TxDOT contract A00059128 bid tabulation

Interchange Improvement (New Or Update), IH 20 (1.55 MI WEST OF SH 31 (MM 588) to 1.14 MI EAST OF SH 31 (MM 590)). Let by Texas DOT on January 7, 2026, Gregg, Tyler District. 7 bids received; low bid $197,976,992 by Indus Road & Bridge, Inc., -10% against the engineer's estimate of $220,422,253.

Owner
Texas DOT
Letting
07 JAN 2026
Pay items
357
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Indus Road & Bridge, Inc.$197,976,992Low-10%
2RPM Xconstruction, LLC$221,032,733+12%0.0%
3James Construction Group, LLC$223,752,127+13%+2.0%
4Webber, LLC$224,683,973+13%+2.0%
5Longview Bridge and Road, LTD.$226,398,604+14%+3.0%
6Pulice Construction, Inc.$241,876,186+22%+10%
7Drake Companies LLC$279,323,710+41%+27%
TxDOT contract A00059128: bids by rank

Engineer's estimate: $220,422,253.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Indus Road & Bridge, Inc.2. RPM Xconstruction, LLC3. James Construction Group, LLC4. Webber, LLC5. Longview Bridge and Road, LTD.6. Pulice Construction, Inc.
1Preparing row (100-7001)ACRE218$8,000.00$10,788$34,000$77,706$103,066$36,000$95,150
2Removing concrete (pavement) (104-7001)SY62,473$36.00$10.00$8.00$6.10$9.70$9.15$16.98
3Removing concrete (mowstrip) (104-7003)SY1,134$60.00$4.80$6.50$8.96$21.20$25.00$6.09
4Removing concrete (riprap) (104-7006)SY10,761$35.00$8.20$3.70$9.44$8.85$14.00$9.85
5Removing concrete (driveways) (104-7011)SY1,900$30.00$14.00$13.00$11.72$17.80$15.00$15.27
6Removing concrete (curb & gutter) (104-7017)LF1,284$20.00$4.80$5.00$6.56$7.35$9.00$3.46
7Removing concrete (appr slab) (104-7030)SY1,642$27.50$10.00$16.00$14.02$30.75$51.00$39.87
8Removing concrete (traffic barrier) (104-7035)LF16,521$20.00$14.00$17.00$10.91$21.50$13.75$15.17
9Removing concrete (rail) (104-7036)LF1,659$60.00$19.00$11.70$20.79$28.60$16.50$15.04
10Removing concrete (flume) (104-7041)SY2,789$35.00$6.30$5.70$23.45$18.80$20.00$14.23
11Removing concrete (miscellaneous) (104-7046)SY6,926$45.00$5.20$14.50$14.37$41.50$20.00$10.99
12Removing stab base & asphalt pavement(12"-27") (105-7130)SY146,413$5.00$6.00$4.15$6.72$8.75$10.75$14.09
13Obliterating abandoned road (106-7002)SY13,162$10.00$12.00$9.50$8.35$6.45$6.50$23.73
14Excavation (roadway) (110-7001)CY579,416$10.00$7.00$6.00$9.96$9.65$8.00$7.00
15Embankment (final)(DC)(type C) (132-7006)CY578,838$11.00$11.00$13.00$16.83$9.65$10.00$10.00
16Furn & place topsoil (4") (160-7002)SY313,547$1.25$1.70$1.35$0.71$1.50$2.25$5.00
17Broadcast seed (permanent_rural_sand) (164-7001)SY313,547$0.25$0.15$0.15$0.14$1.00$0.14$0.14
18Bond fiber MTRX seed (temporary)(warm) (164-7077)SY156,777$0.60$0.40$0.45$0.39$1.00$0.56$0.40
19Bond fiber MTRX seed (temporary)(cool) (164-7078)SY156,777$0.60$0.40$0.45$0.39$1.00$0.56$0.40
20Vegetative watering (168-7001)TGL3,449$10.00$8.00$100.00$37.67$2.00$13.75$26.65
21Wildflower seeding (180-7001)ACRE218$705.00$950.00$1,000.00$947.58$1,150.00$500.00$976.89
22Rdside amenity (type 1) (194-7012)EACH12$18,000$15,900$21,950$16,478$19,700$20,300$62,980
23Rdside amenity (type 2) (194-7013)EACH7$6,000.00$13,100$8,465.00$15,010$16,340$6,000.00$16,348
24Rdside amenity (type 3) (194-7014)EACH7$4,000.00$12,100$6,575.00$15,010$10,440$5,500.00$11,935
25Rdside amenity (type 4) (194-7015)EACH13$2,000.00$7,000.00$4,790.00$15,010$3,960.00$4,500.00$7,498.19
26FL BS (compacted in place)(type A GR 1-2) (8") (247-7067)SY95,771$24.00$25.00$25.00$27.63$23.00$31.00$27.00
27Lime (quicklime (dry)) (260-7002)TON2,304$330.00$365.00$375.00$364.98$347.00$400.00$350.00
28Lime TRT (existing material)(6") (260-7006)SY165,932$4.00$4.70$2.50$4.45$2.75$4.20$3.00
29Lime TRT (existing material)(8") (260-7007)SY3,578$4.00$5.20$9.20$9.95$17.30$6.00$4.00
30Cement (275-7001)TON2,345$270.00$215.00$275.00$226.47$206.00$270.00$400.00
31Cement TRT (existing material)(6") (275-7002)SY47,305$4.00$4.17$2.40$2.11$3.25$3.25$3.00
32Cement TRT (existing material)(8") (275-7003)SY94,771$4.00$4.80$3.15$2.19$4.25$3.25$4.00
33Prime coat & blotter (MC-30) (310-7010)GAL93,292$8.00$5.80$5.75$5.05$5.25$7.00$6.58
34Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) (316-7068)GAL70,850$5.00$4.60$4.55$4.00$4.15$4.30$5.22
35Aggregate (type-PD or PL, GR-4) (316-7258)CY1,640$190.00$220.00$217.10$192.00$200.00$193.00$250.33
36SP mixes SP-B PG64-22 (344-7001)TON74,751$160.00$147.00$160.00$144.00$146.00$158.00$164.00
37SP mixes SP-C sac-A PG70-22 (344-7020)TON23,813$170.00$162.00$174.15$162.00$160.00$170.00$185.00
38Flexible pavement structure repair(10") (351-7009)SY10,031$110.00$112.00$120.00$111.25$100.00$118.00$135.58
39Planing asphalt concrete pavement(2") (354-7051)SY100,311$8.00$3.50$1.90$1.73$2.20$2.30$2.00
40Concrete pavement (CRCP) (14") (360-7008)SY202,906$150.00$116.00$130.00$131.77$118.00$150.00$146.00
41Concrete pavement (CRCP)(JCT terminal)(14") (360-7098)SY713$278.00$125.00$217.00$200.31$291.00$167.00$350.00
42Cut & restore asphalt paving (400-7008)SY2,294$140.00$275.00$154.00$168.87$195.00$125.00$315.76
43Cem stabil BKFL (400-7010)CY15,704$250.00$128.00$180.00$133.66$259.00$210.00$150.00
44Flowable backfill (401-7001)CY43$540.00$500.00$323.00$388.70$774.00$220.00$325.00
45Trench excavation protection (402-7001)LF20,255$20.00$9.00$3.70$1.09$14.00$11.00$5.80
46Temporary special shoring (403-7001)SF58,380$46.00$59.00$62.00$50.00$34.25$37.00$68.44
47Soil nail anchors (410-7001)LF41,712$20.00$27.00$27.00$26.50$20.30$35.00$26.72
48Drilled shaft (18 in) (416-7002)LF1,140$235.00$117.00$121.00$184.46$117.00$125.00$188.17
49Drilled shaft (24 in) (416-7004)LF1,024$250.00$148.00$157.00$354.11$224.00$205.00$172.90
50Drilled shaft (30 in) (416-7005)LF956$330.00$335.00$495.00$450.00$450.00$495.00$628.63
51Drilled shaft (36 in) (416-7006)LF11,717$270.00$222.00$245.00$391.39$206.00$270.00$250.00
52Drilled shaft (42 in) (416-7007)LF2,890$400.00$330.00$468.00$335.15$285.00$375.00$420.22
53Drilled shaft (48 in) (416-7008)LF287$617.50$650.00$723.00$658.00$658.00$725.00$944.42
54Drilled shaft (54 in) (416-7009)LF53$712.00$730.00$810.00$736.00$736.00$810.00$1,053.36
55Drilled shaft (60 in) (416-7010)LF3,360$840.00$660.00$666.00$510.85$464.00$671.00$703.66
56Drilled shaft (84 in) (416-7014)LF2,061$1,905.00$1,500.00$1,538.00$918.83$1,070.00$1,450.00$1,500.00
57Drilled shaft (120 in) (416-7020)LF1,795$2,200.00$2,700.00$2,717.00$1,832.36$2,040.00$2,900.00$2,940.43
58Drilled shaft (sign mounts) (24 in) (416-7028)LF205$230.75$289.00$220.00$199.00$199.00$220.00$143.05
59Drilled shaft (high mast pole) (60 in) (416-7037)LF1,008$735.75$925.00$1,015.00$905.00$905.00$996.00$1,299.04
60Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF16$468.25$300.00$286.00$255.00$255.00$280.00$235.81
61Drilled shaft (traffic signal pole) (30 in) (416-7043)LF22$400.00$950.00$292.00$260.00$260.00$286.00$234.52
62Drilled shaft (traffic signal pole) (36 in) (416-7044)LF39$450.00$1,100.00$331.00$295.00$295.00$325.00$273.28
63Drilled shaft (traffic signal pole) (48 in) (416-7046)LF22$602.00$1,200.00$810.00$722.00$722.00$795.00$487.06
64Class B concrete (flume) (420-7010)CY72$1,858.00$570.00$900.00$731.91$784.00$675.00$796.30
65Class C concrete (abutment) (420-7012)CY918$1,600.00$1,050.00$1,210.00$1,066.87$1,740.00$1,250.00$1,200.00
66Class C concrete (cap) (420-7022)CY1,400.40$1,700.00$1,835.00$1,980.00$1,512.82$1,900.00$1,275.00$1,850.00
67Class C concrete (cap)(mass) (420-7024)CY1,163.50$1,850.00$1,575.00$1,800.00$1,532.60$1,390.00$1,500.00$1,500.00
68Class C concrete (column) (420-7038)CY1,366.50$2,040.00$1,575.00$1,700.00$1,840.79$1,500.00$1,275.00$1,600.00
69Class C concrete (column)(mass) (420-7040)CY2,312.40$1,000.00$1,360.00$2,400.00$1,498.00$1,080.00$1,375.00$1,100.00
70Class C concrete (footing) (420-7044)CY246$970.00$520.00$673.00$732.13$854.00$800.00$500.00
71Class C concrete (crashwall) (420-7050)CY638.20$1,325.00$525.00$1,064.00$1,142.34$1,360.00$800.00$550.00
72Class C concrete (rail foundation) (420-7052)CY263$925.00$480.00$774.00$535.03$793.00$815.00$500.00
73Reinforced concrete slab (422-7001)SF424,669$29.00$21.00$30.00$24.71$26.70$33.00$22.50
74Approach slab (422-7013)CY1,779.70$900.00$755.00$700.00$574.94$555.00$1,050.00$650.00
75Retaining wall (MSE) (423-7001)SF70,096$100.00$93.00$118.00$94.01$153.00$160.00$115.00
76Retaining wall (temporary wall) (423-7012)SF1,577$35.00$88.00$29.00$28.86$69.00$85.00$15.00
77Retaining wall (spread footing) (423-7015)SF15,625$84.00$104.00$105.00$90.58$151.00$110.00$65.00
78Retaining wall (drilled shaft) (fascia) (423-7019)SF6,617$70.00$121.00$154.00$119.60$135.00$130.00$175.00
79Retaining wall (soil nail) (fascia) (423-7023)SF16,826$30.00$130.00$120.00$130.37$153.00$140.00$150.00
80Retaining wall (special) (423-7029)SF3,465$75.00$345.00$408.00$1,287.20$254.00$350.00$350.00
81Prestressed concrete girder (TX46) (425-7004)LF4,880.36$240.00$234.00$247.00$237.44$216.00$255.00$250.00
82Prestressed concrete girder (TX54) (425-7005)LF44,116.61$235.00$223.00$237.00$234.62$222.00$270.00$210.00
83Prestressed concrete girder (TX62) (425-7006)LF3,416.44$240.00$230.00$257.00$230.19$232.00$315.00$220.00
84Prestressed concrete girder (TX70) (425-7007)LF5,492.72$265.00$230.00$252.00$236.43$259.00$345.00$225.00
85Riprap (concrete)(4 in) (432-7001)CY1,254.68$1,210.00$500.00$545.00$529.17$537.00$555.00$294.22
86Riprap (concrete)(5 in) (432-7002)CY659$1,015.00$500.00$780.00$460.93$556.00$545.00$246.48
87Riprap (concrete)(6 in) (432-7003)CY41$1,200.00$500.00$631.50$542.63$636.00$615.00$685.34
