TxDOT contract A00128327 bid tabulation

Widen Road - Add Lanes, SH 107 (SH 495 to FM 1924). Let by Texas DOT on September 4, 2025, Hidalgo, Pharr District. 7 bids received; low bid $32,261,532 by Texas Cordia Construction, LLC, -8.2% against the engineer's estimate of $35,147,303.

Owner
Texas DOT
Letting
04 SEP 2025
Pay items
196
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Texas Cordia Construction, LLC$32,261,532Low-8.0%
2Reim Construction, Inc.$34,208,541+6.0%-3.0%
3Go Underground, Limited Liability Company$35,674,727+11%+2.0%
4Ioc Company LLC$36,425,786+13%+4.0%
5Foremost Paving, Inc.$36,968,221+15%+5.0%
6Posillico Civil, Inc.$37,158,755+15%+6.0%
7Pulice Construction, Inc.$44,983,965+39%+28%
TxDOT contract A00128327: bids by rank

Engineer's estimate: $35,147,303.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Texas Cordia Construction, LLC2. Reim Construction, Inc.3. Go Underground, Limited Liability Company4. Ioc Company LLC5. Foremost Paving, Inc.6. Posillico Civil, Inc.
1Preparing row (100-7002)STA112$4,700.00$1,800.00$7,700.00$1,200.00$5,000.00$9,000.00$11,000
2Removing concrete (medians) (104-7008)SY1,448$20.00$10.00$12.50$12.00$25.00$16.80$12.50
3Removing concrete (driveways) (104-7011)SY579$15.00$5.00$9.75$12.00$30.00$27.70$18.00
4Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY3,324$14.29$7.00$13.25$12.00$15.00$33.70$6.00
5Removing concrete (curb ramp) (104-7015)SY356$20.00$8.00$14.25$12.00$15.00$20.90$4.50
6Removing concrete (curb & gutter) (104-7017)LF5,180$10.00$5.00$3.50$12.00$12.00$8.40$3.00
7Removing concrete (gutter) (104-7019)LF396$6.00$5.00$7.00$12.00$15.00$9.10$3.00
8Remove (8") TRT/untrt base & asphalt pavement (105-7087)CY3,390$5.00$20.00$13.75$8.00$15.00$3.50$19.00
9Excavation (roadway) (110-7001)CY18,333$10.00$11.00$5.40$12.00$10.00$11.60$7.50
10Embankment (final)(DC)(type C) (132-7006)CY29,058$16.00$6.00$5.50$9.00$7.00$19.60$11.00
11Furn & place topsoil (vehicle) (160-7007)CY50$13.50$40.00$38.75$120.00$20.00$43.50$150.00
12Drill seed (permanent_urban_clay) (164-7044)ACRE10$3,050.00$740.00$2,590.00$690.20$2,325.00$2,500.00$691.00
13Drill seed (temporary_warm) (164-7045)ACRE10$1,900.00$640.00$1,560.00$599.70$1,400.00$2,150.00$600.00
14Vegetative watering (168-7001)TGL10$20.00$30.00$29.75$200.00$100.00$153.50$2,385.00
15Sprinkling (dust control) (204-7001)TGL2,243$7.00$12.00$29.75$12.00$1.00$1.00$1.50
16FL BS (roadway del)(type E GR 4)(final pos) (247-7277)CY19,374$36.50$40.00$33.25$39.63$30.00$27.10$40.00
17Rework BS metal (type B)(8")(DC)(org pos) (251-7036)CY31,873$7.20$5.00$5.25$13.00$10.00$8.70$15.00
18Lime (com or QK)(slurry) (260-7005)TON1,950$290.00$340.00$323.00$325.00$238.50$270.70$310.00
19Lime TRT (existing material)(12") (260-7009)SY147,013$3.00$2.00$1.85$3.00$3.00$4.50$3.50
20Cement (275-7001)TON1,730$215.00$200.00$211.00$200.00$190.00$210.50$250.00
21Cement TRT (existing material & new base)(12") (275-7009)SY285,581$3.00$2.00$2.25$2.00$3.00$1.59$1.65
22Cement TRT (new base)(8") (275-7011)SY1,566$11.00$3.00$3.00$12.00$7.00$9.10$5.50
23Salvage, haul & stockpile reclaimed asphalt PV (0 to 2") (305-7002)SY1,566$4.00$6.00$1.40$2.00$4.00$28.50$3.00
24SLV, haul & stockpile reclaimed asphalt PV (8 to 10") (305-7006)SY117,240$3.75$4.00$6.25$3.00$4.00$3.90$5.00
25Prime coat (MC-30) (310-7004)GAL28,758$5.00$5.00$4.45$10.00$5.00$4.60$6.00
26Asphalt (tier II) (316-7266)GAL470$4.00$6.00$11.50$8.00$15.00$35.60$5.50
27Aggregate (type-D GR-4P) (sac B) (316-7280)CY13$141.00$290.00$798.00$165.00$750.00$74.00$200.00
28D-GR HMA type D sac-A PG64-22 (341-7044)TON134$110.00$120.00$113.00$120.00$230.00$186.30$200.00
29SP mixes SP-D sac-B PG76-22 (344-7065)TON24,321$140.00$125.00$105.00$129.00$117.90$109.70$185.00
30Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009)TON12,160$140.00$130.00$129.00$150.33$150.00$120.50$157.00
31Plane & text asphalt concrete pavement(1.5") (354-7018)SY714$0.92$5.00$5.00$8.00$15.00$25.50$2.50
32Planing asphalt concrete pavement (1.5") (354-7074)SY1,267$1.00$5.00$4.00$8.00$10.00$12.40$8.50
33Struct excavation (special) (400-7005)CY5,566$78.00$110.00$76.00$79.50$85.00$64.00$125.00
34Cut & restoring pavement (400-7006)SY1,421.90$100.00$80.00$61.50$100.00$85.00$300.00$135.00
35Cem stabil BKFL (400-7010)CY17,647$80.00$60.00$86.00$48.50$65.00$110.00$57.00
36Trench excavation protection (402-7001)LF17,755$3.00$4.00$2.00$5.00$1.00$1.00$20.00
37Drilled shaft (traffic signal pole) (24 in) (416-7042)LF84$170.00$120.00$128.00$115.00$121.28$115.00$120.00
38Drilled shaft (traffic signal pole) (36 in) (416-7044)LF30$305.00$310.00$323.00$290.00$395.96$290.00$305.00
39Drilled shaft (traffic signal pole) (48 in) (416-7046)LF18$600.00$900.00$948.00$850.00$896.39$850.00$896.00
40Riprap (concrete)(4 in) (432-7001)CY5$475.00$855.00$576.00$480.00$750.00$650.00$656.00
41Concrete box culvert (5 FT X 5 FT) (462-7009)LF8,435$670.00$749.00$725.00$856.42$840.00$772.00$580.00
42Concrete box culvert (8 FT X 6 FT) (462-7023)LF1,968$1,100.00$1,349.00$1,300.00$1,337.55$1,493.00$1,360.00$900.00
43RC pipe (CL III)(18 in) (464-7003)LF713$90.00$80.00$77.50$125.54$120.00$120.00$145.00
44RC pipe (CL III)(24 in) (464-7005)LF3,432$94.19$80.00$88.50$133.58$138.00$200.00$145.00
45RC pipe (CL III)(30 in) (464-7007)LF555$138.09$120.00$121.00$159.91$185.00$115.00$160.00
46RC pipe (CL III)(36 in) (464-7009)LF832$156.00$180.00$178.00$203.97$231.00$230.00$210.00
47RC pipe (CL III)(42 in) (464-7010)LF1,042$205.00$230.00$235.00$244.65$290.00$280.00$285.00
48RC pipe (CL III)(48 in) (464-7011)LF178$280.00$280.00$280.00$281.14$424.00$330.00$350.00
49RC pipe (CL III)(60 in) (464-7013)LF558$250.00$420.00$412.00$552.76$535.00$590.00$450.00
50RC pipe (CL IV)(60 in) (464-7028)LF42$400.00$560.00$495.00$572.86$445.00$600.00$800.00
51Inlet (complete)(pco)(5FT)(none) (465-7021)EACH13$6,000.00$9,550.00$7,960.00$8,750.00$9,500.00$14,000$15,000
52Inlet (complete)(pco)(5FT)(left) (465-7022)EACH11$12,838$9,110.00$7,800.00$8,400.00$9,500.00$14,500$10,000
