TxDOT contract A00200125 bid tabulation

Highway Improvement, SH 302 (SH 158 to 1.0 mi W of SL 338). Let by Texas DOT on May 6, 2026, Ector, Odessa District. 5 bids received; low bid $9,284,543 by Jones Bros. Dirt & Paving Contractors, Inc., -12% against the engineer's estimate of $10,581,432.

Owner
Texas DOT
Letting
06 MAY 2026
Pay items
33
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Jones Bros. Dirt & Paving Contractors, Inc.$9,284,543Low-12%
2Ragle Construction, Inc.$11,138,757+20%+5.0%
3Reece Albert, Inc.$11,146,629+20%+5.0%
4RK Hall, LLC$11,715,700+26%+11%
5FNF Construction, Inc.$12,957,366+40%+22%
TxDOT contract A00200125: bids by rank

Engineer's estimate: $10,581,432.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Jones Bros. Dirt & Paving Contractors, Inc.2. Ragle Construction, Inc.3. Reece Albert, Inc.4. RK Hall, LLC5. FNF Construction, Inc.
1Subgr widen (OC) (112-7001)STA122$1,100.00$1,150.00$1,600.00$1,771.48$1,681.51$2,500.00
2FL BS (compacted in place)(type A GR 4) (8") (247-7069)SY20,118$15.00$22.27$12.00$21.97$29.66$21.00
3Prime coat (AE-P) (310-7001)GAL2,012$5.00$5.63$6.50$3.59$8.91$5.50
4Fog seal (CSS-1H) (315-7004)GAL29,662$4.00$3.95$5.20$2.89$3.38$4.00
5SP mixes SP-B sac-B PG70-22 (344-7005)TON4,369$120.00$125.00$140.00$155.95$123.64$286.00
6Tom-C PG76-22 sac-A (347-7001)TON33,665$180.00$148.00$160.00$186.31$187.98$175.00
7Flexible pavement structure repair(4") (351-7003)SY58,547$33.00$35.00$35.00$41.43$35.69$40.00
8Clean existing culverts (480-7001)EACH3$3,020.00$1,650.00$2,000.00$3,371.76$9,313.11$4,100.00
9Mobilization (500-7001)LS1$630,513$155,000$1,000,000$212,708$775,442$1,294,600
10Barricades, signs and traffic handling (502-7001)MO9$15,000$15,000$60,000$8,187.80$19,524$54,000
11Portable changeable message sign (503-7002)EACH4$15,000$19,250$25,000$4,659.69$14,968$6,900.00
12TMA (stationary) (505-7001)DAY175$200.00$82.50$300.00$263.92$372.76$200.00
13TMA (mobile operation) (505-7003)DAY175$300.00$8.50$400.00$64.37$532.84$445.00
14Biodegradable erosion control logs (install) (18") (506-7045)LF1,030$8.50$12.00$10.75$9.54$8.82$10.50
15Biodegradable erosion control logs (remove) (506-7046)LF1,030$1.20$4.00$1.00$2.23$1.88$1.30
16Mill rumble strips (asphalt) (shoulder) (533-7001)LF265,812$0.10$0.19$0.07$0.16$0.18$0.12
17Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH28$841.00$886.60$806.00$948.41$943.40$825.00
18Remove SM RD SN sup&AM (644-7073)EACH6$120.00$110.00$100.00$139.92$106.00$125.00
19Install object marker assembly (OM-2Y)(WC)GND (658-7056)EACH48$65.00$89.10$81.00$95.31$106.00$83.00
20Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH92$100.00$90.20$82.00$96.49$106.00$84.00
21Remove delin & object marker assms (658-7078)EACH140$22.00$10.00$25.00$35.88$15.90$50.00
22Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF265,812$0.20$0.18$0.16$0.19$0.17$0.17
23Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF265,812$0.24$0.18$0.16$0.19$0.17$0.17
24Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF375$1.00$0.94$0.85$1.00$2.12$2.10
25Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF5,354$1.00$0.94$0.85$1.00$0.80$0.80
26Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF33,227$0.75$0.70$0.64$0.75$0.63$0.61
27Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF132,906$0.50$0.70$0.64$0.75$0.60$0.60
28Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF132,906$0.60$0.69$0.63$0.74$0.60$0.60
29Prefabricated PM type C (W)(24")(solid) (668-7089)LF27$20.00$17.60$16.00$18.83$23.32$23.00
30Prefabricated PM type C (W)(arrow) (668-7091)EACH7$300.00$247.50$225.00$264.75$286.20$280.00
31Reflectorized pavement marker type I-C (672-7002)EACH1,661$4.75$5.50$5.00$5.88$3.98$3.90
32Bonding course (3007-7001)GAL58,547$2.70$2.55$5.50$3.24$3.95$5.00
33TMSP radar speed control monitor (6025-7001)EACH4$10,000$6,500.00$9,500.00$2,965.26$5,196.02$5,100.00
TxDOT contract A00200125: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy