TxDOT contract A00059128 bid tabulation
Interchange Improvement (New Or Update), IH 20 (1.55 MI WEST OF SH 31 (MM 588) to 1.14 MI EAST OF SH 31 (MM 590)). Let by Texas DOT on January 7, 2026, Gregg, Tyler District. 7 bids received; low bid $197,976,992 by Indus Road & Bridge, Inc., -10% against the engineer's estimate of $220,422,253.
- Owner
- Texas DOT
- Letting
- 07 JAN 2026
- Pay items
- 357
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc. | $197,976,992 | Low | -10% |
| 2 | RPM Xconstruction, LLC | $221,032,733 | +12% | 0.0% |
| 3 | James Construction Group, LLC | $223,752,127 | +13% | +2.0% |
| 4 | Webber, LLC | $224,683,973 | +13% | +2.0% |
| 5 | Longview Bridge and Road, LTD. | $226,398,604 | +14% | +3.0% |
| 6 | Pulice Construction, Inc. | $241,876,186 | +22% | +10% |
| 7 | Drake Companies LLC | $279,323,710 | +41% | +27% |
Engineer's estimate: $220,422,253.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Indus Road & Bridge, Inc. | 2. RPM Xconstruction, LLC | 3. James Construction Group, LLC | 4. Webber, LLC | 5. Longview Bridge and Road, LTD. | 6. Pulice Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 218 | $8,000.00 | $10,788 | $34,000 | $77,706 | $103,066 | $36,000 | $95,150 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 62,473 | $36.00 | $10.00 | $8.00 | $6.10 | $9.70 | $9.15 | $16.98 |
| 3 | Removing concrete (mowstrip) (104-7003) | SY | 1,134 | $60.00 | $4.80 | $6.50 | $8.96 | $21.20 | $25.00 | $6.09 |
| 4 | Removing concrete (riprap) (104-7006) | SY | 10,761 | $35.00 | $8.20 | $3.70 | $9.44 | $8.85 | $14.00 | $9.85 |
| 5 | Removing concrete (driveways) (104-7011) | SY | 1,900 | $30.00 | $14.00 | $13.00 | $11.72 | $17.80 | $15.00 | $15.27 |
| 6 | Removing concrete (curb & gutter) (104-7017) | LF | 1,284 | $20.00 | $4.80 | $5.00 | $6.56 | $7.35 | $9.00 | $3.46 |
| 7 | Removing concrete (appr slab) (104-7030) | SY | 1,642 | $27.50 | $10.00 | $16.00 | $14.02 | $30.75 | $51.00 | $39.87 |
| 8 | Removing concrete (traffic barrier) (104-7035) | LF | 16,521 | $20.00 | $14.00 | $17.00 | $10.91 | $21.50 | $13.75 | $15.17 |
| 9 | Removing concrete (rail) (104-7036) | LF | 1,659 | $60.00 | $19.00 | $11.70 | $20.79 | $28.60 | $16.50 | $15.04 |
| 10 | Removing concrete (flume) (104-7041) | SY | 2,789 | $35.00 | $6.30 | $5.70 | $23.45 | $18.80 | $20.00 | $14.23 |
| 11 | Removing concrete (miscellaneous) (104-7046) | SY | 6,926 | $45.00 | $5.20 | $14.50 | $14.37 | $41.50 | $20.00 | $10.99 |
| 12 | Removing stab base & asphalt pavement(12"-27") (105-7130) | SY | 146,413 | $5.00 | $6.00 | $4.15 | $6.72 | $8.75 | $10.75 | $14.09 |
| 13 | Obliterating abandoned road (106-7002) | SY | 13,162 | $10.00 | $12.00 | $9.50 | $8.35 | $6.45 | $6.50 | $23.73 |
| 14 | Excavation (roadway) (110-7001) | CY | 579,416 | $10.00 | $7.00 | $6.00 | $9.96 | $9.65 | $8.00 | $7.00 |
| 15 | Embankment (final)(DC)(type C) (132-7006) | CY | 578,838 | $11.00 | $11.00 | $13.00 | $16.83 | $9.65 | $10.00 | $10.00 |
| 16 | Furn & place topsoil (4") (160-7002) | SY | 313,547 | $1.25 | $1.70 | $1.35 | $0.71 | $1.50 | $2.25 | $5.00 |
| 17 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 313,547 | $0.25 | $0.15 | $0.15 | $0.14 | $1.00 | $0.14 | $0.14 |
| 18 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 156,777 | $0.60 | $0.40 | $0.45 | $0.39 | $1.00 | $0.56 | $0.40 |
| 19 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 156,777 | $0.60 | $0.40 | $0.45 | $0.39 | $1.00 | $0.56 | $0.40 |
| 20 | Vegetative watering (168-7001) | TGL | 3,449 | $10.00 | $8.00 | $100.00 | $37.67 | $2.00 | $13.75 | $26.65 |
| 21 | Wildflower seeding (180-7001) | ACRE | 218 | $705.00 | $950.00 | $1,000.00 | $947.58 | $1,150.00 | $500.00 | $976.89 |
| 22 | Rdside amenity (type 1) (194-7012) | EACH | 12 | $18,000 | $15,900 | $21,950 | $16,478 | $19,700 | $20,300 | $62,980 |
| 23 | Rdside amenity (type 2) (194-7013) | EACH | 7 | $6,000.00 | $13,100 | $8,465.00 | $15,010 | $16,340 | $6,000.00 | $16,348 |
| 24 | Rdside amenity (type 3) (194-7014) | EACH | 7 | $4,000.00 | $12,100 | $6,575.00 | $15,010 | $10,440 | $5,500.00 | $11,935 |
| 25 | Rdside amenity (type 4) (194-7015) | EACH | 13 | $2,000.00 | $7,000.00 | $4,790.00 | $15,010 | $3,960.00 | $4,500.00 | $7,498.19 |
| 26 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 95,771 | $24.00 | $25.00 | $25.00 | $27.63 | $23.00 | $31.00 | $27.00 |
| 27 | Lime (quicklime (dry)) (260-7002) | TON | 2,304 | $330.00 | $365.00 | $375.00 | $364.98 | $347.00 | $400.00 | $350.00 |
| 28 | Lime TRT (existing material)(6") (260-7006) | SY | 165,932 | $4.00 | $4.70 | $2.50 | $4.45 | $2.75 | $4.20 | $3.00 |
| 29 | Lime TRT (existing material)(8") (260-7007) | SY | 3,578 | $4.00 | $5.20 | $9.20 | $9.95 | $17.30 | $6.00 | $4.00 |
| 30 | Cement (275-7001) | TON | 2,345 | $270.00 | $215.00 | $275.00 | $226.47 | $206.00 | $270.00 | $400.00 |
| 31 | Cement TRT (existing material)(6") (275-7002) | SY | 47,305 | $4.00 | $4.17 | $2.40 | $2.11 | $3.25 | $3.25 | $3.00 |
| 32 | Cement TRT (existing material)(8") (275-7003) | SY | 94,771 | $4.00 | $4.80 | $3.15 | $2.19 | $4.25 | $3.25 | $4.00 |
| 33 | Prime coat & blotter (MC-30) (310-7010) | GAL | 93,292 | $8.00 | $5.80 | $5.75 | $5.05 | $5.25 | $7.00 | $6.58 |
| 34 | Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) (316-7068) | GAL | 70,850 | $5.00 | $4.60 | $4.55 | $4.00 | $4.15 | $4.30 | $5.22 |
| 35 | Aggregate (type-PD or PL, GR-4) (316-7258) | CY | 1,640 | $190.00 | $220.00 | $217.10 | $192.00 | $200.00 | $193.00 | $250.33 |
| 36 | SP mixes SP-B PG64-22 (344-7001) | TON | 74,751 | $160.00 | $147.00 | $160.00 | $144.00 | $146.00 | $158.00 | $164.00 |
| 37 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 23,813 | $170.00 | $162.00 | $174.15 | $162.00 | $160.00 | $170.00 | $185.00 |
| 38 | Flexible pavement structure repair(10") (351-7009) | SY | 10,031 | $110.00 | $112.00 | $120.00 | $111.25 | $100.00 | $118.00 | $135.58 |
| 39 | Planing asphalt concrete pavement(2") (354-7051) | SY | 100,311 | $8.00 | $3.50 | $1.90 | $1.73 | $2.20 | $2.30 | $2.00 |
| 40 | Concrete pavement (CRCP) (14") (360-7008) | SY | 202,906 | $150.00 | $116.00 | $130.00 | $131.77 | $118.00 | $150.00 | $146.00 |
| 41 | Concrete pavement (CRCP)(JCT terminal)(14") (360-7098) | SY | 713 | $278.00 | $125.00 | $217.00 | $200.31 | $291.00 | $167.00 | $350.00 |
| 42 | Cut & restore asphalt paving (400-7008) | SY | 2,294 | $140.00 | $275.00 | $154.00 | $168.87 | $195.00 | $125.00 | $315.76 |
| 43 | Cem stabil BKFL (400-7010) | CY | 15,704 | $250.00 | $128.00 | $180.00 | $133.66 | $259.00 | $210.00 | $150.00 |
| 44 | Flowable backfill (401-7001) | CY | 43 | $540.00 | $500.00 | $323.00 | $388.70 | $774.00 | $220.00 | $325.00 |
| 45 | Trench excavation protection (402-7001) | LF | 20,255 | $20.00 | $9.00 | $3.70 | $1.09 | $14.00 | $11.00 | $5.80 |
| 46 | Temporary special shoring (403-7001) | SF | 58,380 | $46.00 | $59.00 | $62.00 | $50.00 | $34.25 | $37.00 | $68.44 |
| 47 | Soil nail anchors (410-7001) | LF | 41,712 | $20.00 | $27.00 | $27.00 | $26.50 | $20.30 | $35.00 | $26.72 |
| 48 | Drilled shaft (18 in) (416-7002) | LF | 1,140 | $235.00 | $117.00 | $121.00 | $184.46 | $117.00 | $125.00 | $188.17 |
| 49 | Drilled shaft (24 in) (416-7004) | LF | 1,024 | $250.00 | $148.00 | $157.00 | $354.11 | $224.00 | $205.00 | $172.90 |
| 50 | Drilled shaft (30 in) (416-7005) | LF | 956 | $330.00 | $335.00 | $495.00 | $450.00 | $450.00 | $495.00 | $628.63 |
| 51 | Drilled shaft (36 in) (416-7006) | LF | 11,717 | $270.00 | $222.00 | $245.00 | $391.39 | $206.00 | $270.00 | $250.00 |
| 52 | Drilled shaft (42 in) (416-7007) | LF | 2,890 | $400.00 | $330.00 | $468.00 | $335.15 | $285.00 | $375.00 | $420.22 |
| 53 | Drilled shaft (48 in) (416-7008) | LF | 287 | $617.50 | $650.00 | $723.00 | $658.00 | $658.00 | $725.00 | $944.42 |
| 54 | Drilled shaft (54 in) (416-7009) | LF | 53 | $712.00 | $730.00 | $810.00 | $736.00 | $736.00 | $810.00 | $1,053.36 |
| 55 | Drilled shaft (60 in) (416-7010) | LF | 3,360 | $840.00 | $660.00 | $666.00 | $510.85 | $464.00 | $671.00 | $703.66 |
| 56 | Drilled shaft (84 in) (416-7014) | LF | 2,061 | $1,905.00 | $1,500.00 | $1,538.00 | $918.83 | $1,070.00 | $1,450.00 | $1,500.00 |
| 57 | Drilled shaft (120 in) (416-7020) | LF | 1,795 | $2,200.00 | $2,700.00 | $2,717.00 | $1,832.36 | $2,040.00 | $2,900.00 | $2,940.43 |
| 58 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 205 | $230.75 | $289.00 | $220.00 | $199.00 | $199.00 | $220.00 | $143.05 |
| 59 | Drilled shaft (high mast pole) (60 in) (416-7037) | LF | 1,008 | $735.75 | $925.00 | $1,015.00 | $905.00 | $905.00 | $996.00 | $1,299.04 |
| 60 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 16 | $468.25 | $300.00 | $286.00 | $255.00 | $255.00 | $280.00 | $235.81 |
| 61 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 22 | $400.00 | $950.00 | $292.00 | $260.00 | $260.00 | $286.00 | $234.52 |
| 62 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 39 | $450.00 | $1,100.00 | $331.00 | $295.00 | $295.00 | $325.00 | $273.28 |
| 63 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 22 | $602.00 | $1,200.00 | $810.00 | $722.00 | $722.00 | $795.00 | $487.06 |
| 64 | Class B concrete (flume) (420-7010) | CY | 72 | $1,858.00 | $570.00 | $900.00 | $731.91 | $784.00 | $675.00 | $796.30 |
| 65 | Class C concrete (abutment) (420-7012) | CY | 918 | $1,600.00 | $1,050.00 | $1,210.00 | $1,066.87 | $1,740.00 | $1,250.00 | $1,200.00 |
| 66 | Class C concrete (cap) (420-7022) | CY | 1,400.40 | $1,700.00 | $1,835.00 | $1,980.00 | $1,512.82 | $1,900.00 | $1,275.00 | $1,850.00 |
| 67 | Class C concrete (cap)(mass) (420-7024) | CY | 1,163.50 | $1,850.00 | $1,575.00 | $1,800.00 | $1,532.60 | $1,390.00 | $1,500.00 | $1,500.00 |
| 68 | Class C concrete (column) (420-7038) | CY | 1,366.50 | $2,040.00 | $1,575.00 | $1,700.00 | $1,840.79 | $1,500.00 | $1,275.00 | $1,600.00 |
| 69 | Class C concrete (column)(mass) (420-7040) | CY | 2,312.40 | $1,000.00 | $1,360.00 | $2,400.00 | $1,498.00 | $1,080.00 | $1,375.00 | $1,100.00 |
| 70 | Class C concrete (footing) (420-7044) | CY | 246 | $970.00 | $520.00 | $673.00 | $732.13 | $854.00 | $800.00 | $500.00 |
| 71 | Class C concrete (crashwall) (420-7050) | CY | 638.20 | $1,325.00 | $525.00 | $1,064.00 | $1,142.34 | $1,360.00 | $800.00 | $550.00 |
| 72 | Class C concrete (rail foundation) (420-7052) | CY | 263 | $925.00 | $480.00 | $774.00 | $535.03 | $793.00 | $815.00 | $500.00 |
| 73 | Reinforced concrete slab (422-7001) | SF | 424,669 | $29.00 | $21.00 | $30.00 | $24.71 | $26.70 | $33.00 | $22.50 |
| 74 | Approach slab (422-7013) | CY | 1,779.70 | $900.00 | $755.00 | $700.00 | $574.94 | $555.00 | $1,050.00 | $650.00 |
| 75 | Retaining wall (MSE) (423-7001) | SF | 70,096 | $100.00 | $93.00 | $118.00 | $94.01 | $153.00 | $160.00 | $115.00 |
| 76 | Retaining wall (temporary wall) (423-7012) | SF | 1,577 | $35.00 | $88.00 | $29.00 | $28.86 | $69.00 | $85.00 | $15.00 |
| 77 | Retaining wall (spread footing) (423-7015) | SF | 15,625 | $84.00 | $104.00 | $105.00 | $90.58 | $151.00 | $110.00 | $65.00 |
| 78 | Retaining wall (drilled shaft) (fascia) (423-7019) | SF | 6,617 | $70.00 | $121.00 | $154.00 | $119.60 | $135.00 | $130.00 | $175.00 |
| 79 | Retaining wall (soil nail) (fascia) (423-7023) | SF | 16,826 | $30.00 | $130.00 | $120.00 | $130.37 | $153.00 | $140.00 | $150.00 |
| 80 | Retaining wall (special) (423-7029) | SF | 3,465 | $75.00 | $345.00 | $408.00 | $1,287.20 | $254.00 | $350.00 | $350.00 |
| 81 | Prestressed concrete girder (TX46) (425-7004) | LF | 4,880.36 | $240.00 | $234.00 | $247.00 | $237.44 | $216.00 | $255.00 | $250.00 |
| 82 | Prestressed concrete girder (TX54) (425-7005) | LF | 44,116.61 | $235.00 | $223.00 | $237.00 | $234.62 | $222.00 | $270.00 | $210.00 |
| 83 | Prestressed concrete girder (TX62) (425-7006) | LF | 3,416.44 | $240.00 | $230.00 | $257.00 | $230.19 | $232.00 | $315.00 | $220.00 |
| 84 | Prestressed concrete girder (TX70) (425-7007) | LF | 5,492.72 | $265.00 | $230.00 | $252.00 | $236.43 | $259.00 | $345.00 | $225.00 |
| 85 | Riprap (concrete)(4 in) (432-7001) | CY | 1,254.68 | $1,210.00 | $500.00 | $545.00 | $529.17 | $537.00 | $555.00 | $294.22 |
| 86 | Riprap (concrete)(5 in) (432-7002) | CY | 659 | $1,015.00 | $500.00 | $780.00 | $460.93 | $556.00 | $545.00 | $246.48 |
| 87 | Riprap (concrete)(6 in) (432-7003) | CY | 41 | $1,200.00 | $500.00 | $631.50 | $542.63 | $636.00 | $615.00 | $685.34 |
| 88 | Riprap (mow strip)(4 in) (432-7013) | CY | 1,511.20 | $700.00 | $580.00 | $588.00 | $710.18 | $593.00 | $650.00 | $566.53 |
| 89 | Riprap (stone protection)(12 in) (432-7041) | CY | 372 | $215.00 | $160.00 | $421.50 | $256.11 | $548.00 | $250.00 | $28.50 |
| 90 | Riprap (stone protection)(15 in) (432-7042) | CY | 505 | $190.00 | $162.00 | $396.50 | $247.95 | $550.00 | $240.00 | $28.50 |
| 91 | Riprap (stone protection)(18 in) (432-7043) | CY | 836 | $205.00 | $162.00 | $335.50 | $248.37 | $320.00 | $240.00 | $20.36 |
| 92 | STR steel (shear connector) (442-7015) | LB | 1,385 | $30.00 | $10.00 | $36.00 | $75.38 | $44.75 | $35.00 | $36.22 |
| 93 | Rail (type SSTR) (450-7024) | LF | 40,151.50 | $65.00 | $82.00 | $78.00 | $69.05 | $63.25 | $56.00 | $95.00 |
| 94 | Rail (CLF-RO) (450-7049) | LF | 1,960 | $150.00 | $225.00 | $122.00 | $173.25 | $173.00 | $150.00 | $119.47 |
| 95 | Retrofit rail (type SSTR) (451-7024) | LF | 180 | $400.00 | $325.00 | $357.00 | $258.84 | $185.00 | $100.00 | $419.28 |
| 96 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 3,188 | $220.00 | $199.00 | $186.00 | $176.20 | $238.00 | $210.00 | $200.00 |
| 97 | CMP (gal steel 24 in) (460-7005) | LF | 876 | $330.00 | $94.00 | $121.00 | $85.90 | $107.00 | $58.00 | $106.60 |
| 98 | CMP (gal steel 48 in) (460-7011) | LF | 40 | $260.00 | $185.00 | $208.00 | $226.20 | $196.00 | $178.00 | $483.32 |
| 99 | Concrete box culvert (4 FT X 3 FT) (462-7004) | LF | 554 | $650.00 | $440.00 | $344.00 | $310.85 | $272.00 | $330.00 | $405.80 |
| 100 | Concrete box culvert (5 FT X 2 FT) (462-7006) | LF | 876 | $675.00 | $500.00 | $400.00 | $334.56 | $301.00 | $400.00 | $477.76 |
| 101 | Concrete box culvert (5 FT X 4 FT) (462-7008) | LF | 1,854 | $610.00 | $525.00 | $563.00 | $436.65 | $351.00 | $500.00 | $608.03 |
| 102 | Concrete box culvert (7 FT X 4 FT) (462-7016) | LF | 158 | $810.00 | $725.00 | $780.00 | $606.28 | $522.00 | $715.00 | $939.40 |
| 103 | Concrete box culvert (8 FT X 4 FT) (462-7021) | LF | 342 | $1,200.00 | $825.00 | $1,113.00 | $681.01 | $540.00 | $750.00 | $1,017.47 |
| 104 | Concrete box culvert (8 FT X 5 FT) (462-7022) | LF | 1,172 | $1,065.00 | $850.00 | $759.00 | $692.76 | $559.00 | $815.00 | $1,045.21 |
| 105 | RC pipe (CL III)(18 in) (464-7003) | LF | 1,834 | $80.00 | $64.00 | $91.00 | $81.81 | $59.50 | $69.00 | $118.00 |
| 106 | RC pipe (CL III)(24 in) (464-7005) | LF | 9,348 | $90.00 | $140.00 | $120.00 | $99.66 | $64.25 | $90.00 | $120.00 |
| 107 | RC pipe (CL III)(30 in) (464-7007) | LF | 2,018 | $164.00 | $175.00 | $166.00 | $148.75 | $106.00 | $111.00 | $180.00 |
| 108 | RC pipe (CL III)(36 in) (464-7009) | LF | 725 | $170.00 | $200.00 | $184.00 | $165.02 | $162.00 | $140.00 | $240.00 |
| 109 | RC pipe (CL III)(42 in) (464-7010) | LF | 1,269 | $190.00 | $245.00 | $257.00 | $190.72 | $165.00 | $183.00 | $286.34 |
| 110 | RC pipe (CL III)(48 in) (464-7011) | LF | 484 | $240.00 | $275.00 | $300.00 | $281.82 | $185.00 | $225.00 | $357.79 |
| 111 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 4 | $9,000.00 | $6,000.00 | $9,125.00 | $5,946.80 | $6,480.00 | $5,500.00 | $11,063 |
| 112 | Manh (complete)(PRM)(60IN) (465-7003) | EACH | 2 | $9,100.00 | $7,000.00 | $10,417 | $7,671.50 | $7,710.00 | $7,200.00 | $17,321 |
| 113 | Junction box(complete)(PJB)(3FTX3FT) (465-7005) | EACH | 6 | $8,000.00 | $7,100.00 | $6,635.00 | $5,771.08 | $6,740.00 | $5,250.00 | $26,343 |
| 114 | Junction box(complete)(PJB)(4FTX4FT) (465-7006) | EACH | 4 | $7,410.00 | $8,100.00 | $8,775.00 | $6,941.60 | $8,780.00 | $6,550.00 | $12,936 |
| 115 | Junction box(complete)(PJB)(5FTX5FT) (465-7009) | EACH | 1 | $9,688.00 | $10,700 | $11,253 | $7,119.87 | $8,680.00 | $8,800.00 | $13,165 |
| 116 | Junction box(complete)(PJB)(6FTX6FT) (465-7011) | EACH | 1 | $13,230 | $12,500 | $12,472 | $9,460.91 | $15,360 | $12,500 | $20,719 |
| 117 | Junction box(complete)(PJB)(8FTX8FT) (465-7012) | EACH | 2 | $18,583 | $21,000 | $26,518 | $18,670 | $22,810 | $22,350 | $32,425 |
| 118 | Inlet (complete)(pcu)(6FT)(both) (465-7044) | EACH | 1 | $17,508 | $9,000.00 | $11,109 | $14,338 | $8,120.00 | $7,750.00 | $23,003 |
| 119 | Inlet (complete)(PMBD)(4FT) (465-7045) | EACH | 2 | $19,000 | $8,000.00 | $21,796 | $11,567 | $15,710 | $17,500 | $18,142 |
| 120 | Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126) | EACH | 3 | $7,456.25 | $7,000.00 | $9,115.00 | $6,138.04 | $6,940.00 | $5,500.00 | $20,908 |
| 121 | Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128) | EACH | 41 | $8,561.00 | $8,000.00 | $8,434.00 | $6,499.93 | $7,330.00 | $7,000.00 | $18,915 |
| 122 | Inlet (complete)(PSL)(FG)(6FTX6FT-4FTX4FT) (465-7141) | EACH | 2 | $7,930.00 | $10,500 | $12,666 | $10,985 | $9,690.00 | $10,000 | $27,139 |
| 123 | Inlet (complete)(rwi)(type I) (465-7353) | EACH | 3 | $6,151.75 | $15,900 | $12,019 | $9,630.47 | $14,770 | $12,825 | $13,308 |
| 124 | Inlet(complete)(type MSE1) (465-7362) | EACH | 17 | $6,210.00 | $12,500 | $11,684 | $15,678 | $14,520 | $11,500 | $13,300 |
| 125 | Wingwall (FW - 0) (HW=4 FT) (466-7146) | EACH | 1 | $26,548 | $25,000 | $18,319 | $13,226 | $16,390 | $14,000 | $19,612 |
| 126 | Wingwall (FW - 0) (HW=6 FT) (466-7148) | EACH | 3 | $20,000 | $24,000 | $20,453 | $19,078 | $18,440 | $15,900 | $24,961 |
| 127 | Wingwall (FW - 0) (HW=9 FT) (466-7151) | EACH | 1 | $30,000 | $26,000 | $31,310 | $37,289 | $27,920 | $27,625 | $41,100 |
| 128 | Wingwall (FW - S) (HW=5 FT) (466-7161) | EACH | 7 | $27,668 | $25,000 | $24,246 | $13,737 | $21,550 | $15,750 | $34,931 |
| 129 | Wingwall (FW - S) (HW=6 FT) (466-7162) | EACH | 2 | $13,500 | $32,000 | $36,077 | $14,245 | $32,320 | $16,500 | $38,622 |
| 130 | Wingwall (FW - S) (HW=7 FT) (466-7163) | EACH | 1 | $29,400 | $34,000 | $42,063 | $14,445 | $38,360 | $22,800 | $32,066 |
| 131 | Wingwall (FW - S) (HW=9 FT) (466-7165) | EACH | 2 | $36,545 | $43,000 | $36,397 | $28,420 | $31,570 | $27,500 | $46,704 |
| 132 | Wingwall (PW - 1) (HW=5 FT) (466-7175) | EACH | 5 | $23,770 | $25,000 | $29,046 | $14,116 | $25,560 | $22,500 | $33,916 |
| 133 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 1 | $21,000 | $24,000 | $32,342 | $19,306 | $28,560 | $24,000 | $43,055 |
| 134 | Wingwall (PW - 1) (HW=10 FT) (466-7180) | EACH | 1 | $59,311 | $41,000 | $39,860 | $50,162 | $35,598 | $24,000 | $40,551 |
| 135 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 26 | $1,600.00 | $2,200.00 | $2,452.00 | $1,634.26 | $1,220.00 | $1,200.00 | $2,307.38 |
| 136 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 12 | $2,500.00 | $2,500.00 | $3,200.00 | $1,985.37 | $1,870.00 | $1,600.00 | $2,811.73 |
| 137 | Removing structure (inlet) (496-7002) | EACH | 2 | $1,500.00 | $1,300.00 | $1,150.00 | $797.41 | $785.00 | $800.00 | $2,851.72 |
| 138 | Removing structure (manhole) (496-7003) | EACH | 2 | $1,000.00 | $1,500.00 | $1,132.00 | $881.29 | $785.00 | $800.00 | $1,577.72 |
| 139 | Removing structure (set) (496-7004) | EACH | 32 | $870.00 | $850.00 | $725.00 | $725.63 | $400.00 | $475.00 | $1,963.36 |
| 140 | Removing structure (wingwall) (496-7005) | EACH | 4 | $3,370.00 | $6,600.00 | $2,184.00 | $3,732.53 | $2,500.00 | $1,565.00 | $6,616.56 |
| 141 | Removing structure (headwall) (496-7006) | EACH | 21 | $2,800.00 | $3,200.00 | $2,186.00 | $1,408.54 | $2,210.00 | $1,640.00 | $3,494.79 |
| 142 | Removing structure (pipe) (496-7007) | LF | 4,286 | $40.00 | $60.00 | $29.00 | $14.62 | $15.00 | $24.00 | $51.69 |
| 143 | Removing structure (box culvert) (496-7008) | LF | 631 | $155.00 | $200.00 | $50.00 | $58.77 | $117.00 | $33.50 | $134.23 |
| 144 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 10 | $125,000 | $150,000 | $75,012 | $116,900 | $217,800 | $50,000 | $327,521 |
| 145 | Remove STR (rail) (496-7017) | LF | 3,224 | $33.00 | $19.00 | $7.00 | $30.61 | $31.75 | $18.00 | $29.44 |
| 146 | Mobilization (500-7001) | LS | 1 | $24,860,257 | $19,700,000 | $22,000,000 | $22,500,000 | $22,468,000 | $19,000,000 | $24,187,619 |
| 147 | Barricades, signs and traffic handling (502-7001) | MO | 58 | $10,000 | $36,000 | $55,000 | $47,684 | $46,514 | $66,500 | $29,713 |
| 148 | Portable changeable message sign (503-7002) | EACH | 10 | $13,000 | $19,000 | $22,550 | $13,766 | $25,150 | $19,800 | $5,892.96 |
| 149 | TMA (stationary) (505-7001) | DAY | 73 | $320.00 | $200.00 | $485.00 | $302.21 | $1,000.00 | $200.00 | $212.80 |
| 150 | TMA (mobile operation) (505-7003) | DAY | 18 | $300.00 | $525.00 | $890.00 | $706.63 | $1,000.00 | $264.00 | $120.04 |
| 151 | Rock filter dams (install) (type 2) (506-7002) | LF | 2,843 | $50.00 | $45.00 | $56.00 | $42.61 | $45.00 | $47.00 | $43.93 |
| 152 | Rock filter dams (remove) (506-7011) | LF | 2,843 | $16.00 | $13.00 | $9.05 | $12.58 | $11.00 | $14.00 | $12.97 |
| 153 | Construction exits (install) (type 1) (506-7020) | SY | 400 | $40.00 | $48.00 | $75.00 | $45.41 | $60.00 | $50.00 | $46.81 |
| 154 | Construction exits (remove) (506-7024) | SY | 400 | $10.00 | $11.00 | $16.00 | $10.83 | $10.00 | $12.00 | $11.16 |
| 155 | Temporary sediment control fence (install) (506-7039) | LF | 51,709 | $5.50 | $3.50 | $4.40 | $3.33 | $6.00 | $3.75 | $3.43 |
| 156 | Temporary sediment control fence (remove) (506-7041) | LF | 51,709 | $2.00 | $0.90 | $0.50 | $0.89 | $0.75 | $1.00 | $0.92 |
| 157 | Constructing detours (type 1) (508-7003) | SY | 9,752 | $120.00 | $110.00 | $136.50 | $128.00 | $140.00 | $145.00 | $133.77 |
| 158 | Constructing detours (type 2) (508-7004) | SY | 41,208 | $120.00 | $85.00 | $109.00 | $120.00 | $92.00 | $102.00 | $125.00 |
| 159 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 38,940 | $55.00 | $48.00 | $47.70 | $61.08 | $45.00 | $81.00 | $73.11 |
| 160 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 3,560 | $80.00 | $80.00 | $78.50 | $41.14 | $49.50 | $90.00 | $82.63 |
| 161 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 180 | $97.50 | $84.00 | $82.00 | $42.57 | $145.00 | $86.00 | $79.52 |
| 162 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 119,670 | $16.00 | $9.50 | $7.00 | $4.68 | $9.00 | $5.00 | $6.79 |
| 163 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 8,732 | $15.00 | $5.00 | $6.00 | $10.75 | $15.10 | $3.00 | $7.65 |
| 164 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 160 | $17.00 | $8.50 | $6.00 | $24.22 | $58.25 | $6.00 | $7.91 |
| 165 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 6,750 | $20.00 | $14.00 | $8.00 | $13.51 | $12.20 | $6.25 | $6.79 |
| 166 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 38,940 | $20.00 | $14.00 | $4.20 | $7.80 | $6.35 | $4.00 | $15.78 |
| 167 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 3,560 | $18.50 | $13.00 | $6.95 | $10.77 | $25.70 | $4.00 | $17.78 |
| 168 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 180 | $25.00 | $14.00 | $6.90 | $19.14 | $35.25 | $7.00 | $18.84 |
| 169 | Permanent CTB (single slope) (type 1) (42 ) (514-7001) | LF | 18,679 | $85.00 | $106.00 | $116.50 | $78.67 | $91.50 | $77.50 | $142.72 |
| 170 | Permanent CTB (single slope) (type 3) (42 ) (514-7002) | LF | 851 | $317.50 | $300.00 | $320.00 | $315.57 | $248.00 | $227.00 | $609.73 |
| 171 | Permanent CTB (single slope) (type 4) (42 ) (514-7003) | LF | 140 | $205.00 | $280.00 | $380.00 | $266.77 | $629.00 | $275.00 | $396.78 |
| 172 | Permanent CTB (single slope) (mod) (514-7035) | LF | 330 | $250.00 | $630.00 | $725.00 | $798.12 | $486.00 | $630.00 | $871.19 |
| 173 | Concrete curb & gutter (type I) (529-7008) | LF | 832 | $59.75 | $28.00 | $34.25 | $33.47 | $44.75 | $26.00 | $17.55 |
| 174 | Driveways (concrete) (hes) (530-7007) | SY | 2,117 | $130.00 | $150.00 | $105.00 | $139.27 | $133.00 | $160.00 | $181.21 |
| 175 | Driveways (ACP) (530-7010) | SY | 2,495 | $75.00 | $100.00 | $73.00 | $75.43 | $67.25 | $92.00 | $117.25 |
| 176 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 43,381 | $0.30 | $0.21 | $0.30 | $0.07 | $0.45 | $0.30 | $0.13 |
| 177 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 6,344 | $0.30 | $0.21 | $0.30 | $0.24 | $0.80 | $0.30 | $0.43 |
| 178 | Mill rumble strips (concrete) (shoulder) (533-7003) | LF | 22,381 | $1.25 | $0.90 | $1.30 | $0.47 | $0.90 | $0.90 | $0.86 |
| 179 | Concrete median (536-7002) | SY | 521 | $138.50 | $87.00 | $84.50 | $58.12 | $85.50 | $115.00 | $42.58 |
| 180 | Metal W-beam guard fence (steel post) (540-7002) | LF | 14,772 | $35.00 | $26.00 | $23.50 | $24.25 | $28.50 | $27.00 | $32.58 |
| 181 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 29 | $2,353.25 | $2,100.00 | $1,990.00 | $1,850.00 | $2,200.00 | $2,050.00 | $2,563.11 |
| 182 | Short radius (28") (540-7013) | LF | 121 | $1,836.00 | $36.00 | $28.15 | $28.00 | $30.00 | $31.00 | $54.90 |
| 183 | Downstream anchor terminal section (540-7015) | EACH | 11 | $1,837.00 | $1,320.00 | $995.00 | $1,250.00 | $1,200.00 | $1,375.00 | $1,205.53 |
| 184 | Remove metal beam guard fence (542-7001) | LF | 7,696 | $5.00 | $2.60 | $2.70 | $2.00 | $2.75 | $2.20 | $2.17 |
| 185 | Remove terminal anchor section (542-7002) | EACH | 27 | $319.25 | $230.00 | $240.50 | $150.00 | $200.00 | $165.00 | $238.93 |
| 186 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 5 | $405.25 | $162.00 | $240.50 | $150.00 | $250.00 | $165.00 | $282.38 |
| 187 | Guardrail end treatment (install) (544-7001) | EACH | 48 | $3,450.00 | $3,100.00 | $2,745.00 | $2,800.00 | $2,950.00 | $3,100.00 | $3,469.97 |
| 188 | Guardrail end treatment (remove) (544-7003) | EACH | 30 | $425.00 | $220.00 | $240.50 | $200.00 | $250.00 | $220.00 | $358.40 |
| 189 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 124 | $2,126.75 | $1,100.00 | $1,060.50 | $1,200.00 | $1,510.00 | $1,350.00 | $1,808.29 |
| 190 | Crash cushion attenuator (remove) (545-7004) | EACH | 43 | $1,300.00 | $900.00 | $900.00 | $500.00 | $855.00 | $550.00 | $879.71 |
| 191 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 5 | $36,500 | $28,000 | $29,150 | $26,250 | $27,250 | $29,000 | $32,256 |
| 192 | Crash cushion attenuator (install)(L)(W)(TL3) (545-7008) | EACH | 1 | $37,000 | $40,000 | $41,625 | $38,400 | $35,250 | $42,250 | $47,352 |
| 193 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 41 | $24,500 | $7,600.00 | $7,950.00 | $8,225.00 | $7,510.00 | $9,100.00 | $7,602.43 |
| 194 | Pipe underdrains (type 1) (6") (556-7001) | LF | 1,630 | $45.00 | $36.00 | $44.00 | $45.54 | $27.20 | $25.00 | $75.59 |
| 195 | Pipe underdrains (type 3) (6") (556-7003) | LF | 9,143 | $45.00 | $41.00 | $33.00 | $50.64 | $44.00 | $25.00 | $75.39 |
| 196 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 3 | $452.00 | $330.00 | $341.25 | $500.00 | $315.00 | $260.00 | $255.22 |
| 197 | Remove RD IL asm (trans-base) (610-7009) | EACH | 11 | $1,400.00 | $620.00 | $815.00 | $725.00 | $725.00 | $798.00 | $997.57 |
| 198 | In RD IL (U/P) (type 1) (150W EQ) LED (610-7014) | EACH | 16 | $2,000.00 | $1,800.00 | $1,730.00 | $1,543.00 | $1,540.00 | $1,698.00 | $3,862.21 |
| 199 | In RD IL (type SP) 38S-8-8 (250W EQ) LED (610-7101) | EACH | 14 | $5,000.00 | $7,400.00 | $9,120.00 | $8,130.50 | $8,130.00 | $8,944.00 | $7,211.80 |
| 200 | In RD IL (type SA) 40T-8-8 (250W EQ) LED (610-7125) | EACH | 2 | $6,348.00 | $6,600.00 | $6,630.00 | $5,910.00 | $5,910.00 | $6,501.00 | $6,809.09 |
| 201 | HI MST IL pole (150 FT)( 80 MPH) (613-7005) | EACH | 28 | $49,070 | $47,000 | $57,100 | $50,910 | $50,900 | $56,000 | $50,556 |
| 202 | LED HI MST IL asm (6 fixt) (type S) (614-7001) | EACH | 1 | $33,426 | $31,000 | $54,250 | $48,379 | $48,380 | $53,217 | $44,453 |
| 203 | LED HI MST IL asm (6 fixt) (type B) (614-7003) | EACH | 27 | $34,373 | $31,000 | $52,880 | $47,150 | $47,150 | $51,865 | $42,680 |
| 204 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 17,485 | $19.00 | $15.00 | $8.40 | $7.50 | $7.50 | $8.25 | $18.13 |
| 205 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 42,020 | $20.00 | $26.00 | $14.00 | $12.50 | $12.50 | $13.75 | $11.82 |
| 206 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 670 | $20.00 | $41.00 | $11.25 | $10.00 | $10.00 | $11.00 | $18.73 |
| 207 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 3,575 | $35.00 | $42.00 | $21.30 | $19.00 | $19.00 | $21.00 | $26.77 |
| 208 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 560 | $28.00 | $44.00 | $13.50 | $12.00 | $12.00 | $13.20 | $20.89 |
| 209 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 2,645 | $42.00 | $46.00 | $25.25 | $22.50 | $22.50 | $24.75 | $29.01 |
| 210 | Conduit (RM) (3/4") (618-7070) | LF | 120 | $51.50 | $40.00 | $67.30 | $60.00 | $60.00 | $66.00 | $29.19 |
| 211 | Electrical conductor (no.14) insulated (620-7002) | LF | 24,560 | $1.50 | $1.80 | $1.85 | $1.65 | $1.65 | $1.82 | $1.05 |
| 212 | Electrical conductor (no.8) bare (620-7007) | LF | 14,945 | $2.25 | $2.30 | $2.25 | $2.00 | $2.00 | $2.20 | $2.53 |
| 213 | Electrical conductor (no.8) insulated (620-7008) | LF | 35,710 | $2.75 | $2.50 | $2.50 | $2.20 | $2.20 | $2.42 | $2.87 |
| 214 | Electrical conductor (no.6) bare (620-7009) | LF | 8,705 | $2.75 | $3.50 | $2.90 | $2.55 | $2.55 | $2.80 | $3.04 |
| 215 | Electrical conductor (no.6) insulated (620-7010) | LF | 13,710 | $3.00 | $3.20 | $3.10 | $2.75 | $2.75 | $3.00 | $3.13 |
| 216 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 3,450 | $3.50 | $6.00 | $2.75 | $2.45 | $2.45 | $2.70 | $4.17 |
| 217 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 51 | $4,824.50 | $4,400.00 | $4,625.00 | $4,123.00 | $4,120.00 | $4,535.00 | $4,213.59 |
| 218 | Ground box type A (122311)W/apron (624-7002) | EACH | 62 | $1,500.00 | $1,900.00 | $1,120.00 | $998.50 | $999.00 | $1,099.00 | $1,373.41 |
| 219 | Ground box type D (162922)W/apron (624-7008) | EACH | 9 | $1,650.00 | $4,000.00 | $1,655.00 | $1,475.00 | $1,480.00 | $1,623.00 | $1,439.73 |
| 220 | Remove electrical services (628-7002) | EACH | 4 | $784.75 | $660.00 | $730.00 | $650.00 | $650.00 | $715.00 | $199.52 |
| 221 | Elc SRV type A 240/480 060(NS)SS(T)SP(O) (628-7052) | EACH | 7 | $7,500.00 | $12,900 | $6,730.00 | $6,000.00 | $6,000.00 | $6,600.00 | $10,757 |
| 222 | Elc SRV type A 240/480 100(NS)SS(T)SP(O) (628-7082) | EACH | 1 | $6,400.00 | $13,300 | $6,730.00 | $6,001.00 | $6,000.00 | $6,601.00 | $11,052 |
| 223 | Elc SRV type D 120/240 070(NS)AL(E)TP(O) (628-7171) | EACH | 1 | $6,000.00 | $16,400 | $5,300.00 | $4,725.00 | $4,730.00 | $5,198.00 | $9,284.88 |
| 224 | Aluminum signs (type G) (636-7002) | SF | 2,192 | $35.50 | $30.00 | $36.30 | $33.00 | $33.00 | $36.00 | $33.40 |
| 225 | Aluminum signs (type O) (636-7003) | SF | 4,631.25 | $32.00 | $35.00 | $39.60 | $36.00 | $36.00 | $40.00 | $47.43 |
| 226 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 70 | $802.75 | $625.00 | $705.00 | $770.00 | $702.00 | $710.00 | $638.62 |
| 227 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 5 | $900.00 | $800.00 | $865.00 | $860.00 | $838.00 | $870.00 | $812.33 |
| 228 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 80 | $810.50 | $730.00 | $925.00 | $770.00 | $840.00 | $930.00 | $740.80 |
| 229 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $924.25 | $1,100.00 | $1,310.00 | $1,050.00 | $997.00 | $1,320.00 | $1,098.43 |
| 230 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 1 | $858.00 | $800.00 | $925.00 | $712.00 | $876.00 | $930.00 | $812.33 |
| 231 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 17 | $1,040.00 | $1,000.00 | $1,120.00 | $930.00 | $992.00 | $1,150.00 | $1,016.68 |
| 232 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,118.00 | $1,220.00 | $1,270.00 | $1,198.00 | $1,150.00 | $1,275.00 | $1,225.13 |
| 233 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 2 | $1,600.00 | $1,250.00 | $1,305.00 | $1,828.00 | $1,280.00 | $1,325.00 | $1,272.14 |
| 234 | Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049) | EACH | 9 | $2,003.00 | $1,900.00 | $2,250.00 | $1,548.00 | $2,440.00 | $2,300.00 | $1,915.86 |
| 235 | In bridge MNT clearance sign assembly(type N) (644-7061) | EACH | 2 | $2,200.00 | $4,200.00 | $2,225.00 | $2,645.00 | $1,750.00 | $2,090.00 | $2,549.38 |
| 236 | In bridge MNT clearance sign assembly(type S) (644-7062) | EACH | 5 | $2,440.00 | $4,200.00 | $2,275.00 | $2,570.00 | $1,650.00 | $2,200.00 | $2,549.37 |
| 237 | Install small roadside sign support and assembly (rail mount) (644-7063) | EACH | 2 | $4,157.75 | $6,950.00 | $4,350.00 | $4,750.00 | $5,110.00 | $4,400.00 | $7,050.38 |
| 238 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 1 | $650.00 | $1,220.00 | $715.00 | $680.00 | $633.00 | $750.00 | $1,190.39 |
| 239 | Remove SM RD SN sup&AM (644-7073) | EACH | 176 | $124.50 | $80.00 | $100.00 | $100.00 | $108.00 | $105.00 | $80.72 |
| 240 | Remove BRDG MNT clearance sign assembly (644-7074) | EACH | 4 | $1,200.00 | $750.00 | $1,200.00 | $1,217.00 | $145.00 | $160.00 | $306.54 |
| 241 | Install LRSS (struct steel) (647-7001) | LB | 11,402 | $9.50 | $7.00 | $6.75 | $5.25 | $5.25 | $5.78 | $5.26 |
| 242 | Remove lrsa (647-7003) | EACH | 19 | $1,500.00 | $1,000.00 | $770.00 | $1,350.00 | $1,350.00 | $1,485.00 | $781.67 |
| 243 | Install overhead sign support(25 FT cant) (650-7025) | EACH | 5 | $44,865 | $31,000 | $26,410 | $24,023 | $24,020 | $26,426 | $33,623 |
| 244 | Install overhead sign support(30 FT cant) (650-7032) | EACH | 7 | $40,756 | $44,000 | $34,425 | $31,312 | $31,310 | $34,444 | $41,975 |
| 245 | Install overhead sign support(35 FT cant) (650-7038) | EACH | 1 | $39,533 | $54,000 | $37,025 | $33,678 | $33,680 | $37,046 | $44,838 |
| 246 | Install overhead sign support(40 FT BRDG)(circ tube) (650-7050) | EACH | 1 | $65,550 | $134,000 | $89,320 | $81,250 | $81,300 | $89,375 | $92,505 |
| 247 | Install overhead sign support(55 FT BRDG) (650-7064) | EACH | 1 | $47,519 | $56,000 | $63,100 | $57,398 | $57,400 | $63,138 | $75,822 |
| 248 | Install overhead sign support(60 FT BRDG) (650-7069) | EACH | 1 | $69,100 | $57,000 | $65,355 | $59,451 | $59,500 | $65,396 | $78,210 |
| 249 | Install overhead sign support(65 FT BRDG) (650-7074) | EACH | 1 | $70,000 | $54,000 | $67,215 | $61,141 | $61,100 | $67,255 | $79,874 |
| 250 | Install overhead sign support(70 FT BRDG) (650-7079) | EACH | 1 | $55,375 | $64,000 | $68,800 | $62,585 | $62,600 | $68,844 | $87,577 |
| 251 | Install overhead sign support(80 FT BRDG) (650-7089) | EACH | 1 | $69,576 | $73,000 | $79,000 | $71,862 | $71,900 | $79,048 | $96,800 |
| 252 | Install overhead sign support(95 FT BRDG) (650-7104) | EACH | 1 | $113,000 | $82,000 | $90,000 | $81,860 | $81,900 | $90,047 | $107,853 |
| 253 | Remove overhd sign sup (650-7193) | EACH | 8 | $8,243.50 | $8,500.00 | $13,170 | $11,980 | $11,980 | $13,178 | $9,830.05 |
| 254 | Remove overhd sign sup (sign only) (650-7194) | EACH | 2 | $1,500.00 | $1,000.00 | $1,085.00 | $985.50 | $986.00 | $1,084.00 | $1,942.23 |
| 255 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 62 | $89.00 | $46.00 | $76.50 | $45.00 | $45.00 | $50.00 | $56.20 |
| 256 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 296 | $36.00 | $21.00 | $26.25 | $12.00 | $20.00 | $14.00 | $15.33 |
| 257 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 2 | $45.00 | $31.00 | $26.25 | $12.00 | $20.00 | $14.00 | $15.33 |
| 258 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 57 | $34.00 | $31.00 | $32.80 | $20.00 | $25.00 | $25.00 | $25.54 |
| 259 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 40 | $42.00 | $31.00 | $32.80 | $25.00 | $25.00 | $27.50 | $25.54 |
| 260 | Install delineator assembly (D-SY)SZ 1(yflx)GND (658-7023) | EACH | 16 | $106.00 | $46.00 | $76.50 | $45.00 | $45.00 | $50.00 | $56.20 |
| 261 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 153 | $25.00 | $21.00 | $26.25 | $12.00 | $20.00 | $14.00 | $15.33 |
| 262 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 168 | $32.50 | $21.00 | $26.25 | $12.00 | $20.00 | $14.00 | $15.33 |
| 263 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 70 | $21.00 | $31.00 | $32.80 | $20.00 | $25.00 | $25.00 | $25.54 |
| 264 | Install delineator assembly (D-DW)SZ 1(WFLX)GND (658-7045) | EACH | 46 | $86.00 | $46.00 | $76.50 | $45.00 | $45.50 | $82.50 | $56.20 |
| 265 | Install delineator assembly (D-DW)SZ 1(BRF)GF2 (658-7048) | EACH | 31 | $28.50 | $31.00 | $32.80 | $20.00 | $25.00 | $25.00 | $25.54 |
| 266 | Install object marker assembly (OM-4)(TWT)was (658-7072) | EACH | 4 | $330.00 | $295.00 | $285.00 | $300.00 | $275.00 | $365.00 | $352.52 |
| 267 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 10,437 | $4.00 | $0.55 | $0.55 | $0.50 | $0.50 | $0.55 | $0.51 |
| 268 | Work zone pavement marking non-removing (W)6"(DOT) (662-7006) | LF | 145 | $1.00 | $2.10 | $2.20 | $2.00 | $2.00 | $2.20 | $2.04 |
| 269 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 62,627 | $0.80 | $0.55 | $0.55 | $0.50 | $0.50 | $0.55 | $0.51 |
| 270 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 3,091 | $0.88 | $0.80 | $0.80 | $0.75 | $0.75 | $0.83 | $0.77 |
| 271 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 24 | $5.00 | $8.30 | $8.75 | $8.00 | $8.00 | $8.80 | $8.16 |
| 272 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 65,867 | $0.70 | $0.55 | $0.55 | $0.50 | $0.50 | $0.55 | $0.51 |
| 273 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 37,229 | $1.50 | $1.30 | $1.40 | $1.25 | $1.25 | $1.38 | $1.28 |
| 274 | Work zone pavement marking removing (W)6"(DOT) (662-7066) | LF | 4,256 | $2.00 | $2.10 | $2.20 | $2.00 | $2.00 | $2.20 | $2.04 |
| 275 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 165,359 | $1.70 | $1.30 | $1.40 | $1.25 | $1.25 | $1.38 | $1.28 |
| 276 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 3,435 | $2.00 | $2.40 | $2.50 | $2.25 | $2.25 | $2.48 | $2.30 |
| 277 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 4,625 | $12.75 | $8.30 | $8.80 | $8.00 | $8.00 | $8.80 | $8.16 |
| 278 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 148,302 | $1.80 | $1.30 | $1.40 | $1.25 | $1.25 | $1.38 | $1.28 |
| 279 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 3,694 | $1.75 | $1.60 | $1.65 | $1.50 | $1.50 | $1.65 | $1.53 |
| 280 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 462 | $2.00 | $1.60 | $1.65 | $1.50 | $1.50 | $1.65 | $1.53 |
| 281 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 21,092 | $1.50 | $1.60 | $1.65 | $1.50 | $1.50 | $1.65 | $1.53 |
| 282 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 1,736 | $4.75 | $4.70 | $4.95 | $4.50 | $4.50 | $4.95 | $4.59 |
| 283 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 656 | $7.50 | $8.00 | $8.20 | $7.50 | $7.50 | $8.25 | $7.65 |
| 284 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 6 | $65.50 | $103.00 | $110.00 | $100.00 | $100.00 | $110.00 | $102.04 |
| 285 | Reflectorized pavement marking type I (Y)6"(DOT)(100MIL) (666-7111) | LF | 42 | $3.50 | $1.60 | $1.65 | $1.50 | $1.50 | $1.65 | $1.53 |
| 286 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 56 | $8.50 | $7.80 | $8.20 | $7.50 | $7.50 | $8.25 | $7.65 |
| 287 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 1 | $299.00 | $520.00 | $550.00 | $500.00 | $500.00 | $550.00 | $510.20 |
| 288 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 1,190 | $0.20 | $0.55 | $0.55 | $0.50 | $0.50 | $0.55 | $0.51 |
| 289 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 2,229 | $0.60 | $0.55 | $0.55 | $0.50 | $0.50 | $0.55 | $0.51 |
| 290 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 51,538 | $0.20 | $0.55 | $0.55 | $0.50 | $0.50 | $0.55 | $0.51 |
| 291 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 6,812 | $0.25 | $0.80 | $0.80 | $0.75 | $0.75 | $0.83 | $0.77 |
| 292 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 1,709 | $2.25 | $2.10 | $2.20 | $2.00 | $2.00 | $2.20 | $2.04 |
| 293 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 124 | $3.25 | $3.10 | $3.30 | $3.00 | $3.00 | $3.30 | $3.06 |
| 294 | Reflectorized pavement marking type II (W) 36" (yld tri) (666-7201) | EACH | 9 | $60.00 | $78.00 | $82.00 | $75.00 | $75.00 | $82.50 | $76.53 |
| 295 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 52,485 | $0.20 | $0.55 | $0.55 | $0.50 | $0.50 | $0.55 | $0.51 |
| 296 | Reflectorized pavement marking type II (Y) 24" (solid) (666-7217) | LF | 56 | $7.00 | $3.10 | $3.30 | $3.00 | $3.00 | $3.50 | $3.06 |
| 297 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 23,283 | $0.90 | $1.60 | $1.65 | $1.50 | $1.50 | $1.65 | $1.53 |
| 298 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 7,470 | $0.75 | $1.10 | $1.10 | $1.00 | $1.00 | $1.10 | $1.02 |
| 299 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 77,045 | $0.90 | $1.00 | $1.00 | $0.90 | $0.90 | $1.00 | $0.92 |
| 300 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 102,613 | $0.75 | $1.00 | $1.00 | $0.90 | $0.90 | $1.00 | $0.92 |
| 301 | Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424) | LF | 585 | $5.00 | $4.70 | $4.95 | $4.50 | $4.50 | $5.00 | $4.59 |
| 302 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 11,110 | $10.75 | $8.30 | $8.75 | $8.00 | $8.00 | $8.80 | $8.16 |
| 303 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 36 | $225.00 | $230.00 | $240.00 | $220.00 | $220.00 | $242.00 | $224.49 |
| 304 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 2 | $225.00 | $270.00 | $285.00 | $260.00 | $260.00 | $286.00 | $265.31 |
| 305 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 3 | $250.00 | $290.00 | $310.00 | $280.00 | $280.00 | $308.00 | $285.71 |
| 306 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 6 | $325.00 | $365.00 | $385.00 | $350.00 | $350.00 | $385.00 | $357.14 |
| 307 | Prefabricated PM type C (W)(number) (668-7102) | EACH | 3 | $300.00 | $310.00 | $330.00 | $300.00 | $300.00 | $330.00 | $306.12 |
| 308 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 60 | $265.00 | $255.00 | $270.00 | $245.00 | $245.00 | $270.00 | $250.00 |
| 309 | Prefabricated PM type C (multi)(shield) (668-7135) | EACH | 20 | $3,005.50 | $1,650.00 | $1,725.00 | $1,575.00 | $1,580.00 | $1,733.00 | $1,607.14 |
| 310 | Reflectorized pavement marker type I-C (672-7002) | EACH | 110 | $5.50 | $6.30 | $6.60 | $6.00 | $6.00 | $6.60 | $6.12 |
| 311 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 654 | $5.50 | $5.20 | $5.50 | $5.00 | $5.00 | $5.50 | $5.10 |
| 312 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 2,489 | $5.00 | $5.20 | $5.50 | $5.00 | $5.00 | $5.50 | $5.10 |
| 313 | Eliminating existing PM & markers (4") (677-7001) | LF | 96,792 | $1.00 | $0.70 | $0.75 | $0.65 | $0.65 | $0.72 | $0.66 |
| 314 | Pavement surface preparation for marking (6") (678-7002) | LF | 118,407 | $0.15 | $0.06 | $0.05 | $0.05 | $0.05 | $0.06 | $0.05 |
| 315 | Pavement surface preparation for marking (8") (678-7004) | LF | 6,812 | $0.20 | $0.10 | $0.10 | $0.10 | $0.10 | $0.11 | $0.10 |
| 316 | Pavement surface preparation for marking (12") (678-7006) | LF | 1,709 | $0.75 | $0.55 | $0.55 | $0.50 | $0.50 | $0.55 | $0.51 |
| 317 | Pavement surface preparation for marking (24") (678-7008) | LF | 180 | $1.00 | $1.10 | $1.10 | $1.00 | $1.00 | $1.10 | $1.02 |
| 318 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 8 | $40.00 | $52.00 | $55.00 | $50.00 | $50.00 | $55.00 | $51.02 |
| 319 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 2 | $45.00 | $52.00 | $55.00 | $50.00 | $50.00 | $55.00 | $51.02 |
| 320 | Pavement surface preparation for marking (number) (678-7015) | EACH | 3 | $45.00 | $52.00 | $55.00 | $50.00 | $50.00 | $55.00 | $51.02 |
| 321 | Pavement surface preparation for marking (word) (678-7016) | EACH | 8 | $40.00 | $52.00 | $55.00 | $50.00 | $50.00 | $55.00 | $51.02 |
| 322 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 6 | $20.00 | $52.00 | $55.00 | $50.00 | $50.00 | $55.00 | $51.02 |
| 323 | Pavement surface preparation for marking (shield) (678-7025) | EACH | 8 | $124.00 | $520.00 | $550.00 | $500.00 | $500.00 | $550.00 | $510.20 |
| 324 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $31,000 | $83,000 | $30,425 | $27,130 | $27,130 | $29,843 | $39,425 |
| 325 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 4 | $351.50 | $1,000.00 | $290.00 | $258.00 | $258.00 | $284.00 | $277.07 |
| 326 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 8 | $358.00 | $1,000.00 | $290.00 | $258.00 | $258.00 | $285.00 | $277.07 |
| 327 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 4 | $365.80 | $1,000.00 | $290.00 | $258.00 | $258.00 | $284.00 | $277.07 |
| 328 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 8 | $358.00 | $1,000.00 | $290.00 | $258.00 | $258.00 | $284.00 | $277.07 |
| 329 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 4 | $351.50 | $1,000.00 | $290.00 | $258.00 | $258.00 | $284.00 | $277.07 |
| 330 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 8 | $359.00 | $1,000.00 | $290.00 | $258.00 | $258.00 | $284.00 | $277.07 |
| 331 | Louver (12") (adjustable) (682-7035) | EACH | 6 | $473.75 | $540.00 | $395.00 | $350.00 | $350.00 | $385.00 | $260.44 |
| 332 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 12 | $153.50 | $330.00 | $195.00 | $171.25 | $171.00 | $190.00 | $260.45 |
| 333 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 1,670 | $3.50 | $7.00 | $3.90 | $3.45 | $3.45 | $3.80 | $5.29 |
| 334 | Ins traffic signal PL AM(S)1 arm(24')lum (686-7027) | EACH | 2 | $13,542 | $27,000 | $12,120 | $10,806 | $10,810 | $11,887 | $15,743 |
| 335 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 1 | $16,270 | $31,000 | $14,350 | $12,779 | $12,780 | $14,057 | $18,638 |
| 336 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 2 | $17,662 | $31,000 | $15,250 | $13,574 | $13,570 | $14,931 | $20,269 |
| 337 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 1 | $38,700 | $73,000 | $39,250 | $35,000 | $35,000 | $38,500 | $58,893 |
| 338 | Install of flasher cabinet (690-7046) | EACH | 1 | $10,000 | $7,000.00 | $2,200.00 | $1,945.00 | $1,950.00 | $2,140.00 | $997.56 |
| 339 | Full - width mowing (730-7019) | CYC | 12 | $7,000.00 | $8,100.00 | $4,437.00 | $3,330.19 | $10,000 | $119,900 | $5,930.35 |
| 340 | Litter removal (734-7002) | CYC | 12 | $2,800.00 | $4,300.00 | $3,100.00 | $2,624.60 | $10,000 | $8,500.00 | $1,725.78 |
| 341 | Anti-graffiti coatng (permnent-type III) (740-7006) | SF | 111,937 | $1.50 | $1.40 | $1.45 | $1.37 | $0.75 | $1.50 | $1.37 |
| 342 | Tip testing(drilled shaft) (4003-7001) | EACH | 34 | $5,415.00 | $8,100.00 | $8,750.00 | $9,614.00 | $5,350.00 | $6,850.00 | $8,378.50 |
| 343 | Ornamental steel fence (4016-7001) | LF | 704 | $150.00 | $330.00 | $700.00 | $404.82 | $982.00 | $900.00 | $362.49 |
| 344 | RVDS (presence detection only) (6008-7001) | EACH | 4 | $10,094 | $16,200 | $6,400.00 | $5,695.00 | $5,700.00 | $6,265.00 | $7,997.22 |
| 345 | RVDS (advance detection only) (6008-7002) | EACH | 4 | $9,089.50 | $16,200 | $6,400.00 | $5,698.00 | $5,700.00 | $6,268.00 | $7,997.22 |
| 346 | Installation of cellular modem (6015-7001) | EACH | 1 | $10,000 | $2,500.00 | $730.00 | $650.00 | $650.00 | $715.00 | $399.02 |
| 347 | CCTV field equipment (digital) (6018-7002) | EACH | 1 | $7,730.00 | $16,600 | $9,535.00 | $8,500.00 | $8,500.00 | $9,350.00 | $9,198.22 |
| 348 | CCTV mount (pole) (6018-7003) | EACH | 1 | $600.00 | $2,400.00 | $1,680.00 | $1,500.00 | $1,500.00 | $1,650.00 | $1,196.54 |
| 349 | Remove CCTV field equipment (6018-7008) | EACH | 1 | $5,500.00 | $3,500.00 | $840.00 | $750.00 | $750.00 | $825.00 | $598.54 |
| 350 | Remove high mast lighting assembly (6019-7001) | EACH | 6 | $13,100 | $7,800.00 | $10,650 | $9,500.00 | $9,500.00 | $10,450 | $6,969.63 |
| 351 | Preformed in-lane (trans) rumble strip (6024-7001) | LF | 160 | $14.50 | $275.00 | $26.25 | $15.00 | $15.00 | $16.50 | $20.72 |
| 352 | 30" HDPE pipe (PE4710 dips DR11) (7076-7001) | LF | 3,640 | $300.00 | $610.00 | $435.00 | $510.00 | $529.00 | $561.00 | $541.08 |
| 353 | 30" HDPE pipe (PE4710 dips DR11) steel (7076-7002) | LF | 58 | $1,005.00 | $1,400.00 | $860.00 | $800.00 | $830.00 | $880.00 | $848.75 |
| 354 | 30" HDPE pipe (PE4710 dips DR11) (bore) (7076-7003) | LF | 1,019 | $1,000.00 | $1,700.00 | $1,500.00 | $1,304.00 | $1,350.00 | $1,435.00 | $1,383.46 |
| 355 | Cut-in connection to existing pipe (7076-7005) | EACH | 4 | $8,575.00 | $50,000 | $16,750 | $54,000 | $56,000 | $60,000 | $57,290 |
| 356 | 6" drain valve assembly (7076-7006) | EACH | 3 | $12,150 | $17,000 | $25,070 | $15,000 | $15,570 | $16,500 | $15,914 |
| 357 | 3" combination air release valve (7076-7007) | EACH | 4 | $7,150.00 | $50,000 | $45,320 | $55,000 | $57,100 | $60,500 | $58,351 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2026. Compiled by Mirage Metrics.