 | $580.00 | $575.00 | $594.71 | $806.71 |
| 42 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 26 | $300.00 | $310.00 | $350.00 | $225.00 | $350.00 | $148.94 | $430.11 |
| 43 | Drilled shaft (sign mounts) (54 in) (416-7033) | LF | 42 | $900.00 | $945.00 | $1,100.00 | $355.00 | $925.00 | $956.73 | $1,297.75 |
| 44 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 32 | $350.00 | $435.00 | $470.00 | $930.00 | $425.00 | $439.58 | $596.26 |
| 45 | Class A concrete (miscellaneous) (420-7002) | CY | 3 | $2,430.00 | $2,600.00 | $1,500.00 | $2,470.00 | $915.35 | $7,419.26 | |
| 46 | Riprap (concrete)(4 in) (432-7001) | CY | 63 | $800.00 | $900.00 | $750.00 | $830.00 | $597.00 | $672.30 | $1,938.57 |
| 47 | Riprap (concrete)(5 in) (432-7002) | CY | 82 | $800.00 | $900.00 | $850.00 | $830.00 | $579.00 | $708.50 | $1,679.28 |
| 48 | Riprap (mow strip)(4 in) (432-7013) | CY | 236 | $800.00 | $710.00 | $850.00 | $1,000.00 | $739.00 | $781.51 | $968.05 |
| 49 | Gabion mattresses (galvanized)(18 in) (459-7008) | SY | 604 | $250.00 | $165.00 | $170.00 | $330.00 | $139.00 | $309.71 | $443.12 |
| 50 | Gabions (3' X 3')(galvanized) (459-7010) | CY | 207 | $400.00 | $365.00 | $480.00 | $705.00 | $311.00 | $550.56 | $787.73 |
| 51 | Concrete box culvert (3 FT X 2 FT) (462-7001) | LF | 339 | $400.00 | $375.00 | $250.00 | $280.00 | $200.00 | $305.82 | $437.77 |
| 52 | Concrete box culvert (4 FT X 2 FT) (462-7003) | LF | 2,032 | $450.00 | $460.00 | $300.00 | $320.00 | $275.00 | $343.23 | $489.44 |
| 53 | Concrete box culvert (4 FT X 3 FT) (462-7004) | LF | 330 | $515.00 | $310.00 | $355.00 | $275.00 | $381.86 | $515.58 | |
| 54 | Concrete box culvert (5 FT X 2 FT) (462-7006) | LF | 1,489 | $550.00 | $605.00 | $390.00 | $395.00 | $315.00 | $422.21 | $558.11 |
| 55 | Concrete box culvert (5 FT X 3 FT) (462-7007) | LF | 43 | $735.00 | $530.00 | $455.00 | $350.00 | $493.19 | $759.16 | |
| 56 | Concrete box culvert (6 FT X 2 FT) (462-7010) | LF | 354 | $715.00 | $400.00 | $480.00 | $325.00 | $514.56 | $622.23 | |
| 57 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 717 | $840.00 | $450.00 | $530.00 | $400.00 | $569.52 | $735.39 | |
| 58 | Concrete box culvert (8 FT X 5 FT) (462-7022) | LF | 117 | $900.00 | $1,275.00 | $660.00 | $755.00 | $585.00 | $825.40 | $1,044.69 |
| 59 | Concrete box culvert (3 FT X 2 FT)(extend) (462-7056) | LF | 316 | $900.00 | $335.00 | $290.00 | $330.00 | $250.00 | $348.30 | $456.25 |
| 60 | Concrete box culvert (4 FT X 2 FT)(extend) (462-7058) | LF | 1,496 | $900.00 | $425.00 | $285.00 | $405.00 | $260.00 | $425.93 | $506.31 |
| 61 | RC pipe (CL III)(24 in) (464-7005) | LF | 4,007 | $175.00 | $130.00 | $100.00 | $120.00 | $120.00 | $131.10 | $192.79 |
| 62 | RC pipe (CL III)(48 in) (464-7011) | LF | 4 | $350.00 | $355.00 | $590.00 | $300.00 | $365.00 | $327.11 | $518.22 |
| 63 | RC pipe (CL III)(60 in) (464-7013) | LF | 372 | $475.00 | $555.00 | $320.00 | $405.00 | $370.00 | $433.91 | $441.38 |
| 64 | RC pipe (arch)(CL III)(des 1) (464-7040) | LF | 2,146 | $275.00 | $250.00 | $180.00 | $200.00 | $175.00 | $212.02 | $317.44 |