88Riprap (mow strip)(4 in) (432-7013)CY1,511.20$700.00$580.00$588.00$710.18$593.00$650.00$566.53
89Riprap (stone protection)(12 in) (432-7041)CY372$215.00$160.00$421.50$256.11$548.00$250.00$28.50
90Riprap (stone protection)(15 in) (432-7042)CY505$190.00$162.00$396.50$247.95$550.00$240.00$28.50
91Riprap (stone protection)(18 in) (432-7043)CY836$205.00$162.00$335.50$248.37$320.00$240.00$20.36
92STR steel (shear connector) (442-7015)LB1,385$30.00$10.00$36.00$75.38$44.75$35.00$36.22
93Rail (type SSTR) (450-7024)LF40,151.50$65.00$82.00$78.00$69.05$63.25$56.00$95.00
94Rail (CLF-RO) (450-7049)LF1,960$150.00$225.00$122.00$173.25$173.00$150.00$119.47
95Retrofit rail (type SSTR) (451-7024)LF180$400.00$325.00$357.00$258.84$185.00$100.00$419.28
96Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF3,188$220.00$199.00$186.00$176.20$238.00$210.00$200.00
97CMP (gal steel 24 in) (460-7005)LF876$330.00$94.00$121.00$85.90$107.00$58.00$106.60
98CMP (gal steel 48 in) (460-7011)LF40$260.00$185.00$208.00$226.20$196.00$178.00$483.32
99Concrete box culvert (4 FT X 3 FT) (462-7004)LF554$650.00$440.00$344.00$310.85$272.00$330.00$405.80
100Concrete box culvert (5 FT X 2 FT) (462-7006)LF876$675.00$500.00$400.00$334.56$301.00$400.00$477.76
101Concrete box culvert (5 FT X 4 FT) (462-7008)LF1,854$610.00$525.00$563.00$436.65$351.00$500.00$608.03
102Concrete box culvert (7 FT X 4 FT) (462-7016)LF158$810.00$725.00$780.00$606.28$522.00$715.00$939.40
103Concrete box culvert (8 FT X 4 FT) (462-7021)LF342$1,200.00$825.00$1,113.00$681.01$540.00$750.00$1,017.47
104Concrete box culvert (8 FT X 5 FT) (462-7022)LF1,172$1,065.00$850.00$759.00$692.76$559.00$815.00$1,045.21
105RC pipe (CL III)(18 in) (464-7003)LF1,834$80.00$64.00$91.00$81.81$59.50$69.00$118.00
106RC pipe (CL III)(24 in) (464-7005)LF9,348$90.00$140.00$120.00$99.66$64.25$90.00$120.00
107RC pipe (CL III)(30 in) (464-7007)LF2,018$164.00$175.00$166.00$148.75$106.00$111.00$180.00
108RC pipe (CL III)(36 in) (464-7009)LF725$170.00$200.00$184.00$165.02$162.00$140.00$240.00
109RC pipe (CL III)(42 in) (464-7010)LF1,269$190.00$245.00$257.00$190.72$165.00$183.00$286.34
110RC pipe (CL III)(48 in) (464-7011)LF484$240.00$275.00$300.00$281.82$185.00$225.00$357.79
111Manh (complete)(PRM)(48IN) (465-7002)EACH4$9,000.00$6,000.00$9,125.00$5,946.80$6,480.00$5,500.00$11,063
112Manh (complete)(PRM)(60IN) (465-7003)EACH2$9,100.00$7,000.00$10,417$7,671.50$7,710.00$7,200.00$17,321
113Junction box(complete)(PJB)(3FTX3FT) (465-7005)EACH6$8,000.00$7,100.00$6,635.00$5,771.08$6,740.00$5,250.00$26,343
114Junction box(complete)(PJB)(4FTX4FT) (465-7006)EACH4$7,410.00$8,100.00$8,775.00$6,941.60$8,780.00$6,550.00$12,936
115Junction box(complete)(PJB)(5FTX5FT) (465-7009)EACH1$9,688.00$10,700$11,253$7,119.87$8,680.00$8,800.00$13,165
116Junction box(complete)(PJB)(6FTX6FT) (465-7011)EACH1$13,230$12,500$12,472$9,460.91$15,360$12,500$20,719
117Junction box(complete)(PJB)(8FTX8FT) (465-7012)EACH2$18,583$21,000$26,518$18,670$22,810$22,350$32,425
118Inlet (complete)(pcu)(6FT)(both) (465-7044)EACH1$17,508$9,000.00$11,109$14,338$8,120.00$7,750.00$23,003
119Inlet (complete)(PMBD)(4FT) (465-7045)EACH2$19,000$8,000.00$21,796$11,567$15,710$17,500$18,142
120Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126)EACH3$7,456.25$7,000.00$9,115.00$6,138.04$6,940.00$5,500.00$20,908
121Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128)EACH41$8,561.00$8,000.00$8,434.00$6,499.93$7,330.00$7,000.00$18,915
122Inlet (complete)(PSL)(FG)(6FTX6FT-4FTX4FT) (465-7141)EACH2$7,930.00$10,500$12,666$10,985$9,690.00$10,000$27,139
123Inlet (complete)(rwi)(type I) (465-7353)EACH3$6,151.75$15,900$12,019$9,630.47$14,770$12,825$13,308
124Inlet(complete)(type MSE1) (465-7362)EACH17$6,210.00$12,500$11,684$15,678$14,520$11,500$13,300
125Wingwall (FW - 0) (HW=4 FT) (466-7146)EACH1$26,548$25,000$18,319$13,226$16,390$14,000$19,612
126Wingwall (FW - 0) (HW=6 FT) (466-7148)EACH3$20,000$24,000$20,453$19,078$18,440$15,900$24,961
127Wingwall (FW - 0) (HW=9 FT) (466-7151)EACH1$30,000$26,000$31,310$37,289$27,920$27,625$41,100
128Wingwall (FW - S) (HW=5 FT) (466-7161)EACH7$27,668$25,000$24,246$13,737$21,550$15,750$34,931
129Wingwall (FW - S) (HW=6 FT) (466-7162)EACH2$13,500$32,000$36,077$14,245$32,320$16,500$38,622
130Wingwall (FW - S) (HW=7 FT) (466-7163)EACH1$29,400$34,000$42,063$14,445$38,360$22,800$32,066
131Wingwall (FW - S) (HW=9 FT) (466-7165)EACH2$36,545$43,000$36,397$28,420$31,570$27,500$46,704
132Wingwall (PW - 1) (HW=5 FT) (466-7175)EACH5$23,770$25,000$29,046$14,116$25,560$22,500$33,916
133Wingwall (PW - 1) (HW=6 FT) (466-7176)EACH1$21,000$24,000$32,342$19,306$28,560$24,000$43,055
134Wingwall (PW - 1) (HW=10 FT) (466-7180)EACH1$59,311$41,000$39,860$50,162$35,598$24,000$40,551
135Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH26$1,600.00$2,200.00$2,452.00$1,634.26$1,220.00$1,200.00$2,307.38
136Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH12$2,500.00$2,500.00$3,200.00$1,985.37$1,870.00$1,600.00$2,811.73
137Removing structure (inlet) (496-7002)EACH2$1,500.00$1,300.00$1,150.00$797.41$785.00$800.00$2,851.72
138Removing structure (manhole) (496-7003)EACH2$1,000.00$1,500.00$1,132.00$881.29$785.00$800.00$1,577.72
139Removing structure (set) (496-7004)EACH32$870.00$850.00$725.00$725.63$400.00$475.00$1,963.36
140Removing structure (wingwall) (496-7005)EACH4$3,370.00$6,600.00$2,184.00$3,732.53$2,500.00$1,565.00$6,616.56
141Removing structure (headwall) (496-7006)EACH21$2,800.00$3,200.00$2,186.00$1,408.54$2,210.00$1,640.00$3,494.79
142Removing structure (pipe) (496-7007)LF4,286$40.00$60.00$29.00$14.62$15.00$24.00$51.69
143Removing structure (box culvert) (496-7008)LF631$155.00$200.00$50.00$58.77$117.00$33.50$134.23
144Removing structure (bridge 100 - 499 FT length) (496-7010)EACH10$125,000$150,000$75,012$116,900$217,800$50,000$327,521
145Remove STR (rail) (496-7017)LF3,224$33.00$19.00$7.00$30.61$31.75$18.00$29.44
146Mobilization (500-7001)LS1$24,860,257$19,700,000$22,000,000$22,500,000$22,468,000$19,000,000$24,187,619
147Barricades, signs and traffic handling (502-7001)MO58$10,000$36,000$55,000$47,684$46,514$66,500$29,713
148Portable changeable message sign (503-7002)EACH10$13,000$19,000$22,550$13,766$25,150$19,800$5,892.96
149TMA (stationary) (505-7001)DAY73$320.00$200.00$485.00$302.21$1,000.00$200.00$212.80
150TMA (mobile operation) (505-7003)DAY18$300.00$525.00$890.00$706.63$1,000.00$264.00$120.04
151Rock filter dams (install) (type 2) (506-7002)LF2,843$50.00$45.00$56.00$42.61$45.00$47.00$43.93
152Rock filter dams (remove) (506-7011)LF2,843$16.00$13.00$9.05$12.58$11.00$14.00$12.97
153Construction exits (install) (type 1) (506-7020)SY400$40.00$48.00$75.00$45.41$60.00$50.00$46.81
154Construction exits (remove) (506-7024)SY400$10.00$11.00$16.00$10.83$10.00$12.00$11.16
155Temporary sediment control fence (install) (506-7039)LF51,709$5.50$3.50$4.40$3.33$6.00$3.75$3.43
156Temporary sediment control fence (remove) (506-7041)LF51,709$2.00$0.90$0.50$0.89$0.75$1.00$0.92
157Constructing detours (type 1) (508-7003)SY9,752$120.00$110.00$136.50$128.00$140.00$145.00$133.77
158Constructing detours (type 2) (508-7004)SY41,208$120.00$85.00$109.00$120.00$92.00$102.00$125.00
159Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF38,940$55.00$48.00$47.70$61.08$45.00$81.00$73.11
160Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF3,560$80.00$80.00$78.50$41.14$49.50$90.00$82.63
161Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF180$97.50$84.00$82.00$42.57$145.00$86.00$79.52
162Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029)LF119,670$16.00$9.50$7.00$4.68$9.00$5.00$6.79
163Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF8,732$15.00$5.00$6.00$10.75$15.10$3.00$7.65
164Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF160$17.00$8.50$6.00$24.22$58.25$6.00$7.91
165Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041)LF6,750$20.00$14.00$8.00$13.51$12.20$6.25$6.79
166Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF38,940$20.00$14.00$4.20$7.80$6.35$4.00$15.78
167Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF3,560$18.50$13.00$6.95$10.77$25.70$4.00$17.78
168Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF180$25.00$14.00$6.90$19.14$35.25$7.00$18.84
169Permanent CTB (single slope) (type 1) (42 ) (514-7001)LF18,679$85.00$106.00$116.50$78.67$91.50$77.50$142.72
170Permanent CTB (single slope) (type 3) (42 ) (514-7002)LF851$317.50$300.00$320.00$315.57$248.00$227.00$609.73
171Permanent CTB (single slope) (type 4) (42 ) (514-7003)LF140$205.00$280.00$380.00$266.77$629.00$275.00$396.78
172Permanent CTB (single slope) (mod) (514-7035)LF330$250.00$630.00$725.00$798.12$486.00$630.00$871.19
173Concrete curb & gutter (type I) (529-7008)LF832$59.75$28.00$34.25$33.47$44.75$26.00$17.55
174Driveways (concrete) (hes) (530-7007)SY2,117$130.00$150.00$105.00$139.27$133.00$160.00$181.21
175Driveways (ACP) (530-7010)SY2,495$75.00$100.00$73.00$75.43$67.25$92.00$117.25
176Mill rumble strips (asphalt) (shoulder) (533-7001)LF43,381$0.30$0.21$0.30$0.07$0.45$0.30$0.13
177Mill rumble strips (asphalt) (centerline) (533-7002)LF6,344$0.30$0.21$0.30$0.24$0.80$0.30$0.43
178Mill rumble strips (concrete) (shoulder) (533-7003)LF22,381$1.25$0.90$1.30$0.47$0.90$0.90$0.86
179Concrete median (536-7002)SY521$138.50$87.00$84.50$58.12$85.50$115.00$42.58
180Metal W-beam guard fence (steel post) (540-7002)LF14,772$35.00$26.00$23.50$24.25$28.50$27.00$32.58
181Metal beam guard fence trans (thrie-beam) (540-7005)EACH29$2,353.25$2,100.00$1,990.00$1,850.00$2,200.00$2,050.00$2,563.11
182Short radius (28") (540-7013)LF121$1,836.00$36.00$28.15$28.00$30.00$31.00$54.90
183Downstream anchor terminal section (540-7015)EACH11$1,837.00$1,320.00$995.00$1,250.00$1,200.00$1,375.00$1,205.53
184Remove metal beam guard fence (542-7001)LF7,696$5.00$2.60$2.70$2.00$2.75$2.20$2.17
185Remove terminal anchor section (542-7002)EACH27$319.25$230.00$240.50$150.00$200.00$165.00$238.93
186RM metal beam guard fence trans (thrie-beam) (542-7004)EACH5$405.25$162.00$240.50$150.00$250.00$165.00$282.38
187Guardrail end treatment (install) (544-7001)EACH48$3,450.00$3,100.00$2,745.00$2,800.00$2,950.00$3,100.00$3,469.97
188Guardrail end treatment (remove) (544-7003)EACH30$425.00$220.00$240.50$200.00$250.00$220.00$358.40
189Crash cushion attenuator (move & reset) (545-7002)EACH124$2,126.75$1,100.00$1,060.50$1,200.00$1,510.00$1,350.00$1,808.29
190Crash cushion attenuator (remove) (545-7004)EACH43$1,300.00$900.00$900.00$500.00$855.00$550.00$879.71
191Crash cushion attenuator (install)(L)(N)(TL3) (545-7006)EACH5$36,500$28,000$29,150$26,250$27,250$29,000$32,256
192Crash cushion attenuator (install)(L)(W)(TL3) (545-7008)EACH1$37,000$40,000$41,625$38,400$35,250$42,250$47,352
193Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH41$24,500$7,600.00$7,950.00$8,225.00$7,510.00$9,100.00$7,602.43
194Pipe underdrains (type 1) (6") (556-7001)LF1,630$45.00$36.00$44.00$45.54$27.20$25.00$75.59
195Pipe underdrains (type 3) (6") (556-7003)LF9,143$45.00$41.00$33.00$50.64$44.00$25.00$75.39
196Mailbox install-S (TWG-post) type 2 (560-7002)EACH3$452.00$330.00$341.25$500.00$315.00$260.00$255.22
197Remove RD IL asm (trans-base) (610-7009)EACH11$1,400.00$620.00$815.00$725.00$725.00$798.00$997.57
198In RD IL (U/P) (type 1) (150W EQ) LED (610-7014)EACH16$2,000.00$1,800.00$1,730.00$1,543.00$1,540.00$1,698.00$3,862.21
199In RD IL (type SP) 38S-8-8 (250W EQ) LED (610-7101)EACH14$5,000.00$7,400.00$9,120.00$8,130.50$8,130.00$8,944.00$7,211.80
200In RD IL (type SA) 40T-8-8 (250W EQ) LED (610-7125)EACH2$6,348.00$6,600.00$6,630.00$5,910.00$5,910.00$6,501.00$6,809.09
201HI MST IL pole (150 FT)( 80 MPH) (613-7005)EACH28$49,070$47,000$57,100$50,910$50,900$56,000$50,556
202LED HI MST IL asm (6 fixt) (type S) (614-7001)EACH1$33,426$31,000$54,250$48,379$48,380$53,217$44,453
203LED HI MST IL asm (6 fixt) (type B) (614-7003)EACH27$34,373$31,000$52,880$47,150$47,150$51,865$42,680
204Conduit (PVC) (schedule 40) (2") (618-7030)LF17,485$19.00$15.00$8.40$7.50$7.50$8.25$18.13
205Conduit (PVC) (schedule 40) (3") (618-7036)LF42,020$20.00$26.00$14.00$12.50$12.50$13.75$11.82
206Conduit (PVC) (schedule 80) (2") (618-7054)LF670$20.00$41.00$11.25$10.00$10.00$11.00$18.73
207Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF3,575$35.00$42.00$21.30$19.00$19.00$21.00$26.77
208Conduit (PVC) (schedule 80) (3") (618-7060)LF560$28.00$44.00$13.50$12.00$12.00$13.20$20.89
209Conduit (PVC) (schedule 80) (3") (bore) (618-7061)LF2,645$42.00$46.00$25.25$22.50$22.50$24.75$29.01
210Conduit (RM) (3/4") (618-7070)LF120$51.50$40.00$67.30$60.00$60.00$66.00$29.19
211Electrical conductor (no.14) insulated (620-7002)LF24,560$1.50$1.80$1.85$1.65$1.65$1.82$1.05
212Electrical conductor (no.8) bare (620-7007)LF14,945$2.25$2.30$2.25$2.00$2.00$2.20$2.53
213Electrical conductor (no.8) insulated (620-7008)LF35,710$2.75$2.50$2.50$2.20$2.20$2.42$2.87
214Electrical conductor (no.6) bare (620-7009)LF8,705$2.75$3.50$2.90$2.55$2.55$2.80$3.04
215Electrical conductor (no.6) insulated (620-7010)LF13,710$3.00$3.20$3.10$2.75$2.75$3.00$3.13
216Tray cable (4 conductor) (12 AWG) (621-7006)LF3,450$3.50$6.00$2.75$2.45$2.45$2.70$4.17
217ITS GND box(pcast) type 1 (243636)W/aprn (623-7002)EACH51$4,824.50$4,400.00$4,625.00$4,123.00$4,120.00$4,535.00$4,213.59
218Ground box type A (122311)W/apron (624-7002)EACH62$1,500.00$1,900.00$1,120.00$998.50$999.00$1,099.00$1,373.41
219Ground box type D (162922)W/apron (624-7008)EACH9$1,650.00$4,000.00$1,655.00$1,475.00$1,480.00$1,623.00$1,439.73
220Remove electrical services (628-7002)EACH4$784.75$660.00$730.00$650.00$650.00$715.00$199.52
221Elc SRV type A 240/480 060(NS)SS(T)SP(O) (628-7052)EACH7$7,500.00$12,900$6,730.00$6,000.00$6,000.00$6,600.00$10,757
222Elc SRV type A 240/480 100(NS)SS(T)SP(O) (628-7082)EACH1$6,400.00$13,300$6,730.00$6,001.00$6,000.00$6,601.00$11,052
223Elc SRV type D 120/240 070(NS)AL(E)TP(O) (628-7171)EACH1$6,000.00$16,400$5,300.00$4,725.00$4,730.00$5,198.00$9,284.88
224Aluminum signs (type G) (636-7002)SF2,192$35.50$30.00$36.30$33.00$33.00$36.00$33.40
225Aluminum signs (type O) (636-7003)SF4,631.25$32.00$35.00$39.60$36.00$36.00$40.00$47.43
226Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH70$802.75$625.00$705.00$770.00$702.00$710.00$638.62
227Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH5$900.00$800.00$865.00$860.00$838.00$870.00$812.33
228Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH80$810.50$730.00$925.00$770.00$840.00$930.00$740.80
229Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH1$924.25$1,100.00$1,310.00$1,050.00$997.00$1,320.00$1,098.43
230Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH1$858.00$800.00$925.00$712.00$876.00$930.00$812.33
231Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH17$1,040.00$1,000.00$1,120.00$930.00$992.00$1,150.00$1,016.68
232Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,118.00$1,220.00$1,270.00$1,198.00$1,150.00$1,275.00$1,225.13
233Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034)EACH2$1,600.00$1,250.00$1,305.00$1,828.00$1,280.00$1,325.00$1,272.14
234Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049)EACH9$2,003.00$1,900.00$2,250.00$1,548.00$2,440.00$2,300.00$1,915.86
235In bridge MNT clearance sign assembly(type N) (644-7061)EACH2$2,200.00$4,200.00$2,225.00$2,645.00$1,750.00$2,090.00$2,549.38
236In bridge MNT clearance sign assembly(type S) (644-7062)EACH5$2,440.00$4,200.00$2,275.00$2,570.00$1,650.00$2,200.00$2,549.37
237Install small roadside sign support and assembly (rail mount) (644-7063)EACH2$4,157.75$6,950.00$4,350.00$4,750.00$5,110.00$4,400.00$7,050.38
238Relocate SM RD SN sup&AM type S80 (644-7067)EACH1$650.00$1,220.00$715.00$680.00$633.00$750.00$1,190.39
239Remove SM RD SN sup&AM (644-7073)EACH176$124.50$80.00$100.00$100.00$108.00$105.00$80.72
240Remove BRDG MNT clearance sign assembly (644-7074)EACH4$1,200.00$750.00$1,200.00$1,217.00$145.00$160.00$306.54
241Install LRSS (struct steel) (647-7001)LB11,402$9.50$7.00$6.75$5.25$5.25$5.78$5.26
242Remove lrsa (647-7003)EACH19$1,500.00$1,000.00$770.00$1,350.00$1,350.00$1,485.00$781.67
243Install overhead sign support(25 FT cant) (650-7025)EACH5$44,865$31,000$26,410$24,023$24,020$26,426$33,623
244Install overhead sign support(30 FT cant) (650-7032)EACH7$40,756$44,000$34,425$31,312$31,310$34,444$41,975
245Install overhead sign support(35 FT cant) (650-7038)EACH1$39,533$54,000$37,025$33,678$33,680$37,046$44,838
246Install overhead sign support(40 FT BRDG)(circ tube) (650-7050)EACH1$65,550$134,000$89,320$81,250$81,300$89,375$92,505
247Install overhead sign support(55 FT BRDG) (650-7064)EACH1$47,519$56,000$63,100$57,398$57,400$63,138$75,822
248Install overhead sign support(60 FT BRDG) (650-7069)EACH1$69,100$57,000$65,355$59,451$59,500$65,396$78,210
249Install overhead sign support(65 FT BRDG) (650-7074)EACH1$70,000$54,000$67,215$61,141$61,100$67,255$79,874
250Install overhead sign support(70 FT BRDG) (650-7079)EACH1$55,375$64,000$68,800$62,585$62,600$68,844$87,577
251Install overhead sign support(80 FT BRDG) (650-7089)EACH1$69,576$73,000$79,000$71,862$71,900$79,048$96,800
252Install overhead sign support(95 FT BRDG) (650-7104)EACH1$113,000$82,000$90,000$81,860$81,900$90,047$107,853
253Remove overhd sign sup (650-7193)EACH8$8,243.50$8,500.00$13,170$11,980$11,980$13,178$9,830.05
254Remove overhd sign sup (sign only) (650-7194)EACH2$1,500.00$1,000.00$1,085.00$985.50$986.00$1,084.00$1,942.23
255Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003)EACH62$89.00$46.00$76.50$45.00$45.00$50.00$56.20
256Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH296$36.00$21.00$26.25$12.00$20.00$14.00$15.33
257Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH2$45.00$31.00$26.25$12.00$20.00$14.00$15.33
258Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH57$34.00$31.00$32.80$20.00$25.00$25.00$25.54
259Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH40$42.00$31.00$32.80$25.00$25.00$27.50$25.54
260Install delineator assembly (D-SY)SZ 1(yflx)GND (658-7023)EACH16$106.00$46.00$76.50$45.00$45.00$50.00$56.20
261Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH153$25.00$21.00$26.25$12.00$20.00$14.00$15.33
262Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032)EACH168$32.50$21.00$26.25$12.00$20.00$14.00$15.33
263Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH70$21.00$31.00$32.80$20.00$25.00$25.00$25.54
264Install delineator assembly (D-DW)SZ 1(WFLX)GND (658-7045)EACH46$86.00$46.00$76.50$45.00$45.50$82.50$56.20
265Install delineator assembly (D-DW)SZ 1(BRF)GF2 (658-7048)EACH31$28.50$31.00$32.80$20.00$25.00$25.00$25.54
266Install object marker assembly (OM-4)(TWT)was (658-7072)EACH4$330.00$295.00$285.00$300.00$275.00$365.00$352.52
267Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF10,437$4.00$0.55$0.55$0.50$0.50$0.55$0.51
268Work zone pavement marking non-removing (W)6"(DOT) (662-7006)LF145$1.00$2.10$2.20$2.00$2.00$2.20$2.04
269Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF62,627$0.80$0.55$0.55$0.50$0.50$0.55$0.51
270Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF3,091$0.88$0.80$0.80$0.75$0.75$0.83$0.77
271Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF24$5.00$8.30$8.75$8.00$8.00$8.80$8.16
272Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF65,867$0.70$0.55$0.55$0.50$0.50$0.55$0.51
273Work zone pavement marking removing (W)6"(broken) (662-7065)LF37,229$1.50$1.30$1.40$1.25$1.25$1.38$1.28
274Work zone pavement marking removing (W)6"(DOT) (662-7066)LF4,256$2.00$2.10$2.20$2.00$2.00$2.20$2.04
275Work zone pavement marking removing (W)6"(solid) (662-7068)LF165,359$1.70$1.30$1.40$1.25$1.25$1.38$1.28
276Work zone pavement marking removing (W)8"(solid) (662-7072)LF3,435$2.00$2.40$2.50$2.25$2.25$2.48$2.30
277Work zone pavement marking removing (W)24"(solid) (662-7077)LF4,625$12.75$8.30$8.80$8.00$8.00$8.80$8.16
278Work zone pavement marking removing (Y)6"(solid) (662-7100)LF148,302$1.80$1.30$1.40$1.25$1.25$1.38$1.28
279Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF3,694$1.75$1.60$1.65$1.50$1.50$1.65$1.53
280Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF462$2.00$1.60$1.65$1.50$1.50$1.65$1.53
281Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF21,092$1.50$1.60$1.65$1.50$1.50$1.65$1.53
282Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF1,736$4.75$4.70$4.95$4.50$4.50$4.95$4.59
283Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF656$7.50$8.00$8.20$7.50$7.50$8.25$7.65
284Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH6$65.50$103.00$110.00$100.00$100.00$110.00$102.04
285Reflectorized pavement marking type I (Y)6"(DOT)(100MIL) (666-7111)LF42$3.50$1.60$1.65$1.50$1.50$1.65$1.53
286Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF56$8.50$7.80$8.20$7.50$7.50$8.25$7.65
287Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132)EACH1$299.00$520.00$550.00$500.00$500.00$550.00$510.20
288Reflectorized pavement marking type II (W) 6" (broken) (666-7172)LF1,190$0.20$0.55$0.55$0.50$0.50$0.55$0.51
289Reflectorized pavement marking type II (W) 6" (DOT) (666-7173)LF2,229$0.60$0.55$0.55$0.50$0.50$0.55$0.51
290Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF51,538$0.20$0.55$0.55$0.50$0.50$0.55$0.51
291Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF6,812$0.25$0.80$0.80$0.75$0.75$0.83$0.77
292Reflectorized pavement marking type II (W) 12" (solid) (666-7182)LF1,709$2.25$2.10$2.20$2.00$2.00$2.20$2.04
293Reflectorized pavement marking type II (W) 24" (solid) (666-7184)LF124$3.25$3.10$3.30$3.00$3.00$3.30$3.06
294Reflectorized pavement marking type II (W) 36" (yld tri) (666-7201)EACH9$60.00$78.00$82.00$75.00$75.00$82.50$76.53
295Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF52,485$0.20$0.55$0.55$0.50$0.50$0.55$0.51
296Reflectorized pavement marking type II (Y) 24" (solid) (666-7217)LF56$7.00$3.10$3.30$3.00$3.00$3.50$3.06
297Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF23,283$0.90$1.60$1.65$1.50$1.50$1.65$1.53
298Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF7,470$0.75$1.10$1.10$1.00$1.00$1.10$1.02
299Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF77,045$0.90$1.00$1.00$0.90$0.90$1.00$0.92
300Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF102,613$0.75$1.00$1.00$0.90$0.90$1.00$0.92
301Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424)LF585$5.00$4.70$4.95$4.50$4.50$5.00$4.59
302Prefabricated PM type B (W)(6")(broken)contrast (668-7012)LF11,110$10.75$8.30$8.75$8.00$8.00$8.80$8.16
303Prefabricated PM type C (W)(arrow) (668-7091)EACH36$225.00$230.00$240.00$220.00$220.00$242.00$224.49
304Prefabricated PM type C (W)(double arrow) (668-7093)EACH2$225.00$270.00$285.00$260.00$260.00$286.00$265.31
305Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH3$250.00$290.00$310.00$280.00$280.00$308.00$285.71
306Prefabricated PM type C (W)(LN reduct arrow) (668-7100)EACH6$325.00$365.00$385.00$350.00$350.00$385.00$357.14
307Prefabricated PM type C (W)(number) (668-7102)EACH3$300.00$310.00$330.00$300.00$300.00$330.00$306.12
308Prefabricated PM type C (W)(word) (668-7103)EACH60$265.00$255.00$270.00$245.00$245.00$270.00$250.00
309Prefabricated PM type C (multi)(shield) (668-7135)EACH20$3,005.50$1,650.00$1,725.00$1,575.00$1,580.00$1,733.00$1,607.14
310Reflectorized pavement marker type I-C (672-7002)EACH110$5.50$6.30$6.60$6.00$6.00$6.60$6.12
311Reflectorized pavement marker type II-A-A (672-7004)EACH654$5.50$5.20$5.50$5.00$5.00$5.50$5.10
312Reflectorized pavement marker type II-C-R (672-7006)EACH2,489$5.00$5.20$5.50$5.00$5.00$5.50$5.10
313Eliminating existing PM & markers (4") (677-7001)LF96,792$1.00$0.70$0.75$0.65$0.65$0.72$0.66
314Pavement surface preparation for marking (6") (678-7002)LF118,407$0.15$0.06$0.05$0.05$0.05$0.06$0.05
315Pavement surface preparation for marking (8") (678-7004)LF6,812$0.20$0.10$0.10$0.10$0.10$0.11$0.10
316Pavement surface preparation for marking (12") (678-7006)LF1,709$0.75$0.55$0.55$0.50$0.50$0.55$0.51
317Pavement surface preparation for marking (24") (678-7008)LF180$1.00$1.10$1.10$1.00$1.00$1.10$1.02
318Pavement surface preparation for marking (arrow) (678-7009)EACH8$40.00$52.00$55.00$50.00$50.00$55.00$51.02
319Pavement surface preparation for marking (double arrow) (678-7010)EACH2$45.00$52.00$55.00$50.00$50.00$55.00$51.02
320Pavement surface preparation for marking (number) (678-7015)EACH3$45.00$52.00$55.00$50.00$50.00$55.00$51.02
321Pavement surface preparation for marking (word) (678-7016)EACH8$40.00$52.00$55.00$50.00$50.00$55.00$51.02
322Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH6$20.00$52.00$55.00$50.00$50.00$55.00$51.02
323Pavement surface preparation for marking (shield) (678-7025)EACH8$124.00$520.00$550.00$500.00$500.00$550.00$510.20
324Install highway traffic signal (isolated) (680-7002)EACH1$31,000$83,000$30,425$27,130$27,130$29,843$39,425
325Vehicle signal section (12")LED(green) (682-7001)EACH4$351.50$1,000.00$290.00$258.00$258.00$284.00$277.07
326Vehicle signal section (12")LED(green arrow) (682-7002)EACH8$358.00$1,000.00$290.00$258.00$258.00$285.00$277.07
327Vehicle signal section (12")LED(yel) (682-7003)EACH4$365.80$1,000.00$290.00$258.00$258.00$284.00$277.07
328Vehicle signal section (12")LED(yel arrow) (682-7004)EACH8$358.00$1,000.00$290.00$258.00$258.00$284.00$277.07
329Vehicle signal section (12")LED(red) (682-7005)EACH4$351.50$1,000.00$290.00$258.00$258.00$284.00$277.07
330Vehicle signal section (12")LED(red arrow) (682-7006)EACH8$359.00$1,000.00$290.00$258.00$258.00$284.00$277.07
331Louver (12") (adjustable) (682-7035)EACH6$473.75$540.00$395.00$350.00$350.00$385.00$260.44
332Backplate W/reflectorized border(3 sec) (682-7054)EACH12$153.50$330.00$195.00$171.25$171.00$190.00$260.45
333Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012)LF1,670$3.50$7.00$3.90$3.45$3.45$3.80$5.29
334Ins traffic signal PL AM(S)1 arm(24')lum (686-7027)EACH2$13,542$27,000$12,120$10,806$10,810$11,887$15,743
335Ins traffic signal PL AM(S)1 arm(36')lum (686-7039)EACH1$16,270$31,000$14,350$12,779$12,780$14,057$18,638
336Ins traffic signal PL AM(S)1 arm(44')lum (686-7047)EACH2$17,662$31,000$15,250$13,574$13,570$14,931$20,269
337Ins traffic signal PL AM(S)1 arm(65')lum (686-7067)EACH1$38,700$73,000$39,250$35,000$35,000$38,500$58,893
338Install of flasher cabinet (690-7046)EACH1$10,000$7,000.00$2,200.00$1,945.00$1,950.00$2,140.00$997.56
339Full - width mowing (730-7019)CYC12$7,000.00$8,100.00$4,437.00$3,330.19$10,000$119,900$5,930.35
340Litter removal (734-7002)CYC12$2,800.00$4,300.00$3,100.00$2,624.60$10,000$8,500.00$1,725.78
341Anti-graffiti coatng (permnent-type III) (740-7006)SF111,937$1.50$1.40$1.45$1.37$0.75$1.50$1.37
342Tip testing(drilled shaft) (4003-7001)EACH34$5,415.00$8,100.00$8,750.00$9,614.00$5,350.00$6,850.00$8,378.50
343Ornamental steel fence (4016-7001)LF704$150.00$330.00$700.00$404.82$982.00$900.00$362.49
344RVDS (presence detection only) (6008-7001)EACH4$10,094$16,200$6,400.00$5,695.00$5,700.00$6,265.00$7,997.22
345RVDS (advance detection only) (6008-7002)EACH4$9,089.50$16,200$6,400.00$5,698.00$5,700.00$6,268.00$7,997.22
346Installation of cellular modem (6015-7001)EACH1$10,000$2,500.00$730.00$650.00$650.00$715.00$399.02
347CCTV field equipment (digital) (6018-7002)EACH1$7,730.00$16,600$9,535.00$8,500.00$8,500.00$9,350.00$9,198.22
348CCTV mount (pole) (6018-7003)EACH1$600.00$2,400.00$1,680.00$1,500.00$1,500.00$1,650.00$1,196.54
349Remove CCTV field equipment (6018-7008)EACH1$5,500.00$3,500.00$840.00$750.00$750.00$825.00$598.54
350Remove high mast lighting assembly (6019-7001)EACH6$13,100$7,800.00$10,650$9,500.00$9,500.00$10,450$6,969.63
351Preformed in-lane (trans) rumble strip (6024-7001)LF160$14.50$275.00$26.25$15.00$15.00$16.50$20.72
35230" HDPE pipe (PE4710 dips DR11) (7076-7001)LF3,640$300.00$610.00$435.00$510.00$529.00$561.00$541.08
35330" HDPE pipe (PE4710 dips DR11) steel (7076-7002)LF58$1,005.00$1,400.00$860.00$800.00$830.00$880.00$848.75
35430" HDPE pipe (PE4710 dips DR11) (bore) (7076-7003)LF1,019$1,000.00$1,700.00$1,500.00$1,304.00$1,350.00$1,435.00$1,383.46
355Cut-in connection to existing pipe (7076-7005)EACH4$8,575.00$50,000$16,750$54,000$56,000$60,000$57,290
3566" drain valve assembly (7076-7006)EACH3$12,150$17,000$25,070$15,000$15,570$16,500$15,914
3573" combination air release valve (7076-7007)EACH4$7,150.00$50,000$45,320$55,000$57,100$60,500$58,351
TxDOT contract A00059128: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of January 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy