TxDOT contract A00007222 bid tabulation

Reconstruct Existing Roadway, US 81 (NORTH OF HARMON ROAD to NORTH OF IH 35W). Let by Texas DOT on August 5, 2026, Tarrant, Fort Worth District. 11 bids received; low bid $66,140,142 by Indus Road & Bridge, Inc., -11% against the engineer's estimate of $74,343,262.

Owner
Texas DOT
Letting
05 AUG 2026
Pay items
382
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Indus Road & Bridge, Inc.$66,140,142Low-11%
2Harper Brothers Construction LLC$66,949,776+1.0%-10%
3Sema Construction, Inc.$67,334,856+2.0%-9.0%
4Ragle Construction, Inc.$69,761,946+5.0%-6.0%
5Reyes TX, Inc.$70,600,000+7.0%-5.0%
6Mario Sinacola & Sons Excavating, Inc.$71,702,834+8.0%-4.0%
7Webber, LLC$72,890,348+10%-2.0%
8Pulice Construction, Inc.$72,923,640+10%-2.0%
9RPM Xconstruction, LLC$73,293,567+11%-1.0%
10Austin Bridge & Road Services, LP$77,613,527+17%+4.0%
11Tiseo Paving Co.$78,548,255+19%+6.0%
TxDOT contract A00007222: bids by rank

Engineer's estimate: $74,343,262.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Indus Road & Bridge, Inc.2. Harper Brothers Construction LLC3. Sema Construction, Inc.4. Ragle Construction, Inc.5. Reyes TX, Inc.6. Mario Sinacola & Sons Excavating, Inc.
1Preparing row (100-7002)STA84$43,539$7,500.00$76,153$75,000$19,276$10,000
2Removing concrete (pavement) (104-7001)SY9,757$68.50$12.00$15.00$16.90$10.00$7.00$12.00
3Removing concrete (riprap) (104-7006)SY5,374$7.00$10.00$13.82$8.00$14.00$12.00
4Removing concrete (medians) (104-7008)SY1,204$14.00$10.00$13.80$15.00$12.00$20.00
5Removing concrete (driveways) (104-7011)SY875$11.00$14.00$15.00$19.97$16.00$8.50$12.00
6Removing concrete (curb & gutter) (104-7017)LF135$7.00$10.00$23.56$14.00$12.00$15.00
7Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002)SY5,312$10.00$3.50$7.50$4.52$4.00$2.10$8.00
8Remove (6"-12") TRT/untrt base & asphalt pavement (105-7057)SY21,351$15.00$6.00$10.00$6.55$6.00$5.00$10.00
9Remove(12"-24") TRT/untrt base & asphalt pavement (105-7124)SY27,975$20.00$12.50$7.00$8.61$10.00$7.00$12.00
10Excavation (roadway) (110-7001)CY62,189$20.00$10.00$9.00$8.15$14.00$7.50$20.00
11Embankment (final)(DC)(type B) (132-7004)CY318,099$15.00$13.00$25.00$17.02$15.00$23.50$20.00
12Embankment (final)(DC)(type D) (132-7012)CY47,058$30.00$14.00$5.00$14.15$18.00$3.30$10.00
13Backfill (type A or B) (134-7004)STA161$440.00$266.00$575.00$170.38$125.00$1,140.00$800.00
14Furn & place topsoil (4") (160-7002)SY1,541$10.00$4.50$5.25$6.20$2.50$9.50$1.00
15Compost manuf topsoil (4") (161-7002)SY196,750$2.00$1.60$0.93$2.00$0.72$0.76$3.12
16Block sodding (162-7002)SY24,595$7.00$4.90$6.80$4.85$6.50$5.10$4.85
17Broadcast seed (permanent_urban_clay) (164-7004)SY1,541$1.00$0.50$0.12$0.46$0.46$0.50$0.46
18Drill seed (permanent_urban_clay) (164-7012)SY172,155$0.20$0.14$0.16$0.13$0.13$0.15$0.13
19Hydro mulch seed (temporary_cool) (164-7022)SY771$5.00$0.85$0.42$0.83$0.83$0.90$0.83
20Straw/hay mulch seed (temporary_warm) (164-7029)SY98,381$2.00$0.40$0.15$0.39$0.39$0.50$0.39
21Straw/hay mulch seed (temporary_cool) (164-7030)SY98,381$2.00$0.40$0.18$0.39$0.39$0.50$0.39
22Fertilizer (166-7002)TON0.10$750.00$520.00$1,500.00$464.95$464.95$428.00$464.95
23Vegetative watering (168-7001)TGL13,827$40.00$2.00$8.00$0.10$15.00$40.00$0.10
24Soil retention blankets (CL 1) (type B) (169-7043)SY2,935$2.00$0.70$1.15$0.67$0.67$0.71$0.67
25Lime (com or QK)(slurry) (260-7005)TON3,443$360.00$344.00$350.00$253.16$312.00$379.00$300.00
26Lime TRT (existing material)(18") (260-7019)SY91,884$10.00$7.60$5.50$5.53$3.50$6.00$10.00
27Cement (275-7001)TON3$227.00$225.00$400.00$300.00$162.95$300.00
28Cement TRT (existing material)(18") (275-7034)SY100$15.50$15.00$100.24$200.00$20.00$25.00
29Prime coat(MC-30 or AE-P) (310-7013)GAL18,376$7.00$6.00$5.80$7.00$5.00$6.00$7.00
30D-GR HMA type-B PG64-22 (341-7001)TON23,532$130.00$112.00$112.75$111.00$140.00$119.00$111.00
31Tack coat (341-7082)GAL4,230$6.00$5.60$3.00$5.00$5.00$3.00
32SP mixes SP-C sac-A PG70-28 (344-7024)TON11,288$200.00$152.00$150.00$144.00$185.00$177.00$144.00
33Tack coat (344-7077)GAL19,422$5.00$6.00$5.60$3.00$5.00$5.00$3.00
34Flexible pavement structure repair(4") (351-7003)SY2,500$35.00$54.00$61.00$40.00$60.00$47.27$60.00
35Plane & text asphalt concrete pavement(0" to 2") (354-7002)SY92,232$7.00$1.90$2.73$1.45$1.50$2.90$3.00
36Concrete pavement (CRCP) (10") (360-7004)SY22,777$87.00$85.00$79.00$90.00$110.00$93.00
37Concrete pavement (CRCP) (11") (360-7005)SY50,703$95.00$95.00$80.00$84.00$92.00$117.00$91.00
38Concrete pavement (CRCP)(hes) (11") (360-7050)SY964$145.00$110.00$139.78$130.00$154.00$120.00
39Full - depth repair CRCP (8") (361-7049)SY8,500$205.00$171.00$125.00$212.51$215.00$96.04$280.00
40Cut & restoring pavement (400-7006)SY930$732.00$40.00$63.00$220.00$117.61$150.00
41Cut & restore asphalt paving (400-7008)SY1,879$13.00$262.00$40.00$35.00$125.00$57.17$75.00
42Cem stabil BKFL (400-7010)CY1,988$160.00$250.00$200.00$158.48$125.00$168.00$250.00
43Cement stab backfill (inlet or MH) (400-7011)CY50$229.00$200.00$137.00$125.00$175.00$250.00
44Trench excavation protection (402-7001)LF3,998$5.00$1.10$2.50$7.83$9.00$4.50$1.00
45Temporary special shoring (403-7001)SF20,968$12.00$2.50$18.81$5.00$50.20$1.00
46Drilled shaft (18 in) (416-7002)LF286$75.00$200.00$134.64$125.00$109.50$250.00
47Drilled shaft (36 in) (416-7006)LF2,455$165.00$400.00$201.53$200.00$160.00$255.00
48Drilled shaft (48 in) (416-7008)LF30$460.00$425.50$700.00$775.00$659.50$425.00
49Drilled shaft (non - reinforced) (12 in) (416-7024)LF14$95.00$92.00$80.00$120.04$126.95$92.00
50Drilled shaft (sign mounts) (24 in) (416-7028)LF40$182.00$186.50$200.00$425.87$192.50$186.50
51Drilled shaft (sign mounts) (48 in) (416-7032)LF21$485.00$496.00$650.00$844.16$670.20$496.00
52Drilled shaft (sign mounts) (54 in) (416-7033)LF29$495.00$508.50$850.00$1,013.80$876.50$508.50
53Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF152$205.00$208.60$334.00$334.00$340.00$208.60
54Drilled shaft (traffic signal pole) (30 in) (416-7043)LF24$625.00$640.50$346.00$346.00$384.00$640.50
55Drilled shaft (traffic signal pole) (36 in) (416-7044)LF84$720.00$735.00$376.00$376.00$382.00$735.00
56Drilled shaft (traffic signal pole) (48 in) (416-7046)LF88$925.00$950.25$448.00$448.00$612.50$950.25
57Class B concrete (flume) (420-7010)CY123$440.00$585.39$670.01$635.00$581.50$800.00
58Class C concrete (abutment)(HPC) (420-7013)CY320.40$850.00$1,200.00$1,320.59$950.00$1,190.00$1,500.00
59Class C concrete (cap)(HPC) (420-7023)CY117.70$1,035.00$2,150.00$1,538.97$1,150.00$1,600.00$1,500.00
60Class C concrete (column)(HPC) (420-7039)CY97.50$940.00$1,775.00$1,144.70$1,200.00$1,480.00$1,500.00
61Class C concrete (rail foundation) (420-7052)CY281$450.00$975.00$518.44$540.00$681.00$800.00
62Class C concrete (collar) (420-7061)EACH8$3,200.00$1,100.00$5,000.00$2,057.74$3,375.00$1,690.00$100.00
63Reinforced concrete slab (HPC) (422-7002)SF55,131$20.00$35.00$23.80$22.50$30.00$29.00
64Bridge median (422-7011)SF2,310$12.00$20.00$20.39$14.50$19.00$28.00
65Approach slab (HPC) (422-7014)CY510.80$680.00$1,000.00$726.57$555.00$688.00$700.00
66Retaining wall (MSE) (423-7001)SF27,064$69.00$55.00$74.82$95.00$90.00$91.00
67Retaining wall (temporary wall) (423-7012)SF6,560$25.00$38.00$17.50$30.69$20.00$51.00$36.00
68Prestressed concrete girder (TX46) (425-7004)LF6,900.04$220.00$250.00$234.58$220.00$290.00$200.00
69Riprap (concrete)(5 in) (432-7002)CY824$650.00$460.00$600.00$564.01$530.00$671.00$610.00
70Riprap (concrete)(CL A) (432-7004)CY1.25$905.00$2,000.00$557.01$1,090.00$1,040.00$3,000.00
71Riprap (mow strip)(4 in) (432-7013)CY110$650.00$460.00$775.00$567.51$530.00$662.00$700.00
72Riprap (mow strip)(5 in) (432-7014)CY521$460.00$750.00$619.01$525.00$656.00$600.00
73Riprap (stone protection)(24 in) (432-7045)CY692$120.00$175.00$223.25$150.00$213.00$140.00
74Riprap (concrete)(CL B)(RR8&RR9) (432-7055)CY99$460.00$775.00$613.02$635.00$720.00$750.00
75Rail (type SSTR) (450-7024)LF2,652$85.00$90.00$71.41$56.00$70.00$100.00
76Rail (type SSTR)(HPC) (450-7025)LF1,304$95.00$90.00$78.24$86.00$101.00$100.00
77Rail (type C221) (450-7032)LF576$130.00$86.00$175.00$197.32$112.00$103.00$190.00
78Rail (type PR22) (450-7045)LF1,892$150.00$120.00$175.00$146.65$120.00$111.00$170.00
79Rail (type PR22)(HPC) (450-7046)LF762$120.00$175.00$164.65$120.00$108.50$170.00
80Typ retaining wall safety maintenance rail (450-7083)LF1,134$30.00$125.00$75.00$90.00$84.50$95.00
81Type A joint (454-7001)LF210$20.00$15.00$11.06$25.00$32.00$17.00
82Armor joint (sealed) (454-7003)LF538$95.00$185.00$121.53$105.00$147.00$125.00
83Concrete box culvert (4 FT X 2 FT) (462-7003)LF2,237$380.00$335.00$300.00$258.63$260.00$377.00$300.00
84Concrete box culvert (5 FT X 2 FT) (462-7006)LF568$600.00$400.00$365.00$339.12$330.00$440.00$360.00
85Concrete box culvert (6 FT X 2 FT) (462-7010)LF610$490.00$425.00$377.49$380.00$528.00$420.00
86Concrete box culvert (6 FT X 3 FT) (462-7011)LF126$610.00$525.00$568.16$495.00$616.00$682.00
87Concrete box culvert (10 FT X 5 FT) (462-7033)LF3,924$1,100.00$1,710.00$1,050.80$820.00$1,562.00$1,150.00
88RC pipe (CL III)(18 in) (464-7003)LF123$120.00$125.00$130.96$60.00$108.00$120.00
89RC pipe (CL III)(24 in) (464-7005)LF5,387$100.00$125.00$130.00$91.42$70.00$104.00$140.00
90RC pipe (CL III)(30 in) (464-7007)LF1,198$140.00$140.00$135.00$103.74$90.00$132.00$160.00
91RC pipe (CL III)(36 in) (464-7009)LF507$185.00$175.00$165.00$128.35$115.00$181.00$200.00
92RC pipe (CL III)(42 in) (464-7010)LF844$215.00$220.00$210.00$160.14$170.00$224.00$220.00
93RC pipe (CL V)(18 in) (464-7032)LF104$190.00$130.00$93.04$120.00$98.00$150.00
94RC pipe (CL V)(24 in) (464-7034)LF236$200.00$145.00$110.88$125.00$120.00$160.00
95Inlet (complete)(CO)(10 FT)(FTW) (465-7185)EACH8$10,850$9,600.00$12,500$8,454.62$14,125$17,090$9,200.00
96Inlet (complete)(CO)(15 FT)(FTW) (465-7186)EACH2$10,800$15,250$11,414$17,500$19,170$11,900
97Inlet (complete)( CO)(20 FT)(FTW) (465-7187)EACH26$17,850$13,900$17,475$13,978$20,220$23,040$14,000
98Inlet (complete)(CO-C)(20 FT)(FTW) (465-7191)EACH1$8,000.00$12,000$12,000$12,708$19,150$22,870$13,000
99Inlet (complete)(CU)(20 FT)(FTW) (465-7195)EACH3$15,000$19,250$15,885$21,800$22,280$16,000
100Inlet (complete)(FG)(4'X 4'-3' X 3')(FTW) (465-7210)EACH5$5,300.00$13,425$4,912.25$10,340$11,420$6,200.00
101Inlet (complete)(FGS2)(FTW) (465-7230)EACH2$8,500.00$13,550$8,792.61$12,000$12,680$9,600.00
102Inlet (complete)(AD)(5'X 4'-3' X 3')(FTW) (465-7238)EACH1$5,300.00$8,375.00$4,481.10$5,820.00$11,690$5,800.00
103Inlet (complete)(AD)(6'X 6'-3' X 3')(FTW) (465-7243)EACH4$6,500.00$11,850$5,582.27$6,080.00$11,140$6,800.00
104Inlet (complete)(AD-2)(FTW) (465-7256)EACH1$8,500.00$10,500$7,420.33$6,350.00$12,990$8,400.00
105Manh (complete)(type SD)(3FT X 3FT)(FTW) (465-7259)EACH2$4,500.00$8,500.00$3,176.90$8,825.00$9,250.00$4,700.00
106Manh (complete)(type SD)(4'X 4'-3'X 3')(FTW) (465-7261)EACH12$12,000$6,000.00$7,800.00$4,934.95$10,625$11,630$6,200.00
107Manh (complete)(type SD)(5'X 5'-3'X 3')(FTW) (465-7264)EACH3$9,600.00$14,850$9,240.48$22,850$14,530$10,000
108Manh (complete)(type SD)(6'X 6'-3'X 3')(FTW) (465-7268)EACH1$7,000.00$7,500.00$10,385$6,149.57$14,800$16,200$7,300.00
109Manh (complete)(type SD)(7'X 7'-3'X 3')(FTW) (465-7273)EACH3$7,500.00$9,600.00$12,375$8,282.64$21,000$21,300$9,100.00
110Manh (complete)(type SD)(8'X 4'-3'X 3')(FTW) (465-7275)EACH1$9,600.00$11,100$6,694.19$20,200$27,240$7,800.00
111Junct box (complete)(JB)(8FT X 8FT)(FTW) (465-7301)EACH1$11,900$26,000$9,303.78$24,950$28,410$17,400
112Inlet (complete)(SSB)(10 FT)(FTW) (465-7304)EACH1$12,900$17,650$12,355$18,750$23,890$12,700
113Wingwall (PW - 2) (HW=9 FT) (466-7193)EACH2$145,000$150,000$150,222$135,000$98,720$140,000
114Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH5$2,200.00$1,685.00$2,278.33$1,445.00$830.00$2,600.00
115Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH4$1,800.00$2,400.00$2,000.00$2,309.68$1,450.00$840.00$2,900.00
116Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327)EACH3$2,800.00$2,650.00$2,612.74$1,700.00$840.00$3,100.00
117Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH2$2,800.00$2,350.00$2,612.73$1,700.00$840.00$3,100.00
118Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH1$3,200.00$3,300.00$3,891.42$2,350.00$2,170.00$3,400.00
119Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366)EACH2$3,000.00$6,400.00$6,100.00$5,292.68$4,240.00$3,340.00$5,500.00
120Set (type II) (42 in) (RCP) (6: 1) (C) (467-7379)EACH1$8,700.00$8,600.00$8,450.00$6,784.43$6,300.00$3,900.00$6,800.00
121Set(type II)(24 in)(RCP)(4:1)(P) (467-7468)EACH1$2,200.00$2,675.00$2,309.67$1,500.00$840.00$2,900.00
122Set (type I) (S=6FT)(HW=3FT)(4:1) (P) (467-7488)EACH1$13,000$19,700$13,729$14,500$5,610.00$18,700
123Jack bor or tun pipe(42 in)(RC)(CL III) (476-7014)LF159$1,700.00$1,800.00$750.00$1,312.80$970.00$1,165.60$800.00
124Removing structure (inlet) (496-7002)EACH5$1,100.00$2,265.00$1,659.07$620.00$2,110.00$1,900.00
125Removing structure (set) (496-7004)EACH2$1,800.00$1,975.00$924.93$620.00$507.00$950.00
126Removing structure (wingwall) (496-7005)EACH11$1,075.00$4,500.00$4,325.00$3,292.22$3,800.00$2,920.00$6,000.00
127Removing structure (pipe) (496-7007)LF1,374$19.00$50.00$45.00$39.11$17.00$21.00$55.00
128Removing structure (box culvert) (496-7008)LF3,178$78.00$135.00$100.00$78.33$48.00$27.00$110.00
129Removing structure (bridge 100 - 499 FT length) (496-7010)EACH1$186,000$125,750$99,414$500,000$128,900$75,000
130Mobilization (500-7001)LS1$4,000,000$6,500,000$6,500,000$6,733,486$6,800,000$6,883,500$7,000,000
131Barricades, signs and traffic handling (502-7001)MO34$20,000$10,000$15,000$36,795$35,000$5,387.50$71,000
132Portable changeable message sign (503-7002)EACH5$19,000$21,000$17,250$18,403$35,000$18,295$19,000
133TMA (stationary) (505-7001)DAY250$225.00$235.00$300.00$191.67$350.00$192.00$1,000.00
134TMA (mobile operation) (505-7003)DAY22$800.00$700.00$650.00$950.00$600.00$952.00$1,800.00
135Rock filter dams (install) (type 1) (506-7001)LF465$46.00$31.00$39.72$39.72$42.00$47.50
136Rock filter dams (install) (type 2) (506-7002)LF260$42.00$46.00$38.50$40.09$40.09$42.00$47.50
137Rock filter dams (remove) (506-7011)LF725$18.00$13.00$30.70$12.71$12.71$13.50$4.00
138Construction exits (install) (type 1) (506-7020)SY612$40.00$44.00$37.15$38.37$38.37$40.50$25.00
139Construction exits (remove) (506-7024)SY612$15.00$9.00$21.70$8.10$8.10$8.50$5.00
140Temporary sediment control fence (install) (506-7039)LF12,232$4.00$4.00$3.00$3.39$3.39$3.50$1.70
141Temporary sediment control fence (remove) (506-7041)LF12,232$0.90$0.90$0.71$0.83$0.83$0.90$0.10
142Biodegradable erosion control logs (install) (8") (506-7043)LF4$7.00$28.00$15.00$26.50$26.50$28.00$3.25
143Biodegradable erosion control logs (install) (12") (506-7044)LF2,160$8.00$8.10$3.75$8.03$8.03$8.50$4.25
144Biodegradable erosion control logs (remove) (506-7046)LF2,164$5.00$0.90$0.60$0.83$0.83$0.90$0.25
145Constructing detours (508-7001)SY32,874$100.00$99.00$60.00$83.78$107.00$51.00$90.00
146Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF15,090$80.00$50.00$7.50$24.21$75.00$54.00$65.00
147Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF2,880$56.00$77.00$7.50$24.99$75.00$70.00$20.00
148Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF220$80.00$77.00$7.50$81.04$75.00$66.00$20.00
149Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF14,420$9.00$8.20$5.00$7.54$10.00$7.00$12.00
150Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF3,420$6.00$7.00$5.00$9.77$10.00$3.60$8.00
151Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF220$10.00$8.00$5.00$25.34$10.00$9.00$8.00
152Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049)LF15,090$13.00$9.00$5.00$9.14$12.00$12.00$10.00
153Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF2,840$10.00$11.50$5.00$16.82$12.00$11.00$10.00
154Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF220$25.00$14.00$5.00$26.40$12.00$15.00$10.00
155Portable concrete traffic barrier (pinning) (512-7071)EACH504$54.00$25.00$56.47$95.00$76.00$100.00
156Permanent CTB (single slope) (type 1) (42 ) (514-7001)LF1,162$115.00$145.00$78.13$85.00$97.00$110.00
157Concrete curb (mono) (type I) (529-7006)LF421$25.00$6.00$10.00$3.40$10.00$5.00$35.00
158Concrete curb (mono) (type II) (529-7007)LF30,207$6.00$2.70$4.00$2.87$9.28$5.50$1.00
159Concrete curb & gutter (type II) (529-7009)LF1,198$25.00$19.00$5.00$43.05$29.50$35.00$15.00
160Intersections (concrete) (530-7001)SY310$128.00$150.00$174.22$150.00$163.00$95.00
161Driveways (concrete) (530-7006)SY1,066$140.00$88.00$115.00$95.22$96.00$61.00$140.00
162Concrete sidewalks (5") (531-7002)SY17,603$78.00$61.00$80.00$50.78$58.00$65.00$65.00
163Curb ramps (type 2) (531-7006)EACH8$3,330.00$2,950.00$2,392.21$4,600.00$2,700.00$3,000.00
164Curb ramps (type 7) (531-7010)EACH10$3,330.00$2,950.00$2,342.21$5,110.00$2,400.00$2,800.00
165Curb ramps (type 21) (531-7013)EACH2$3,600.00$2,950.00$2,671.21$5,670.00$3,800.00$3,200.00
166Curb ramps (type 22) (531-7014)EACH6$4,150.00$2,950.00$3,207.21$6,295.00$4,040.00$3,700.00
167Mill rumble strips (asphalt) (shoulder) (533-7001)LF30,084$0.33$0.10$0.19$0.10$0.25$0.10
168Metal W-beam guard fence (timber post) (540-7001)LF2,900$24.00$23.65$23.00$23.00$24.00$23.65
169Metal W-beam guard fence (steel post) (540-7002)LF4,825$45.00$32.00$29.57$30.00$30.00$28.50$29.57
170Metal beam guard fence trans (thrie-beam) (540-7005)EACH1$1,850.00$1,969.00$1,800.00$1,800.00$1,695.00$1,969.00
171Downstream anchor terminal section (540-7015)EACH27$1,300.00$1,250.00$1,465.00$1,200.00$1,200.00$1,408.00$1,465.00
172TL-3 31" short radius (complete) (540-7039)EACH2$31,000$27,885$30,000$30,000$30,178$27,885
173Remove metal beam guard fence (542-7001)LF9,679$3.00$3.00$2.55$2.75$2.75$3.10$2.55
174Remove terminal anchor section (542-7002)EACH17$185.00$165.00$255.00$150.00$150.00$307.00$255.00
175Cable barrier system (install)(TL-3) (543-7001)LF2,995$32.00$49.06$25.00$26.00$13.00$49.06
176Cable barrier terminal sec (install)(TL-3) (543-7017)EACH10$5,600.00$2,623.00$4,766.00$4,700.00$4,390.00$2,623.00
177Cable barrier (remove) (543-7037)LF4,020$12.00$6.62$10.00$5.00$5.00$6.62
178Cable barrier terminal section (remove) (543-7038)EACH11$1,800.00$1,465.00$1,500.00$1,025.00$1,400.00$1,465.00
179Guardrail end treatment (install) (544-7001)EACH27$3,200.00$3,100.00$3,345.00$3,000.00$3,000.00$3,380.00$3,345.00
180Guardrail end treatment (remove) (544-7003)EACH35$280.00$255.00$255.00$250.00$250.00$205.00$255.00
181Crash cushion attenuator (move & reset) (545-7002)EACH13$1,100.00$2,624.86$1,877.56$950.00$883.00$1,232.03
182Crash cushion attenuator (remove) (545-7004)EACH18$900.00$1,652.43$1,812.56$950.00$2,030.00$1,743.54
183Crash cushion attenuator (install)(L)(N)(TL3) (545-7006)EACH6$38,000$30,000$26,951$31,500$36,050$30,815
184Crash cushion attenuator (install)(L)(W)(TL3) (545-7008)EACH1$52,000$40,000$37,565$38,000$50,420$40,994
185Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH16$8,000.00$10,250$10,954$7,350.00$9,850.00$8,614.07
186Pipe underdrains (type 7) (6") (556-7007)LF1,702$29.00$50.00$27.93$32.00$36.00$47.08
187In RD IL (U/P) (type 1) (150W EQ) LED (610-7014)EACH14$1,700.00$1,675.00$818.00$818.00$884.00$1,675.00
188In RD IL (U/P) (type 2) (150W EQ) LED (610-7016)EACH14$1,750.00$1,755.50$831.00$831.00$894.00$1,755.50
189In RD IL (type SA) 40B-8 (250W EQ) LED (610-7108)EACH6$4,200.00$4,220.00$6,124.00$6,124.00$4,579.00$4,220.00
190In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124)EACH14$3,800.00$3,858.00$3,781.00$3,781.00$5,024.00$3,858.00
191In RD IL (type SA) 40T-8-8 (250W EQ) LED (610-7125)EACH5$5,000.00$5,046.00$5,130.00$5,130.00$5,489.00$5,046.00
192Conduit (PVC) (schedule 40) (2") (618-7030)LF95$13.00$12.65$19.00$19.00$23.00$12.65
193Conduit (PVC) (schedule 40) (2") (bore) (618-7031)LF70$32.00$32.50$31.00$31.00$27.00$32.50
194Conduit (PVC) (schedule 40) (3") (618-7036)LF1,250$10.00$9.85$21.00$21.00$33.00$9.85
195Conduit (PVC) (schedule 40) (4") (bore) (618-7041)LF70$40.00$40.80$37.00$37.00$49.00$4.80
196Conduit (PVC) (schedule 80) (2") (618-7054)LF7,010$28.00$12.00$12.15$20.00$20.00$22.00$12.15
197Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF1,895$38.00$25.00$25.40$33.00$33.00$27.00$25.40
198Conduit (PVC) (schedule 80) (3") (618-7060)LF985$34.00$34.65$23.00$23.00$34.00$34.65
199Conduit (PVC) (schedule 80) (3") (bore) (618-7061)LF930$62.00$63.30$34.00$34.00$39.00$63.30
200Conduit (PVC) (schedule 80) (4") (618-7064)LF600$36.00$36.75$29.00$29.00$46.00$36.75
201Conduit (PVC) (schedule 80) (4") (bore) (618-7065)LF210$66.00$67.25$39.00$39.00$51.00$67.25
202Conduit (RM) (1") (618-7072)LF2,825$70.00$71.45$35.00$35.00$26.00$71.45
203Conduit (RM) (3") (618-7082)LF1,344$101.00$103.60$42.00$42.00$55.00$103.60
204Conduit (RM) (4") (618-7086)LF520$92.00$94.50$55.00$55.00$74.00$94.50
205ITS multi-duct CND (PVC-40) (619-7001)LF3,800$24.00$24.50$36.00$36.00$46.00$24.50
206ITS multi-duct CND (PVC-80)(bore) (619-7006)LF1,110$28.00$28.50$54.00$54.00$51.00$28.50
207Electrical conductor (no.12) bare (620-7003)LF11,555$1.50$1.70$1.69$1.00$1.00$3.00$1.69
208Electrical conductor (no.12) insulated (620-7004)LF27,870$3.00$1.70$1.69$1.00$1.00$3.00$1.69
209Electrical conductor (no.10) bare (620-7005)LF885$1.90$1.90$1.20$1.20$3.00$1.90
210Electrical conductor (no.10) insulated (620-7006)LF2,410$1.90$1.90$1.20$1.20$3.00$1.90
211Electrical conductor (no.8) bare (620-7007)LF6,697$2.70$2.77$2.00$2.00$3.00$2.77
212Electrical conductor (no.6) insulated (620-7010)LF60$4.10$4.20$2.30$2.30$4.00$4.20
213Electrical conductor (no.4) bare (620-7011)LF432$3.80$3.85$4.00$4.00$4.00$3.85
214Electrical conductor (no.4) insulated (620-7012)LF864$3.80$3.85$4.00$4.00$4.00$3.85
215Electrical conductor (no.2) bare (620-7015)LF85$5.70$5.85$5.00$5.00$5.00$5.85
216Electrical conductor (no.2) insulated (620-7016)LF170$5.70$5.85$5.00$5.00$6.00$5.85
217Tray cable (3 conductor) (8 AWG) (621-7004)LF15,110$4.10$4.20$2.60$2.60$5.00$4.20
218ITS GND box(pcast) type 1 (243636)W/aprn (623-7002)EACH10$4,200.00$4,316.00$5,410.00$5,410.00$4,013.00$4,316.00
219ITS GND box(pcast) type 2 (366036)W/aprn (623-7008)EACH1$6,400.00$6,496.00$7,989.00$7,989.00$6,027.00$6,496.00
220Ground box type A (122311) (624-7001)EACH3$1,100.00$1,048.00$1,133.00$1,133.00$1,316.00$1,048.00
221Ground box type A (122311)W/apron (624-7002)EACH32$2,000.00$1,700.00$1,680.50$1,610.00$1,610.00$1,431.00$1,680.50
222Ground box type D (162922)W/apron (624-7008)EACH27$2,500.00$2,551.00$1,967.00$1,967.00$1,612.00$2,551.00
223Relocate electrical services (628-7001)EACH2$2,500.00$2,509.00$4,358.00$4,358.00$2,554.00$2,509.00
224Remove electrical services (628-7002)EACH1$560.00$569.00$495.00$495.00$1,021.00$569.00
225Elc SRV type A 120/240 060(NS)SS(E)SP(O) (628-7009)EACH3$13,200$13,556$9,557.00$9,557.00$6,823.00$13,556
226Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048)EACH2$13,500$13,660$14,054$14,054$6,823.00$13,660
227Elc SRV type D 120/240 060(NS)SS(E)SP(U) (628-7149)EACH2$12,000$11,550$8,201.00$8,201.00$6,823.00$11,550
228Elc SRV type D 120/240 060(NS)SS(N)SP(O) (628-7156)EACH1$11,000$10,993$8,432.00$8,432.00$6,823.00$10,993
229Aluminum signs (type A) (636-7001)SF162$74.00$73.50$35.00$75.21$36.50$73.50
230Aluminum signs (type G) (636-7002)SF450$32.00$31.00$35.00$32.40$36.50$31.00
231Aluminum signs (type O) (636-7003)SF342$30.00$29.35$35.00$38.73$36.50$29.35
232Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH62$900.00$715.00$645.00$635.00$825.00$655.00$645.00
233Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH33$975.00$850.00$785.00$870.00$925.00$897.00$785.00
234Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH8$1,300.00$1,500.00$299.00$1,250.00$1,200.00$1,288.00$1,299.00
235In bridge MNT clearance sign assembly(type N) (644-7061)EACH4$3,200.00$395.00$2,500.00$2,800.00$2,577.00$3,395.00
236Install LRSS (struct steel) (647-7001)LB1,642.05$7.10$7.05$12.00$14.43$12.37$7.05
237Remove lrsa (647-7003)EACH6$760.00$757.00$2,000.00$865.99$2,062.00$757.00
238Install overhead sign support(30 FT cant) (650-7032)EACH1$38,000$37,142$34,000$33,646$35,052$37,142
239Install overhead sign support(40 FT cant) (650-7045)EACH1$49,000$48,858$40,000$42,431$41,238$48,858
240Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001)EACH17$26.00$25.00$30.00$44.36$38.00$25.00
241Install delineator assembly (D-SY)SZ 1(yflx)SRF (658-7025)EACH56$62.00$99.00$150.00$100.00$52.50$99.00
242Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH12$21.00$15.00$180.00$25.50$40.00$15.00
243Work zone pavement marking removing (W)6"(broken) (662-7065)LF13,473$1.50$1.50$1.20$1.05$1.20$1.30$1.05
244Work zone pavement marking removing (W)6"(DOT) (662-7066)LF770$1.00$1.50$1.20$2.10$1.20$1.30$2.10
245Work zone pavement marking removing (W)6"(solid) (662-7068)LF65,933$1.50$1.40$1.15$0.83$1.15$1.20$0.83
246Work zone pavement marking removing (W)8"(solid) (662-7072)LF3,372$1.70$2.40$2.00$1.80$2.00$2.10$1.80
247Work zone pavement marking removing (W)12"(lane drop) (662-7074)LF1,887$3.55$3.00$3.00$3.00$3.10$3.00
248Work zone pavement marking removing (W)12"(solid) (662-7075)LF1,800$2.00$3.80$3.25$2.90$3.25$3.40$2.90
249Work zone pavement marking removing (W)24"(solid) (662-7077)LF576$5.00$7.10$6.00$10.25$6.00$6.50$10.25
250Work zone pavement marking removing (W)(arrow) (662-7082)EACH17$65.00$118.00$100.00$394.00$100.00$104.00$394.00
251Work zone pavement marking removing (W)(entr gore) (662-7084)EACH6$1,200.00$1,025.00$887.00$1,025.00$1,070.00$887.00
252Work zone pavement marking removing (W)(exit gore) (662-7085)EACH4$800.00$1,700.00$1,450.00$887.00$1,450.00$1,510.00$887.00
253Work zone pavement marking removing (W)(uturn arrow) (662-7091)EACH2$152.00$130.00$834.00$130.00$136.00$834.00
254Work zone pavement marking removing (W)(word) (662-7092)EACH10$40.00$142.00$120.00$531.00$120.00$125.00$531.00
255Work zone pavement marking removing (Y)6"(solid) (662-7100)LF56,808$1.50$1.50$1.20$0.83$1.20$1.45$0.83
256Reflectorized pavement marking type I (W)4"(DOT)(100MIL) (666-7003)LF281$1.50$2.40$2.00$1.55$2.00$2.10$1.55
257Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008)LF124$2.40$2.00$1.20$2.00$2.10$1.20
258Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF3,462$1.30$1.10$1.10$1.10$1.10$1.10
259Reflectorized pavement marking type I (W)12"(lane drop)(090MIL) (666-7026)LF136$4.70$4.00$4.05$4.00$4.20$4.05
260Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029)LF1,524$5.20$4.45$4.05$4.45$4.60$4.05
261Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH2$150.00$193.00$165.00$161.00$165.00$172.00$161.00
262Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH2$175.00$230.00$195.00$197.00$195.00$203.00$197.00
263Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114)LF1,043$1.70$1.30$1.10$1.05$1.10$1.10$1.05
264RE PV marking type I(black)6"(shadow)(090MIL) (666-7137)LF4,400$1.00$1.20$1.00$0.75$1.00$1.00$0.75
265Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF860$1.20$2.40$2.00$0.24$2.00$2.10$0.24
266Reflectorized pavement marking type II (W) 18" (solid) (666-7183)LF281$2.00$7.10$6.00$2.60$6.00$6.50$2.60
267Reflectorized pavement marking type II (W) (arrow) (666-7186)EACH2$160.00$118.00$100.00$99.00$100.00$104.00$99.00
268Reflectorized pavement marking type II (W) (word) (666-7194)EACH2$170.00$142.00$120.00$118.00$120.00$125.00$118.00
269Reflectorized pavement marking type II (Y) 8" (solid) (666-7214)LF1,043$1.50$2.40$2.00$2.60$2.00$2.10$2.60
270Reflectorized pavement marking type III (W)(6")(solid) (666-7236)LF19,392$4.00$1.00$0.80$0.71$0.80$1.00$0.71
271Reflectorized pavement marking type III (W)(6")(broken) (666-7237)LF4,400$5.00$1.00$0.85$0.77$0.85$0.90$0.77
272Reflectorized pavement marking type III (W)(6")(DOT) (666-7238)LF304$9.00$3.25$2.75$1.75$2.75$2.90$1.75
273Reflectorized pavement marking type III (W)(8")(solid) (666-7239)LF10,277$5.00$1.60$1.30$1.20$1.30$1.40$1.20
274Reflectorized pavement marking type III (W)(8")(DOT) (666-7241)LF495$10.00$1.80$1.50$1.50$1.50$1.60$1.50
275Reflectorized pavement marking type III (W)(12")(solid) (666-7242)LF718$19.00$8.50$7.20$4.55$7.20$7.50$4.55
276Reflectorized pavement marking type III (W)(24")(solid) (666-7244)LF1,631$30.00$11.00$9.00$9.10$9.00$9.50$9.10
277Reflectorized pavement marking type III (Y)(6")(solid) (666-7248)LF18,332$1.00$1.00$0.80$0.71$0.80$0.85$0.71
278Reflectorized pavement marking type III (Y)(24")(solid) (666-7253)LF732$11.00$9.00$10.00$9.00$9.50$10.00
279Reflectorized pavement marking type III (W)(arrow) (666-7254)EACH59$200.00$325.00$275.00$253.00$275.00$287.00$253.00
280Reflectorized pavement marking type III (W)(double arrow) (666-7255)EACH4$400.00$400.00$340.00$313.00$340.00$354.00$313.00
281Reflectorized pavement marking type III (W)(U-turn arrow) (666-7256)EACH2$375.00$320.00$313.00$320.00$334.00$313.00
282Reflectorized pavement marking type III (W)(word) (666-7257)EACH48$150.00$380.00$325.00$321.00$325.00$339.00$321.00
283Reflectorized pavement marking type III (W)(36" yld tri) (666-7260)EACH48$315.00$82.00$70.00$121.00$70.00$73.00$121.00
284Pavement sler 6" (666-7347)LF46,952$0.80$0.30$0.25$0.20$0.25$0.25$0.20
285Pavement sler 8" (666-7348)LF14,234$1.00$0.36$0.30$0.29$0.30$0.30$0.29
286Pavement sler 12" (666-7350)LF2,378$0.70$1.20$1.00$0.82$1.00$1.00$0.82
287Pavement sler 24" (666-7352)LF718$3.00$2.40$2.00$1.45$2.00$2.10$1.45
288Pavement sler (arrow) (666-7353)EACH63$67.00$47.00$40.00$37.00$40.00$42.00$37.00
289Pavement sler (word) (666-7354)EACH52$71.00$59.00$50.00$47.00$50.00$52.00$47.00
290Pavement sler (double arrow) (666-7356)EACH4$50.00$53.00$45.00$54.00$45.00$47.00$54.00
291Pavement sler (yld tri) (666-7365)EACH48$33.00$30.00$25.00$34.00$25.00$26.00$34.00
292Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407)LF5,050$0.85$0.70$0.73$0.70$0.75$0.73
293Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF17,978$0.80$0.65$0.63$0.65$0.70$0.63
294Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF17,956$0.80$0.65$0.63$0.65$0.70$0.63
295Prefabricated PM type C (W)(arrow) (668-7091)EACH4$305.00$260.00$301.00$260.00$271.00$301.00
296Prefabricated PM type C (W)(bike symbol) (668-7115)EACH8$325.00$275.00$293.00$275.00$287.00$293.00
297Reflectorized pavement marker type II-A-A (672-7004)EACH110$6.00$5.00$4.95$5.00$5.00$4.95
298Reflectorized pavement marker type II-C-R (672-7006)EACH2,098$5.00$6.00$5.00$4.95$5.00$5.00$4.95
299Eliminating existing PM & markers (4") (677-7001)LF54,053$0.50$0.75$0.60$0.56$0.60$0.75$0.56
300Eliminating existing PM & markers (8") (677-7004)LF1,460$0.90$0.75$0.74$0.75$0.90$0.74
301Eliminating existing PM & markers (18") (677-7007)LF67$3.00$1.80$1.50$1.95$1.50$1.80$1.95
302Eliminating existing PM & markers (arrow) (677-7009)EACH1$50.00$71.00$60.00$43.00$60.00$63.00$43.00
303Pavement surface preparation for marking (6") (678-7002)LF47,812$0.50$0.24$0.20$0.02$0.20$0.20$0.02
304Pavement surface preparation for marking (8") (678-7004)LF15,277$0.50$0.50$0.40$0.07$0.40$0.40$0.07
305Pavement surface preparation for marking (12") (678-7006)LF2,378$0.50$0.90$0.75$0.29$0.75$0.80$0.29
306Pavement surface preparation for marking (18") (678-7007)LF281$1.25$0.90$0.75$0.37$0.75$0.80$0.37
307Pavement surface preparation for marking (24") (678-7008)LF2,363$0.75$1.20$1.00$0.51$1.00$1.00$0.51
308Pavement surface preparation for marking (arrow) (678-7009)EACH65$18.00$36.00$30.00$12.25$30.00$31.00$12.25
309Pavement surface preparation for marking (double arrow) (678-7010)EACH4$20.00$48.00$40.00$17.25$40.00$42.00$17.25
310Pavement surface preparation for marking (word) (678-7016)EACH54$32.00$53.00$45.00$14.50$45.00$47.00$14.50
311Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH48$6.00$24.00$20.00$5.75$20.00$21.00$5.75
312Pavement surface preparation for marking (RPM) (678-7033)EACH35$0.30$1.20$1.00$0.71$1.00$1.00$0.71
313Install highway traffic signal (system) (680-7003)EACH2$67,000$68,250$60,000$37,343$66,000$68,250
314Temporary traffic signals (681-7001)EACH2$103,000$105,000$135,000$50,000$71,500$105,000
315Vehicle signal section (12")LED(green) (682-7001)EACH19$720.00$735.00$225.00$225.00$710.00$735.00
316Vehicle signal section (12")LED(green arrow) (682-7002)EACH21$720.00$735.00$225.00$225.00$710.00$735.00
317Vehicle signal section (12")LED(yel) (682-7003)EACH25$720.00$735.00$225.00$225.00$710.00$735.00
318Vehicle signal section (12")LED(yel arrow) (682-7004)EACH11$720.00$735.00$225.00$225.00$710.00$735.00
319Vehicle signal section (12")LED(red) (682-7005)EACH25$720.00$735.00$225.00$225.00$710.00$735.00
320Vehicle signal section (12")LED(red arrow) (682-7006)EACH9$720.00$735.00$225.00$225.00$710.00$735.00
321Pedestrian signal section (LED)(countdown) (682-7018)EACH18$1,400.00$1,339.00$475.00$475.00$1,850.00$1,339.00
322Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH33$220.00$221.00$140.00$140.00$323.00$221.00
323Backplate W/ref border(4 sec)(vent)aluminum (682-7043)EACH3$340.00$347.00$183.00$183.00$445.00$347.00
324Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007)LF13,431$3.10$3.15$2.60$2.60$5.30$3.15
325Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF13,585$4.10$4.20$3.00$3.00$5.30$4.20
326Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF1,958$4.10$4.20$4.00$4.00$6.00$4.20
327Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046)LF7,740$8.20$8.40$5.80$5.80$9.30$8.40
328Ins traffic signal PL AM(S)1 arm(32')lum (686-7035)EACH2$17,500$17,535$12,327$12,327$18,500$17,535
329Ins traffic signal PL AM(S)1 arm(40')lum (686-7043)EACH2$20,000$19,740$14,287$14,287$24,230$19,470
330Ins traffic signal PL AM(S)1 arm(44')lum (686-7047)EACH3$20,000$20,160$14,317$14,317$25,600$20,160
331Ins traffic signal PL AM(S)1 arm(50')lum (686-7055)EACH2$45,000$45,255$35,223$35,223$47,843$45,255
332Ins traffic signal PL AM(S)1 arm(55')lum (686-7059)EACH2$46,000$46,935$36,554$36,554$44,900$46,935
333Pedestrian pole assembly (687-7001)EACH16$6,200.00$6,300.00$3,210.00$3,210.00$4,160.00$6,300.00
334Pedestrian detect push button (standard) (688-7002)EACH22$1,100.00$1,103.00$847.00$847.00$1,030.00$1,103.00
335Pedestrian detector controller unit (688-7003)EACH2$7,200.00$7,350.00$3,831.00$3,831.00$6,500.00$7,350.00
336Spalling repair (hydraulic cement) (720-7001)CF4,400$25.00$175.00$165.00$181.81$50.00$167.00$233.00
337Full - width mowing (730-7019)CYC10$3,500.00$3,500.00$4,250.00$2,500.00$5,000.00$1,000.00$2,000.00
338Litter removal (734-7002)CYC29$2,000.00$1,800.00$2,750.00$500.00$1,425.00$997.00$1,200.00
339Debris removal (CNTR medians/mainlanes) (735-7014)CYC29$1,000.00$1,500.00$500.00$1,300.00$997.00$1,500.00
340Cleaning / sweeping (center median) (738-7004)CYC29$2,000.00$670.00$3,000.00$2,000.00$1,300.00$997.00$2,500.00
341VIVDS prosr sys (6006-7001)EACH2$14,000$13,650$12,768$12,768$10,920$13,650
342VIVDS temporary (6006-7006)EACH7$5,700.00$5,775.00$4,496.00$4,496.00$4,180.00$5,775.00
343Video imaging vehicle detection system (6006-7025)EACH12$8,200.00$8,400.00$8,183.00$8,183.00$6,290.00$8,400.00
344Bbu system (external battery cabinet) (6007-7001)EACH2$9,800.00$9,975.00$9,060.00$9,060.00$7,460.00$9,975.00
345ITS RVSD (data collect & wwa) sys (6010-7001)EACH1$18,000$18,110$44,597$44,597$11,603$18,110
346Remove ITS RSVD (DC only) (6010-7003)EACH1$2,000.00$2,010.00$1,187.00$1,187.00$405.00$2,010.00
347ITS pole (60 FT)(90 MPH) (6011-7003)EACH1$23,000$23,575$26,593$26,593$27,230$23,575
348ITS pole MNT cab (type 3)(conf 2) (6011-7004)EACH1$6,400.00$6,518.00$8,465.00$8,465.00$8,400.00$6,518.00
349ITS pole (30 FT)(rem) (6011-7037)EACH1$950.00$948.00$297.40$297.00$1,570.00$948.00
350ITS pole MNT cab (type 3)(conf 2)(rem) (6011-7038)EACH1$370.00$379.00$495.00$495.00$719.00$379.00
351ITS pole (60 FT)(rem) (6011-7040)EACH1$750.00$757.00$594.00$594.00$1,570.00$757.00
352ITS radio(SNGL)(5 GHZ)-I-U (6014-7001)EACH2$7,600.00$7,770.00$5,017.00$5,017.00$4,020.00$7,770.00
353Remove ITS radio (6014-7007)EACH1$2,100.00$2,095.00$297.00$297.00$405.00$2,095.00
354CCTV field equipment (digital) (6018-7005)EACH3$9,800.00$10,060$9,911.00$9,911.00$7,640.00$10,060
355CCTV mount (pole) (6018-7006)EACH2$475.00$475.00$122.00$122.00$719.00$475.00
356Remove CCTV field equipment (6018-7008)EACH1$2,100.00$2,097.00$297.00$297.00$405.00$2,097.00
357CCTV mount (pedestal) (6018-7010)EACH1$2,200.00$2,230.00$244.00$244.00$719.00$2,230.00
358Cofw emr vehicle (EV) preempt (inst only) (6031-7001)EACH9$670.00$683.00$198.00$198.00$584.00$683.00
359Cofw cellular router (inst only) (6049-7001)EACH2$155.00$158.00$198.00$198.00$989.00$158.00
360Installation of ethernet switch (6052-7001)EACH1$2,200.00$2,211.00$396.00$396.00$584.00$2,211.00
361Installation of serial server unit (6052-7003)EACH1$950.00$970.00$396.00$396.00$584.00$970.00
362Cat 5 ethernet cable (6055-7001)LF8,682$3.10$3.15$2.00$2.00$2.60$3.15
363Remove existing cables (power) (6106-7002)LF400$1.00$0.95$0.80$0.80$2.60$0.95
3646" blow-off valve vault adj - MNR (7097-7002)EACH2$80,000$9,500.00$20,500$10,000$9,275.00$9,220.00$16,000
3652" comb. arv asmby adj - MNR (7097-7003)EACH2$80,000$9,500.00$14,625$10,000$8,500.00$9,280.00$15,000
3662"-3" comb arv asm pipe mod for WTR (7097-7004)EACH2$400,000$4,800.00$14,900$5,000.00$5,000.00$17,470$15,000
36748" AWWA BFV & 3" arv W/ VLT adj(M) (7097-7005)EACH2$80,000$19,000$19,575$25,000$25,000$32,420$64,000
36848" AWWA BFV W/ vault adj - MJR (7097-7006)EACH1$150,000$170,000$275,000$200,000$187,800$331,630$250,000
36936" gate valve W/ vault adj - MNR (7097-7007)EACH1$90,000$15,000$17,645$10,000$10,000$15,100$10,000
37048" steel AWWA C200 WP, CSS BF_RSTRN JNT (7097-7008)LF1,125$900.00$1,600.00$1,100.00$1,712.00$1,648.50$1,210.00$1,425.00
37124" steel AWWA C200 WP, CSS BF_RSTRN JNT (7097-7009)LF40$60.00$3,400.00$1,815.00$4,000.00$4,000.00$691.00$3,400.00
37224" gate valve W/ vault (7097-7011)EACH1$40,000$52,000$105,000$60,000$60,000$79,980$39,000
373Connection to EX 48" water main (7097-7012)EACH4$35,000$30,000$115,000$20,000$20,000$22,690$110,000
37448" pressure plug (7097-7013)EACH4$10,000$4,800.00$12,145$5,000.00$5,000.00$7,320.00$15,000
375Water line grouting (7097-7014)CY45$200.00$900.00$1,000.00$943.00$943.00$357.00$1,100.00
3764' manhole (7097-7015)EACH4$15,000$25,000$42,650$20,000$25,000$24,900$31,000
377Cathodic protection (7097-7016)EACH1$50,000$25,000$100,000$15,000$17,250$3,730.00$200,000
378Post-CCTV inspection (7097-7017)LF1,165$5.00$2.00$10.00$2.00$2.00$6.00$5.00
379Temporary water services (7097-7018)EACH1$10,000$1,900.00$5,000.00$4,000.00$2,500.00$3,820.00$5,000.00
380Utility markers (7097-7020)LS1$5,000.00$950.00$7,500.00$1,000.00$750.00$7,450.00$15,000
381Exploratory excavation of EX utl (7097-7021)EACH9$2,500.00$480.00$2,000.00$500.00$2,500.00$1,000.00$2,700.00
382As-built survey (7097-7028)EACH1$5,000.00$20,000$12,500$20,000$7,500.00$9,570.00$2,500.00
TxDOT contract A00007222: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way