TxDOT contract A00058522 bid tabulation
Widen Road - Add Lanes, US 271 (SMITH C/L, SW to FM 16). Let by Texas DOT on July 1, 2026, Smith, Tyler District. 7 bids received; low bid $89,285,640 by Drake Companies LLC, -10% against the engineer's estimate of $99,453,910.
- Owner
- Texas DOT
- Letting
- 01 JUL 2026
- Pay items
- 282
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Drake Companies LLC | $89,285,640 | Low | -10% |
| 2 | East Texas Bridge, Inc. | $92,528,349 | +4.0% | -7.0% |
| 3 | Longview Bridge and Road, LTD. | $92,886,055 | +4.0% | -7.0% |
| 4 | Highway 19 Construction LLC | $93,554,962 | +5.0% | -6.0% |
| 5 | Indus Road & Bridge, Inc. | $99,220,428 | +11% | 0.0% |
| 6 | James Construction Group, LLC | $105,308,971 | +18% | +6.0% |
| 7 | A. L. Helmcamp, Inc. | $109,382,477 | +23% | +10% |
Engineer's estimate: $99,453,910.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Drake Companies LLC | 2. East Texas Bridge, Inc. | 3. Longview Bridge and Road, LTD. | 4. Highway 19 Construction LLC | 5. Indus Road & Bridge, Inc. | 6. James Construction Group, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 394 | $6,000.00 | $3,500.00 | $10,000 | $10,000 | $2,600.00 | $15,080 | $26,650 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 76,579 | $10.00 | $6.85 | $5.25 | $6.00 | $15.00 | $9.00 | $6.03 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 874 | $12.50 | $15.00 | $15.00 | $15.00 | $8.00 | $9.65 | |
| 4 | Removing concrete (driveways) (104-7011) | SY | 3,937 | $18.30 | $14.50 | $15.00 | $7.50 | $25.00 | $14.00 | $8.61 |
| 5 | Removing concrete (curb & gutter) (104-7017) | LF | 293 | $12.35 | $10.00 | $2.25 | $10.00 | $5.00 | $5.90 | |
| 6 | Removing concrete (flume) (104-7041) | SY | 17 | $40.00 | $20.00 | $40.00 | $25.00 | $8.00 | $37.55 | |
| 7 | Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004) | SY | 80,345 | $5.00 | $4.50 | $6.00 | $4.50 | $3.00 | $6.00 | $3.28 |
| 8 | Remove (12"-16") TRT/untrt base & asphalt pavement (105-7012) | SY | 146,188 | $7.00 | $6.70 | $10.75 | $7.50 | $6.19 | $8.00 | $7.98 |
| 9 | Excavation (roadway) (110-7001) | CY | 771,996 | $8.00 | $5.80 | $6.00 | $5.00 | $5.46 | $7.00 | $8.56 |
| 10 | Embankment (final)(DC)(type C) (132-7006) | CY | 243,318 | $11.00 | $8.00 | $7.50 | $6.25 | $10.00 | $4.00 | $6.60 |
| 11 | Furn & place topsoil (4") (160-7002) | SY | 750,353 | $1.50 | $1.40 | $1.20 | $1.50 | $1.00 | $1.00 | $0.69 |
| 12 | Block sodding (162-7002) | SY | 4,066 | $5.00 | $5.00 | $6.20 | $5.00 | $5.70 | $4.50 | |
| 13 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 375,179 | $0.15 | $0.13 | $0.13 | $0.13 | $0.12 | $0.11 | $0.12 |
| 14 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073) | SY | 750,353 | $0.95 | $0.55 | $0.54 | $0.60 | $0.50 | $0.50 | $0.50 |
| 15 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 375,179 | $0.41 | $0.53 | $0.52 | $0.60 | $0.48 | $0.50 | $0.48 |
| 16 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 375,179 | $0.41 | $0.54 | $0.53 | $0.60 | $0.49 | $0.50 | $0.49 |
| 17 | Vegetative watering (168-7001) | TGL | 20,680 | $7.00 | $8.75 | $8.00 | $12.50 | $5.00 | $8.50 | $32.00 |
| 18 | FL BS (compacted in place)(type A GR 1-2) (6") (247-7044) | SY | 888 | $22.00 | $22.00 | $17.50 | $19.00 | $54.00 | $22.22 | |
| 19 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 368,022 | $24.00 | $22.00 | $23.00 | $21.50 | $17.50 | $25.00 | $21.54 |
| 20 | Lime (quicklime (dry)) (260-7002) | TON | 3,527 | $365.00 | $335.00 | $380.00 | $463.00 | $330.00 | $364.00 | $364.88 |
| 21 | Lime TRT (existing material)(8") (260-7007) | SY | 195,931 | $5.15 | $3.75 | $4.00 | $2.75 | $2.77 | $5.30 | $8.22 |
| 22 | Cement (275-7001) | TON | 3,527 | $210.00 | $263.00 | $265.00 | $322.00 | $210.00 | $310.00 | $268.67 |
| 23 | Cement TRT (existing material)(8") (275-7003) | SY | 195,931 | $3.00 | $3.75 | $2.75 | $2.00 | $2.77 | $4.20 | $2.16 |
| 24 | Prime coat & blotter (MC-30) (310-7010) | GAL | 109,674 | $5.00 | $5.20 | $5.75 | $6.50 | $5.61 | $6.00 | $5.00 |
| 25 | Emuls asphalt (erosion control)(CSS-1) (314-7010) | GAL | 8,710 | $8.00 | $3.85 | $5.00 | $4.60 | $5.00 | $3.10 | $4.50 |
| 26 | Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) (316-7068) | GAL | 125,664 | $4.90 | $3.85 | $5.00 | $4.00 | $4.50 | $5.00 | $4.50 |
| 27 | Aggregate (type-PD or PL, GR-4) (316-7258) | CY | 2,586 | $220.00 | $180.00 | $190.00 | $235.00 | $150.00 | $225.00 | $180.00 |
| 28 | SP mixes SP-B PG64-22 (344-7001) | TON | 95,363 | $135.00 | $137.91 | $145.00 | $127.00 | $148.00 | $128.00 | $132.00 |
| 29 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 45,266 | $142.00 | $145.50 | $152.00 | $143.00 | $157.00 | $142.00 | $155.00 |
| 30 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 1,688 | $2.00 | $8.50 | $12.00 | $26.00 | $6.00 | $26.00 | $5.16 |
| 31 | Concrete pavement (CRCP) (10") (360-7004) | SY | 15,480 | $110.00 | $110.00 | $103.00 | $110.00 | $93.00 | $112.48 | |
| 32 | Concrete pavement (CRCP)(fast TRK) (13") (360-7077) | SY | 3,652 | $157.00 | $145.00 | $155.00 | $130.00 | $121.00 | $166.41 | |
| 33 | Cut & restoring pavement (400-7006) | SY | 2,254 | $250.00 | $90.00 | $100.00 | $70.00 | $250.00 | $236.00 | $105.52 |
| 34 | Cem stabil BKFL (400-7010) | CY | 2,467 | $150.00 | $195.00 | $160.00 | $210.00 | $250.00 | $300.00 | $139.56 |
| 35 | Flowable backfill (401-7001) | CY | 749 | $552.00 | $190.00 | $200.00 | $200.00 | $250.00 | $200.00 | $285.01 |
| 36 | Trench excavation protection (402-7001) | LF | 3,891 | $9.00 | $12.20 | $10.00 | $7.00 | $5.00 | $3.00 | $1.10 |
| 37 | Temporary special shoring (403-7001) | SF | 7,314 | $59.00 | $45.00 | $50.00 | $25.00 | $55.00 | $58.00 | $25.74 |
| 38 | Temporary special shoring (cofferdam) (403-7002) | SF | 2,400 | $29.93 | $29.00 | $30.00 | $50.00 | $55.00 | $10.00 | $114.32 |
| 39 | Foundaton loadtest(D4945)(drilld shaft) (405-7003) | EACH | 3 | $30,250 | $30,000 | $31,000 | $30,000 | $43,000 | $27,500 | |
| 40 | Drilled shaft (18 in) (416-7002) | LF | 310 | $178.00 | $85.00 | $70.00 | $143.00 | $168.00 | $230.00 | $65.35 |
| 41 | Drilled shaft (36 in) (416-7006) | LF | 1,280 | $240.00 | $265.00 | $250.00 | $262.00 | $330.00 | $355.00 | $235.74 |
| 42 | Drilled shaft (42 in) (416-7007) | LF | 1,265 | $361.40 | $340.00 | $395.00 | $450.00 | $370.00 | $322.54 | |
| 43 | Drilled shaft (60 in) (416-7010) | LF | 4,599 | $745.00 | $705.00 | $700.00 | $650.00 | $670.00 | $654.36 | |
| 44 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 126 | $295.00 | $290.00 | $295.00 | $268.00 | $290.00 | $268.00 | |
| 45 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 28 | $355.00 | $345.00 | $352.00 | $320.00 | $337.00 | $320.00 | |
| 46 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 44 | $895.00 | $875.00 | $900.00 | $815.00 | $860.00 | $815.00 | |
| 47 | Class C concrete (abutment) (420-7012) | CY | 305.80 | $1,100.00 | $1,015.00 | $1,100.00 | $980.00 | $985.00 | $885.00 | $1,115.38 |
| 48 | Class C concrete (cap) (420-7022) | CY | 453.40 | $1,085.00 | $1,100.00 | $1,005.00 | $1,200.00 | $985.00 | $1,261.13 | |
| 49 | Class C concrete (column) (420-7038) | CY | 1,071.50 | $900.00 | $1,075.00 | $1,070.00 | $1,100.00 | $900.00 | $1,453.58 | |
| 50 | Class C concrete (rail foundation) (420-7052) | CY | 21 | $500.00 | $715.00 | $800.00 | $970.00 | $1,500.00 | $520.00 | $624.33 |
| 51 | Class C concrete (miscellaneous) (420-7067) | CY | 6 | $1,500.00 | $1,000.00 | $2,220.00 | $1,500.00 | $1,400.00 | $1,094.96 | |
| 52 | CL E concrete (seal slab)(non-reinforced) (420-7070) | CY | 294 | $400.00 | $515.00 | $500.00 | $405.00 | $350.00 | $320.00 | $501.99 |
| 53 | Reinforced concrete slab (422-7001) | SF | 133,830 | $23.00 | $25.00 | $24.00 | $26.00 | $22.50 | $20.00 | $24.57 |
| 54 | Approach slab (422-7013) | CY | 763.40 | $755.00 | $750.00 | $800.00 | $600.00 | $750.00 | $705.00 | $628.50 |
| 55 | Prestressed concrete girder (TX40) (425-7003) | LF | 1,509.60 | $200.00 | $230.00 | $206.00 | $275.00 | $256.00 | $202.00 | $194.41 |
| 56 | Prestressed concrete girder (TX54) (425-7005) | LF | 3,627 | $236.00 | $230.00 | $275.00 | $256.00 | $217.00 | $205.14 | |
| 57 | Prestressed concrete girder (TX70) (425-7007) | LF | 14,377 | $268.00 | $280.00 | $275.00 | $256.00 | $240.00 | $237.86 | |
| 58 | Riprap (concrete)(5 in) (432-7002) | CY | 305 | $500.00 | $590.00 | $600.00 | $500.00 | $700.00 | $488.00 | $516.18 |
