| 1 | Preparing row (100-7002) | STA | 65 | $2,500.00 | $40,060 | $1,000.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 1,733 | $20.00 | $14.80 | $20.00 |
| 3 | Removing concrete (curb & gutter) (104-7017) | LF | 2,859 | $9.00 | $9.60 | $4.06 |
| 4 | Removing concrete (sawcut) (104-7020) | LF | 38 | $25.00 | $55.50 | $75.00 |
| 5 | Removing concrete (MSE panels) (104-7026) | SF | 4,986 | $20.00 | $34.25 | $10.00 |
| 6 | Remove (6") TRT/untrt base & asphalt pavement (105-7026) | SY | 25,794 | $5.11 | $4.95 | $10.00 |
| 7 | Excavation (roadway) (110-7001) | CY | 1,545.49 | $10.45 | $16.60 | $10.00 |
| 8 | Embankment (final)(DC)(type C) (132-7006) | CY | 64,487.18 | $15.00 | $17.60 | $34.25 |
| 9 | Backfill (type A) (134-7001) | STA | 65 | $167.00 | $740.00 | $200.00 |
| 10 | Drill seed (permanent_rural_sand) (164-7009) | SY | 138,463 | $0.50 | $0.20 | $0.25 |
| 11 | Vegetative watering (168-7001) | TGL | 58 | $30.00 | $500.00 | $46.35 |
| 12 | Proof rolling (216-7001) | HR | 50 | $150.00 | $290.00 | $259.70 |
| 13 | FL BS (compacted in place)(type A GR 4) (6") (247-7046) | SY | 39,450 | $16.00 | $23.00 | $20.00 |
| 14 | Rework BS metal (type B)(6")(density control) (251-7026) | SY | 5,751 | $4.00 | $12.40 | $10.00 |
| 15 | Prime coat (MC-30) (310-7004) | GAL | 10,226 | $6.25 | $5.25 | $6.00 |
| 16 | Emuls asphalt (erosion control)(CSS-1H) (314-7011) | GAL | 18,000 | $4.75 | $5.05 | $4.00 |
| 17 | Fog seal (CSS-1H) (315-7004) | GAL | 7,465 | $5.25 | $5.05 | $4.50 |
| 18 | Asphalt (AC-20-5TR) (316-7007) | GAL | 12,109 | $4.20 | $12.00 | $6.00 |
| 19 | Aggregate (type-PB, GR-4)(sac-B) (316-7211) | CY | 303 | $135.00 | $300.00 | $350.00 |
| 20 | Tack coat (341-7082) | GAL | 13,372 | $5.50 | $2.85 | $6.00 |
| 21 | D-GR HMA type-B sac-B PG70-28 (341-7083) | TON | 16,476 | $130.00 | $192.00 | $250.00 |
| 22 | Stone-MTRX-asphalt SMA-D sac-A PG76-28 (346-7010) | TON | 11,058 | $160.00 | $220.00 | $300.00 |
| 23 | Tack coat (346-7028) | GAL | 4,488 | $5.50 | $2.95 | $4.75 |
| 24 | Flexible pavement structure repair(3") (351-7002) | SY | 1,000 | $35.00 | $100.00 | $72.40 |
| 25 | Flexible pavement structure repair(6") (351-7005) | SY | 500 | $60.00 | $200.00 | $77.40 |
| 26 | Planing asphalt concrete pavement(6") (354-7055) | SY | 20,854 | $4.50 | $5.00 | $4.06 |
| 27 | Planing asphalt concrete pavement (6" to 30") (354-7094) | SY | 4,895 | $18.00 | $14.80 | $6.65 |
| 28 | Cem stabil BKFL (400-7010) | CY | 284.50 | $275.00 | $188.00 | $256.76 |
| 29 | Trench excavation protection (402-7001) | LF | 148 | $20.00 | $26.90 | $15.00 |
| 30 | Drilled shaft (42 in) (416-7007) | LF | 24 | $600.00 | $400.00 | $645.12 |
| 31 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 32 | $450.00 | $150.00 | $445.00 |
| 32 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 160 | $480.00 | $293.00 | $471.00 |
| 33 | Class A concrete (miscellaneous) (420-7002) | CY | 1.40 | $1,500.00 | $2,930.00 | $2,500.00 |
| 34 | Class C concrete (abutment) (420-7012) | CY | 41 | $1,400.00 | $2,350.00 | $2,000.00 |