| 65 | RC pipe (arch)(CL III)(des 3) (464-7042) | LF | 1,092 | $360.00 | $275.00 | $200.00 | $300.00 | $200.00 | $317.05 | $285.93 |
| 66 | RC pipe (arch)(CL III)(des 4) (464-7043) | LF | 164 | $335.00 | $250.00 | $355.00 | $225.00 | $369.49 | $320.31 | |
| 67 | Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128) | EACH | 5 | $8,000.00 | $10,000 | $7,800.00 | $9,900.00 | $10,000 | $10,850 | $14,860 |
| 68 | Inl(CMP)(pazd-CZ)(FG)(4FTX4FT-4FTX4FT) (465-7165) | EACH | 2 | $8,000.00 | $20,000 | $13,000 | $14,000 | $20,000 | $15,537 | $32,038 |
| 69 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 1 | $20,000 | $38,000 | $38,000 | $23,000 | $50,000 | $23,789 | $33,996 |
| 70 | Wingwall (PW - 1) (HW=5 FT) (466-7175) | EACH | 2 | $20,000 | $37,500 | $35,000 | $25,000 | $75,000 | $25,857 | $39,703 |
| 71 | Set (type I)(S= 3 FT)(HW= 3 FT)(4:1)(C) (467-7041) | EACH | 2 | $12,500 | $8,500.00 | $14,000 | $9,100.00 | $15,000 | $9,308.69 | $10,729 |
| 72 | Set (type I)(S= 3 FT)(HW= 3 FT)(6:1)(C) (467-7042) | EACH | 5 | $15,000 | $9,500.00 | $13,000 | $10,000 | $20,000 | $10,343 | $12,579 |
| 73 | Set (type I)(S= 4 FT)(HW= 3 FT)(4:1)(C) (467-7068) | EACH | 4 | $13,000 | $7,250.00 | $10,000 | $9,600.00 | $15,000 | $9,825.84 | $9,618.95 |
| 74 | Set (type I)(S= 4 FT)(HW= 3 FT)(6:1)(C) (467-7069) | EACH | 41 | $14,000 | $7,500.00 | $8,500.00 | $12,000 | $20,000 | $12,412 | $10,359 |
| 75 | Set (type I)(S= 4 FT)(HW= 4 FT)(6:1)(C) (467-7073) | EACH | 4 | $12,000 | $12,000 | $12,500 | $25,000 | $12,929 | $15,538 | |
| 76 | Set (type I)(S= 5 FT)(HW= 3 FT)(6:1)(C) (467-7097) | EACH | 14 | $15,000 | $9,500.00 | $10,000 | $14,000 | $25,000 | $14,480 | $12,209 |
| 77 | Set (type I)(S= 5 FT)(HW= 5 FT)(6:1)(P) (467-7102) | EACH | 2 | $17,500 | $17,000 | $16,000 | $35,000 | $16,549 | $22,531 | |
| 78 | Set (type I)(S= 6 FT)(HW= 3 FT)(6:1)(C) (467-7126) | EACH | 4 | $10,750 | $12,000 | $16,500 | $25,000 | $17,066 | $14,058 | |
| 79 | Set (type I)(S= 6 FT)(HW= 4 FT)(6:1)(C) (467-7130) | EACH | 3 | $15,000 | $11,000 | $17,000 | $28,000 | $17,583 | $20,311 | |
| 80 | Set (type I)(S= 6 FT)(HW= 4 FT)(6:1)(P) (467-7131) | EACH | 3 | $17,000 | $10,000 | $17,000 | $28,000 | $17,583 | $22,013 | |
| 81 | Set (type I)(S= 8 FT)(HW= 6 FT)(6:1)(C) (467-7189) | EACH | 2 | $19,000 | $42,000 | $40,000 | $22,000 | $65,000 | $22,755 | $54,125 |
| 82 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 4 | $2,600.00 | $2,750.00 | $1,500.00 | $2,800.00 | $5,000.00 | $2,896.03 | $4,498.58 |
| 83 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 118 | $2,600.00 | $2,750.00 | $1,700.00 | $2,500.00 | $3,000.00 | $2,585.75 | $5,061.31 |
| 84 | Set (type II) (60 in) (RCP) (6: 1) (P) (467-7408) | EACH | 2 | $9,500.00 | $21,000 | $35,000 | $22,000 | $12,000 | $22,755 | $19,509 |
| 85 | Set (type II) (des 1) (RCP) (6: 1) (P) (467-7418) | EACH | 35 | $3,000.00 | $2,250.00 | $3,300.00 | $3,000.00 | $5,000.00 | $3,102.90 | $3,989.69 |
| 86 | Set (type II) (des 3) (RCP) (6: 1) (C) (467-7433) | EACH | 2 | $3,000.00 | $2,750.00 | $3,400.00 | $4,500.00 | $5,000.00 | $4,654.35 | $5,648.29 |
| 87 | Set (type II) (des 3) (RCP) (6: 1) (P) (467-7434) | EACH | 26 | $3,000.00 | $2,750.00 | $3,500.00 | $4,500.00 | $5,000.00 | $4,654.35 | $3,005.85 |
| 88 | Set (type II) (des 4) (RCP) (6: 1) (C) (467-7441) | EACH | 4 | $5,000.00 | $3,600.00 | $6,000.00 | $5,000.00 | $6,205.79 | $3,804.66 | |
| 89 | Clean existing culverts (480-7001) | EACH | 14 | $4,000.00 | $8,500.00 | $3,500.00 | $4,000.00 | $5,000.00 | $3,077.61 | $15,287 |
| 90 | Removing structure (inlet) (496-7002) | EACH | 2 | $1,700.00 | $1,200.00 | $3,700.00 | $1,500.00 | $5,000.00 | $1,602.54 | $5,990.84 |
| 91 | Removing structure (set) (496-7004) | EACH | 46 | $800.00 | $1,200.00 | $850.00 | $805.00 | $5,000.00 | $878.00 | $2,680.90 |
| 92 | Removing structure (wingwall) (496-7005) | EACH | 14 | $2,000.00 | $1,500.00 | $2,000.00 | $1,500.00 | $5,000.00 | $1,653.45 | $5,759.87 |
| 93 | Removing structure (headwall) (496-7006) | EACH | 8 | $2,000.00 | $1,500.00 | $1,900.00 | $1,500.00 | $5,000.00 | $1,653.42 | $2,379.54 |
| 94 | Removing structure (pipe) (496-7007) | LF | 1,169 | $50.00 | $20.00 | $30.00 | $30.00 | $50.00 | $32.64 | $57.02 |
| 95 | Removing structure (box culvert) (496-7008) | LF | 1,163 | $145.00 | $130.00 | $60.00 | $120.00 | $75.00 | $133.63 | $117.20 |
| 96 | Remove STR (barrier gate) (496-7043) | EACH | 12 | $1,000.00 | $365.00 | $2,500.00 | $605.00 | $5,000.00 | $5,438.03 | $591.94 |
| 97 | Mobilization (500-7001) | LS | 1 | $15,250,000 | $9,985,528 | $12,500,000 | $13,100,000 | $13,790,000 | $15,070,919 | $22,113,157 |
| 98 | Barricades, signs and traffic handling (502-7001) | MO | 48 | $250,000 | $24,000 | $24,000 | $16,500 | $100,000 | $9,287.61 | $75,000 |
| 99 | Portable changeable message sign (503-7002) | EACH | 2 | $15,000 | $24,500 | $20,000 | $17,500 | $25,000 | $23,845 | $38,927 |
| 100 | TMA (stationary) (505-7001) | DAY | 250 | $150.00 | $215.00 | $500.00 | $250.00 | $750.00 | $407.32 | $603.00 |
| 101 | TMA (mobile operation) (505-7002) | HR | 320 | $200.00 | $600.00 | $85.00 | $90.50 | $170.00 | $688.74 | $114.52 |
| 102 | Rock filter dams (install) (type 2) (506-7002) | LF | 3,068 | $50.00 | $70.00 | $62.00 | $51.50 | $58.25 | $53.03 | $71.93 |
| 103 | Rock filter dams (remove) (506-7011) | LF | 3,068 | $16.00 | $18.00 | $19.00 | $20.50 | $18.10 | $21.04 | $28.54 |
| 104 | Construction exits (install) (type 1) (506-7020) | SY | 1,794 | $45.00 | $30.00 | $24.00 | $49.00 | $23.10 | $50.11 | $67.97 |
| 105 | Construction exits (remove) (506-7024) | SY | 1,794 | $12.00 | $7.00 | $7.00 | $17.00 | $7.05 | $17.66 | $23.95 |
| 106 | Backhoe work (erosion & sediment control) (506-7030) | HR | 80 | $170.00 | $120.00 | $210.00 | $150.00 | $200.00 | $156.67 | $281.66 |
| 107 | Blading work (erosion & sediment control) (506-7032) | HR | 350 | $250.00 | $145.00 | $240.00 | $170.00 | $345.00 | $184.80 | $421.64 |
| 108 | Temporary sediment control fence (install) (506-7039) | LF | 564 | $5.00 | $8.00 | $7.00 | $5.25 | $8.20 | $5.39 | $7.31 |
| 109 | Temporary sediment control fence (remove) (506-7041) | LF | 564 | $2.00 | $1.00 | $1.20 | $1.40 | $1.75 | $1.46 | $1.98 |
| 110 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 21,921 | $8.00 | $5.00 | $3.80 | $6.45 | $4.25 | $6.62 | $8.98 |
| 111 | Biodegradable erosion control logs (remove) (506-7046) | LF | 21,921 | $3.00 | $1.00 | $1.05 | $1.40 | $1.00 | $1.46 | $1.98 |
| 112 | Constructing detours (508-7001) | SY | 14,676 | $165.00 | $110.00 | $120.00 | $140.00 | $135.00 | $115.03 | $220.33 |
| 113 | Portable concrete traffic barrier (des source)(F-shape)(type 1) (512-7017) | LF | 1,710 | $35.00 | $13.00 | $30.00 | $25.00 | $20.00 | $25.70 | $20.21 |
| 114 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 4,050 | $16.00 | $4.00 | $25.00 | $10.50 | $20.00 | $6.13 | $15.27 |
| 115 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 1,710 | $35.00 | $11.00 | $30.00 | $26.00 | $20.00 | $20.14 | $24.12 |
| 116 | Portable concrete traffic barrier (connection hardware) (512-7070) | EACH | 170 | $100.00 | $45.00 | $48.00 | $60.50 | $200.00 | $43.89 | $64.08 |
| 117 | Intersections (ACP) (530-7002) | SY | 5,853 | $90.00 | $40.00 | $55.00 | $66.50 | $68.50 | $107.97 | $108.89 |
| 118 | Driveways (ACP) (530-7010) | SY | 4,993 | $75.00 | $50.00 | $52.00 | $86.50 | $80.00 | $114.37 | $150.11 |
| 119 | Driveways (ACP) (type 1) (530-7011) | SY | 6,517 | $55.00 | $6.00 | $30.00 | $6.85 | $46.25 | $48.54 | $56.10 |
| 120 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 327,783 | $0.40 | $0.15 | $0.24 | $0.10 | $1.75 | $0.14 | $0.10 |
| 121 | Metal W-beam guard fence (steel post) (540-7002) | LF | 3,300 | $40.00 | $31.00 | $30.00 | $27.00 | $44.00 | $32.32 | $42.09 |
| 122 | Downstream anchor terminal section (540-7015) | EACH | 14 | $2,000.00 | $1,805.00 | $1,500.00 | $1,400.00 | $1,630.00 | $1,292.87 | $2,490.28 |
| 123 | Metal beam guard fence (long span system) (540-7027) | EACH | 3 | $2,000.00 | $2,235.00 | $1,500.00 | $1,300.00 | $1,580.00 | $1,416.99 | $3,086.54 |
| 124 | Remove metal beam guard fence (542-7001) | LF | 1,625 | $5.00 | $2.25 | $3.50 | $3.00 | $5.15 | $3.10 | $2.81 |
| 125 | Guardrail end treatment (install) (544-7001) | EACH | 14 | $3,700.00 | $3,700.00 | $3,400.00 | $3,100.00 | $3,520.00 | $3,170.13 | $5,050.70 |
| 126 | Guardrail end treatment (remove) (544-7003) | EACH | 10 | $450.00 | $205.00 | $340.00 | $300.00 | $480.00 | $341.32 | $280.59 |
| 127 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 3 | $285.00 | $1,600.00 | $3,500.00 | $2,520.00 | $1,572.13 | $3,507.43 | |
| 128 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $2,300.00 | $2,500.00 | $1,200.00 | $1,660.00 | $837.78 | $1,402.97 | |
| 129 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 2 | $5,000.00 | $11,000 | $10,000 | $10,980 | $8,724.32 | $13,328 | |
| 130 | Wire fence (remove) (552-7011) | LF | 64,541 | $2.00 | $0.75 | $2.50 | $2.00 | $5.65 | $2.03 | $2.99 |
| 131 | Mailbox install-S (RR-post) type 4 (560-7006) | EACH | 1 | $225.00 | $245.00 | $300.00 | $600.00 | $325.80 | $315.42 | |
| 132 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 7 | $350.00 | $225.00 | $245.00 | $330.00 | $650.00 | $325.80 | $315.42 |
| 133 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 4 | $650.00 | $560.00 | $600.00 | $655.00 | $1,300.00 | $915.35 | $788.53 |
| 134 | Relocate RD IL asm (trans-base) (610-7004) | EACH | 4 | $2,700.00 | $3,730.00 | $4,000.00 | $3,700.00 | $3,660.00 | $3,780.36 | $5,127.87 |
| 135 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 793 | $18.00 | $27.00 | $28.00 | $25.50 | $25.50 | $26.37 | $35.78 |
| 136 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 1,237 | $20.00 | $34.00 | $36.00 | $33.00 | $32.50 | $33.61 | $45.60 |
| 137 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 338 | $30.00 | $45.00 | $48.00 | $44.50 | $44.00 | $45.51 | $61.73 |
| 138 | Electrical conductor (no.8) bare (620-7007) | LF | 1,756 | $2.30 | $3.00 | $3.40 | $3.00 | $3.00 | $3.10 | $4.21 |
| 139 | Electrical conductor (no.8) insulated (620-7008) | LF | 3,512 | $2.40 | $4.00 | $4.00 | $3.55 | $3.50 | $3.62 | $4.91 |
| 140 | Electrical conductor (no.4) bare (620-7011) | LF | 612 | $3.75 | $4.50 | $4.70 | $4.30 | $4.25 | $4.40 | $5.96 |
| 141 | Electrical conductor (no.4) insulated (620-7012) | LF | 1,836 | $4.00 | $4.75 | $5.20 | $4.70 | $4.65 | $4.80 | $6.52 |
| 142 | Ground box type D (162922)W/apron (624-7008) | EACH | 12 | $2,500.00 | $2,194.00 | $2,400.00 | $2,200.00 | $2,150.00 | $2,223.74 | $3,016.39 |
| 143 | Elc SRV type D 120/240 100(NS)AL(N)SP(O) (628-7226) | EACH | 6 | $11,000 | $10,485 | $11,300 | $10,500 | $10,280 | $10,627 | $14,416 |
| 144 | Aluminum signs (type G) (636-7002) | SF | 271 | $41.00 | $32.00 | $35.00 | $47.50 | $47.00 | $28.29 | $44.45 |
| 145 | Replace existing aluminum signs(type A) (636-7004) | SF | 42 | $50.00 | $32.00 | $35.00 | $47.50 | $58.00 | $23.01 | $44.45 |
| 146 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 39 | $1,200.00 | $737.00 | $800.00 | $705.00 | $700.00 | $661.95 | $1,039.44 |
| 147 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 88 | $1,200.00 | $1,006.00 | $1,100.00 | $960.00 | $950.00 | $848.12 | $1,419.36 |
| 148 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 270 | $1,200.00 | $830.00 | $900.00 | $805.00 | $800.00 | $848.12 | $1,168.47 |
| 149 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 14 | $1,200.00 | $1,220.00 | $1,350.00 | $1,100.00 | $1,100.00 | $1,091.18 | $1,720.44 |
| 150 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $1,500.00 | $1,118.00 | $1,200.00 | $1,000.00 | $1,000.00 | $1,204.96 | $1,577.07 |
| 151 | Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035) | EACH | 3 | $1,500.00 | $1,220.00 | $1,350.00 | $1,200.00 | $1,150.00 | $1,287.70 | $1,720.44 |
| 152 | Remove SM RD SN sup&AM (644-7073) | EACH | 97 | $160.00 | $102.00 | $120.00 | $100.00 | $100.00 | $113.76 | $143.37 |
| 153 | Install LRSS (struct steel) (647-7001) | LB | 2,052 | $10.00 | $10.00 | $10.00 | $9.05 | $10.00 | $8.73 | $12.91 |
| 154 | Remove lrsa (647-7003) | EACH | 2 | $1,300.00 | $762.00 | $850.00 | $805.00 | $4,000.00 | $775.72 | $1,075.27 |
| 155 | Install overhead sign support(30 FT bal tee) (650-7028) | EACH | 2 | $70,000 | $59,000 | $65,000 | $58,000 | $57,800 | $59,731 | $81,022 |
| 156 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 48 | $145.00 | $135.00 | $145.00 | $105.00 | $105.00 | $101.36 | $186.39 |
| 157 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 80 | $40.00 | $26.00 | $50.00 | $45.50 | $30.00 | $46.28 | $35.07 |
| 158 | Install delineator assembly (D-SY)SZ 1(yflx)GND (658-7023) | EACH | 3 | $145.00 | $132.00 | $145.00 | $105.00 | $105.00 | $102.39 | $186.39 |
| 159 | Install delineator assembly (D-DY)SZ 1(yflx)GND (658-7050) | EACH | 908 | $145.00 | $132.00 | $145.00 | $105.00 | $105.00 | $102.91 | $186.39 |
| 160 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 181 | $145.00 | $132.00 | $145.00 | $105.00 | $105.00 | $100.32 | $186.39 |
| 161 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 75 | $145.00 | $132.00 | $145.00 | $105.00 | $105.00 | $97.22 | $186.39 |
| 162 | Remove delin & object marker assms (658-7078) | EACH | 149 | $40.00 | $28.00 | $30.00 | $15.00 | $15.00 | $15.25 | $35.85 |
| 163 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 1,074 | $0.75 | $0.50 | $0.38 | $0.35 | $0.35 | $0.36 | $0.49 |
| 164 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 298,954 | $0.70 | $0.35 | $0.32 | $0.30 | $0.30 | $0.31 | $0.42 |
| 165 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 31 | $22.00 | $25.00 | $20.00 | $20.00 | $20.69 | $28.06 | |
| 166 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 305,219 | $0.70 | $0.35 | $0.32 | $0.30 | $0.30 | $0.31 | $0.42 |
| 167 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 22 | $11.00 | $12.00 | $10.00 | $10.00 | $10.34 | $14.03 | |
| 168 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 2,150 | $0.85 | $1.75 | $1.60 | $1.50 | $1.50 | $1.55 | $2.10 |
| 169 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 29,131 | $1.00 | $1.00 | $1.10 | $0.96 | $0.95 | $0.98 | $1.33 |
| 170 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 164 | $17.00 | $22.00 | $25.00 | $20.00 | $20.00 | $20.69 | $28.06 |
| 171 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 28,152 | $1.00 | $1.00 | $1.00 | $0.96 | $0.95 | $0.98 | $1.33 |
| 172 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 16,289 | $1.50 | $1.00 | $1.20 | $1.55 | $1.45 | $3.99 | $2.81 |
| 173 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 5,314 | $1.50 | $1.00 | $1.20 | $1.55 | $1.45 | $4.02 | $2.81 |
| 174 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 393 | $1.30 | $1.00 | $1.10 | $1.00 | $1.00 | $1.03 | $1.40 |
| 175 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 85,006 | $2.00 | $1.00 | $1.10 | $1.00 | $1.00 | $1.03 | $1.40 |
| 176 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 301 | $2.50 | $7.75 | $8.30 | $7.55 | $7.50 | $7.75 | $10.52 |
| 177 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 373 | $10.00 | $13.00 | $14.00 | $12.50 | $12.50 | $12.93 | $17.54 |
| 178 | Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041) | EACH | 173 | $200.00 | $254.00 | $280.00 | $250.00 | $250.00 | $258.57 | $350.74 |
| 179 | Reflectorized pavement marking type I(W)(lane drop arrow)(090MIL) (666-7059) | EACH | 4 | $400.00 | $430.00 | $470.00 | $430.00 | $425.00 | $439.58 | $596.26 |
| 180 | Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065) | EACH | 173 | $275.00 | $330.00 | $360.00 | $330.00 | $325.00 | $336.14 | $455.97 |
| 181 | Ref pavement marking type I(W)18"(yld tri)(090MIL) (666-7086) | EACH | 1,283 | $44.00 | $60.00 | $65.00 | $58.00 | $57.50 | $59.47 | $80.67 |
| 182 | Type I high perf PM (W)6"(broken)(090MIL) (666-7289) | LF | 55,345 | $0.85 | $1.00 | $0.88 | $0.81 | $0.80 | $0.83 | $1.12 |
| 183 | Type I high perf PM (W)6"(solid)(090MIL) (666-7292) | LF | 221,051 | $0.80 | $0.75 | $0.83 | $0.76 | $0.75 | $0.78 | $1.05 |
| 184 | Type I high perf PM (Y)6"(broken)(090MIL) (666-7301) | LF | 1,010 | $1.00 | $0.88 | $0.81 | $0.80 | $0.83 | $1.12 | |
| 185 | Type I high perf PM (Y)6"(solid)(090MIL) (666-7304) | LF | 213,354 | $0.80 | $0.75 | $0.83 | $0.76 | $0.75 | $0.78 | $1.05 |
| 186 | Pavement sler 6" (666-7347) | LF | 7,872 | $0.50 | $1.25 | $1.20 | $1.10 | $1.10 | $1.14 | $1.54 |
| 187 | Plowable reflectorized pavement marker type II-C-R (672-7015) | EACH | 45 | $90.00 | $102.00 | $110.00 | $100.00 | $100.00 | $103.42 | $140.30 |
| 188 | Recessed reflectorized pavement marker type I-C (672-7023) | EACH | 243 | $52.00 | $55.00 | $50.50 | $50.00 | $51.71 | $70.15 | |
| 189 | Recessed reflectorized pavement marker type II-A-A (672-7025) | EACH | 259 | $52.00 | $55.00 | $50.50 | $50.00 | $51.71 | $70.15 | |
| 190 | Recessed reflectorized pavement marker type II-C-R (672-7027) | EACH | 4,868 | $39.00 | $47.00 | $50.00 | $45.50 | $45.00 | $46.54 | $63.13 |
| 191 | Eliminating existing PM & markers (4") (677-7001) | LF | 35,718 | $1.25 | $0.75 | $0.85 | $0.76 | $0.75 | $0.78 | $1.05 |
| 192 | Eliminating existing PM & markers (24") (677-7008) | LF | 12 | $10.00 | $11.00 | $10.00 | $10.00 | $10.34 | $14.03 | |
| 193 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 4 | $102.00 | $110.00 | $100.00 | $100.00 | $103.44 | $140.30 | |
| 194 | Pavement surface preparation for marking (6") (678-7002) | LF | 7,872 | $0.50 | $1.00 | $1.10 | $1.00 | $1.00 | $1.03 | $1.40 |
| 195 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 45 | $2.00 | $10.00 | $11.00 | $10.00 | $10.00 | $10.34 | $14.03 |
| 196 | Full - width mowing (730-7019) | CYC | 8 | $18,000 | $11,000 | $9,800.00 | $25,000 | $19,070 | $8,121.10 | $18,730 |
| 197 | Underseal course (3006-7001) | GAL | 128,818 | $7.00 | $3.00 | $3.70 | $4.35 | $4.55 | $8.11 | $5.39 |
| 198 | Install DMS (pole MTD cabinet) (6004-7001) | EACH | 2 | $20,000 | $44,000 | $48,000 | $43,000 | $42,750 | $44,216 | $59,977 |
| 199 | ITS pole (50 FT) (90 MPH) (6011-7005) | EACH | 4 | $25,000 | $23,000 | $25,000 | $22,500 | $22,500 | $23,272 | $31,567 |
| 200 | ITS pole MNTD cab (type 2)(conf 1) (6011-7028) | EACH | 4 | $1,000.00 | $7,272.00 | $8,000.00 | $7,200.00 | $7,130.00 | $7,369.38 | $9,996.19 |
| 201 | Installation of cellular modem (6015-7001) | EACH | 6 | $4,500.00 | $3,470.00 | $3,800.00 | $3,400.00 | $3,400.00 | $3,516.61 | $4,770.11 |
| 202 | CCTV field equipment (digital) (6018-7002) | EACH | 4 | $24,000 | $15,562 | $17,000 | $15,500 | $15,250 | $15,773 | $21,395 |
| 203 | CCTV mount (pole) (6018-7006) | EACH | 4 | $5,000.00 | $1,863.00 | $2,000.00 | $1,800.00 | $1,830.00 | $1,887.60 | $2,560.43 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.