TxDOT contract A00062293 bid tabulation
Widen Road - Add Lanes And Shoulders, US 82 (Red River C/L to 0.1 Mi W of US 259). Let by Texas DOT on March 4, 2026, Bowie, Atlanta District. 7 bids received; low bid $54,806,522 by Highway 19 Construction LLC, -9.4% against the engineer's estimate of $60,477,403.
- Owner
- Texas DOT
- Letting
- 04 MAR 2026
- Pay items
- 159
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Highway 19 Construction LLC | $54,806,522 | Low | -9.0% |
| 2 | Longview Bridge and Road, LTD. | $55,995,702 | +2.0% | -7.0% |
| 3 | A. K. Gillis & Sons, LLC | $59,724,731 | +9.0% | -1.0% |
| 4 | Drake Companies LLC | $62,162,574 | +13% | +3.0% |
| 5 | East Texas Bridge, Inc. | $62,375,843 | +14% | +3.0% |
| 6 | Webber, LLC | $65,973,000 | +20% | +9.0% |
| 7 | H. H. Howard & Sons, Inc. | $67,620,238 | +23% | +12% |
Engineer's estimate: $60,477,403.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Highway 19 Construction LLC | 2. Longview Bridge and Road, LTD. | 3. A. K. Gillis & Sons, LLC | 4. Drake Companies LLC | 5. East Texas Bridge, Inc. | 6. Webber, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 361 | $1,500.00 | $1,000.00 | $6,500.00 | $3,470.00 | $1,550.00 | $2,400.00 | $18,250 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 80,207 | $11.00 | $13.00 | $7.50 | $8.40 | $6.75 | $5.00 | $7.25 |
| 3 | Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004) | SY | 80,207 | $6.00 | $4.61 | $4.80 | $5.17 | $4.75 | $5.00 | $4.00 |
| 4 | Remove (17"-21") TRT/untrt base & asphalt pavement (105-7017) | SY | 98,808 | $8.00 | $11.39 | $13.00 | $14.18 | $10.00 | $13.00 | $9.00 |
| 5 | Remove (6") TRT/untrt base & asphalt pavement (105-7026) | SY | 6,577 | $10.00 | $4.75 | $13.00 | $13.72 | $6.00 | $9.00 | $4.00 |
| 6 | Excavation (roadway) (110-7001) | CY | 193,069 | $11.00 | $7.47 | $10.00 | $8.00 | $11.75 | $10.45 | $10.00 |
| 7 | Embankment (final)(OC)(type C) (132-7005) | CY | 39,005 | $10.00 | $16.00 | $12.50 | $11.10 | $16.00 | $13.00 | $4.15 |
| 8 | Embankment (final)(DC)(type C) (132-7006) | CY | 211,002 | $12.00 | $11.00 | $12.50 | $13.60 | $15.90 | $13.40 | $15.50 |
| 9 | Embankment (vehicle)(DC)(type C) (132-7018) | CY | 84,485 | $15.00 | $20.00 | $12.50 | $13.60 | $16.00 | $15.00 | $21.00 |
| 10 | Furn & place topsoil (4") (160-7002) | SY | 349,028 | $2.50 | $1.00 | $2.50 | $2.25 | $2.10 | $2.00 | $0.65 |
| 11 | Block sodding (162-7002) | SY | 1,703 | $5.00 | $4.00 | $6.60 | $7.00 | $6.60 | $6.50 | $5.00 |
| 12 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 386,305 | $0.55 | $0.64 | $0.55 | $0.65 | $0.60 | $0.59 | $0.55 |
| 13 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 193,152.50 | $0.60 | $0.64 | $0.55 | $0.65 | $0.60 | $0.59 | $0.55 |
| 14 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 193,152.50 | $0.65 | $0.64 | $0.55 | $0.65 | $0.60 | $0.59 | $0.55 |
| 15 | Vegetative watering (168-7001) | TGL | 6,180.88 | $5.00 | $10.00 | $18.00 | $7.50 | $14.75 | $8.00 | $18.00 |
| 16 | Soil ret BLKT(SL_mod_sand_short) (169-7003) | SY | 23,633 | $1.80 | $2.00 | $0.60 | $1.75 | $0.80 | $0.80 | $1.50 |
| 17 | Soil ret BLKT(chan_permanent_4 PSF) (169-7032) | SY | 2,518 | $2.00 | $5.50 | $3.30 | $3.50 | $3.75 | $3.65 | $4.00 |
