TxDOT contract A00124174 bid tabulation
Convert Non-Freeway, FM 1585 (CR 2240 (AVE U) to 0.5 MI EAST OF US 87). Let by Texas DOT on July 2, 2026, Lubbock, Lubbock District. 5 bids received; low bid $221,640,502 by Williams Brothers Construction Co., Inc., -25% against the engineer's estimate of $296,722,197.
- Owner
- Texas DOT
- Letting
- 02 JUL 2026
- Pay items
- 404
- Data through
- 19 NOV 2026
4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Williams Brothers Construction Co., Inc. | $221,640,502 | Low | -25% |
| 3 | Sema Construction, Inc. | $269,724,854 | +22% | -9.0% |
| 4 | Zachry Construction Corporation | $276,846,375 | +25% | -7.0% |
| 5 | Pulice Construction, Inc. | $307,007,227 | +39% | +3.0% |
Engineer's estimate: $296,722,197.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Williams Brothers Construction Co., Inc. | 2. Sema Construction, Inc. | 3. Zachry Construction Corporation | 4. Pulice Construction, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparation row (tree remove) (24"-36" diameter) (100-7005) | EACH | 3 | $5,000.00 | $6,033.79 | $1,218.66 | $50,000 | |
| 2 | Preparation row (tree prune and trim) (100-7010) | STA | 1 | $15,000 | $28,314 | $6,128.88 | $10,000 | |
| 3 | Disposal of water well (103-7001) | EACH | 4 | $1,400.00 | $7,500.00 | $5,000.00 | $2,451.55 | $7,500.00 |
| 4 | Removing concrete (riprap) (104-7006) | SY | 29,584 | $18.00 | $6.00 | $9.89 | $8.49 | $30.00 |
| 5 | Removing concrete (driveways) (104-7011) | SY | 12,865 | $18.00 | $13.00 | $11.64 | $10.23 | $100.00 |
| 6 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 641 | $18.00 | $11.00 | $24.92 | $14.42 | $50.00 |
| 7 | Removing concrete (curb & gutter) (104-7017) | LF | 17,502 | $12.00 | $3.00 | $6.26 | $21.63 | $50.00 |
| 8 | Removing concrete (flume) (104-7041) | SY | 98 | $50.00 | $31.65 | $36.48 | $80.00 | |
| 9 | Removing concrete (miscellaneous) (104-7046) | SY | 5,898 | $37.00 | $8.00 | $8.92 | $19.42 | $80.00 |
| 10 | Remove (10"-14") TRT/untrt base & asphalt pavement (105-7010) | SY | 249,379 | $6.50 | $7.00 | $3.72 | $10.91 | $15.00 |
| 11 | Excavation (roadway) (110-7001) | CY | 209,733 | $20.00 | $47.00 | $13.54 | $10.50 | $46.50 |
| 12 | Embankment (final)(DC)(type B) (132-7004) | CY | 38,206 | $28.00 | $10.00 | $6.00 | $10.00 | $31.04 |
| 13 | Embankment (final)(DC)(type C) (132-7006) | CY | 257,237 | $29.00 | $14.00 | $18.58 | $45.00 | $15.00 |
| 14 | Furn & place topsoil (4") (160-7002) | SY | 401,027 | $1.20 | $1.00 | $4.78 | $1.92 | $3.76 |
| 15 | Block sodding (162-7002) | SY | 15,973 | $5.00 | $6.00 | $5.97 | $8.71 | $7.14 |
| 16 | Drill seed (permanent_urban_sand) (164-7011) | SY | 400,916 | $0.50 | $0.20 | $0.12 | $0.24 | $0.19 |
| 17 | Drill seed (temporary_warm_cool) (164-7015) | SY | 53,979 | $0.50 | $0.20 | $0.12 | $0.22 | $0.18 |
| 18 | Hydro mulch seed (permanent_urban_sandy) (164-7019) | SY | 400,916 | $1.00 | $0.50 | $0.45 | $0.72 | $0.59 |
| 19 | Vegetative watering (168-7001) | TGL | 15,853 | $12.00 | $30.00 | $42.72 | $28.83 | $11.16 |
| 20 | Soil retention blankets (CL 1) (type B) (169-7043) | SY | 33,374 | $5.50 | $1.50 | $0.74 | $1.68 | $1.38 |
| 21 | Proof rolling (216-7001) | HR | 200 | $160.00 | $100.00 | $209.15 | $78.45 | $500.00 |
| 22 | FL BS (compacted in place)(type A GR 4) (6") (247-7046) | SY | 8,325 | $21.00 | $15.00 | $14.90 | $19.23 | $50.00 |
| 23 | FL BS (compacted in place) (type A GR 4) (9") (247-7347) | SY | 14,654 | $34.00 | $20.00 | $21.46 | $27.60 | $75.00 |
| 24 | Lime TRT (subgrade) (8") (260-7020) | SY | 19,329 | $6.00 | $3.25 | $6.13 | $6.57 | $10.06 |
| 25 | Lime (quicklime) (grade DS) (260-7025) | TON | 383 | $440.00 | $425.00 | $378.50 | $470.35 | $740.85 |
| 26 | Salvage, haul & stockpile reclaimed asphalt PV (3 1/2") (305-7017) | SY | 249,379 | $4.50 | $2.60 | $1.97 | $0.70 | $30.00 |
| 27 | Prime coat (MC-30) (310-7004) | GAL | 4,597 | $8.00 | $5.00 | $10.00 | $7.67 | $11.13 |
| 28 | Fog seal (CSS-1H) (315-7004) | GAL | 3,546 | $6.00 | $5.00 | $5.00 | $8.58 | $8.15 |
| 29 | D-GR HMA type-C sac-B PG70-28 (341-7028) | TON | 93,077 | $150.00 | $144.00 | $164.25 | $200.10 | $201.77 |
| 30 | D-GR HMA type D sac-A PG70-28 (341-7053) | TON | 1,457 | $145.00 | $151.00 | $186.00 | $226.76 | $282.43 |
| 31 | Stone-MTRX-asphalt SMA-D sac-A PG76-28 (346-7010) | TON | 4,258 | $210.00 | $197.00 | $179.00 | $218.18 | $347.61 |
| 32 | Tack coat (346-7028) | GAL | 2,779 | $3.00 | $5.00 | $3.00 | $3.68 | $8.15 |
| 33 | Flexible pavement structure repair(3") (351-7002) | SY | 5,000 | $50.00 | $51.00 | $75.00 | $50.64 | $101.61 |
| 34 | Flexible pavement structure repair(6") (351-7005) | SY | 14,340 | $70.00 | $100.00 | $90.00 | $77.48 | $233.75 |
| 35 | Planing asphalt concrete pavement(2") (354-7051) | SY | 8,168 | $4.00 | $0.80 | $1.89 | $4.45 | |
| 36 | Concrete pavement (CRCP) (8") (360-7002) | SY | 55,505 | $120.00 | $70.00 | $74.97 | $85.00 | $105.00 |
| 37 | Concrete pavement (CRCP) (9") (360-7003) | SY | 78,688 | $125.00 | $85.00 | $85.90 | $90.00 | $105.00 |
| 38 | Concrete pavement (CRCP) (10") (360-7004) | SY | 105,211 | $175.00 | $80.00 | $87.42 | $95.00 | $105.00 |
| 39 | Concrete pavement (CRCP) (12") (360-7006) | SY | 124,236 | $150.00 | $95.00 | $103.03 | $105.00 | $125.00 |
| 40 | Concrete pavement(transition slab) (8") (360-7031) | SY | 707 | $175.00 | $255.00 | $189.83 | $201.57 | $125.00 |
| 41 | Concrete pavement(transition slab) (9") (360-7032) | SY | 144 | $275.00 | $223.59 | $207.67 | $155.00 | |
| 42 | Concrete pavement(transition slab) (12") (360-7035) | SY | 171 | $315.00 | $213.23 | $220.11 | $175.00 | |
| 43 | Struct excavation (400-7001) | CY | 6,052 | $100.00 | $20.00 | $34.13 | $37.12 | $50.00 |
| 44 | Struct excavation (box) (400-7002) | CY | 10,358 | $20.00 | $5.00 | $29.71 | $10.00 | $20.00 |
| 45 | Struct excavation (pipe) (400-7003) | CY | 153,669 | $20.00 | $5.00 | $31.53 | $15.00 | $10.00 |
| 46 | Struct excavation (special) (400-7005) | CY | 161,670 | $80.00 | $39.00 | $24.34 | $13.00 | $60.00 |
| 47 | Flowable backfill (401-7001) | CY | 1,190 | $140.00 | $178.91 | $292.24 | $329.93 | |
| 48 | Flowable fill (embankment) (401-7002) | CY | 47,743 | $300.00 | $140.00 | $140.00 | $175.00 | $302.55 |
| 49 | Trench excavation protection (402-7001) | LF | 55,045 | $11.00 | $3.00 | $3.00 | $3.71 | $2.84 |
| 50 | Temporary special shoring (403-7001) | SF | 108,167 | $40.00 | $30.00 | $65.16 | $32.38 | $27.68 |
| 51 | Foundaton loadtest(D4945)(drilld shaft) (405-7003) | EACH | 8 | $26,000 | $55,000 | $27,068 | $48,110 | $27,876 |
| 52 | Drilled shaft (18 in) (416-7002) | LF | 120 | $200.00 | $222.86 | $180.09 | $174.11 | |
| 53 | Drilled shaft (36 in) (416-7006) | LF | 4,254 | $330.00 | $500.00 | $251.98 | $307.14 | $274.94 |
| 54 | Drilled shaft (42 in) (416-7007) | LF | 125 | $330.00 | $450.00 | $603.50 | $612.88 | $633.33 |
| 55 | Drilled shaft (48 in) (416-7008) | LF | 3,304 | $400.00 | $650.00 | $376.73 | $313.40 | $405.47 |
| 56 | Drilled shaft (54 in) (416-7009) | LF | 4,852 | $750.00 | $750.00 | $472.80 | $404.75 | $514.80 |
| 57 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 186 | $370.00 | $165.00 | $230.00 | $287.57 | $176.75 |
| 58 | Drilled shaft (sign mounts) (36 in) (416-7030) | LF | 290 | $500.00 | $375.00 | $380.00 | $475.11 | $478.57 |
| 59 | Drilled shaft (sign mounts) (48 in) (416-7032) | LF | 44 | $475.00 | $530.00 | $662.65 | $889.81 | |
| 60 | Drilled shaft (sign mounts) (54 in) (416-7033) | LF | 144 | $550.00 | $680.00 | $850.20 | $1,076.32 | |
| 61 | Drilled shaft (high mast pole) (60 in) (416-7037) | LF | 79 | $750.00 | $600.00 | $880.00 | $1,100.25 | $907.34 |
| 62 | Drilled shaft (high mast pole) (66 in) (416-7038) | LF | 326 | $1,300.00 | $650.00 | $980.00 | $1,225.29 | $1,010.27 |
| 63 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 350 | $330.00 | $195.00 | $270.00 | $337.58 | $262.03 |
| 64 | Drilled shaft (traffic signal pole) (42 in) (416-7045) | LF | 72 | $500.00 | $450.00 | $480.00 | $600.14 | $713.34 |
| 65 | Class C concrete (abutment) (420-7012) | CY | 223.70 | $400.00 | $1,800.00 | $2,081.65 | $1,440.79 | $1,600.00 |
| 66 | Class C concrete (cap) (420-7022) | CY | 239.20 | $1,500.00 | $2,495.68 | $1,383.22 | $2,000.00 | |
| 67 | Class C concrete (cap)(mass) (420-7024) | CY | 485.50 | $1,500.00 | $1,000.00 | $1,745.39 | $1,287.88 | $1,400.00 |
| 68 | Class C concrete (column) (420-7038) | CY | 1,342.40 | $1,450.00 | $1,600.00 | $2,150.05 | $2,376.38 | $2,300.00 |
| 69 | Class C concrete (column)(mass) (420-7040) | CY | 9,178.60 | $1,250.00 | $800.00 | $1,502.89 | $1,492.23 | $1,350.00 |
| 70 | Class C concrete (footing) (420-7044) | CY | 627 | $1,200.00 | $900.00 | $1,849.20 | $1,582.89 | $1,800.00 |
| 71 | Class C concrete (footing)(mass) (420-7046) | CY | 2,812.80 | $1,150.00 | $200.00 | $1,537.41 | $1,096.14 | $1,250.00 |
| 72 | CL F concrete (cap)(invt) (420-7079) | CY | 3,115.30 | $1,050.00 | $1,300.00 | $2,124.55 | $1,934.66 | $1,900.00 |
| 73 | CL F concrete (cap)(STRDL) (420-7087) | CY | 661.80 | $1,150.00 | $1,700.00 | $2,626.32 | $4,674.44 | $1,500.00 |
| 74 | Class A concrete (channel lining) (420-7150) | CY | 561 | $660.00 | $650.00 | $563.54 | $837.62 | $839.93 |
| 75 | Reinforced concrete slab (422-7001) | SF | 393,045 | $31.00 | $30.00 | $31.41 | $35.66 | $30.00 |
| 76 | Approach slab (422-7013) | CY | 420 | $770.00 | $250.00 | $678.98 | $759.27 | $750.00 |
| 77 | Retaining wall (MSE) (423-7001) | SF | 121,125 | $83.00 | $100.00 | $155.51 | $80.43 | $125.00 |
| 78 | Prestressed concrete girder (TX54) (425-7005) | LF | 43,356.48 | $290.00 | $140.00 | $260.01 | $272.85 | $240.00 |
| 79 | Epoxy waterproof finish (type X) (427-7005) | SF | 28,634 | $11.00 | $3.57 | $3.57 | $6.79 | $3.57 |
| 80 | Riprap (concrete)(5 in) (432-7002) | CY | 1,826.40 | $750.00 | $650.00 | $603.20 | $519.75 | $654.22 |
| 81 | Riprap (concrete)(6 in) (432-7003) | CY | 24 | $650.00 | $552.96 | $695.71 | $484.91 | |
| 82 | Riprap (concrete)(flume) (432-7012) | CY | 20 | $600.00 | $650.00 | $713.55 | $926.14 | $714.62 |
| 83 | Riprap (mow strip)(5 in) (432-7014) | CY | 1,271 | $690.00 | $650.00 | $713.54 | $600.78 | $559.47 |
| 84 | Riprap (stone type R)(dry)(6 in) (432-7021) | CY | 2,392 | $220.00 | $250.00 | $320.87 | $251.38 | $349.56 |
| 85 | Riprap (stone common)(grout)(12 in) (432-7038) | CY | 24 | $600.00 | $605.92 | $732.81 | $2,200.81 | |
| 86 | Riprap (stone protection)(12 in) (432-7041) | CY | 2,047 | $160.00 | $200.00 | $293.03 | $258.11 | $341.98 |
| 87 | Riprap (stone protection)(18 in) (432-7043) | CY | 47 | $200.00 | $600.00 | $640.64 | $341.46 | $1,249.48 |
| 88 | Sliding elastomeric bearing (ES 8) (434-7048) | EACH | 8 | $4,000.00 | $6,000.00 | $5,288.45 | $9,448.22 | $4,113.10 |
| 89 | Sliding elastomeric bearing (ES9) (mod) (434-7113) | EACH | 8 | $3,900.00 | $6,000.00 | $6,791.47 | $11,179 | $4,113.10 |
| 90 | Elastomeric bearing (F9) (mod) (434-7114) | EACH | 8 | $4,000.00 | $6,000.00 | $7,516.84 | $12,052 | $4,113.10 |
| 91 | Cleaning and sealing existing joints (438-7001) | LF | 13,879 | $40.00 | $6.00 | $8.00 | $9.81 | $6.12 |
| 92 | STR steel (plate girder) (442-7001) | LB | 4,062,000 | $3.40 | $2.60 | $2.84 | $3.28 | $3.50 |
| 93 | Rail (type SSTR) (450-7024) | LF | 18,042 | $80.00 | $55.00 | $98.52 | $73.05 | $45.16 |
| 94 | Rail (type T80SS) (450-7028) | LF | 23,025 | $170.00 | $115.00 | $155.55 | $122.22 | $91.24 |
| 95 | Rail (handrail)(type E) (450-7062) | LF | 167 | $175.00 | $450.00 | $350.00 | $204.17 | $231.05 |
| 96 | Rail (type SSTR)(mod) (450-7066) | LF | 1,323 | $170.00 | $70.00 | $312.91 | $221.92 | $44.26 |
| 97 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 1,346 | $250.00 | $160.00 | $217.53 | $272.27 | $289.68 |
| 98 | Sealed expansion joint (5 in) (SEJ - M) (454-7005) | LF | 112 | $200.00 | $160.00 | $218.85 | $272.28 | $351.84 |
| 99 | Concrete box culvert (3 FT X 3 FT) (462-7002) | LF | 2,666 | $500.00 | $250.00 | $250.00 | $309.51 | $750.00 |
| 100 | Concrete box culvert (4 FT X 4 FT) (462-7005) | LF | 159 | $710.00 | $310.00 | $310.00 | $383.79 | $750.00 |
| 101 | Concrete box culvert (5 FT X 3 FT) (462-7007) | LF | 251 | $670.00 | $360.00 | $360.00 | $445.69 | $750.00 |
| 102 | Concrete box culvert (5 FT X 5 FT) (462-7009) | LF | 515 | $660.00 | $430.00 | $430.00 | $532.35 | $900.00 |
| 103 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 179 | $750.00 | $460.00 | $460.00 | $569.49 | $1,100.00 |
| 104 | RC pipe (CL III)(18 in) (464-7003) | LF | 0 | $105.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 105 | RC pipe (CL III)(24 in) (464-7005) | LF | 0 | $130.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 106 | RC pipe (CL III)(30 in) (464-7007) | LF | 0 | $160.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 107 | RC pipe (CL III)(36 in) (464-7009) | LF | 0 | $180.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 108 | RC pipe (CL III)(42 in) (464-7010) | LF | 0 | $270.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 109 | RC pipe (CL III)(48 in) (464-7011) | LF | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 110 | RC pipe (CL III)(54 in) (464-7012) | LF | 489 | $285.00 | $285.00 | $352.84 | $547.10 | |
| 111 | RC pipe (CL III)(60 in) (464-7013) | LF | 1,806 | $330.00 | $330.00 | $408.55 | $542.91 | |
| 112 | RC pipe (CL IV)(24 in) (464-7021) | LF | 2,886 | $160.00 | $108.00 | $108.00 | $133.70 | $247.12 |
| 113 | RC pipe (CL IV)(30 in) (464-7023) | LF | 1,544 | $135.00 | $135.00 | $167.13 | $257.76 | |
| 114 | RC pipe (CL IV)(36 in) (464-7024) | LF | 890 | $195.00 | $195.00 | $241.41 | $382.63 | |
| 115 | RC pipe (CL IV)(42 in) (464-7025) | LF | 4,178 | $340.00 | $250.00 | $250.00 | $309.50 | $460.40 |
| 116 | RC pipe (CL IV)(48 in) (464-7026) | LF | 4,982 | $380.00 | $310.00 | $310.00 | $383.79 | $461.55 |
| 117 | RC pipe (CL IV)(54 in) (464-7027) | LF | 1,021 | $550.00 | $425.00 | $425.00 | $526.16 | $538.44 |
| 118 | RC pipe (CL V)(24 in) (464-7034) | LF | 977 | $115.00 | $115.00 | $142.37 | $257.82 | |
| 119 | RC pipe (CL V)(30 in) (464-7036) | LF | 132 | $165.00 | $165.00 | $204.27 | $296.12 | |
| 120 | RC pipe (CL V)(48 in) (464-7039) | LF | 764 | $400.00 | $400.00 | $495.21 | $678.30 | |
| 121 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 1 | $12,115 | $12,115 | $14,999 | $14,709 | |
| 122 | Junction box(complete)(PJB)(4FTX4FT) (465-7006) | EACH | 1 | $9,185.00 | $9,185.00 | $11,371 | $8,550.06 | |
| 123 | Junction box(complete)(PJB)(3FTX5FT) (465-7007) | EACH | 3 | $9,070.00 | $9,070.00 | $11,229 | $8,519.84 | |
| 124 | Junction box(complete)(PJB)(5FTX6FT) (465-7010) | EACH | 2 | $11,310 | $11,310 | $14,002 | $13,804 | |
| 125 | Inlet (complete)(pco)(3FT)(none) (465-7013) | EACH | 13 | $24,690 | $24,690 | $30,567 | $28,475 | |
| 126 | Inlet (complete)(pco)(3FT)(left) (465-7014) | EACH | 38 | $14,580 | $14,580 | $18,051 | $15,474 | |
| 127 | Inlet (complete)(pco)(3FT)(right) (465-7015) | EACH | 24 | $13,985 | $13,985 | $17,314 | $14,706 | |
| 128 | Inlet (complete)(pco)(3FT)(both) (465-7016) | EACH | 54 | $6,500.00 | $14,890 | $14,890 | $18,434 | $15,877 |
| 129 | Inlet (complete)(pco)(4FT)(none) (465-7017) | EACH | 1 | $11,355 | $11,355 | $14,058 | $11,327 | |
| 130 | Inlet (complete)(pco)(5FT)(none) (465-7021) | EACH | 2 | $11,520 | $11,520 | $14,262 | $11,534 | |
| 131 | Inlet (complete)(pco)(5FT)(both) (465-7024) | EACH | 1 | $13,862 | $13,862 | $17,162 | $14,552 | |
| 132 | Inlet (complete)(pcu)(3FT)(right) (465-7031) | EACH | 1 | $9,700.00 | $12,405 | $12,405 | $15,358 | $12,677 |
| 133 | Inlet (complete)(PMBD)(4FT) (465-7045) | EACH | 11 | $7,500.00 | $12,740 | $12,740 | $15,773 | $13,106 |
| 134 | Inlet (complete)(PMBD)(5FT) (465-7046) | EACH | 2 | $8,500.00 | $17,535 | $17,535 | $21,709 | $19,278 |
| 135 | Inlet (complete)(PMBD)(6FT) (465-7047) | EACH | 3 | $8,000.00 | $24,235 | $24,235 | $30,004 | $30,419 |
| 136 | Inlet (complete)(PSL)(SL)(3FTX3FT) (465-7054) | EACH | 1 | $8,620.00 | $8,620.00 | $10,672 | $13,484 | |
| 137 | Inlet (complete)(PSL)(RC)(3FTX3FT) (465-7070) | EACH | 63 | $9,000.00 | $15,035 | $15,035 | $18,614 | $21,725 |
| 138 | Inlet (complete)(PSL)(RC)(4FTX4FT) (465-7071) | EACH | 2 | $12,645 | $12,645 | $15,655 | $16,539 | |
| 139 | Inlet (complete)(PSL)(RC)(6FTX6FT) (465-7076) | EACH | 5 | $18,070 | $18,070 | $22,371 | $28,306 | |
| 140 | Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126) | EACH | 51 | $7,000.00 | $10,690 | $10,690 | $13,235 | $16,129 |
| 141 | Inlet (complete)(PSL)(FG)(4FTX4FT-3FTX3FT) (465-7127) | EACH | 3 | $11,485 | $11,485 | $14,219 | $17,220 | |
| 142 | Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128) | EACH | 24 | $9,200.00 | $12,210 | $12,210 | $15,116 | $18,151 |
| 143 | Inlet (complete)(PSL)(FG)(3FTX5FT-3FTX5FT) (465-7130) | EACH | 1 | $11,285 | $11,285 | $13,971 | $16,908 | |
| 144 | Inlet(complete)(PSL)(SFG)(3FTX3FT-3FTX3FT) (465-7146) | EACH | 4 | $28,125 | $28,125 | $34,820 | $38,557 | |
| 145 | Inlet(complete)(PSL)(SFG)(4FTX4FT-4FTX4FT) (465-7147) | EACH | 4 | $20,255 | $20,255 | $25,076 | $28,507 | |
| 146 | Inlet(complete)(PSL)(SFG)(3FTX5FT-3FTX5FT) (465-7148) | EACH | 1 | $33,510 | $33,510 | $41,486 | $45,494 | |
| 147 | Inlet (complete)(pazd)(SL)(5FTX5FT) (465-7151) | EACH | 1 | $6,000.00 | $12,600 | $12,600 | $15,599 | $18,680 |
| 148 | Inlet(complete)(pazd)(FG)(4FTX4FT-4FTX4FT) (465-7160) | EACH | 3 | $11,410 | $11,410 | $14,126 | $17,142 | |
| 149 | Inl(CMP)(pazd-CZ)(FG)(4FTX4FT-4FTX4FT) (465-7165) | EACH | 5 | $10,000 | $34,375 | $34,375 | $42,557 | $46,681 |
| 150 | Inlet (complete) (rwi) (type II) (465-7349) | EACH | 29 | $13,000 | $10,190 | $10,190 | $12,616 | $7,842.68 |
| 151 | Inlet (stage II) (pco) (3FT) (both) (465-7350) | EACH | 15 | $13,000 | $8,580.00 | $8,580.00 | $10,622 | $7,034.39 |
| 152 | Inlet (SPCL) (type MSE2) (top only) (465-7351) | EACH | 13 | $2,600.00 | $10,125 | $10,125 | $12,535 | $7,758.01 |
| 153 | Inlet (stageii) (pcu) (3 FT) (both) (465-7412) | EACH | 2 | $13,000 | $9,120.00 | $9,120.00 | $11,291 | $7,727.32 |
| 154 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 1 | $27,000 | $27,745 | $48,880 | $30,525 | $22,604 |
| 155 | Wingwall (PW-MSE)(dal) (466-7229) | EACH | 1 | $25,000 | $29,140 | $16,940 | $3,639.05 | $20,483 |
| 156 | Set (type I) (48 in) (6: 1) (C) (467-7025) | EACH | 2 | $19,400 | $12,246 | $52,787 | $28,298 | |
| 157 | Set (type I)(S= 3 FT)(HW= 4 FT)(6:1)(C) (467-7046) | EACH | 2 | $13,000 | $12,945 | $14,246 | $29,006 | $24,640 |
| 158 | Set (type I)(S= 3 FT)(HW= 5 FT)(6:1)(C) (467-7050) | EACH | 2 | $36,000 | $18,726 | $16,246 | $40,081 | $29,664 |
| 159 | Set (type I)(S= 4 FT)(HW= 5 FT)(3:1)(C) (467-7075) | EACH | 1 | $18,000 | $12,344 | $19,246 | $23,152 | $20,820 |
| 160 | Set (type I)(S= 4 FT)(HW= 5 FT)(6:1)(C) (467-7077) | EACH | 1 | $26,000 | $19,150 | $19,246 | $44,780 | $35,443 |
| 161 | Set (type I)(S= 5 FT)(HW= 6 FT)(6:1)(C) (467-7109) | EACH | 2 | $29,000 | $21,385 | $20,246 | $62,234 | $51,514 |
| 162 | Set (type I)(S= 6 FT)(HW= 4 FT)(6:1)(C) (467-7130) | EACH | 2 | $2,500.00 | $16,185 | $20,246 | $38,163 | $34,286 |
| 163 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 11 | $2,500.00 | $7,775.00 | $7,775.00 | $9,625.72 | $4,733.70 |
| 164 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 12 | $2,700.00 | $7,775.00 | $7,775.00 | $9,625.72 | $4,733.62 |
| 165 | Set (type II) (30 in) (RCP) (6: 1) (C) (467-7347) | EACH | 1 | $10,540 | $10,540 | $13,049 | $8,293.88 | |
| 166 | Set (type II) (36 in) (RCP) (6: 1) (C) (467-7367) | EACH | 2 | $12,630 | $12,630 | $15,636 | $10,980 | |
| 167 | Set (type II) (48 in) (RCP) (6: 1) (C) (467-7391) | EACH | 1 | $15,040 | $15,040 | $18,620 | $14,919 | |
| 168 | Set (type II) (54 in) (RCP) (6: 1) (C) (467-7399) | EACH | 1 | $17,000 | $17,665 | $17,665 | $21,870 | $19,980 |
| 169 | Set (type II) (60 in) (RCP) (6: 1) (C) (467-7407) | EACH | 1 | $19,810 | $19,810 | $24,525 | $22,739 | |
| 170 | Grate and frame (bridge drain) (471-7006) | EACH | 58 | $6,800.00 | $5,000.00 | $3,071.71 | $3,719.74 | $9,516.21 |
| 171 | Jack bor or tun pipe(48 in)(RC)(CL V) (476-7035) | LF | 85 | $3,000.00 | $2,420.00 | $2,471.88 | $3,042.21 | $2,455.70 |
| 172 | Jack bor tun box culvert (5 FT X 3 FT) (476-7046) | LF | 120 | $8,500.00 | $2,880.00 | $2,554.48 | $3,151.44 | $2,508.72 |
| 173 | Jack bor tun box culvert (6 FT X 3 FT) (476-7050) | LF | 116 | $8,600.00 | $3,325.00 | $3,134.05 | $3,921.61 | $3,220.39 |
| 174 | Clean existing culverts (480-7001) | EACH | 7 | $3,200.00 | $5,965.00 | $5,000.00 | $1,750.04 | $21,765 |
| 175 | Clean existing culverts (480-7002) | CY | 4,871 | $100.00 | $65.00 | $25.00 | $26.87 | $54.85 |
| 176 | Pipe (PVC) (schedule 40) (6 in) (481-7013) | LF | 1,895 | $95.00 | $80.00 | $88.69 | $164.39 | $100.28 |
| 177 | Pipe (PVC) (schedule 40) (8 in) (481-7014) | LF | 943 | $125.00 | $85.00 | $137.67 | $132.59 | $96.90 |
| 178 | Removing structure (box culvert) (496-7001) | EACH | 3 | $26,000 | $13,400 | $17,700 | $21,100 | $19,154 |
| 179 | Removing structure (inlet) (496-7002) | EACH | 5 | $700.00 | $1,660.16 | $2,034.40 | $5,266.44 | |
| 180 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 2 | $25,000 | $465,879 | $71,316 | $75,326 | |
| 181 | Remove STR (rail) (496-7017) | LF | 236 | $28.00 | $20.00 | $34.52 | $52.04 | $58.42 |
| 182 | Removing structure (pipe) (496-7037) | EACH | 60 | $700.00 | $550.00 | $2,741.20 | $2,398.02 | $1,961.98 |
| 183 | Mobilization (500-7001) | LS | 1 | $27,000,000 | $24,108,873 | $29,669,734 | $27,000,000 | $31,236,805 |
| 184 | Barricades, signs and traffic handling (502-7001) | MO | 55 | $28,000 | $15,000 | $178,363 | $250,000 | $34,868 |
| 185 | Portable changeable message sign (503-7001) | DAY | 730 | $88.00 | $10.00 | $98.21 | $57.12 | $364.60 |
| 186 | TMA (stationary) (505-7001) | DAY | 815 | $300.00 | $50.00 | $204.61 | $214.14 | $353.63 |
| 187 | TMA (mobile operation) (505-7003) | DAY | 24 | $200.00 | $50.00 | $2,828.88 | $884.31 | $837.67 |
| 188 | Rock filter dams (install) (type 3) (506-7003) | LF | 4,210 | $55.00 | $95.00 | $54.32 | $108.86 | $89.29 |
| 189 | Rock filter dams (remove) (506-7011) | LF | 2,105 | $15.00 | $18.00 | $9.12 | $12.44 | $10.20 |
| 190 | Construction exits (install) (type 1) (506-7020) | SY | 1,800 | $35.00 | $25.00 | $25.00 | $59.72 | $48.98 |
| 191 | Construction exits (remove) (506-7024) | SY | 900 | $12.00 | $13.00 | $13.00 | $12.44 | $10.20 |
| 192 | Sandbags for erosion control (506-7035) | EACH | 1,887 | $14.00 | $18.50 | $18.50 | $14.93 | $12.24 |
| 193 | Temporary sediment control fence (install) (506-7039) | LF | 169,436 | $7.00 | $4.85 | $2.11 | $4.98 | $4.08 |
| 194 | Temporary sediment control fence (remove) (506-7041) | LF | 84,720 | $1.00 | $1.15 | $0.54 | $0.93 | $0.77 |
| 195 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 13,432 | $10.00 | $8.50 | $8.50 | $10.76 | $8.83 |
| 196 | Biodegradable erosion control logs (remove) (506-7046) | LF | 6,720 | $1.25 | $1.25 | $1.25 | $0.62 | $0.51 |
| 197 | Constructing detours (508-7001) | SY | 16,498 | $130.00 | $103.00 | $107.55 | $135.12 | $82.46 |
| 198 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 14,890 | $80.00 | $50.00 | $85.23 | $92.88 | $111.89 |
| 199 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 4,400 | $55.00 | $50.00 | $99.28 | $128.92 | $112.23 |
| 200 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 480 | $80.00 | $50.00 | $103.85 | $146.66 | $134.34 |
| 201 | Portable concrete traffic barrier (des source)(low prof)(type 1) (512-7021) | LF | 760 | $40.00 | $9.00 | $11.95 | $19.42 | $11.09 |
| 202 | Portable concrete traffic barrier (des source)(low prof)(type 2) (512-7022) | LF | 80 | $45.00 | $9.00 | $24.97 | $29.39 | $8.85 |
| 203 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 13,540 | $6.00 | $6.59 | $4.00 | $13.01 | |
| 204 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 13,813 | $13.00 | $6.00 | $11.73 | $4.12 | $10.41 |
| 205 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 1,160 | $22.00 | $6.00 | $16.54 | $7.83 | $11.53 |
| 206 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 12,220 | $6.00 | $7.25 | $7.94 | $8.21 | |
| 207 | Portable concrete traffic barrier (stockpile)(low prof)(type 1) (512-7045) | LF | 4,400 | $6.00 | $13.16 | $8.13 | $9.91 | |
| 208 | Portable concrete traffic barrier (stockpile)(low prof)(type 2) (512-7046) | LF | 480 | $6.00 | $26.65 | $11.59 | $9.86 | |
| 209 | Permanent CTB (single slope) (type 1) (42 ) (514-7001) | LF | 4,015 | $130.00 | $60.00 | $112.77 | $145.46 | $62.80 |
| 210 | Permanent CTB (single slope) (type 4) (42 ) (514-7003) | LF | 110 | $155.00 | $200.00 | $455.92 | $340.55 | $260.00 |
| 211 | Concrete curb & gutter (type I) (529-7008) | LF | 1,826 | $50.00 | $33.29 | $50.66 | $19.82 | $13.26 |
| 212 | Concrete curb & gutter (type II) (529-7009) | LF | 50,357 | $55.00 | $28.20 | $29.68 | $19.95 | $13.29 |
| 213 | Concrete curb & gutter (slotted) (529-7021) | LF | 4,948 | $55.00 | $37.70 | $49.81 | $44.27 | $44.99 |
| 214 | Driveways (concrete) (530-7006) | SY | 8,079 | $135.00 | $100.00 | $128.36 | $119.08 | $75.49 |
| 215 | Driveways (concrete) (hes) (530-7007) | SY | 1,956 | $175.00 | $100.00 | $150.47 | $125.34 | $108.40 |
| 216 | Driveways (ACP) (530-7010) | SY | 2,745 | $88.00 | $82.00 | $67.85 | $129.43 | $91.84 |
| 217 | Concrete sidewalks (5") (531-7002) | SY | 23,548 | $77.00 | $100.00 | $65.57 | $94.13 | $90.03 |
| 218 | Curb ramps (type 1) (531-7015) | SY | 183 | $275.00 | $225.00 | $332.85 | $155.81 | $190.23 |
| 219 | Curb ramps (type 7) (531-7020) | SY | 284 | $230.00 | $190.00 | $332.85 | $180.56 | $190.23 |
| 220 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 3,847 | $0.45 | $0.93 | $0.78 | $1.56 | |
| 221 | Mill rumble strips (concrete) (shoulder) (533-7003) | LF | 46,842 | $1.00 | $1.35 | $0.25 | $0.21 | $0.41 |
| 222 | Concrete median (536-7002) | SY | 239 | $110.00 | $120.00 | $107.85 | $218.68 | $533.54 |
| 223 | Metal W-beam guard fence (timber post) (540-7001) | LF | 260 | $29.60 | $29.60 | $42.15 | $31.71 | |
| 224 | Metal W-beam guard fence (steel post) (540-7002) | LF | 4,125 | $45.00 | $35.50 | $35.50 | $36.77 | $38.03 |
| 225 | Metal W-beam guard fence adjustment (540-7009) | LF | 350 | $20.00 | $20.00 | $23.29 | $21.43 | |
| 226 | Downstream anchor terminal section (540-7015) | EACH | 10 | $2,200.00 | $1,190.00 | $1,190.00 | $1,961.24 | $1,274.97 |
| 227 | Metal beam guard fence trans (non - sym) (540-7016) | EACH | 1 | $1,260.00 | $1,260.00 | $1,470.93 | $1,349.97 | |
| 228 | Metal thrie-beam guard fence (steel post) (540-7020) | EACH | 8 | $3,100.00 | $2,625.00 | $2,625.00 | $2,819.28 | $2,812.44 |
| 229 | Remove metal beam guard fence (542-7001) | LF | 5,580 | $3.00 | $3.00 | $3.68 | $3.21 | |
| 230 | Remove terminal anchor section (542-7002) | EACH | 6 | $220.00 | $220.00 | $367.73 | $235.71 | |
| 231 | Remove downstream anchor terminal (542-7003) | EACH | 3 | $230.00 | $230.00 | $367.73 | $246.42 | |
| 232 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 8 | $260.00 | $260.00 | $367.73 | $278.57 | |
| 233 | Cable barrier system (install)(TL-4) (543-7002) | LF | 9,740 | $17.25 | $17.25 | $21.14 | $18.48 | |
| 234 | Cable barrier terminal sec (install)(TL-4) (543-7018) | EACH | 12 | $3,045.00 | $3,045.00 | $3,799.90 | $3,262.43 | |
| 235 | Guardrail end treatment (install) (544-7001) | EACH | 19 | $5,500.00 | $3,465.00 | $3,465.00 | $4,045.06 | $3,712.41 |
| 236 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 2 | $3,000.00 | $2,025.76 | $15,322 | $3,214.21 | |
| 237 | Crash cushion attenuator (stockpile) (545-7003) | EACH | 4 | $890.00 | $1,960.76 | $3,677.33 | $953.55 | |
| 238 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 32 | $39,000 | $26,650 | $26,518 | $29,725 | $27,214 |
| 239 | Crash cushion attenuator (install)(L)(W)(TL3) (545-7008) | EACH | 7 | $50,000 | $43,000 | $39,925 | $47,805 | $42,856 |
| 240 | Chain link fence (remove) (550-7007) | LF | 196 | $6.00 | $11.00 | $20.56 | $5.05 | $11.79 |
| 241 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 51 | $440.00 | $325.00 | $381.00 | $398.38 | $348.21 |
| 242 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 8 | $895.00 | $823.00 | $1,103.19 | $958.91 | |
| 243 | Remove RD IL asm (trans-base) (610-7009) | EACH | 1 | $860.00 | $2,000.00 | $500.00 | $625.14 | $1,000.00 |
| 244 | In RD IL (U/P) (type 1) (150W EQ) LED (610-7014) | EACH | 18 | $2,800.00 | $1,600.00 | $1,800.00 | $2,250.52 | $1,737.93 |
| 245 | In RD IL (type SP) 48S-12-12(400W EQ)LED (610-7177) | EACH | 10 | $8,000.00 | $6,500.00 | $8,500.00 | $10,627 | $9,055.86 |
| 246 | In RD IL (type SA) 50S-12 (400W EQ) LED (610-7192) | EACH | 3 | $4,500.00 | $5,900.00 | $7,376.73 | $6,106.21 | |
| 247 | In RD IL (type SA) 50T-12 (400W EQ) LED (610-7200) | EACH | 35 | $7,700.00 | $4,750.00 | $4,690.00 | $5,863.87 | $6,019.29 |
| 248 | HI MST IL pole (150 FT)(100 MPH) (613-7006) | EACH | 3 | $60,000 | $58,000 | $56,950 | $71,204 | $69,782 |
| 249 | HI MST IL pole (175 FT)(100 MPH) (613-7008) | EACH | 11 | $88,000 | $70,000 | $71,450 | $89,333 | $79,404 |
| 250 | LED HI MST IL asm (6 fixt) (type S) (614-7001) | EACH | 6 | $39,500 | $40,000 | $43,500 | $54,388 | $51,743 |
| 251 | LED HI MST IL asm (6 fixt) (type A) (614-7002) | EACH | 8 | $34,000 | $40,000 | $43,500 | $54,388 | $50,660 |
| 252 | Conduit (HDPE) (2") (618-7009) | LF | 24,213 | $22.00 | $7.50 | $10.00 | $12.50 | $15.87 |
| 253 | Conduit (HDPE) (2") bore (618-7010) | LF | 3,180 | $55.00 | $17.50 | $25.00 | $31.26 | $27.77 |
| 254 | Conduit (HDPE) (3") (618-7013) | LF | 1,825 | $50.00 | $10.00 | $14.00 | $17.50 | $19.96 |
| 255 | Conduit (HDPE) (3") bore (618-7014) | LF | 1,290 | $55.00 | $23.00 | $25.00 | $31.26 | $29.92 |
| 256 | Conduit (HDPE) (4") (618-7015) | LF | 75,844 | $50.00 | $20.00 | $19.00 | $23.76 | $33.64 |
| 257 | Conduit (HDPE) (4") bore (618-7016) | LF | 15,836 | $70.00 | $25.00 | $22.00 | $27.51 | $35.53 |
| 258 | Conduit (RM) (2") (618-7078) | LF | 750 | $77.00 | $21.00 | $40.00 | $50.01 | $78.88 |
| 259 | Fiber optic cable road marker (619-7014) | EACH | 193 | $5.00 | $175.00 | $180.00 | $225.05 | $378.39 |
| 260 | Electrical conductor (no.14) insulated (620-7002) | LF | 50,781 | $2.00 | $1.00 | $1.00 | $1.25 | $2.30 |
| 261 | Electrical conductor (no.6) bare (620-7009) | LF | 3,715 | $3.00 | $1.75 | $1.75 | $2.19 | $2.53 |
| 262 | Electrical conductor (no.6) insulated (620-7010) | LF | 6,415 | $3.00 | $2.20 | $1.95 | $2.44 | $4.69 |
| 263 | Electrical conductor (no.4) bare (620-7011) | LF | 33,889 | $4.50 | $2.50 | $2.90 | $3.63 | $4.05 |
| 264 | Electrical conductor (no.4) insulated (620-7012) | LF | 66,544 | $5.00 | $2.75 | $3.20 | $4.00 | $4.50 |
| 265 | ITS GND box(pcast) type 1 (243648)W/aprn (623-7004) | EACH | 75 | $6,000.00 | $5,500.00 | $5,500.00 | $6,876.60 | $7,392.78 |
| 266 | ITS GND box(pcast) type 2 (366036)W/aprn (623-7008) | EACH | 10 | $10,000 | $7,500.00 | $7,200.00 | $9,002.10 | $11,593 |
| 267 | Ground box type A (122311) (624-7001) | EACH | 20 | $2,200.00 | $650.00 | $785.00 | $981.48 | $1,423.29 |
| 268 | Ground box type A (122311)W/apron (624-7002) | EACH | 71 | $2,200.00 | $900.00 | $900.00 | $1,125.26 | $1,677.52 |
| 269 | Ground box type D (162922) (624-7007) | EACH | 9 | $1,500.00 | $750.00 | $865.00 | $1,081.50 | $1,782.67 |
| 270 | Ground box type D (162922)W/apron (624-7008) | EACH | 4 | $2,000.00 | $1,100.00 | $1,200.00 | $1,500.35 | $1,873.79 |
| 271 | Remove ground box (624-7013) | EACH | 2 | $575.00 | $150.00 | $245.00 | $306.32 | $649.50 |
| 272 | Elc SRV type A 240/480 100(NS)SS(E)SP(U) (628-7080) | EACH | 5 | $6,000.00 | $6,500.00 | $6,900.00 | $8,627.02 | $11,412 |
| 273 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $9,800.00 | $6,500.00 | $5,700.00 | $7,126.66 | $11,342 |
| 274 | Elc SRV type D 120/240 100(NS)SS(N)SP(O) (628-7259) | EACH | 6 | $8,000.00 | $6,500.00 | $5,700.00 | $7,126.66 | $11,342 |
| 275 | Aluminum signs (type A) (636-7001) | SF | 415.25 | $44.00 | $28.60 | $35.65 | $32.76 | $30.64 |
| 276 | Aluminum signs (type G) (636-7002) | SF | 904 | $38.00 | $32.70 | $30.00 | $36.26 | $35.03 |
| 277 | Aluminum signs (type O) (636-7003) | SF | 3,143 | $35.00 | $31.50 | $27.00 | $33.76 | $44.91 |
| 278 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 42 | $790.00 | $690.00 | $685.00 | $1,109.03 | $739.15 |
| 279 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 18 | $880.00 | $900.00 | $943.00 | $1,361.97 | $964.11 |
| 280 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 149 | $900.00 | $770.00 | $733.00 | $1,195.13 | $824.85 |
| 281 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 4 | $775.00 | $764.00 | $1,164.49 | $830.21 | |
| 282 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 21 | $900.00 | $900.00 | $853.00 | $1,225.78 | $964.11 |
| 283 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 15 | $1,150.00 | $1,040.00 | $975.00 | $1,532.22 | $1,114.09 |
| 284 | Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035) | EACH | 4 | $1,400.00 | $1,460.00 | $1,368.00 | $2,083.81 | $1,564.01 |
| 285 | Install small roadside sign support and assembly TYS80(1)SB(T) (644-7040) | EACH | 3 | $1,200.00 | $1,080.00 | $1,038.00 | $1,716.09 | $1,156.94 |
| 286 | Install small roadside sign support and assembly TYS80(1)SB(U) (644-7042) | EACH | 3 | $1,500.00 | $1,235.00 | $1,038.00 | $1,961.24 | $1,322.98 |
| 287 | Install small roadside sign support and assembly TYS80(1)SB(U-1EXT) (644-7043) | EACH | 1 | $1,200.00 | $1,335.00 | $1,038.00 | $2,145.11 | $1,430.10 |
| 288 | Install small roadside sign support and assembly TYS80(2)SA(P) (644-7048) | EACH | 7 | $1,900.00 | $2,290.00 | $1,716.00 | $2,696.71 | $2,453.13 |
| 289 | Install small roadside sign support and assembly TYS80(2)SB(P) (644-7050) | EACH | 4 | $1,650.00 | $2,450.00 | $1,876.00 | $2,819.28 | $2,624.53 |
| 290 | In bridge MNT clearance sign assembly(type N) (644-7061) | EACH | 7 | $2,900.00 | $2,175.00 | $2,281.00 | $4,290.21 | $2,329.94 |
| 291 | In bridge MNT clearance sign assembly(type S) (644-7062) | EACH | 3 | $3,300.00 | $2,225.00 | $2,342.00 | $3,799.90 | $2,383.50 |
| 292 | Install small roadside sign support and assembly (rail mount) (644-7063) | EACH | 8 | $5,500.00 | $4,090.00 | $5,533.00 | $6,374.03 | $4,381.36 |
| 293 | Remove SM RD SN sup&AM (644-7073) | EACH | 154 | $105.00 | $150.00 | $205.25 | $257.42 | $107.12 |
| 294 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 1 | $110.00 | $75.00 | $50.00 | $183.86 | $80.34 |
| 295 | Install LRSS (struct steel) (647-7001) | LB | 6,588 | $10.00 | $6.10 | $6.90 | $8.63 | $6.53 |
| 296 | Remove lrsa (647-7003) | EACH | 11 | $1,485.00 | $500.00 | $625.14 | $787.36 | |
| 297 | Install overhead sign support(30 FT bal tee) (650-7028) | EACH | 2 | $42,000 | $46,300 | $57,889 | $59,725 | |
| 298 | Install overhead sign support(30 FT cant) (650-7032) | EACH | 2 | $52,000 | $55,600 | $69,516 | $69,729 | |
| 299 | Install overhead sign support(35 FT cant) (650-7038) | EACH | 2 | $37,000 | $40,100 | $50,137 | $51,420 | |
| 300 | Install overhead sign support(35 FT cant)(span only) (650-7041) | EACH | 3 | $33,000 | $25,500 | $26,300 | $32,883 | $36,101 |
| 301 | Install overhead sign support(40 FT cant) (650-7045) | EACH | 3 | $48,000 | $50,500 | $63,140 | $63,392 | |
| 302 | Install overhead sign support(70 FT BRDG) (650-7079) | EACH | 1 | $68,000 | $70,000 | $87,520 | $96,356 | |
| 303 | Install overhead sign support(85 FT BRDG) (650-7094) | EACH | 1 | $80,000 | $83,600 | $104,524 | $120,010 | |
| 304 | Install overhead sign support(90 FT BRDG) (650-7099) | EACH | 1 | $85,000 | $89,600 | $112,026 | $125,218 | |
| 305 | Remove overhd sign sup (sign only) (650-7194) | EACH | 3 | $2,300.00 | $650.00 | $600.00 | $750.18 | $7,293.65 |
| 306 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 256 | $10.00 | $45.00 | $38.00 | $44.13 | $48.21 |
| 307 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 53 | $25.00 | $45.00 | $45.00 | $53.93 | $48.21 |
| 308 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 256 | $25.00 | $45.00 | $38.00 | $44.13 | $48.21 |
| 309 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 47 | $20.00 | $45.00 | $38.00 | $47.80 | $48.21 |
| 310 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 36 | $10.00 | $45.00 | $45.00 | $57.61 | $48.21 |
| 311 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 13 | $60.00 | $65.00 | $52.00 | $92.62 | $69.63 |
| 312 | Install OM SM RD sign (2-OM-type 1)Y (658-7089) | EACH | 11 | $550.00 | $110.00 | $94.00 | $147.09 | $117.84 |
| 313 | Install delineator assembly (D-DW)SZ 1(WFLX)GNDLL (658-7138) | EACH | 38 | $94.00 | $76.00 | $122.57 | $100.70 | |
| 314 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 197 | $5.00 | $35.00 | $13.00 | $61.29 | $37.49 |
| 315 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 690 | $0.50 | $0.50 | $0.50 | $0.61 | $0.51 |
| 316 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 38,270 | $0.60 | $0.50 | $0.50 | $0.61 | $0.51 |
| 317 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 40,685 | $0.50 | $0.50 | $0.50 | $0.61 | $0.51 |
| 318 | Work zone pavement marking removing (reflectorized) type I-C (662-7049) | EACH | 1,530 | $5.00 | $5.00 | $5.00 | $6.13 | $5.05 |
| 319 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 2,317 | $5.50 | $5.00 | $5.00 | $6.13 | $5.05 |
| 320 | Work zone pavement marking removing (traffic BTN) type W (662-7058) | LF | 30,526 | $2.00 | $0.90 | $0.90 | $1.10 | $0.91 |
| 321 | Work zone pavement marking removing (traffic BTN) type Y (662-7060) | LF | 46,250 | $2.00 | $0.90 | $0.90 | $1.10 | $0.91 |
| 322 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 1,942 | $1.50 | $1.00 | $1.00 | $1.23 | $1.01 |
| 323 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 41 | $22.00 | $1.25 | $1.25 | $1.53 | $1.26 |
| 324 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 24,809 | $1.00 | $1.25 | $1.25 | $1.53 | $1.26 |
| 325 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 40 | $60.00 | $60.00 | $60.00 | $73.54 | $60.61 |
| 326 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 1 | $400.00 | $500.00 | $500.00 | $612.88 | $505.05 |
| 327 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 1,942 | $0.65 | $0.50 | $0.50 | $0.61 | $0.51 |
| 328 | Reflectorized pavement marking type II (W) 8" (DOT) (666-7177) | LF | 67 | $0.55 | $0.50 | $0.50 | $0.61 | $0.51 |
| 329 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 24,809 | $0.50 | $0.50 | $0.50 | $0.61 | $0.51 |
| 330 | Reflectorized pavement marking type II (W) 36" (yld tri) (666-7201) | EACH | 40 | $25.00 | $25.00 | $25.00 | $30.64 | $25.25 |
| 331 | Reflectorized pavement marking type II (Y) (med nose) (666-7220) | EACH | 1 | $200.00 | $200.00 | $200.00 | $245.16 | $202.02 |
| 332 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 17,974 | $12.00 | $15.00 | $15.00 | $18.39 | $15.15 |
| 333 | Prefabricated PM type B (W)(12")(solid) (668-7017) | LF | 5,298 | $18.00 | $15.00 | $15.00 | $18.39 | $15.15 |
| 334 | Prefabricated PM type B (W)(12")(lane drop) (668-7019) | LF | 1,529 | $16.00 | $16.00 | $16.00 | $19.61 | $16.16 |
| 335 | Prefabricated PM type B (W)(24")(solid) (668-7021) | LF | 1,279 | $45.00 | $32.00 | $32.00 | $39.22 | $32.32 |
| 336 | Prefabricated PM type B (W)(word)contrast (668-7060) | EACH | 31 | $1,300.00 | $7,800.00 | $7,800.00 | $9,561.05 | $7,878.79 |
| 337 | Prefabricated PM type B (W)(arrow)contrast (668-7061) | EACH | 47 | $1,000.00 | $6,250.00 | $6,250.00 | $7,661.09 | $6,313.13 |
| 338 | Prefabricated PM type C (W)(6")(broken) (668-7077) | LF | 2,320 | $5.00 | $5.00 | $6.13 | $5.05 | |
| 339 | Prefabricated PM type C (W)(12")(lane drop) (668-7086) | LF | 102 | $10.00 | $10.00 | $12.26 | $10.10 | |
| 340 | Prefabricated PM type C (W)(12")(solid) (668-7087) | LF | 300 | $10.00 | $10.00 | $12.26 | $10.10 | |
| 341 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 94 | $20.00 | $20.00 | $24.51 | $20.20 | |
| 342 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 4 | $300.00 | $300.00 | $367.73 | $303.03 | |
| 343 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 4 | $400.00 | $400.00 | $490.31 | $404.04 | |
| 344 | Reflectorized pavement marker type I-A (672-7001) | EACH | 789 | $6.50 | $5.25 | $5.25 | $6.44 | $5.30 |
| 345 | Reflectorized pavement marker type I-C (672-7002) | EACH | 1,121 | $5.50 | $5.25 | $5.25 | $6.44 | $5.30 |
| 346 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 115 | $5.50 | $6.00 | $6.00 | $7.35 | $6.06 |
| 347 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 3,025 | $5.00 | $5.00 | $5.00 | $6.13 | $5.05 |
| 348 | Eliminating existing PM & markers (4") (677-7001) | LF | 46,646 | $1.00 | $0.75 | $0.75 | $0.92 | $0.76 |
| 349 | Pavement surface preparation for marking (6") (678-7002) | LF | 185,324 | $0.20 | $0.25 | $0.25 | $0.31 | $0.25 |
| 350 | Pavement surface preparation for marking (8") (678-7004) | LF | 39,685 | $0.50 | $0.30 | $0.30 | $0.37 | $0.30 |
| 351 | Pavement surface preparation for marking (10") (678-7005) | LF | 18,144 | $1.00 | $0.40 | $0.40 | $0.49 | $0.40 |
| 352 | Pavement surface preparation for marking (12") (678-7006) | LF | 7,229 | $1.50 | $1.00 | $1.00 | $1.23 | $1.01 |
| 353 | Pavement surface preparation for marking (24") (678-7008) | LF | 1,373 | $1.00 | $3.00 | $3.00 | $3.68 | $3.03 |
| 354 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 51 | $25.00 | $110.00 | $110.00 | $134.83 | $111.11 |
| 355 | Pavement surface preparation for marking (word) (678-7016) | EACH | 35 | $100.00 | $135.00 | $135.00 | $165.48 | $136.36 |
| 356 | Pavement surface preparation for marking (med nose) (678-7024) | EACH | 1 | $100.00 | $500.00 | $500.00 | $612.88 | $505.05 |
| 357 | Install highway traffic signal (system) (680-7003) | EACH | 1 | $57,000 | $16,000 | $42,500 | $53,137 | $39,062 |
| 358 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 24 | $400.00 | $300.00 | $305.00 | $381.34 | $413.83 |
| 359 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 4 | $400.00 | $300.00 | $305.00 | $381.34 | $413.83 |
| 360 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 24 | $400.00 | $300.00 | $305.00 | $381.34 | $413.83 |
| 361 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $400.00 | $300.00 | $305.00 | $381.34 | $413.83 |
| 362 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 24 | $400.00 | $300.00 | $305.00 | $381.34 | $413.83 |
| 363 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 4 | $400.00 | $300.00 | $305.00 | $381.34 | $413.83 |
| 364 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 16 | $750.00 | $800.00 | $660.00 | $825.19 | $1,529.84 |
| 365 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 28 | $230.00 | $250.00 | $170.00 | $212.54 | $308.68 |
| 366 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 3,039 | $4.00 | $5.00 | $2.90 | $3.63 | $6.65 |
| 367 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 1,695 | $8.00 | $9.50 | $6.80 | $8.50 | $11.53 |
| 368 | Removing RDSD FLSH BCN AM (solar PWRD) (685-7006) | EACH | 4 | $700.00 | $1,800.00 | $365.00 | $456.36 | $1,287.70 |
| 369 | Ins traffic signal PL AM(S)2 arm(40-32') (686-7141) | EACH | 2 | $34,000 | $23,000 | $19,300 | $24,131 | $27,748 |
| 370 | Ins traffic signal PL AM(S)2 arm(44-32') (686-7161) | EACH | 2 | $34,500 | $24,000 | $20,300 | $25,381 | $28,325 |
| 371 | Pedestrian pole assembly (687-7001) | EACH | 16 | $3,000.00 | $2,100.00 | $2,500.00 | $3,125.73 | $6,671.54 |
| 372 | Remove underground conduit (690-7147) | LF | 330 | $2.00 | $15.00 | $5.00 | $6.25 | $21.90 |
| 373 | JT / CRCK seal (hot - poured rubber) (712-7002) | LF | 6,235 | $8.00 | $5.00 | $2.45 | $4.70 | |
| 374 | Full - width mowing (730-7019) | CYC | 8 | $9,000.00 | $5,000.00 | $6,500.00 | $18,387 | $7,668.75 |
| 375 | Litter removal (734-7002) | CYC | 8 | $5,600.00 | $4,000.00 | $2,085.33 | $9,806.21 | $3,000.00 |
| 376 | Clean / sweep - frontage road - area(1) (738-7051) | CYC | 55 | $2,200.00 | $5,000.00 | $2,500.00 | $3,727.04 | $5,953.80 |
| 377 | Tree trimming / brush removal (752-7001) | MI | 4 | $4,500.00 | $6,500.00 | $8,638.07 | $1,943.37 | $2,750.00 |
| 378 | Tip testing(drilled shaft) (4003-7001) | EACH | 16 | $6,000.00 | $9,000.00 | $4,872.15 | $6,795.91 | $5,017.69 |
| 379 | Amphibian/reptile exclusion fence inst (5003-7001) | LF | 80,400 | $6.00 | $5.50 | $1.97 | $4.90 | $5.72 |
| 380 | Amphibian/reptile exclusion fence rem (5003-7002) | LF | 80,400 | $1.50 | $1.15 | $0.47 | $1.29 | $2.77 |
| 381 | Install DMS (pole MTD cabinet) (6004-7001) | EACH | 2 | $9,000.00 | $17,000 | $21,255 | $18,471 | |
| 382 | VIVDS cam assy (install only) (6006-7010) | EACH | 1 | $1,100.00 | $500.00 | $485.00 | $606.39 | $927.53 |
| 383 | RVDS (advance det)(install only) (6008-7005) | EACH | 4 | $4,000.00 | $600.00 | $485.00 | $606.39 | $927.53 |
| 384 | ITS RVSD(data coll only)(install only) (6010-7006) | EACH | 3 | $13,000 | $700.00 | $365.00 | $456.36 | $4,503.82 |
| 385 | ITS pole MNT cab (type 3)(conf 2) (6011-7004) | EACH | 7 | $9,000.00 | $3,000.00 | $7,500.00 | $9,377.19 | $13,276 |
| 386 | ITS pole (40 FT) (130 MPH) (W/stiff) (6011-7034) | EACH | 5 | $21,000 | $16,000 | $13,900 | $17,379 | $19,841 |
| 387 | Temporary speed monitor sys (6016-7001) | EACH | 2 | $22,000 | $29,798 | $20,000 | $24,516 | $25,253 |
| 388 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 5 | $24,000 | $1,500.00 | $500.00 | $625.14 | $11,642 |
| 389 | Fiber optic CBL (single-mode)(12 fiber) (6027-7001) | LF | 2,322 | $4.00 | $6.00 | $5.40 | $6.75 | $2.47 |
| 390 | Fiber optic fusion splice (6027-7004) | EACH | 15 | $85.00 | $50.00 | $165.00 | $206.29 | $83.38 |
| 391 | FO splice enclosure (type 3) (6027-7010) | EACH | 6 | $1,600.00 | $2,500.00 | $3,300.00 | $4,125.96 | $3,029.66 |
| 392 | Fiber optic patch panel (6 position) (6027-7012) | EACH | 8 | $2,300.00 | $2,500.00 | $2,500.00 | $3,125.73 | $2,071.15 |
| 393 | FO CBL (96 SMF) (6027-7029) | LF | 40,763 | $6.00 | $4.50 | $5.60 | $7.00 | $4.44 |
| 394 | Ethernet switch (install only) (6036-7001) | EACH | 7 | $750.00 | $1,500.00 | $300.00 | $375.09 | $1,723.02 |
| 395 | Long channel mount curb sys (install) (6039-7001) | LF | 3,315 | $100.00 | $87.60 | $52.00 | $110.32 | $93.84 |
| 396 | Mltply PV MK W/wty (W) (6") (solid) (6065-7001) | LF | 90,105 | $1.00 | $1.00 | $1.00 | $1.23 | $1.01 |
| 397 | Mltply PV MK W/wty (Y) (6") (solid) (6065-7004) | LF | 93,460 | $1.00 | $1.00 | $1.00 | $1.23 | $1.01 |
| 398 | Curb inlet sediment protection (7014-7001) | LF | 2,154 | $10.00 | $15.00 | $15.00 | $24.51 | $12.24 |
| 399 | Thermoplastic pipe (PP) (18") (468-7001) | LF | 580 | $105.00 | $52.00 | $52.00 | $52.52 | $70.00 |
| 400 | Thermoplastic pipe (PP) (24") (468-7002) | LF | 11,336 | $130.00 | $64.00 | $64.00 | $64.64 | $80.00 |
| 401 | Thermoplastic pipe (PP) (30") (468-7003) | LF | 7,152 | $160.00 | $85.00 | $85.00 | $85.85 | $103.00 |
| 402 | Thermoplastic pipe (PP) (36") (468-7004) | LF | 7,054 | $180.00 | $100.00 | $100.00 | $101.00 | $126.00 |
| 403 | Thermoplastic pipe (PP) (42") (468-7005) | LF | 4,363 | $270.00 | $116.00 | $116.00 | $117.16 | $155.00 |
| 404 | Thermoplastic pipe (PP) (48") (468-7006) | LF | 2,322 | $158.00 | $158.00 | $159.58 | $184.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.