53Inlet (complete)(pco)(5FT)(right) (465-7023)EACH15$10,744$10,780$8,000.00$8,600.00$9,500.00$14,500$10,000
54Inlet (complete)(pco)(5FT)(both) (465-7024)EACH14$11,200$9,360.00$9,560.00$11,368$10,500$15,000$12,500
55Inlet (complete)(pcu)(5FT)(none) (465-7037)EACH1$9,726.67$7,380.00$4,765.00$5,700.00$9,000.00$15,000$12,500
56Inlet (complete)(pcu)(5FT)(left) (465-7038)EACH7$8,000.00$11,770$10,050$10,550$11,500$20,000$15,000
57Inlet (complete)(pcu)(5FT)(right) (465-7039)EACH1$8,000.00$11,150$9,525.00$10,050$11,500$2,000.00$25,000
58Inlet (complete)(pcu)(5FT)(both) (465-7040)EACH5$9,000.00$12,420$9,590.00$9,775.00$12,500$18,300$15,000
59Inlet (complete)(PSL)(RC)(4FTX4FT) (465-7071)EACH5$6,000.00$8,020.00$5,305.00$9,775.00$8,750.00$18,000$10,000
60Inlet (complete)(PSL)(RC)(5FTX5FT) (465-7074)EACH6$7,000.00$13,880$10,465$6,215.00$14,000$25,000$25,000
61Inlet (complete)(PSL)(RC)(8FTX8FT) (465-7077)EACH1$18,500$15,130$12,125$12,200$35,000$46,000$35,000
62Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126)EACH1$5,000.00$5,630.00$4,190.00$5,150.00$8,000.00$11,700$10,000
63Inlet(complete)(PSL)(SFG)(3FTX3FT-3FTX3FT) (465-7146)EACH1$7,828.33$5,230.00$3,850.00$4,825.00$8,000.00$11,900$10,000
64Wingwall (SW - 0) (HW=6 FT) (466-7205)EACH4$20,000$17,860$19,000$22,000$21,200$23,000$35,000
65Jack bor or tun pipe(36 in)(RC)(CL III) (476-7013)LF8$1,500.00$1,880.00$1,050.00$427.50$3,250.00$850.00$6,500.00
66Jack bor or tun pipe(60 in)(RC)(CL III) (476-7017)LF42$2,000.00$1,920.00$1,690.00$572.00$1,500.00$1,160.00$3,500.00
67Removing structure (inlet) (496-7002)EACH19$800.00$700.00$411.00$1,600.00$750.00$500.00$1,000.00
68Removing structure (manhole) (496-7003)EACH1$1,200.00$2,630.00$572.00$1,600.00$1,500.00$500.00$1,000.00
69Removing structure (set) (496-7004)EACH81$100.00$340.00$196.00$1,600.00$400.00$500.00$500.00
70Removing structure (wingwall) (496-7005)EACH2$2,000.00$5,810.00$1,890.00$6,400.00$3,000.00$10,000$5,000.00
71Removing structure (pipe) (496-7007)LF6,538$11.00$10.00$11.25$5.00$15.00$25.00$20.00
72Mobilization (500-7001)LS1$3,279,505$2,500,000$3,250,000$365,000$3,665,000$2,950,000$3,378,069
73Barricades, signs and traffic handling (502-7001)MO48$6,322.18$750.00$2,620.00$4,200.00$3,850.00$7,800.00$10,000
74Portable changeable message sign (503-7002)EACH2$6,000.00$610.00$2,850.00$7,300.00$15,000$8,259.80$20,000
75TMA (stationary) (505-7001)DAY762$100.00$30.00$28.50$250.00$1.00$22.90$225.00
76TMA (mobile operation) (505-7002)HR3,048$30.00$7.00$58.00$62.22$10.00$0.01$65.00
77Construction exits (install) (type 1) (506-7020)SY1,716$30.00$20.00$30.00$34.00$25.00$21.90$55.00
78Construction exits (remove) (506-7024)SY1,716$8.00$7.00$8.40$2.00$10.00$13.30$12.00
79Temporary sediment control fence (install) (506-7039)LF50$3.15$10.00$4.90$8.00$13.50$15.00$12.00
80Temporary sediment control fence (remove) (506-7041)LF50$1.00$2.00$2.00$8.00$10.00$10.00$2.00
81Biodegradable erosion control logs (install) (12") (506-7044)LF5,245$4.00$8.00$3.50$18.00$5.90$6.30$8.00
82Biodegradable erosion control logs (remove) (506-7046)LF5,245$1.00$1.00$1.00$2.00$1.30$2.00$1.00
83Constructing detours (508-7001)SY16,095$50.00$30.00$34.00$65.00$40.00$50.10$24.00
84Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF11,100$20.00$30.00$58.50$74.00$15.00$45.70$33.00
85Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF1,280$17.00$20.00$51.00$66.00$32.83$26.60$31.00
86Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF15,920$4.00$7.00$4.65$8.00$5.00$7.50$5.00
87Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF1,760$6.00$6.00$4.65$6.00$20.00$4.10$6.00
88Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF11,100$7.00$7.00$4.00$29.73$5.00$8.20$3.00
89Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF1,280$10.00$10.00$4.00$30.00$5.00$5.90$3.00
90PCTB (fur&inst)(F-shape or SNGL SLP)type 1 (512-7089)LF11,760$33.00$30.00$37.50$64.00$20.00$49.30$27.00
91PCTB (move)(F-shape or SNGL SLP)type 1 (512-7090)LF17,980$4.00$5.00$4.65$5.00$10.00$8.30$7.50
92PCTB (remove)(F-shape or SNGL SLP)type 1 (512-7092)LF11,760$8.00$7.00$4.30$4.00$5.00$8.80$6.80
93Concrete C&G (valley gutter) (529-7019)LF1,157$130.00$50.00$41.25$40.00$44.93$45.30$50.00
94Concrete curb & gutter (type B) (mountable) (529-7024)LF10,600$16.00$20.00$15.25$18.00$15.15$15.50$18.00
95Concrete curb & gutter (type A) (barrier) (529-7025)LF9,983$14.37$20.00$14.50$18.00$15.15$15.50$18.00
96Driveways (concrete) (530-7006)SY2,690$90.00$100.00$64.00$80.00$100.00$60.00$65.00
97Driveways (ACP) (530-7010)SY6,880$45.00$30.00$40.00$65.00$100.00$31.00$65.00
98Concrete sidewalks (4") (531-7001)SY17,816$65.00$50.00$42.25$80.00$46.70$49.00$55.00
99Curb ramps (type 1) (531-7005)EACH18$2,000.00$1,890.00$1,610.00$3,200.00$2,675.72$2,650.00$3,000.00
100Curb ramps (type 7) (531-7010)EACH27$1,600.00$1,890.00$1,340.00$4,200.00$2,675.72$2,650.00$3,000.00
101Concrete median (536-7002)SY13,442$100.00$70.00$95.00$70.00$45.94$45.50$46.00
102Cable barrier (remove) (543-7037)LF771$5.00$7.00$10.00$3.00$10.00$9.30$5.00
103Crash cushion attenuator (move & reset) (545-7002)EACH86$600.00$2,100.00$1,710.00$900.00$1,250.00$3,500.00$3,100.00
104Crash cushion attenuator (remove) (545-7004)EACH80$592.86$660.00$554.00$900.00$1,250.00$500.00$1,500.00
105Crash cushion attenuator (install)(L)(N)(TL3) (545-7006)EACH80$27,887$20,650$27,500$32,950$30,550$25,850$25,000
106Mailbox install-M (TWG-post) type 1 (560-7001)EACH7$550.00$1,160.00$663.00$650.00$595.00$595.00$680.00
107Mailbox install-S (TWG-post) type 2 (560-7002)EACH48$328.87$550.00$295.00$325.00$265.00$265.00$250.00
108Conduit (PVC) (schedule 40) (2") (618-7030)LF80$12.00$10.00$11.25$10.00$10.55$10.00$12.00
109Conduit (PVC) (schedule 40) (4") (618-7040)LF1,292$30.00$20.00$22.25$20.00$21.09$20.00$22.00
110Conduit (PVC) (schedule 80) (4") (bore) (618-7065)LF1,046$40.00$50.00$50.00$45.00$47.46$45.00$47.00
111Electrical conductor (no.8) bare (620-7007)LF2,200$1.65$1.00$1.55$1.40$1.48$1.40$2.00
112Electrical conductor (no.6) bare (620-7009)LF75$2.00$2.00$1.85$1.65$1.74$1.70$2.00
113Electrical conductor (no.6) insulated (620-7010)LF174$1.80$2.00$1.85$1.70$1.79$1.70$2.00
114Tray cable (4 conductor) (12 AWG) (621-7006)LF2,588$3.00$2.00$2.35$2.10$2.21$2.10$2.00
115Ground box type A (122311)W/apron (624-7002)EACH19$1,100.00$1,030.00$1,090.00$975.00$1,028.21$975.00$1,029.00
116Ground box type D (162922)W/apron (624-7008)EACH3$1,200.00$1,450.00$1,530.00$1,370.00$1,444.77$1,370.00$1,445.00
117Zinc-coat steel wire strand (3/16") (625-7001)LF960$5.76$2.00$1.85$1.70$1.79$1.70$2.00
118Zinc-coat steel wire strand (5/16") (625-7003)LF1,440$4.78$2.00$2.50$2.20$2.32$2.20$2.00
119Elc SRV type D 120/240 060(NS)GS(N)TP(O) (628-7138)EACH2$5,421.50$3,690.00$3,900.00$5,200.00$3,691.02$3,500.00$3,692.00
120Elc SRV type T 120/240 000(NS)GS(L)TS(O) (628-7322)EACH1$2,000.00$2,270.00$2,400.00$2,150.00$2,267.34$2,150.00$2,268.00
121Aluminum signs (type A) (636-7001)SF119.25$31.00$20.00$44.50$90.00$38.49$36.50$26.00
122Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH24$760.08$820.00$953.00$850.00$855.00$855.00$813.00
123Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH15$900.00$900.00$1,210.00$950.00$1,085.00$1,085.00$850.00
124Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH14$935.24$890.00$1,170.00$1,075.00$1,050.00$1,050.00$934.00
125Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032)EACH2$1,200.00$1,300.00$2,060.00$1,100.00$1,850.00$1,850.00$1,500.00
126Remove SM RD SN sup&AM (644-7073)EACH75$103.11$260.00$83.50$150.00$75.00$75.00$105.00
127Remove delin & object marker assms (658-7078)EACH19$15.00$140.00$22.25$25.00$20.00$20.00$33.00
128Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF6,132$0.50$1.00$0.60$0.58$0.58$0.60$1.00
129Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF5,180$0.35$1.00$0.60$0.58$0.58$0.60$1.00
130Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF4,794$0.60$1.00$0.80$0.68$0.68$0.70$1.00
131Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF336$5.50$8.00$8.90$8.00$8.00$8.00$12.00
132Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH18$100.00$130.00$139.00$125.00$125.00$125.00$220.00
133Work zone pavement marking non-removing(W)(word) (662-7030)EACH18$90.00$230.00$251.00$225.00$225.00$225.00$220.00
134Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF318$0.40$1.00$0.60$0.58$0.58$0.60$1.00
135Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF24,386$0.41$0.50$0.55$0.48$0.48$0.50$1.00
136Work zone pavement marking removing (W)6"(broken) (662-7065)LF37,562$1.40$1.00$0.60$0.53$0.53$0.60$1.00
137Work zone pavement marking removing (W)6"(DOT) (662-7066)LF638$1.48$1.00$1.35$1.20$1.20$1.20$2.00
138Work zone pavement marking removing (W)6"(solid) (662-7068)LF105,705$0.50$0.40$0.50$0.42$0.42$0.50$1.00
139Work zone pavement marking removing (W)8"(solid) (662-7072)LF34,430$0.50$0.50$0.55$0.45$0.45$0.50$2.00
140Work zone pavement marking removing (W)12"(solid) (662-7075)LF11,591$2.00$1.00$0.85$0.75$0.75$0.80$4.00
141Work zone pavement marking removing (W)24"(solid) (662-7077)LF2,990$9.25$6.00$6.70$6.00$6.00$6.00$8.00
142Work zone pavement marking removing (W)(arrow) (662-7082)EACH167$150.00$130.00$139.00$125.00$125.00$125.00$280.00
143Work zone pavement marking removing (W)(word) (662-7092)EACH162$160.00$230.00$251.00$225.00$225.00$225.00$290.00
144Work zone pavement marking removing (Y)6"(broken) (662-7098)LF6,378$0.60$1.00$0.85$0.75$0.75$0.80$1.00
145Work zone pavement marking removing (Y)6"(solid) (662-7100)LF204,567$0.50$0.50$0.45$0.42$0.42$0.50$1.00
146Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH1,820$1.00$5.00$1.50$0.53$2.03$1.30$1.00
147Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH1,110$1.50$5.00$1.10$1.66$2.00$1.30$1.00
148Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF684$10.00$1.00$1.25$1.10$1.10$1.10$3.00
149Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF16,209$1.15$1.00$1.00$0.88$0.88$0.90$2.00
150Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF603$3.40$2.00$2.25$2.00$2.00$2.00$6.00
151Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF4,425$8.75$6.00$6.70$6.00$6.00$6.00$9.00
152Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF970$4.00$2.00$2.25$2.00$2.00$2.00$6.00
153Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF11,950$0.65$1.00$1.25$1.10$1.10$1.10$1.00
154Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF2,430$0.60$2.00$2.25$2.00$2.00$2.00$1.00
155Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF380$0.75$5.00$5.55$5.00$5.00$5.00$1.00
156Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF29,154$0.60$1.00$1.00$0.88$0.88$0.90$1.00
157Prefabricated PM type C (W)(arrow) (668-7091)EACH67$230.00$150.00$167.00$150.00$150.00$150.00$240.00
158Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH6$340.00$350.00$390.00$350.00$350.00$350.00$441.00
159Prefabricated PM type C (W)(word) (668-7103)EACH73$260.00$250.00$279.00$250.00$250.00$250.00$240.00
160Reflectorized pavement marker type I-C (672-7002)EACH336$6.00$8.00$8.35$7.50$7.50$7.50$6.00
161Reflectorized pavement marker type II-A-A (672-7004)EACH432$4.00$8.00$8.35$7.50$7.50$7.50$6.00
162Reflectorized pavement marker type II-C-R (672-7006)EACH1,254$4.50$8.00$8.35$7.50$7.50$7.50$6.00
163Eliminating existing PM & markers (4") (677-7001)LF40,904$0.20$0.50$0.40$0.35$0.35$0.40$1.00
164Eliminating existing PM & markers (8") (677-7004)LF2,673$0.85$1.00$0.65$0.60$0.60$0.60$1.00
165Eliminating existing PM & markers (12") (677-7006)LF530$1.50$1.00$1.00$0.85$0.85$0.90$4.00
166Eliminating existing PM & markers (arrow) (677-7009)EACH48$62.00$70.00$78.00$70.00$70.00$70.00$80.00
167Eliminating existing PM & markers (word) (677-7015)EACH36$65.00$70.00$78.00$70.00$70.00$70.00$80.00
168Install highway traffic signal (isolated) (680-7002)EACH3$10,500$8,970.00$9,480.00$8,500.00$8,963.90$8,500.00$8,967.00
169Removing traffic signals (680-7004)EACH3$3,000.00$2,900.00$3,070.00$2,750.00$2,900.09$2,750.00$2,901.00
170Temporary traffic signals (681-7001)EACH3$20,000$6,860.00$7,250.00$7,500.00$6,854.75$6,500.00$6,857.00
171Vehicle signal section (12")LED(green) (682-7001)EACH28$300.00$360.00$385.00$345.00$363.83$345.00$364.00
172Vehicle signal section (12")LED(green arrow) (682-7002)EACH12$300.00$360.00$385.00$355.00$363.83$345.00$364.00
173Vehicle signal section (12")LED(yel) (682-7003)EACH32$300.00$360.00$385.00$345.00$363.83$345.00$364.00
174Vehicle signal section (12")LED(yel arrow) (682-7004)EACH24$300.00$360.00$385.00$355.00$363.83$345.00$364.00
175Vehicle signal section (12")LED(red) (682-7005)EACH28$300.00$360.00$385.00$345.00$363.83$345.00$364.00
176Vehicle signal section (12")LED(red arrow) (682-7006)EACH12$300.00$360.00$385.00$355.00$363.83$345.00$364.00
177Pedestrian signal section (LED)(countdown) (682-7018)EACH24$600.00$580.00$613.00$355.00$580.02$550.00$580.00
178Backplate W/reflectorized border(4 sec) (682-7037)EACH12$170.00$190.00$195.00$175.00$184.55$175.00$185.00
179Backplate W/reflectorized border(3 sec)aluminum (682-7039)EACH28$140.00$130.00$139.00$125.00$131.82$125.00$132.00
180Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007)LF5,031$2.00$2.00$1.60$1.45$1.53$1.50$2.00
181Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010)LF9,271$2.75$2.00$2.00$1.80$1.90$1.80$2.00
182Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012)LF3,349$3.00$3.00$2.70$2.40$2.53$2.40$3.00
183Install RDSD flash beacon assembly (685-7001)EACH2$6,000.00$5,840.00$6,180.00$5,540.00$5,842.36$5,540.00$5,844.00
184Remove RDSD flash beacon assembly (685-7003)EACH2$1,000.00$480.00$502.00$450.00$474.56$450.00$475.00
185Ins traffic signal PL AM (S)STR(type D)lum (686-7020)EACH1$10,600$15,350$16,200$14,550$15,344$14,550$15,350
186Ins traffic signal PL AM(S)1 arm(44') (686-7045)EACH1$14,000$16,720$17,700$15,850$16,715$15,850$16,721
187Ins traffic signal PL AM(S)1 arm(55')lum (686-7059)EACH1$37,000$33,180$35,100$31,450$33,166$31,450$33,178
188Pedestrian pole assembly (687-7001)EACH14$1,500.00$1,420.00$1,510.00$1,350.00$1,423.68$1,350.00$1,424.00
189Pedestrian detect push button (APS) (688-7001)EACH24$1,000.00$900.00$948.00$850.00$896.39$850.00$897.00
190Pedestrian detector controller unit (688-7003)EACH3$3,600.00$3,640.00$3,850.00$3,450.00$3,638.29$3,450.00$3,640.00
191Removal of conduit (690-7001)LF4,140$12.50$3.00$3.35$3.00$3.16$3.00$3.00
192Removal of ground boxes (690-7006)EACH50$160.00$300.00$318.00$285.00$300.55$285.00$301.00
193Bonding course (3007-7001)GAL10,064$4.50$6.00$4.45$4.00$3.50$2.80$4.00
194RVDS (presence detection only) (6008-7001)EACH8$9,000.00$8,020.00$8,470.00$8,440.00$8,014.78$7,600.00$8,018.00
195RVDS (advance detection only) (6008-7002)EACH8$7,000.00$10,500$11,100$10,685$10,493$9,950.00$10,497
196RVDS (presence and advance detection) (6008-7003)EACH4$7,500.00$11,210$11,900$10,685$11,210$10,630$11,214
TxDOT contract A00128327: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of September 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy