TxDOT contract A00080576 bid tabulation
Construct Bridge, US 385 (AT SOUTH SL 338 to .). Let by Texas DOT on July 1, 2026, Ector, Odessa District. 6 bids received; low bid $53,657,268 by Jones Bros. Dirt & Paving Contractors, Inc., +16% against the engineer's estimate of $46,211,493.
- Owner
- Texas DOT
- Letting
- 01 JUL 2026
- Pay items
- 255
- Data through
- 19 NOV 2026
5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jones Bros. Dirt & Paving Contractors, Inc. | $53,657,268 | Low | +16% |
| 2 | Ragle Construction, Inc. | $57,618,435 | +7.0% | +25% |
| 3 | FNF Construction, Inc. | $58,921,034 | +10% | +28% |
| 5 | Webber, LLC | $63,315,500 | +18% | +37% |
| 6 | Altus Construction LLC | $66,505,548 | +24% | +44% |
Engineer's estimate: $46,211,493.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jones Bros. Dirt & Paving Contractors, Inc. | 2. Ragle Construction, Inc. | 3. FNF Construction, Inc. | 4. Webber, LLC | 5. Altus Construction LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 14 | $10,000 | $3,700.00 | $371,425 | $100,000 | $400,000 | $470,296 |
| 2 | Removing concrete (mowstrip) (104-7003) | SY | 2,652 | $16.00 | $29.56 | $14.00 | $15.00 | $18.00 | $14.94 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 522 | $30.00 | $11.84 | $16.50 | $30.00 | $20.00 | $12.39 |
| 4 | Removing concrete (medians) (104-7008) | SY | 64 | $13.00 | $28.00 | $23.00 | $50.00 | $41.50 | $15.18 |
| 5 | Removing concrete (driveways) (104-7011) | SY | 3,088 | $16.00 | $12.50 | $13.50 | $30.00 | $26.60 | $14.88 |
| 6 | Removing concrete (curb) (104-7016) | LF | 647 | $12.00 | $2.33 | $5.50 | $14.00 | $8.00 | $4.99 |
| 7 | Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004) | SY | 4,745 | $9.00 | $9.85 | $5.50 | $7.00 | $4.20 | $13.36 |
| 8 | Remove (11"-15") TRT/untrt base & asphalt pavement (105-7011) | SY | 42,839 | $8.00 | $8.42 | $7.25 | $6.00 | $3.60 | $7.21 |
| 9 | Remove (12"-16") TRT/untrt base & asphalt pavement (105-7012) | SY | 77,400 | $10.00 | $7.60 | $6.50 | $7.00 | $4.30 | $4.70 |
| 10 | Excavation (roadway) (110-7001) | CY | 66,699 | $15.00 | $22.39 | $24.00 | $14.00 | $17.10 | $6.13 |
| 11 | Embankment (final)(DC)(type C) (132-7006) | CY | 265,703 | $14.00 | $18.89 | $23.50 | $32.00 | $11.40 | $33.34 |
| 12 | Blading (150-7002) | HR | 40 | $150.00 | $400.00 | $158.40 | $150.00 | $190.00 | $132.19 |
| 13 | Drill seed (permanent_rural_sand) (164-7009) | SY | 315,649 | $0.25 | $0.20 | $0.12 | $0.20 | $0.20 | $0.20 |
| 14 | Proof rolling (216-7001) | HR | 40 | $82.00 | $150.00 | $98.00 | $100.00 | $282.00 | $93.57 |
| 15 | FL BS (compacted in place)(type A GR 4)(7") (247-7343) | SY | 197,014 | $15.00 | $13.50 | $9.00 | $10.00 | $11.20 | $8.55 |
| 16 | FL BS (compacted in place)(type A GR 4)(5") (247-7345) | SY | 2,986 | $8.00 | $10.98 | $9.40 | $12.00 | $11.20 | $6.11 |
| 17 | Prime coat (AE-P) (310-7001) | GAL | 39,409 | $5.00 | $4.60 | $4.00 | $5.00 | $7.75 | $3.71 |
| 18 | Asphalt (AC-20-5TR) (316-7007) | GAL | 36,308 | $4.00 | $4.80 | $6.00 | $5.00 | $4.95 | $3.05 |
| 19 | Asphalt (CRS-2P) (316-7012) | GAL | 36,308 | $4.00 | $4.97 | $6.00 | $5.00 | $4.95 | $15.02 |
| 20 | Aggregate (type-B, GR-4)(sac-A) (316-7099) | CY | 873 | $94.00 | $131.85 | $175.00 | $100.00 | $210.00 | $337.10 |
| 21 | Aggregate (type-PB, GR-4)(sac-A) (316-7136) | CY | 873 | $128.00 | $167.58 | $175.00 | $175.00 | $210.00 | $97.74 |
| 22 | SP mixes SP-B sac-B PG70-22 (344-7005) | TON | 85,803 | $90.00 | $106.00 | $108.00 | $125.00 | $119.00 | $143.61 |
| 23 | Tack coat (344-7077) | GAL | 20,251 | $4.00 | $4.11 | $6.00 | $6.50 | $3.00 | $2.61 |
| 24 | Stone-MTRX-asphalt smar-F sac-A (346-7023) | TON | 0 | $138.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 25 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 6,595 | $3.00 | $4.97 | $3.00 | $3.00 | $2.60 | $1.46 |
| 26 | Concrete pavement (CRCP) (11") (360-7005) | SY | 19,378 | $119.00 | $148.08 | $114.00 | $130.00 | $125.00 | $101.67 |
| 27 | Concrete pavement(transition slab) (11") (360-7034) | SY | 656 | $135.00 | $198.88 | $146.00 | $130.00 | $222.00 | $101.66 |
| 28 | Cut & restore asphalt paving (400-7008) | SY | 22 | $130.00 | $75.00 | $142.00 | $250.00 | $174.00 | $108.63 |
| 29 | Cem stabil BKFL (400-7010) | CY | 1,482 | $225.00 | $299.02 | $111.00 | $220.00 | $132.00 | $133.22 |
| 30 | Cement stab backfill (inlet or MH) (400-7011) | CY | 40 | $180.00 | $322.50 | $151.00 | $220.00 | $303.00 | $99.62 |
| 31 | Drilled shaft (18 in) (416-7002) | LF | 200 | $150.00 | $258.00 | $211.20 | $250.00 | $175.00 | $216.74 |
| 32 | Drilled shaft (36 in) (416-7006) | LF | 1,280 | $300.00 | $338.63 | $282.00 | $400.00 | $291.00 | $282.16 |
| 33 | Drilled shaft (42 in) (416-7007) | LF | 878 | $325.00 | $575.70 | $396.00 | $525.00 | $324.00 | $326.74 |
| 34 | Drilled shaft (sign mounts) (12 in) (416-7027) | LF | 28 | $130.00 | $193.50 | $180.00 | $110.00 | $100.00 | $114.85 |
| 35 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 98 | $260.00 | $247.25 | $230.00 | $210.00 | $200.00 | $183.76 |
| 36 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 418 | $300.00 | $483.75 | $275.00 | $300.00 | $275.00 | $252.67 |
| 37 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 84 | $462.00 | $645.00 | $400.00 | $450.00 | $400.00 | $367.52 |
| 38 | Class C concrete (abutment) (420-7012) | CY | 116 | $1,400.00 | $1,075.00 | $886.00 | $1,800.00 | $1,760.00 | $934.89 |
| 39 | Class C concrete (cap)(HPC) (420-7023) | CY | 94.80 | $1,700.00 | $1,026.63 | $1,470.00 | $1,900.00 | $1,590.00 | $1,257.28 |
| 40 | Class C concrete (column) (420-7038) | CY | 81.20 | $1,700.00 | $1,075.00 | $1,065.00 | $1,200.00 | $1,220.00 | $1,144.10 |
| 41 | Class C concrete (vehicle defl wall) (420-7062) | CY | 175.40 | $450.00 | $602.00 | $1,109.00 | $770.00 | $1,320.00 | $539.28 |
| 42 | Reinforced concrete slab (HPC) (422-7002) | SF | 24,000 | $33.00 | $29.03 | $29.00 | $30.00 | $28.30 | $28.19 |
| 43 | Approach slab (HPC) (422-7014) | CY | 122 | $935.00 | $731.00 | $676.00 | $1,000.00 | $980.00 | $569.10 |
| 44 | Retaining wall (MSE) (ashlar stone fin) (423-7002) | SF | 91,546 | $75.00 | $93.23 | $40.00 | $49.09 | $116.00 | $53.22 |
| 45 | Prestressed concrete girder (TX54) (425-7005) | LF | 3,220.02 | $300.00 | $295.62 | $240.00 | $300.00 | $250.00 | $203.77 |
| 46 | Riprap (concrete)(4 in) (432-7001) | CY | 471 | $700.00 | $866.50 | $670.00 | $600.00 | $490.00 | $410.16 |
| 47 | Riprap (concrete)(CL A) (432-7004) | CY | 182 | $515.00 | $1,290.00 | $680.00 | $700.00 | $473.00 | $313.26 |
| 48 | Riprap (mow strip)(4 in) (432-7013) | CY | 1,107 | $700.00 | $687.33 | $522.00 | $700.00 | $558.00 | $524.39 |
| 49 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 1,000 | $27.00 | $27.95 | $25.00 | $50.00 | $29.20 | $23.06 |
| 50 | Rail (type SSTR)(HPC) (450-7025) | LF | 4,973 | $136.00 | $111.80 | $60.00 | $100.00 | $101.00 | $58.07 |
| 51 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 160 | $235.00 | $275.20 | $190.00 | $300.00 | $282.00 | $162.22 |
| 52 | Concrete box culvert (3 FT X 2 FT) (462-7001) | LF | 418 | $430.00 | $639.63 | $433.00 | $400.00 | $330.00 | $328.01 |
| 53 | Concrete box culvert (4 FT X 2 FT) (462-7003) | LF | 1,145 | $360.00 | $671.88 | $520.00 | $450.00 | $308.00 | $429.71 |
| 54 | Concrete box culvert (5 FT X 2 FT) (462-7006) | LF | 32 | $450.00 | $768.63 | $743.00 | $900.00 | $453.00 | $348.25 |
| 55 | RC pipe (CL III)(24 in) (464-7005) | LF | 2,173 | $100.00 | $139.75 | $115.00 | $200.00 | $134.00 | $99.07 |
| 56 | Manh (complete)(PRM)(72IN) (465-7004) | EACH | 3 | $11,570 | $13,438 | $9,120.00 | $13,000 | $11,100 | $8,787.28 |
| 57 | Junction box(complete)(PJB)(3FTX3FT) (465-7005) | EACH | 2 | $6,900.00 | $7,202.50 | $4,900.00 | $8,000.00 | $6,270.00 | $5,768.24 |
| 58 | Junction box(complete)(PJB)(4FTX4FT) (465-7006) | EACH | 1 | $9,000.00 | $11,019 | $6,050.00 | $9,000.00 | $7,410.00 | $5,582.62 |
| 59 | Inlet (complete)(pco)(3FT)(right) (465-7015) | EACH | 2 | $5,400.00 | $12,363 | $7,000.00 | $7,000.00 | $17,140 | $5,359.14 |
| 60 | Inlet(complete)(pazd)(FG)(5FTX5FT-3FTX3FT) (465-7161) | EACH | 1 | $8,000.00 | $13,438 | $7,300.00 | $8,000.00 | $11,501 | $3,858.92 |
| 61 | Inlet(complete)(type MSE1) (465-7362) | EACH | 19 | $7,800.00 | $5,912.50 | $7,700.00 | $5,000.00 | $14,040 | $8,303.83 |
| 62 | Set (type I)(S= 3 FT)(HW= 2 FT)(4:1)(C) (467-7037) | EACH | 4 | $8,900.00 | $9,406.25 | $11,000 | $7,000.00 | $7,220.00 | $744.22 |
| 63 | Set (type I)(S= 3 FT)(HW= 2 FT)(6:1)(P) (467-7039) | EACH | 2 | $4,200.00 | $13,438 | $11,000 | $13,000 | $10,750 | $10,336 |
| 64 | Set (type I)(S= 4 FT)(HW= 2 FT)(4:1)(C) (467-7064) | EACH | 4 | $9,000.00 | $9,137.50 | $11,550 | $9,000.00 | $8,770.00 | $6,221.73 |
| 65 | Set (type I)(S= 4 FT)(HW= 2 FT)(6:1)(P) (467-7066) | EACH | 8 | $12,000 | $13,330 | $11,400 | $13,000 | $12,080 | $8,269.12 |
| 66 | Set (type I)(S= 5 FT)(HW= 3 FT)(6:1)(P) (467-7098) | EACH | 2 | $13,700 | $15,426 | $15,000 | $18,000 | $12,520 | $9,420.21 |
| 67 | Set (type II) (18 in) (TP) (3: 1) (C) (467-7309) | EACH | 2 | $2,200.00 | $1,773.75 | $1,800.00 | $2,000.00 | $1,530.00 | $1,075.91 |
| 68 | Set (type II) (18 in) (TP) (6: 1) (P) (467-7312) | EACH | 24 | $2,750.00 | $2,956.25 | $1,900.00 | $2,200.00 | $1,880.00 | $979.47 |
| 69 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 2 | $2,200.00 | $2,580.00 | $2,200.00 | $2,300.00 | $1,570.00 | $1,376.12 |
| 70 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 28 | $2,400.00 | $3,225.00 | $2,200.00 | $2,500.00 | $1,910.00 | $1,397.03 |
| 71 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 1 | $2,750.00 | $3,225.00 | $2,200.00 | $3,000.00 | $3,361.00 | $1,668.08 |
| 72 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 3 | $2,750.00 | $3,493.75 | $2,200.00 | $3,200.00 | $2,510.00 | $1,285.84 |
| 73 | Set (type II) (24 in) (TP) (6: 1) (P) (467-7332) | EACH | 40 | $2,870.00 | $3,493.75 | $2,400.00 | $3,200.00 | $2,510.00 | $1,942.68 |
| 74 | Set (type II) (30 in) (TP) (6: 1) (P) (467-7352) | EACH | 2 | $5,885.00 | $4,837.50 | $5,100.00 | $6,000.00 | $3,810.00 | $3,849.52 |
| 75 | Thermoplastic pipe (PP) (18") (468-7001) | LF | 1,072 | $93.00 | $118.25 | $80.00 | $75.00 | $71.00 | $51.28 |
| 76 | Thermoplastic pipe (PP) (24") (468-7002) | LF | 1,144 | $95.00 | $136.53 | $110.00 | $90.00 | $87.00 | $80.65 |
| 77 | Thermoplastic pipe (PP) (30") (468-7003) | LF | 36 | $144.00 | $193.50 | $144.00 | $130.00 | $126.00 | $109.57 |
| 78 | Removing structure (pipe) (496-7007) | LF | 402 | $20.00 | $16.13 | $14.00 | $40.00 | $45.00 | $15.47 |
| 79 | Removing structure(driveway culvert) (496-7039) | EACH | 10 | $370.00 | $5,375.00 | $560.00 | $3,000.00 | $2,700.00 | $253.25 |
| 80 | Mobilization (500-7001) | LS | 1 | $2,590,109 | $2,570,000 | $5,500,000 | $5,914,000 | $6,212,000 | $6,617,396 |
| 81 | Barricades, signs and traffic handling (502-7001) | MO | 24 | $13,000 | $20,000 | $134,500 | $30,000 | $35,415 | $138,555 |
| 82 | Portable changeable message sign (503-7002) | EACH | 4 | $10,000 | $19,250 | $13,200 | $15,000 | $22,660 | $6,776.51 |
| 83 | TMA (stationary) (505-7001) | DAY | 88 | $100.00 | $110.00 | $1,100.00 | $250.00 | $122.00 | $146.89 |
| 84 | TMA (mobile operation) (505-7003) | DAY | 34 | $500.00 | $935.00 | $650.00 | $500.00 | $836.00 | $146.38 |
| 85 | Rock filter dams (install) (type 3) (506-7003) | LF | 270 | $95.00 | $23.45 | $95.00 | $100.00 | $95.00 | $90.96 |
| 86 | Rock filter dams (remove) (506-7011) | LF | 270 | $18.00 | $7.65 | $18.00 | $20.00 | $18.00 | $11.94 |
| 87 | Construction exits (install) (type 1) (506-7020) | SY | 2,016 | $31.00 | $9.56 | $26.00 | $55.00 | $26.00 | $32.16 |
| 88 | Construction exits (remove) (506-7024) | SY | 2,016 | $8.00 | $5.57 | $13.50 | $7.00 | $13.50 | $8.27 |
| 89 | Temporary sediment control fence (install) (506-7039) | LF | 1,000 | $6.00 | $6.45 | $5.85 | $7.00 | $5.85 | $2.86 |
| 90 | Temporary sediment control fence (remove) (506-7041) | LF | 1,000 | $1.75 | $1.08 | $1.25 | $1.25 | $1.25 | $0.86 |
| 91 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 5,510 | $11.00 | $9.68 | $10.00 | $10.00 | $10.00 | $5.60 |
| 92 | Biodegradable erosion control logs (remove) (506-7046) | LF | 5,510 | $1.50 | $1.34 | $1.25 | $1.00 | $1.25 | $0.86 |
| 93 | Constructing detours (508-7001) | SY | 28,467 | $45.00 | $56.00 | $90.00 | $82.00 | $98.25 | $152.72 |
| 94 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 4,204 | $35.00 | $16.13 | $47.00 | $75.00 | $42.50 | $8.01 |
| 95 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 3,063 | $12.00 | $15.59 | $12.00 | $6.00 | $6.10 | $5.54 |
| 96 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 4,204 | $35.00 | $16.66 | $22.00 | $14.00 | $29.90 | $8.80 |
| 97 | Landscape pavers (528-7001) | SY | 2,986 | $75.00 | $164.48 | $108.00 | $125.00 | $295.00 | $77.04 |
| 98 | Concrete curb (type II) (529-7002) | LF | 6,795 | $40.00 | $12.36 | $30.00 | $20.00 | $46.00 | $14.14 |
| 99 | Concrete curb & gutter (type II) (529-7009) | LF | 4,548 | $40.00 | $39.78 | $24.00 | $60.00 | $59.00 | $25.82 |
| 100 | Driveways (concrete) (530-7006) | SY | 5,667 | $125.00 | $130.64 | $88.00 | $115.00 | $159.00 | $78.77 |
| 101 | Driveways (ACP) (530-7010) | SY | 3,301 | $56.00 | $80.00 | $82.00 | $65.00 | $53.75 | $275.99 |
| 102 | Concrete sidewalks (4") (531-7001) | SY | 1,810 | $80.00 | $83.85 | $58.00 | $80.00 | $109.00 | $48.82 |
| 103 | Curb ramps (type 1) (531-7005) | EACH | 20 | $3,000.00 | $3,010.00 | $2,055.00 | $3,000.00 | $3,610.00 | $1,950.60 |
| 104 | Curb ramps (type 21) (531-7023) | SY | 41 | $230.00 | $306.38 | $218.00 | $225.00 | $358.00 | $157.15 |
| 105 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 54,781 | $0.25 | $0.24 | $0.18 | $0.20 | $0.60 | $0.17 |
| 106 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,656 | $34.00 | $40.85 | $40.06 | $40.00 | $36.25 | $23.39 |
| 107 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 6 | $2,600.00 | $3,117.50 | $2,678.00 | $3,250.00 | $3,360.00 | $1,557.39 |
| 108 | Downstream anchor terminal section (540-7015) | EACH | 3 | $1,200.00 | $1,746.88 | $1,634.00 | $2,000.00 | $1,580.00 | $858.48 |
| 109 | Cable barrier sys (install)(TL-4)(10'-0") (543-7006) | LF | 10,275 | $8.00 | $25.80 | $36.83 | $26.00 | $27.00 | $8.28 |
| 110 | Cable barrier terminal sec (install)(TL-4) (543-7018) | EACH | 15 | $3,250.00 | $6,450.00 | $4,767.25 | $7,000.00 | $4,290.00 | $2,387.82 |
| 111 | Cable barrier system (relocate)(TL-4) (543-7020) | LF | 6,267 | $13.00 | $16.13 | $25.95 | $16.00 | $22.00 | $8.83 |
| 112 | Cable barrier terminal sec (reloc)(TL-4) (543-7036) | EACH | 10 | $3,320.00 | $6,450.00 | $4,250.00 | $7,000.00 | $2,600.00 | $2,285.56 |
| 113 | Cable barrier (remove) (543-7037) | LF | 900 | $3.00 | $6.45 | $6.85 | $8.00 | $9.00 | $3.27 |
| 114 | Guardrail end treatment (install) (544-7001) | EACH | 9 | $4,000.00 | $3,547.50 | $3,858.00 | $3,500.00 | $3,880.00 | $2,300.19 |
| 115 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 8 | $1,000.00 | $3,225.00 | $1,100.00 | $200.00 | $1,800.00 | $1,041.41 |
| 116 | Crash cushion attenuator (remove) (545-7004) | EACH | 8 | $1,000.00 | $2,150.00 | $1,000.00 | $1,500.00 | $950.00 | $723.28 |
| 117 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 6 | $30,000 | $40,850 | $34,500 | $30,000 | $25,980 | $17,911 |
| 118 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 10 | $8,000.00 | $10,213 | $7,200.00 | $10,000 | $9,300.00 | $5,296.83 |
| 119 | Pipe underdrains (type 6) (6") (556-7006) | LF | 4,005 | $25.00 | $10.75 | $30.00 | $32.00 | $27.30 | $24.76 |
| 120 | Remove RD IL asm (trans-base) (610-7009) | EACH | 4 | $675.00 | $537.50 | $600.00 | $750.00 | $600.00 | $551.27 |
| 121 | In RD IL (U/P) (type 1) (150W EQ) LED (610-7014) | EACH | 8 | $1,900.00 | $2,795.00 | $800.00 | $1,000.00 | $800.00 | $735.03 |
| 122 | In RD IL (type SA) 40T-10 (250W EQ) LED (610-7126) | EACH | 36 | $5,400.00 | $6,181.25 | $5,200.00 | $6,500.00 | $5,200.00 | $4,777.72 |
| 123 | In RD IL (type SA) 50T-10-10(400W EQ)LED (610-7199) | EACH | 13 | $6,500.00 | $9,137.50 | $7,500.00 | $9,500.00 | $7,500.00 | $6,890.94 |
| 124 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 405 | $13.00 | $7.53 | $15.00 | $19.00 | $15.00 | $13.78 |
| 125 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 60 | $18.00 | $16.13 | $15.00 | $19.00 | $15.00 | $13.78 |
| 126 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 960 | $34.00 | $48.38 | $20.00 | $25.00 | $20.00 | $18.38 |
| 127 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 10,820 | $16.00 | $7.53 | $15.00 | $19.00 | $15.00 | $13.78 |
| 128 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 1,890 | $30.00 | $21.50 | $25.00 | $31.00 | $25.00 | $22.97 |
| 129 | Conduit (PVC) (schedule 80) (2") (concrete encse) (618-7057) | LF | 80 | $20.00 | $16.13 | $22.00 | $27.00 | $22.00 | $20.21 |
| 130 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 195 | $45.00 | $37.63 | $16.00 | $20.00 | $16.00 | $14.70 |
| 131 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 470 | $32.00 | $53.75 | $25.00 | $31.00 | $25.00 | $22.97 |
| 132 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 215 | $33.00 | $43.00 | $20.00 | $25.00 | $20.00 | $18.38 |
| 133 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 70 | $37.00 | $64.50 | $35.00 | $44.00 | $35.00 | $32.16 |
| 134 | Conduit (RM) (1") (618-7072) | LF | 120 | $37.00 | $69.88 | $30.00 | $38.00 | $30.00 | $27.56 |
| 135 | Electrical conductor (no.12) insulated (620-7004) | LF | 480 | $1.30 | $1.61 | $2.00 | $2.50 | $2.00 | $1.84 |
| 136 | Electrical conductor (no.8) insulated (620-7008) | LF | 2,230 | $3.00 | $2.15 | $2.50 | $3.00 | $2.50 | $2.30 |
| 137 | Electrical conductor (no.6) bare (620-7009) | LF | 15,680 | $2.50 | $2.69 | $2.60 | $3.25 | $2.60 | $2.39 |
| 138 | Electrical conductor (no.6) insulated (620-7010) | LF | 29,830 | $3.00 | $2.96 | $2.90 | $3.50 | $2.90 | $2.66 |
| 139 | Electrical conductor (no.4) bare (620-7011) | LF | 1,650 | $2.50 | $5.38 | $3.50 | $4.00 | $3.50 | $3.22 |
| 140 | Electrical conductor (no.4) insulated (620-7012) | LF | 825 | $3.00 | $5.91 | $3.75 | $4.50 | $3.75 | $3.45 |
| 141 | Electrical conductor (no.2) bare (620-7015) | LF | 1,160 | $2.00 | $7.53 | $5.00 | $6.00 | $5.00 | $4.59 |
| 142 | Electrical conductor (no.2) insulated (620-7016) | LF | 580 | $3.00 | $8.06 | $5.25 | $6.50 | $5.25 | $4.82 |
| 143 | Ground box type A (122311)W/apron (624-7002) | EACH | 31 | $1,500.00 | $2,150.00 | $1,300.00 | $1,500.00 | $1,300.00 | $1,194.43 |
| 144 | Ground box type D (162922)W/apron (624-7008) | EACH | 13 | $1,900.00 | $2,956.25 | $1,350.00 | $1,600.00 | $1,350.00 | $1,240.37 |
| 145 | Remove ground box (624-7013) | EACH | 6 | $400.00 | $537.50 | $500.00 | $600.00 | $500.00 | $459.40 |
| 146 | Elc SRV type A 240/480 100(NS)SS(E)SP(U) (628-7080) | EACH | 3 | $5,500.00 | $11,825 | $7,000.00 | $8,000.00 | $7,000.00 | $6,431.54 |
| 147 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 2 | $11,000 | $11,825 | $7,000.00 | $8,000.00 | $7,000.00 | $6,431.54 |
| 148 | Elc SRV type D 120/240 060(SS)SS(E)SP(O) (628-7161) | EACH | 1 | $8,000.00 | $13,438 | $8,000.00 | $9,000.00 | $8,000.00 | $7,350.33 |
| 149 | Aluminum signs (type A) (636-7001) | SF | 125 | $45.00 | $59.13 | $40.00 | $45.00 | $25.50 | $36.75 |
| 150 | Aluminum signs (type G) (636-7002) | SF | 1,150 | $30.00 | $40.85 | $38.00 | $40.00 | $39.75 | $34.91 |
| 151 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 49 | $750.00 | $732.08 | $681.00 | $800.00 | $68.75 | $150.88 |
| 152 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 60 | $825.00 | $842.80 | $784.00 | $1,000.00 | $769.00 | $717.58 |
| 153 | Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005) | EACH | 7 | $815.00 | $989.00 | $920.00 | $1,100.00 | $850.00 | $849.88 |
| 154 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 2 | $1,000.00 | $1,019.10 | $948.00 | $1,150.00 | $800.00 | $874.69 |
| 155 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 6 | $875.00 | $781.53 | $727.00 | $800.00 | $725.00 | $667.04 |
| 156 | Install small roadside sign support and assembly type 10BWG(1)SB(P-BM) (644-7010) | EACH | 2 | $850.00 | $781.53 | $727.00 | $800.00 | $775.00 | $795.67 |
| 157 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 2 | $990.00 | $942.78 | $877.00 | $1,000.00 | $775.00 | $795.67 |
| 158 | Install small roadside sign support and assembly type 10BWG(1)SB(U) (644-7015) | EACH | 1 | $1,000.00 | $1,054.58 | $981.00 | $1,200.00 | $850.00 | $856.31 |
| 159 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 1 | $1,000.00 | $994.38 | $925.00 | $1,100.00 | $775.00 | $856.31 |
| 160 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 2 | $1,100.00 | $1,093.28 | $1,017.00 | $1,200.00 | $875.00 | $941.76 |
| 161 | Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035) | EACH | 8 | $1,200.00 | $1,340.53 | $1,247.00 | $1,500.00 | $975.00 | $1,154.00 |
| 162 | Install small roadside sign support and assembly TYS80(1)SB(U) (644-7042) | EACH | 3 | $1,300.00 | $1,231.95 | $1,146.00 | $1,300.00 | $950.00 | $1,056.95 |
| 163 | Install small roadside sign support and assembly TYS80(1)SB(U-WC) (644-7046) | EACH | 4 | $1,200.00 | $1,263.13 | $1,175.00 | $1,500.00 | $1,250.00 | $1,079.58 |
| 164 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $300.00 | $683.70 | $636.00 | $800.00 | $475.00 | $577.92 |
| 165 | Relocate SM RD SN sup&AM(sign only) (644-7072) | EACH | 10 | $350.00 | $185.98 | $173.00 | $200.00 | $75.00 | $121.28 |
| 166 | Remove SM RD SN sup&AM (644-7073) | EACH | 64 | $100.00 | $141.00 | $150.00 | $200.00 | $100.00 | $86.56 |
| 167 | Install LRSS (struct steel) (647-7001) | LB | 7,926 | $9.00 | $8.92 | $8.30 | $10.00 | $12.00 | $7.63 |
| 168 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 11 | $75.00 | $77.40 | $72.00 | $28.00 | $80.00 | $66.15 |
| 169 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 6 | $23.00 | $53.75 | $25.00 | $52.00 | $80.00 | $17.50 |
| 170 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014) | EACH | 38 | $5.00 | $53.75 | $39.00 | $52.00 | $80.00 | $19.98 |
| 171 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BR) (658-7033) | EACH | 6 | $6.00 | $53.75 | $40.00 | $52.00 | $80.00 | $19.40 |
| 172 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 12 | $33.00 | $43.00 | $60.00 | $45.00 | $80.00 | $35.19 |
| 173 | Install delineator assembly (D-DW)SZ 1(WFLX)GND (658-7045) | EACH | 22 | $100.00 | $78.48 | $73.00 | $28.00 | $80.00 | $67.07 |
| 174 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 125 | $70.00 | $83.85 | $78.00 | $85.00 | $90.00 | $71.67 |
| 175 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 111 | $24.00 | $13.98 | $13.00 | $14.00 | $90.00 | $11.94 |
| 176 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 36 | $20.00 | $13.98 | $13.00 | $14.00 | $90.00 | $11.94 |
| 177 | Install OM LG RD sign (2-OM-PW)Y (658-7321) | EACH | 11 | $24.00 | $19.35 | $18.00 | $19.00 | $90.00 | $16.54 |
| 178 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 28,444 | $1.00 | $0.38 | $0.35 | $0.65 | $0.35 | $0.32 |
| 179 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 119,911 | $1.00 | $0.38 | $0.35 | $0.65 | $0.35 | $0.32 |
| 180 | Work zone pavement marking removing (W)8"(DOT) (662-7070) | LF | 5,251 | $1.75 | $0.43 | $0.40 | $1.00 | $0.40 | $0.37 |
| 181 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 1,373 | $14.00 | $5.91 | $5.50 | $7.00 | $5.50 | $5.05 |
| 182 | Work zone pavement marking removing (Y)6"(broken) (662-7098) | LF | 15,573 | $1.00 | $0.38 | $0.35 | $0.65 | $0.35 | $0.32 |
| 183 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 65,519 | $1.00 | $0.38 | $0.35 | $0.65 | $0.35 | $0.32 |
| 184 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 1,596 | $1.25 | $0.91 | $0.85 | $0.65 | $0.85 | $0.78 |
| 185 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 809 | $1.50 | $1.08 | $1.00 | $1.00 | $1.00 | $0.92 |
| 186 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 14,888 | $0.75 | $0.81 | $0.75 | $1.00 | $0.75 | $0.69 |
| 187 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,931 | $13.00 | $10.75 | $10.00 | $10.00 | $10.00 | $9.19 |
| 188 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 2 | $900.00 | $1,075.00 | $1,000.00 | $1,100.00 | $1,000.00 | $918.79 |
| 189 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 2 | $1,300.00 | $1,612.50 | $1,500.00 | $1,100.00 | $1,500.00 | $1,378.19 |
| 190 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 14 | $30.00 | $69.88 | $65.00 | $45.00 | $65.00 | $59.72 |
| 191 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 2,028 | $6.00 | $10.75 | $10.00 | $9.00 | $10.00 | $9.19 |
| 192 | Pavement sler 6" (666-7347) | LF | 6,475 | $0.50 | $0.38 | $0.35 | $0.25 | $0.35 | $0.32 |
| 193 | Pavement sler 8" (666-7348) | LF | 3,545 | $0.50 | $0.43 | $0.40 | $0.45 | $0.40 | $0.37 |
| 194 | Pavement sler 24" (666-7352) | LF | 674 | $1.75 | $4.30 | $4.00 | $3.10 | $4.00 | $3.68 |
| 195 | Pavement sler (arrow) (666-7353) | EACH | 9 | $30.00 | $86.00 | $80.00 | $80.00 | $80.00 | $73.50 |
| 196 | Pavement sler (word) (666-7354) | EACH | 11 | $34.00 | $107.50 | $100.00 | $85.00 | $100.00 | $91.88 |
| 197 | Pavement sler (double arrow) (666-7356) | EACH | 4 | $36.00 | $172.00 | $160.00 | $105.00 | $160.00 | $147.01 |
| 198 | Pavement sler (uturn arrow) (666-7358) | EACH | 2 | $60.00 | $150.50 | $140.00 | $125.00 | $140.00 | $128.63 |
| 199 | Pavement sler (yld tri) (666-7365) | EACH | 14 | $20.00 | $21.50 | $20.00 | $40.00 | $20.00 | $18.38 |
| 200 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 9,367 | $0.75 | $0.70 | $0.65 | $0.70 | $0.65 | $0.60 |
| 201 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 48,680 | $0.75 | $0.70 | $0.65 | $0.70 | $0.65 | $0.37 |
| 202 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 53,159 | $0.75 | $0.70 | $0.65 | $0.70 | $0.65 | $0.60 |
| 203 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 438 | $15.00 | $16.13 | $15.00 | $13.00 | $15.00 | $13.78 |
| 204 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 34 | $180.00 | $258.00 | $240.00 | $200.00 | $240.00 | $220.51 |
| 205 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 6 | $300.00 | $430.00 | $400.00 | $400.00 | $400.00 | $367.52 |
| 206 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 8 | $340.00 | $483.75 | $450.00 | $600.00 | $450.00 | $413.46 |
| 207 | Prefabricated PM type C (W)(U-LT arrow) (668-7098) | EACH | 4 | $400.00 | $483.75 | $450.00 | $625.00 | $450.00 | $413.46 |
| 208 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 4 | $510.00 | $564.38 | $525.00 | $625.00 | $525.00 | $482.37 |
| 209 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 43 | $240.00 | $365.50 | $340.00 | $300.00 | $340.00 | $312.39 |
| 210 | Reflectorized pavement marker type I-C (672-7002) | EACH | 682 | $4.00 | $5.38 | $5.00 | $5.25 | $5.00 | $4.59 |
| 211 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 281 | $4.50 | $5.38 | $5.00 | $5.25 | $5.00 | $4.59 |
| 212 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 800 | $4.00 | $5.38 | $5.00 | $5.25 | $5.00 | $4.59 |
| 213 | Pavement surface preparation for marking (6") (678-7002) | LF | 6,475 | $0.50 | $0.38 | $0.35 | $0.30 | $0.35 | $0.32 |
| 214 | Pavement surface preparation for marking (8") (678-7004) | LF | 3,545 | $0.15 | $0.43 | $0.40 | $0.35 | $0.40 | $0.37 |
| 215 | Pavement surface preparation for marking (24") (678-7008) | LF | 674 | $3.00 | $3.76 | $3.50 | $2.10 | $3.50 | $3.22 |
| 216 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 9 | $20.00 | $80.63 | $75.00 | $64.00 | $75.00 | $68.91 |
| 217 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 4 | $22.00 | $193.50 | $180.00 | $76.00 | $180.00 | $165.38 |
| 218 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 2 | $4.00 | $193.50 | $180.00 | $190.00 | $180.00 | $165.38 |
| 219 | Pavement surface preparation for marking (word) (678-7016) | EACH | 11 | $20.00 | $96.75 | $90.00 | $65.00 | $90.00 | $82.69 |
| 220 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 14 | $12.00 | $19.35 | $18.00 | $40.00 | $18.00 | $16.54 |
| 221 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $32,000 | $67,188 | $50,000 | $55,000 | $50,000 | $45,940 |
| 222 | Removing traffic signals (680-7004) | EACH | 1 | $10,000 | $13,438 | $4.00 | $5,000.00 | $4,000.00 | $3,675.17 |
| 223 | Temporary traffic signals (681-7001) | EACH | 1 | $105,000 | $456,875 | $50,000 | $55,000 | $50,000 | $45,940 |
| 224 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 20 | $355.00 | $430.00 | $350.00 | $400.00 | $350.00 | $321.58 |
| 225 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 8 | $375.00 | $430.00 | $350.00 | $400.00 | $350.00 | $321.58 |
| 226 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 20 | $345.00 | $430.00 | $350.00 | $400.00 | $350.00 | $321.58 |
| 227 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $470.00 | $430.00 | $350.00 | $400.00 | $350.00 | $321.58 |
| 228 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 20 | $345.00 | $430.00 | $350.00 | $400.00 | $350.00 | $321.58 |
| 229 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 8 | $400.00 | $430.00 | $350.00 | $400.00 | $350.00 | $321.58 |
| 230 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 16 | $1,000.00 | $967.50 | $675.00 | $700.00 | $675.00 | $620.18 |
| 231 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 16 | $210.00 | $188.13 | $180.00 | $200.00 | $180.00 | $165.38 |
| 232 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 8 | $275.00 | $215.00 | $190.00 | $210.00 | $190.00 | $174.57 |
| 233 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 730 | $4.00 | $4.30 | $2.85 | $3.00 | $2.85 | $2.62 |
| 234 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 470 | $5.00 | $5.38 | $3.50 | $4.00 | $3.50 | $3.22 |
| 235 | Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036) | LF | 2,250 | $6.00 | $6.45 | $3.75 | $4.00 | $3.75 | $3.45 |
| 236 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 1,690 | $8.00 | $10.75 | $9.00 | $10.00 | $9.00 | $8.27 |
| 237 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 4,000 | $3.00 | $3.23 | $3.00 | $3.50 | $3.00 | $2.76 |
| 238 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 2 | $18,900 | $19,888 | $16,000 | $18,000 | $16,000 | $14,701 |
| 239 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 4 | $21,200 | $24,188 | $20,000 | $22,000 | $20,000 | $18,376 |
| 240 | Pedestrian pole assembly (687-7001) | EACH | 8 | $4,600.00 | $4,138.75 | $3,500.00 | $4,000.00 | $3,500.00 | $3,215.77 |
| 241 | Pedestrian detect push button (APS) (688-7001) | EACH | 14 | $1,100.00 | $1,290.00 | $725.00 | $800.00 | $725.00 | $666.12 |
| 242 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $5,000.00 | $6,987.50 | $3,500.00 | $4,000.00 | $3,500.00 | $3,215.77 |
| 243 | Post and cable fence (removal) (772-7001) | LF | 2,938 | $3.00 | $5.38 | $5.00 | $6.00 | $5.10 | $3.54 |
| 244 | Carbon fiber reinforced polymer protection (786-7001) | SF | 1,044.30 | $60.00 | $47.30 | $40.00 | $98.00 | $44.00 | $62.13 |
| 245 | Bonding course (3007-7001) | GAL | 23,686 | $3.00 | $2.76 | $6.00 | $6.00 | $3.00 | $2.29 |
| 246 | Install DMS (pole MTD cabinet) (6004-7001) | EACH | 2 | $15,000 | $37,625 | $15,000 | $16,000 | $15,000 | $13,782 |
| 247 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $10,800 | $13,438 | $10,000 | $12,000 | $10,000 | $9,187.91 |
| 248 | RVDS (presence detection only) (6008-7001) | EACH | 6 | $10,400 | $8,600.00 | $6,000.00 | $7,000.00 | $6,000.00 | $5,512.75 |
| 249 | RVDS (advance detection only) (6008-7002) | EACH | 4 | $7,500.00 | $8,600.00 | $7,000.00 | $8,000.00 | $7,000.00 | $6,431.54 |
| 250 | ITS pole (50 FT) (90 MPH) (6011-7005) | EACH | 2 | $25,000 | $18,813 | $15,000 | $17,000 | $15,000 | $13,782 |
| 251 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 1 | $3,500.00 | $10,213 | $2,500.00 | $3,000.00 | $2,500.00 | $2,296.98 |
| 252 | CCTV field equipment (digital) (6018-7002) | EACH | 2 | $8,000.00 | $19,888 | $12,500 | $14,000 | $12,500 | $11,485 |
| 253 | CCTV mount (pole) (6018-7003) | EACH | 3 | $1,300.00 | $2,150.00 | $300.00 | $350.00 | $300.00 | $275.64 |
| 254 | ITS com CBL (ethernet) (6018-7004) | LF | 570 | $4.00 | $18.81 | $1.75 | $2.00 | $1.75 | $1.61 |
| 255 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 16,235 | $138.00 | $142.00 | $137.00 | $200.14 | $185.00 | $193.58 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.