| 35 | Class C concrete (rail foundation) (420-7052) | CY | 135 | $670.00 | $744.00 | $1,000.00 |
| 36 | Class C concrete (miscellaneous) (420-7067) | CY | 1.50 | $1,400.00 | $16,820 | $2,000.00 |
| 37 | Reinforced concrete slab (422-7001) | SF | 22,480 | $33.00 | $29.00 | $29.90 |
| 38 | Approach slab (422-7013) | CY | 240.80 | $790.00 | $642.00 | $1,000.06 |
| 39 | Retaining wall (MSE) (423-7001) | SF | 34,887 | $70.00 | $89.00 | $110.00 |
| 40 | Coping (special) (423-7031) | LF | 364 | $100.00 | $202.00 | $90.00 |
| 41 | Prestressed concrete girder (TX46) (425-7004) | LF | 2,794.40 | $260.00 | $153.00 | $300.00 |
| 42 | Silicone resin paint finish (427-7004) | SF | 185 | $25.00 | $7.90 | $7.90 |
| 43 | Riprap (concrete)(4 in) (432-7001) | CY | 1,191 | $670.00 | $639.00 | $587.25 |
| 44 | Riprap (concrete)(5 in) (432-7002) | CY | 10 | $680.00 | $750.00 | $700.00 |
| 45 | Rail (type SSTR) (450-7024) | LF | 5,469 | $90.00 | $51.50 | $112.98 |
| 46 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 174 | $260.00 | $260.00 | $225.02 |
| 47 | Concrete box culvert (3 FT X 2 FT) (462-7001) | LF | 180 | $400.00 | $264.00 | $431.75 |
| 48 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 204 | $700.00 | $488.00 | $706.75 |
| 49 | RC pipe (CL III)(24 in) (464-7005) | LF | 52 | $200.00 | $361.00 | $256.75 |
| 50 | Inlet (complete)(type S) (465-7001) | EACH | 2 | $3,000.00 | $9,360.00 | $7,088.95 |
| 51 | Inlet (comp)(type C) (465-7383) | EACH | 2 | $8,000.00 | $9,160.00 | $8,477.95 |
| 52 | Inlet (complete)(type BB) (465-7389) | EACH | 1 | $8,000.00 | $2,532.24 | $5,327.95 |
| 53 | Set (type I)(S= 3 FT)(HW= 3 FT)(6:1)(C) (467-7042) | EACH | 2 | $19,500 | $13,540 | $8,477.95 |
| 54 | Set (type I)(S= 6 FT)(HW= 4 FT)(6:1)(C) (467-7130) | EACH | 2 | $22,500 | $22,600 | $8,977.95 |
| 55 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 5 | $3,000.00 | $4,330.00 | $6,377.95 |
| 56 | Clean existing culverts (480-7001) | EACH | 21 | $3,000.00 | $6,650.00 | $4,977.95 |
| 57 | Removing structure (pipe) (496-7037) | EACH | 4 | $2,000.00 | $5,540.00 | $4,977.95 |
| 58 | Mobilization (500-7001) | LS | 1 | $1,697,000 | $2,603,900 | $2,680,000 |
| 59 | Barricades, signs and traffic handling (502-7001) | MO | 19 | $17,500 | $136,575 | $85,000 |
| 60 | Portable changeable message sign (503-7001) | DAY | 2,308 | $100.00 | $58.00 | $40.00 |
| 61 | TMA (stationary) (505-7001) | DAY | 630 | $200.00 | $220.00 | $350.00 |
| 62 | TMA (mobile operation) (505-7003) | DAY | 108 | $250.00 | $220.00 | $350.00 |
| 63 | Construction exits (install) (type 1) (506-7020) | SY | 650 | $35.00 | $40.75 | $40.00 |
| 64 | Construction exits (remove) (506-7024) | SY | 650 | $10.00 | $13.10 | $15.00 |
| 65 | Sandbags for erosion control (506-7035) | EACH | 360 | $9.00 | $25.10 | $20.00 |
| 66 | Temporary sediment control fence (install) (506-7039) | LF | 200 | $4.15 | $5.50 | $7.00 |
| 67 | Temporary sediment control fence (remove) (506-7041) | LF | 100 | $1.00 | $1.10 | $3.00 |
| 68 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 4,480 | $8.50 | $9.10 | $7.88 |
| 69 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,240 | $1.50 | $1.10 | $2.00 |
| 70 | Constructing detours (508-7001) | SY | 1,000 | $100.00 | $106.00 | $78.00 |
| 71 | Portable concrete traffic barrier (des source)(F-shape)(type 1) (512-7017) | LF | 3,950 | $10.00 | $11.70 | $2.30 |
| 72 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 13,940 | $8.00 | $7.40 | $1.33 |
| 73 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 8,190 | $18.00 | $9.30 | $2.30 |
| 74 | Permanent CTB (single slope) (type 1) (42 ) (514-7001) | LF | 3,844 | $100.00 | $77.75 | $140.00 |
| 75 | Concrete curb & gutter (type II) (529-7009) | LF | 2,118 | $41.00 | $40.50 | $39.75 |
| 76 | Concrete curb (slotted) (529-7013) | LF | 40 | $33.00 | $24.00 | $60.00 |
| 77 | Driveways (concrete) (530-7006) | SY | 124 | $170.00 | $128.00 | $150.00 |
| 78 | Driveways (ACP) (530-7010) | SY | 2,845.80 | $50.00 | $86.50 | $75.00 |
| 79 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 28,446 | $0.28 | $0.45 | $0.25 |
| 80 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 4 | $1,500.00 | $2,500.00 | $3,443.13 |
| 81 | Crash cushion attenuator (remove) (545-7004) | EACH | 5 | $1,100.00 | $1,000.00 | $3,443.13 |
| 82 | Crash cushion attenuator (install)(R)(N)(TL3) (545-7010) | EACH | 2 | $31,000 | $33,500 | $3,443.13 |
| 83 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 5 | $8,727.12 | $9,000.00 | $3,443.13 |
| 84 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 7 | $325.00 | $205.00 | $220.00 |
| 85 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 1 | $330.00 | $233.00 | $220.00 |
| 86 | Remove RD IL asm (trans-base) (610-7009) | EACH | 2 | $1,000.00 | $1,320.00 | $1,000.00 |
| 87 | In RD IL (U/P) (type 1) (150W EQ) LED (610-7014) | EACH | 8 | $1,900.00 | $785.00 | $1,374.00 |
| 88 | In RD IL (type ST) 40T-12 (250W EQ) LED (610-7168) | EACH | 20 | $7,000.00 | $5,790.00 | $7,462.00 |
| 89 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 4,828 | $15.00 | $19.60 | $35.00 |
| 90 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 3,392 | $20.00 | $50.00 | $45.00 |
| 91 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 55 | $30.00 | $24.50 | $65.00 |
| 92 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 80 | $30.00 | $55.00 | $138.00 |
| 93 | Conduit (RM) (1") (618-7072) | LF | 215 | $25.00 | $37.00 | $50.00 |
| 94 | Electrical conductor (no.8) bare (620-7007) | LF | 135 | $4.00 | $2.30 | $3.00 |
| 95 | Electrical conductor (no.8) insulated (620-7008) | LF | 405 | $8.00 | $2.45 | $3.00 |
| 96 | Electrical conductor (no.6) bare (620-7009) | LF | 8,046 | $2.50 | $2.40 | $3.50 |
| 97 | Electrical conductor (no.6) insulated (620-7010) | LF | 16,092 | $2.70 | $2.80 | $3.50 |
| 98 | Ground box type A (122311) (624-7001) | EACH | 2 | $1,248.39 | $1,460.00 | $1,548.00 |
| 99 | Ground box type A (122311)W/apron (624-7002) | EACH | 19 | $1,382.85 | $1,770.00 | $2,308.00 |
| 100 | Ground box type D (162922) (624-7007) | EACH | 1 | $1,700.00 | $1,740.00 | $2,093.00 |
| 101 | Ground box type D (162922)W/apron (624-7008) | EACH | 1 | $2,000.00 | $2,070.00 | $2,308.00 |
| 102 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $10,000 | $6,300.00 | $11,584 |
| 103 | Aluminum signs (type G) (636-7002) | SF | 96 | $32.00 | $30.75 | $27.00 |
| 104 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 14 | $780.00 | $669.00 | $750.00 |
| 105 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 17 | $820.00 | $782.00 | $850.00 |
| 106 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 2 | $750.00 | $736.00 | $850.00 |
| 107 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 17 | $825.00 | $888.00 | $990.00 |
| 108 | Install small roadside sign support and assembly type 10BWG(1)SB(U) (644-7015) | EACH | 2 | $850.00 | $1,010.00 | $990.00 |
| 109 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 5 | $1,250.00 | $1,140.00 | $1,500.00 |
| 110 | Install small roadside sign support and assembly TYS80(1)SB(U-2EXT) (644-7044) | EACH | 2 | $850.00 | $1,600.00 | $1,500.00 |
| 111 | In bridge MNT clearance sign assembly(type N) (644-7061) | EACH | 6 | $2,800.00 | $3,440.00 | $2,750.00 |
| 112 | Remove SM RD SN sup&AM (644-7073) | EACH | 30 | $110.00 | $50.00 | $100.00 |
| 113 | Install LRSS (struct steel) (647-7001) | LB | 726.80 | $8.00 | $7.75 | $9.00 |
| 114 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 37 | $80.00 | $123.00 | $90.00 |
| 115 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 46 | $7.30 | $37.50 | $100.00 |
| 116 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 37 | $5.00 | $38.00 | $90.00 |
| 117 | Install delineator assembly (D-DW)SZ 1(WFLX)GND (658-7045) | EACH | 14 | $86.00 | $124.00 | $90.00 |
| 118 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 94 | $100.00 | $128.00 | $90.00 |
| 119 | Remove delin & object marker assms (658-7078) | EACH | 11 | $25.00 | $15.00 | $20.00 |
| 120 | Install object marker assembly (OM-2Z)(WFLX)GNDHH (658-7249) | EACH | 28 | $160.00 | $210.00 | $190.00 |
| 121 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 53 | $10.50 | $8.50 | $15.00 |
| 122 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 14 | $10.50 | $8.50 | $15.00 |
| 123 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 16,808 | $0.40 | $0.25 | $0.20 |
| 124 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 127,305 | $0.35 | $0.25 | $0.20 |
| 125 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 15,780 | $0.90 | $0.30 | $0.20 |
| 126 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 890 | $1.10 | $5.85 | $0.97 |
| 127 | Work zone pavement marking non-removing(W)36"(yld tri) (662-7032) | EACH | 60 | $20.00 | $25.80 | $26.00 |
| 128 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 123,870 | $0.30 | $0.25 | $0.20 |
| 129 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 2,160 | $1.40 | $1.50 | $2.00 |
| 130 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,865 | $1.20 | $1.50 | $2.00 |
| 131 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 114 | $1.30 | $1.25 | $1.40 |
| 132 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 5,030 | $1.15 | $1.00 | $1.20 |
| 133 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 2 | $290.67 | $500.00 | $500.00 |
| 134 | Type I high perf PM (W)6"(broken)(100MIL) (666-7290) | LF | 6,188 | $0.70 | $0.75 | $0.80 |
| 135 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 28,805 | $0.70 | $0.70 | $0.80 |
| 136 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 28,410 | $0.70 | $0.70 | $0.80 |
| 137 | Prefabricated PM type C (W)(12")(solid) (668-7087) | LF | 890 | $11.00 | $11.00 | $8.00 |
| 138 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 230 | $15.00 | $16.00 | $14.00 |
| 139 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 4 | $250.00 | $300.00 | $250.00 |
| 140 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 4 | $275.00 | $400.00 | $326.19 |
| 141 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 4 | $320.00 | $450.00 | $455.00 |
| 142 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 34 | $50.00 | $65.00 | $45.00 |
| 143 | Reflectorized pavement marker type I-C (672-7002) | EACH | 70 | $4.00 | $7.00 | $4.75 |
| 144 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 22 | $4.25 | $7.00 | $4.74 |
| 145 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 144 | $4.50 | $7.00 | $4.75 |
| 146 | Eliminating existing PM & markers (6") (677-7002) | LF | 48,100 | $0.40 | $0.85 | $0.35 |
| 147 | Eliminating existing PM & markers (24") (callout) (677-7039) | LF | 660 | $5.00 | $5.00 | $4.70 |
| 148 | Pavement surface preparation for marking (12") (678-7006) | LF | 890 | $0.40 | $7.80 | $0.55 |
| 149 | Pavement surface preparation for marking (24") (678-7008) | LF | 230 | $1.15 | $2.75 | $0.75 |
| 150 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 12 | $25.00 | $100.00 | $50.00 |
| 151 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 34 | $17.00 | $25.00 | $40.00 |
| 152 | Removing RDSD FLSH BCN AM (solar PWRD) (685-7006) | EACH | 2 | $800.00 | $2,850.00 | $100.00 |
| 153 | Removal of traffic signal pole FND (690-7033) | LF | 4 | $500.00 | $810.00 | $100.00 |
| 154 | Salvage traffic signal (690-7099) | EACH | 2 | $1,500.00 | $2,850.00 | $2,274.00 |
| 155 | Full - width mowing (730-7019) | CYC | 4 | $4,000.00 | $6,300.00 | $442.00 |
| 156 | Litter removal (734-7002) | CYC | 4 | $2,000.00 | $3,700.00 | $2,204.00 |
| 157 | Cleaning / sweeping(entrance/exit ramp) (738-7071) | CYC | 4 | $1,400.00 | $1,600.00 | $1,500.00 |
| 158 | Reinforced fab for asphalt PVMNT overlays (3002-7001) | SY | 59,684 | $6.50 | $6.10 | $7.00 |
| 159 | Asphalt for reinforced fab (PG76-28) (3002-7002) | GAL | 8,953 | $4.25 | $2.95 | $3.40 |
| 160 | Install bridge identification numbers (4019-7001) | EACH | 4 | $1,000.00 | $1,030.00 | $500.00 |
| 161 | ITS pole(40 FT)(110 MPH)(W/stiff) (6011-7015) | EACH | 1 | $17,000 | $20,300 | $25,000 |
| 162 | ITS pole MNTD cab (type 2)(conf 1) (6011-7028) | EACH | 1 | $6,650.00 | $11,450 | $25,000 |
| 163 | Temporary speed monitor sys (6016-7001) | EACH | 1 | $12,000 | $17,000 | $20,000 |
| 164 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 1 | $3,750.00 | $3,290.00 | $4,000.00 |
| 165 | LED roadside sign (6066-7001) | EACH | 4 | $15,000 | $4,450.00 | $13,000 |