| 18 | FL BS (compacted in place)(type A GR 1-2) (6") (247-7044) | SY | 47,521 | $10.50 | $12.25 | $14.65 | $18.00 | $16.00 | $14.00 | |
| 19 | FL BS (compacted in place)(type A GR 1-2) (10") (247-7090) | SY | 346,593 | $25.00 | $15.00 | $18.00 | $22.85 | $27.00 | $26.00 | $19.00 |
| 20 | Lime (quicklime (slurry)) (260-7003) | TON | 4,841.50 | $300.00 | $350.00 | $400.00 | $360.00 | $395.00 | $380.00 | $225.00 |
| 21 | Lime TRT (subgrade) (8") (260-7020) | SY | 230,561 | $3.00 | $6.50 | $3.80 | $3.50 | $3.15 | $4.35 | $3.00 |
| 22 | Cement (275-7001) | TON | 14,516.86 | $192.00 | $210.00 | $280.00 | $220.00 | $270.00 | $245.00 | $160.00 |
| 23 | Cement TRT (new base)(10") (275-7012) | SY | 346,593 | $3.00 | $3.78 | $2.35 | $3.30 | $3.15 | $3.50 | $1.70 |
| 24 | Cement treat (subgrade) (8") (275-7017) | SY | 290,246.50 | $2.00 | $3.55 | $2.30 | $3.25 | $3.20 | $3.00 | $1.79 |
| 25 | Cement TRT (subgrade)(10") (275-7028) | SY | 304,145 | $2.00 | $3.55 | $2.30 | $3.30 | $3.20 | $3.25 | $1.65 |
| 26 | Prime coat (MC-30) (310-7004) | GAL | 118,244 | $5.50 | $4.25 | $5.10 | $5.05 | $5.25 | $6.50 | $4.00 |
| 27 | Asphalt (AC-20-5TR) (316-7007) | GAL | 141,880.56 | $3.50 | $3.25 | $4.05 | $4.32 | $4.50 | $5.50 | $4.00 |
| 28 | Aggregate (type PB GR 4 sac-A) (316-7259) | TON | 3,265.75 | $150.00 | $190.00 | $230.00 | $181.60 | $176.00 | $190.00 | $185.00 |
| 29 | SP mixes SP-C PG76-22 (344-7029) | TON | 55,773 | $150.00 | $120.00 | $105.23 | $105.23 | $126.20 | $145.00 | $140.00 |
| 30 | SP mixes SP-D sac-A PG76-22 (344-7064) | TON | 36,738 | $140.00 | $122.00 | $106.89 | $106.89 | $127.20 | $147.00 | $145.00 |
| 31 | Tack coat (344-7077) | GAL | 82,153 | $4.00 | $4.10 | $5.32 | $5.32 | $5.00 | $5.00 | $3.40 |
| 32 | Cut & restore asphalt paving (400-7008) | SY | 1,730 | $180.00 | $250.00 | $155.00 | $249.21 | $189.50 | $100.00 | $275.00 |
| 33 | Cem stabil BKFL (400-7010) | CY | 1,739 | $275.00 | $180.00 | $205.00 | $250.00 | $262.50 | $220.00 | $74.00 |
| 34 | Flowable backfill (401-7001) | CY | 1,272 | $260.00 | $250.00 | $205.00 | $250.00 | $275.70 | $270.00 | $150.00 |
| 35 | Trench excavation protection (402-7001) | LF | 1,324 | $16.00 | $5.00 | $20.00 | $10.00 | $21.80 | $20.00 | $8.00 |
| 36 | Temporary special shoring (403-7001) | SF | 4,745 | $30.00 | $35.00 | $42.00 | $5.00 | $63.50 | $45.00 | $52.00 |
| 37 | Class C concrete (collar) (420-7061) | EACH | 30 | $900.00 | $2,500.00 | $1,200.00 | $500.00 | $1,950.00 | $1,200.00 | $3,500.00 |
| 38 | CL E concrete (seal slab) (420-7069) | CY | 1,021 | $643.00 | $350.00 | $420.00 | $275.00 | $615.00 | $565.00 | $350.00 |
| 39 | Riprap (concrete)(5 in) (432-7002) | CY | 138 | $1,100.00 | $750.00 | $550.00 | $700.00 | $665.00 | $625.00 | $625.00 |
| 40 | Riprap (mow strip)(4 in) (432-7013) | CY | 74 | $560.00 | $550.00 | $675.00 | $725.00 | $695.00 | $575.00 | $600.00 |
| 41 | Riprap (stone protection)(12 in) (432-7041) | CY | 915 | $180.00 | $150.00 | $190.00 | $225.00 | $187.00 | $165.00 | $178.00 |
| 42 | Riprap (stone protection)(15 in) (432-7042) | CY | 50 | $235.00 | $180.00 | $240.00 | $225.00 | $195.00 | $160.00 | $192.00 |
| 43 | Riprap (stone protection)(18 in) (432-7043) | CY | 1,522 | $205.00 | $150.00 | $200.00 | $235.00 | $187.00 | $160.00 | $208.00 |
| 44 | Rail (handrail)(type E) (450-7062) | LF | 2,105 | $130.00 | $145.00 | $136.69 | $145.00 | $135.00 | $225.00 | |
| 45 | CMP (gal steel 18 in) (460-7003) | LF | 4,216 | $100.00 | $43.00 | $47.00 | $45.00 | $60.00 | $55.00 | $65.00 |
| 46 | Concrete box culvert (3 FT X 2 FT) (462-7001) | LF | 1,010 | $344.00 | $229.00 | $195.00 | $290.00 | $270.00 | $260.00 | $350.00 |
| 47 | Concrete box culvert (3 FT X 3 FT) (462-7002) | LF | 519 | $372.00 | $254.00 | $230.00 | $340.00 | $305.00 | $295.00 | $375.00 |
| 48 | Concrete box culvert (4 FT X 2 FT) (462-7003) | LF | 310 | $445.00 | $322.00 | $260.00 | $390.00 | $330.00 | $325.00 | $470.00 |
| 49 | Concrete box culvert (4 FT X 3 FT) (462-7004) | LF | 334 | $422.00 | $391.00 | $290.00 | $410.00 | $356.00 | $370.00 | $484.00 |
| 50 | Concrete box culvert (5 FT X 2 FT) (462-7006) | LF | 353 | $515.00 | $450.00 | $332.00 | $550.00 | $407.50 | $425.00 | $435.00 |
| 51 | Concrete box culvert (5 FT X 3 FT) (462-7007) | LF | 421 | $500.00 | $463.00 | $376.00 | $560.00 | $450.00 | $470.00 | $480.00 |
| 52 | Concrete box culvert (6 FT X 2 FT) (462-7010) | LF | 115 | $675.00 | $500.00 | $405.00 | $590.00 | $490.00 | $500.00 | $643.00 |
| 53 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 23 | $562.00 | $500.00 | $535.00 | $650.00 | $660.00 | $650.00 | $697.00 |
| 54 | Concrete box culvert (6 FT X 4 FT) (462-7012) | LF | 166 | $530.00 | $600.00 | $550.00 | $690.00 | $630.00 | $670.00 | $711.00 |
| 55 | Concrete box culvert (7 FT X 3 FT) (462-7015) | LF | 461 | $820.00 | $700.00 | $555.00 | $750.00 | $660.00 | $670.00 | $702.00 |
| 56 | Concrete box culvert (8 FT X 4 FT) (462-7021) | LF | 890 | $980.00 | $800.00 | $685.00 | $800.00 | $790.00 | $825.00 | $793.00 |
| 57 | RC pipe (CL III)(18 in) (464-7003) | LF | 311 | $81.00 | $46.00 | $65.00 | $50.00 | $60.00 | $65.00 | $140.00 |
| 58 | RC pipe (CL III)(24 in) (464-7005) | LF | 3,002 | $123.00 | $60.00 | $77.00 | $80.00 | $77.00 | $85.00 | $100.00 |
| 59 | RC pipe (CL IV)(18 in) (464-7019) | LF | 404 | $106.00 | $62.00 | $65.00 | $60.00 | $66.00 | $80.00 | $145.00 |
| 60 | RC pipe (CL IV)(24 in) (464-7021) | LF | 562 | $181.00 | $79.00 | $89.00 | $90.00 | $88.00 | $105.00 | $165.00 |
| 61 | RC pipe (CL IV)(30 in) (464-7023) | LF | 25 | $170.00 | $120.00 | $140.00 | $130.00 | $150.00 | $135.00 | $175.00 |
| 62 | Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126) | EACH | 3 | $7,871.00 | $5,000.00 | $6,600.00 | $6,000.00 | $7,060.00 | $7,000.00 | $6,280.00 |
| 63 | Inlet (complete)(PSL)(FG)(5FTX5FT-4FTX4FT) (465-7135) | EACH | 1 | $11,171 | $7,500.00 | $8,350.00 | $8,500.00 | $9,000.00 | $9,500.00 | $7,900.00 |
| 64 | Inlet (complete)(pazd)(RC)(3FTX3FT) (465-7152) | EACH | 6 | $8,052.00 | $5,000.00 | $6,325.00 | $5,500.00 | $6,800.00 | $6,500.00 | $5,410.00 |
| 65 | Inlet (complete)(pazd)(RC)(5FTX5FT) (465-7154) | EACH | 2 | $6,457.00 | $6,500.00 | $7,775.00 | $8,000.00 | $8,250.00 | $8,500.00 | $6,940.00 |
| 66 | Wingwall (FW - 0) (HW=3 FT) (466-7145) | EACH | 8 | $11,500 | $9,000.00 | $4,900.00 | $5,000.00 | $9,800.00 | $5,000.00 | $20,590 |
| 67 | Wingwall (FW - 0) (HW=4 FT) (466-7146) | EACH | 1 | $10,800 | $12,000 | $9,650.00 | $5,500.00 | $9,750.00 | $6,000.00 | $22,108 |
| 68 | Wingwall (FW - 0) (HW=5 FT) (466-7147) | EACH | 2 | $17,400 | $15,000 | $9,900.00 | $6,000.00 | $11,400 | $13,000 | $22,695 |
| 69 | Wingwall (FW - 0) (HW=6 FT) (466-7148) | EACH | 1 | $18,700 | $18,000 | $15,650 | $8,500.00 | $11,200 | $11,000 | $21,040 |
| 70 | Wingwall (FW - S) (HW=3 FT) (466-7159) | EACH | 2 | $9,461.00 | $9,000.00 | $6,330.00 | $5,500.00 | $9,750.00 | $5,000.00 | $20,430 |
| 71 | Wingwall (FW - S) (HW=4 FT) (466-7160) | EACH | 4 | $12,550 | $12,000 | $6,370.00 | $6,000.00 | $10,050 | $7,000.00 | $21,070 |
| 72 | Wingwall (FW - S) (HW=5 FT) (466-7161) | EACH | 2 | $13,735 | $15,000 | $16,450 | $6,500.00 | $14,950 | $15,000 | $21,370 |
| 73 | Wingwall (PW - 1) (HW=3 FT) (466-7173) | EACH | 2 | $13,342 | $9,000.00 | $9,200.00 | $9,500.00 | $10,050 | $10,000 | $20,250 |
| 74 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 10 | $19,500 | $12,000 | $12,725 | $14,000 | $14,620 | $14,000 | $21,330 |
| 75 | Wingwall (PW - 1) (HW=5 FT) (466-7175) | EACH | 2 | $27,425 | $15,000 | $17,100 | $16,500 | $14,650 | $15,000 | $21,230 |
| 76 | Set (type I)(S= 3 FT)(HW= 2 FT)(4:1)(C) (467-7037) | EACH | 1 | $8,730.00 | $9,000.00 | $10,500 | $5,500.00 | $11,000 | $7,500.00 | $16,000 |
| 77 | Set (type I)(S= 3 FT)(HW= 3 FT)(4:1)(C) (467-7041) | EACH | 12 | $9,785.00 | $9,000.00 | $9,500.00 | $6,500.00 | $10,205 | $8,000.00 | $8,310.00 |
| 78 | Set (type I)(S= 4 FT)(HW= 3 FT)(4:1)(C) (467-7068) | EACH | 1 | $9,685.00 | $12,000 | $10,500 | $7,000.00 | $11,900 | $9,000.00 | $16,710 |
| 79 | Set (type I)(S= 5 FT)(HW= 3 FT)(4:1)(C) (467-7096) | EACH | 3 | $8,500.00 | $15,000 | $10,650 | $7,500.00 | $13,700 | $10,000 | $22,350 |
| 80 | Set (type I)(S= 6 FT)(HW= 3 FT)(4:1)(C) (467-7125) | EACH | 1 | $8,253.00 | $9,000.00 | $15,200 | $8,000.00 | $15,320 | $12,000 | $14,890 |
| 81 | Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305) | EACH | 8 | $1,268.00 | $685.00 | $805.00 | $700.00 | $980.00 | $750.00 | $1,410.00 |
| 82 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 2 | $1,201.00 | $812.00 | $1,135.00 | $750.00 | $1,020.00 | $800.00 | $1,440.00 |
| 83 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 31 | $1,182.00 | $900.00 | $960.00 | $800.00 | $1,125.00 | $900.00 | $1,520.00 |
| 84 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 6 | $2,058.00 | $1,100.00 | $1,200.00 | $1,100.00 | $1,275.00 | $1,100.00 | $1,640.00 |
| 85 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 2 | $1,923.00 | $1,160.00 | $1,500.00 | $1,200.00 | $1,350.00 | $1,200.00 | $1,690.00 |
| 86 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 144 | $1,950.00 | $2,200.00 | $1,425.00 | $1,400.00 | $1,600.00 | $1,500.00 | $1,860.00 |
| 87 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 2 | $3,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,600.00 | $3,000.00 | $2,480.00 |
| 88 | Removing structure (set) (496-7004) | EACH | 145 | $100.00 | $200.00 | $375.00 | $100.00 | $395.00 | $250.00 | $610.00 |
| 89 | Removing structure (wingwall) (496-7005) | EACH | 46 | $1,940.00 | $1,000.00 | $2,100.00 | $800.00 | $1,575.00 | $1,200.00 | $2,200.00 |
| 90 | Removing structure (headwall) (496-7006) | EACH | 2 | $2,000.00 | $500.00 | $3,900.00 | $800.00 | $1,575.00 | $1,000.00 | $1,830.00 |
| 91 | Removing structure (pipe) (496-7007) | LF | 7,026 | $20.00 | $20.00 | $16.00 | $8.00 | $16.00 | $15.00 | $26.70 |
| 92 | Removing structure (box culvert) (496-7008) | LF | 1,289 | $105.00 | $100.00 | $45.00 | $30.00 | $55.00 | $50.00 | $84.25 |
| 93 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 4 | $25,000 | $5,000.00 | $15,000 | $20,000 | $9,850.00 | $20,000 | $50,500 |
| 94 | Mobilization (500-7001) | LS | 1 | $5,460,000 | $6,000,000 | $5,000,000 | $5,787,862 | $5,000,000 | $4,390,000 | $6,500,000 |
| 95 | Barricades, signs and traffic handling (502-7001) | MO | 45 | $5,000.00 | $5,000.00 | $4,700.00 | $36,750 | $7,000.00 | $10,000 | $46,800 |
| 96 | Portable changeable message sign (503-7001) | DAY | 204 | $105.00 | $100.00 | $200.00 | $150.00 | $195.00 | $300.00 | $100.00 |
| 97 | TMA (stationary) (505-7001) | DAY | 20 | $150.00 | $1,000.00 | $275.00 | $150.00 | $330.00 | $500.00 | $245.00 |
| 98 | Rock filter dams (install) (type 2) (506-7002) | LF | 10,640 | $45.00 | $45.00 | $32.00 | $50.00 | $44.00 | $43.00 | $30.00 |
| 99 | Rock filter dams (install) (type 3) (506-7003) | LF | 540 | $80.00 | $55.00 | $36.00 | $65.00 | $55.00 | $55.00 | $34.00 |
| 100 | Rock filter dams (install) (type 4) (506-7004) | LF | 171 | $90.00 | $85.00 | $55.00 | $75.00 | $55.00 | $55.00 | $51.00 |
| 101 | Rock filter dams (remove) (506-7011) | LF | 11,351 | $15.00 | $5.00 | $16.50 | $10.00 | $10.00 | $10.00 | $15.00 |
| 102 | Construction exits (install) (type 1) (506-7020) | SY | 468 | $40.00 | $25.00 | $42.00 | $35.00 | $38.50 | $38.00 | $40.00 |
| 103 | Construction exits (remove) (506-7024) | SY | 468 | $12.00 | $10.00 | $18.00 | $10.00 | $10.00 | $10.00 | $15.00 |
| 104 | Temporary sediment control fence (install) (506-7039) | LF | 17,189 | $4.00 | $4.00 | $3.75 | $4.50 | $4.50 | $4.25 | $3.50 |
| 105 | Temporary sediment control fence (remove) (506-7041) | LF | 17,139 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $0.60 | $1.00 |
| 106 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 240 | $5.75 | $5.00 | $5.50 | $8.00 | $7.00 | $6.50 | $5.00 |
| 107 | Biodegradable erosion control logs (remove) (506-7046) | LF | 240 | $1.25 | $1.00 | $1.00 | $2.00 | $2.50 | $2.20 | $1.00 |
| 108 | Constructing detours (type 1) (508-7003) | SY | 6,144 | $80.00 | $82.00 | $155.00 | $114.24 | $88.25 | $90.00 | $105.00 |
| 109 | Constructing detours (type 2) (508-7004) | SY | 406 | $60.00 | $100.00 | $145.00 | $136.62 | $80.00 | $75.00 | $90.00 |
| 110 | Constructing detours (type 3) (508-7005) | SY | 5,147 | $25.00 | $25.00 | $35.00 | $58.59 | $20.00 | $8.00 | $65.00 |
| 111 | One-way traffic control (port traffic signal) (510-7003) | MO | 12 | $7,500.00 | $5,000.00 | $5,500.00 | $13,333 | $7,500.00 | $4,000.00 | $4,000.00 |
| 112 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 1,530 | $45.00 | $75.00 | $86.00 | $90.78 | $78.00 | $85.00 | $55.00 |
| 113 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 1,900 | $10.00 | $10.00 | $12.50 | $23.00 | $8.00 | $12.00 | $20.00 |
| 114 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 1,530 | $10.00 | $25.00 | $20.00 | $50.00 | $11.00 | $15.00 | $20.00 |
| 115 | Intersections (ACP) (530-7002) | SY | 10,839 | $50.00 | $38.00 | $22.00 | $73.70 | $70.00 | $100.00 | $115.00 |
| 116 | Driveways (ACP) (530-7010) | SY | 10,989 | $60.00 | $45.00 | $65.00 | $69.29 | $69.00 | $65.00 | $81.00 |
| 117 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 70,025 | $0.20 | $0.34 | $0.30 | $0.21 | $0.28 | $0.30 | $0.35 |
| 118 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,175 | $24.00 | $25.00 | $24.75 | $23.95 | $25.00 | $24.75 | $22.00 |
| 119 | Downstream anchor terminal section (540-7015) | EACH | 4 | $1,400.00 | $1,490.00 | $1,430.00 | $1,495.00 | $1,450.00 | $1,400.00 | $1,250.00 |
| 120 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 100 | $83.00 | $122.00 | $105.00 | $121.90 | $100.00 | $100.00 | $85.00 |
| 121 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,175.00 | $3,169.00 | $3,300.00 | $3,169.00 | $3,300.00 | $3,300.00 | $1,950.00 |
| 122 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 8 | $2,000.00 | $1,000.00 | $2,200.00 | $1,175.00 | $2,200.00 | $2,200.00 | $1,500.00 |
| 123 | Crash cushion attenuator (remove) (545-7004) | EACH | 6 | $1,000.00 | $500.00 | $1,000.00 | $895.00 | $880.00 | $900.00 | $852.00 |
| 124 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 6 | $8,000.00 | $7,500.00 | $9,100.00 | $7,669.00 | $9,075.00 | $9,000.00 | $7,950.00 |
| 125 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 34 | $375.00 | $275.00 | $305.00 | $275.00 | $395.00 | $300.00 | $220.00 |
| 126 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 2 | $335.00 | $315.00 | $350.00 | $315.00 | $275.00 | $350.00 | $250.00 |
| 127 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 6 | $675.00 | $715.00 | $790.00 | $715.00 | $900.00 | $800.00 | $820.00 |
| 128 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $500.00 | $1,075.00 | $1,200.00 | $1,075.00 | $990.00 | $1,200.00 | $900.00 |
| 129 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $1,000.00 | $899.00 | $1,000.00 | $899.00 | $1,090.00 | $1,000.00 | $990.00 |
| 130 | Install small roadside sign support and assembly TYS80(1)SA(T-exal) (644-7030) | EACH | 1 | $1,200.00 | $1,290.00 | $1,400.00 | $1,290.00 | $1,090.00 | $1,400.00 | $990.00 |
| 131 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 49 | $1,020.00 | $1,125.00 | $1,020.00 | $1,210.00 | $1,100.00 | $1,100.00 | |
| 132 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 143 | $415.00 | $375.00 | $413.00 | $375.00 | $505.00 | $420.00 | $460.00 |
| 133 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 2 | $355.00 | $399.00 | $440.00 | $399.00 | $505.00 | $440.00 | $460.00 |
| 134 | Remove SM RD SN sup&AM (644-7073) | EACH | 53 | $100.00 | $79.00 | $100.00 | $79.00 | $110.00 | $100.00 | $100.00 |
| 135 | Install delineator assembly (D-SW)SZ 1(WFLX)GND(BI) (658-7004) | EACH | 35 | $80.00 | $65.00 | $95.00 | $65.00 | $77.00 | $75.00 | $70.00 |
| 136 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 9 | $35.00 | $25.00 | $42.00 | $25.00 | $42.00 | $42.00 | $40.00 |
| 137 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 28 | $90.00 | $65.00 | $71.50 | $65.00 | $110.00 | $75.00 | $70.00 |
| 138 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 10,870 | $0.30 | $4.30 | $4.75 | $4.30 | $4.75 | $4.65 | $4.30 |
| 139 | Work zone pavement marking removing (traffic BTN) type W (662-7057) | EACH | 12,053 | $0.25 | $4.30 | $4.75 | $4.30 | $4.75 | $4.65 | $4.30 |
| 140 | Work zone pavement marking removing (traffic BTN) type Y (662-7059) | EACH | 139,308 | $0.97 | $2.00 | $2.20 | $2.00 | $2.20 | $2.20 | $2.00 |
| 141 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 78,743 | $0.85 | $1.20 | $1.30 | $1.20 | $1.32 | $1.35 | $1.20 |
| 142 | Work zone pavement marking removing (W)8"(DOT) (662-7070) | LF | 2,256 | $0.60 | $2.00 | $2.20 | $2.00 | $2.20 | $2.20 | $2.00 |
| 143 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 562 | $1.00 | $10.00 | $11.00 | $10.00 | $11.00 | $11.00 | $10.00 |
| 144 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 78,092 | $0.75 | $1.20 | $1.30 | $1.20 | $1.32 | $1.35 | $1.20 |
| 145 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 234 | $1.20 | $2.00 | $2.20 | $2.00 | $2.20 | $2.20 | $2.00 |
| 146 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 7,592 | $1.00 | $1.50 | $1.65 | $1.50 | $1.70 | $1.65 | $1.50 |
| 147 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 375 | $3.20 | $4.00 | $4.50 | $4.00 | $4.50 | $4.35 | $4.00 |
| 148 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 82,488 | $0.70 | $1.20 | $1.30 | $1.20 | $1.32 | $1.35 | $1.20 |
| 149 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 13,290 | $0.75 | $1.20 | $1.30 | $1.20 | $1.32 | $1.35 | $1.20 |
| 150 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 17,160 | $0.60 | $0.70 | $0.80 | $0.70 | $0.80 | $0.75 | $0.70 |
| 151 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 74,220 | $0.55 | $0.70 | $0.80 | $0.70 | $0.80 | $0.75 | $0.70 |
| 152 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 178 | $18.00 | $15.00 | $16.50 | $15.00 | $16.50 | $16.50 | $15.00 |
| 153 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 23 | $215.00 | $215.00 | $240.00 | $215.00 | $237.00 | $235.00 | $215.00 |
| 154 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 2 | $310.00 | $275.00 | $300.00 | $275.00 | $305.00 | $300.00 | $275.00 |
| 155 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 21 | $275.00 | $245.00 | $270.00 | $245.00 | $270.00 | $265.00 | $245.00 |
| 156 | Reflectorized pavement marker type I-C (672-7002) | EACH | 1,162 | $6.00 | $5.00 | $5.50 | $5.00 | $5.50 | $5.50 | $5.00 |
| 157 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 2,705 | $5.00 | $5.00 | $5.50 | $5.00 | $5.50 | $5.50 | $5.00 |
| 158 | Removable bollard (5005-7001) | EACH | 100 | $1,000.00 | $1,300.00 | $1,769.00 | $975.00 | $1,500.00 | $225.00 | |
| 159 | LED roadside sign (6066-7001) | EACH | 1 | $4,250.00 | $3,969.00 | $4,500.00 | $3,969.00 | $3,100.00 | $4,400.00 | $2,800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.