| 59 | Riprap (concrete)(CL B)(5 in) (432-7008) | CY | 615 | $580.00 | $545.00 | $600.00 | $675.00 | $600.00 | $502.00 | $435.10 |
| 60 | Riprap (mow strip)(4 in) (432-7013) | CY | 56 | $580.00 | $610.00 | $600.00 | $555.00 | $550.00 | $515.00 | $778.53 |
| 61 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 572 | $160.00 | $190.00 | $195.00 | $230.00 | $180.00 | $160.00 | $274.04 |
| 62 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 53 | $200.00 | $235.00 | $195.00 | $242.00 | $180.00 | $140.00 | $342.92 |
| 63 | Riprap (stone common)(dry)(24 in) (432-7034) | CY | 208 | $230.00 | $190.00 | $195.00 | $233.00 | $180.00 | $160.00 | $245.52 |
| 64 | Riprap (stone protection)(24 in) (432-7045) | CY | 5,160 | $165.00 | $202.00 | $233.00 | $180.00 | $160.00 | $247.82 | |
| 65 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 1,228 | $45.00 | $33.00 | $40.00 | $33.00 | $30.00 | $18.00 | $22.08 |
| 66 | Rail (type T222) (450-7006) | LF | 2,790 | $100.00 | $133.00 | $100.00 | $103.00 | $180.00 | $90.00 | $69.67 |
| 67 | Rail (type SSTR) (450-7024) | LF | 115 | $82.00 | $125.00 | $175.00 | $150.00 | $210.00 | $130.00 | $146.97 |
| 68 | Rail (type PR11) (450-7044) | LF | 2,790 | $135.00 | $134.00 | $120.00 | $125.00 | $180.00 | $130.00 | $109.36 |
| 69 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 257 | $200.00 | $229.00 | $200.00 | $260.00 | $250.00 | $199.00 | $194.64 |
| 70 | Sealed expansion joint (5 in) (SEJ - M) (454-7005) | LF | 516 | $229.00 | $200.00 | $260.00 | $250.00 | $199.00 | $206.88 | |
| 71 | Concrete box culvert (3 FT X 3 FT) (462-7002) | LF | 353 | $320.00 | $315.00 | $300.00 | $234.00 | $310.00 | $330.00 | $260.05 |
| 72 | Concrete box culvert (4 FT X 3 FT) (462-7004) | LF | 814 | $440.00 | $365.65 | $355.00 | $286.00 | $350.00 | $350.00 | $302.69 |
| 73 | Concrete box culvert (4 FT X 4 FT) (462-7005) | LF | 208 | $460.00 | $430.00 | $425.00 | $348.00 | $450.00 | $390.00 | $364.46 |
| 74 | Concrete box culvert (5 FT X 3 FT) (462-7007) | LF | 176 | $468.00 | $465.00 | $465.00 | $388.00 | $470.00 | $450.00 | $406.82 |
| 75 | Concrete box culvert (5 FT X 4 FT) (462-7008) | LF | 212 | $525.00 | $495.00 | $510.00 | $420.00 | $500.00 | $450.00 | $427.06 |
| 76 | Concrete box culvert (5 FT X 5 FT) (462-7009) | LF | 180 | $525.00 | $550.00 | $458.00 | $520.00 | $470.00 | $467.55 | |
| 77 | Concrete box culvert (6 FT X 4 FT) (462-7012) | LF | 342 | $600.00 | $645.00 | $700.00 | $584.00 | $650.00 | $540.00 | $615.51 |
| 78 | Concrete box culvert (7 FT X 5 FT) (462-7017) | LF | 266 | $750.00 | $765.00 | $800.00 | $667.00 | $676.00 | $700.00 | $690.50 |
| 79 | Concrete box culvert (8 FT X 5 FT) (462-7022) | LF | 990 | $850.00 | $850.00 | $900.00 | $754.00 | $800.00 | $740.00 | $811.13 |
| 80 | RC pipe (CL III)(18 in) (464-7003) | LF | 3,747 | $55.00 | $58.00 | $55.00 | $50.00 | $46.00 | $55.00 | $85.76 |
| 81 | RC pipe (CL III)(24 in) (464-7005) | LF | 3,189 | $75.00 | $77.00 | $75.00 | $70.00 | $60.00 | $105.00 | $92.69 |
| 82 | RC pipe (CL III)(30 in) (464-7007) | LF | 342 | $98.00 | $100.00 | $110.00 | $96.00 | $87.00 | $140.00 | $121.04 |
| 83 | RC pipe (CL III)(36 in) (464-7009) | LF | 1,079 | $145.00 | $145.00 | $140.00 | $130.00 | $110.00 | $170.00 | $146.05 |
| 84 | RC pipe (CL III)(42 in) (464-7010) | LF | 240 | $200.00 | $180.00 | $195.00 | $164.00 | $206.00 | $220.00 | $173.52 |
| 85 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 1 | $6,100.00 | $7,000.00 | $4,870.00 | $5,000.00 | $4,600.00 | $4,611.37 | |
| 86 | Inlet (complete)(PSL)(RC)(4FTX4FT) (465-7071) | EACH | 1 | $7,750.00 | $7,575.00 | $9,000.00 | $6,364.00 | $7,000.00 | $6,800.00 | $5,438.50 |
| 87 | Inlet (complete)(PSL)(SH)(3FTX3FT-3FTX3FT) (465-7086) | EACH | 1 | $7,900.00 | $9,000.00 | $6,200.00 | $7,000.00 | $6,200.00 | $5,971.41 | |
| 88 | Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128) | EACH | 11 | $8,000.00 | $8,500.00 | $9,500.00 | $6,500.00 | $7,000.00 | $7,600.00 | $5,696.00 |
| 89 | Inlet (complete)(cco)(3FT)(both) (465-7171) | EACH | 1 | $7,100.00 | $9,500.00 | $9,700.00 | $10,000 | $6,700.00 | $5,473.42 | |
| 90 | Inlet(complete)(PSL)(FG)(4'X4'-4'X4')(mod) (465-7378) | EACH | 6 | $9,500.00 | $9,200.00 | $10,000 | $7,000.00 | $8,000.00 | $7,700.00 | $5,213.08 |
| 91 | Headwall (CH - FW - 30) (diameter= 42 in) (466-7040) | EACH | 2 | $9,600.00 | $10,500 | $8,500.00 | $12,235 | $12,000 | $9,200.00 | $14,689 |
| 92 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 3 | $14,500 | $10,850 | $5,000.00 | $12,620 | $9,000.00 | $11,000 | $13,668 |
| 93 | Headwall (CH - PW - 0) (diameter= 54 in) (466-7108) | EACH | 1 | $15,000 | $19,000 | $13,500 | $25,000 | $15,000 | $20,000 | $29,533 |
| 94 | Headwall (CH - PW - 0) (diameter= 72 in) (466-7111) | EACH | 1 | $23,500 | $20,250 | $10,000 | $32,625 | $18,000 | $20,000 | $39,759 |
| 95 | Wingwall (FW - 0) (HW=4 FT) (466-7146) | EACH | 6 | $18,500 | $15,200 | $7,500.00 | $9,425.00 | $12,000 | $17,000 | $9,383.92 |
| 96 | Wingwall (FW - 0) (HW=5 FT) (466-7147) | EACH | 2 | $25,250 | $19,500 | $10,500 | $12,915 | $15,000 | $28,000 | $14,312 |
| 97 | Wingwall (FW - 0) (HW=6 FT) (466-7148) | EACH | 3 | $24,000 | $18,800 | $14,500 | $16,320 | $18,000 | $23,000 | $15,179 |
| 98 | Wingwall (FW - S) (HW=4 FT) (466-7160) | EACH | 3 | $12,000 | $16,000 | $9,000.00 | $12,930 | $12,000 | $22,000 | $13,011 |
| 99 | Wingwall (FW - S) (HW=5 FT) (466-7161) | EACH | 4 | $25,000 | $15,850 | $10,000 | $12,950 | $15,000 | $27,000 | $13,445 |
| 100 | Wingwall (PW - 2) (HW=4 FT) (466-7188) | EACH | 1 | $15,000 | $10,500 | $6,000.00 | $11,565 | $12,000 | $22,000 | $14,197 |
| 101 | Wingwall (PW - 2) (HW=8 FT) (466-7192) | EACH | 1 | $31,400 | $30,000 | $34,700 | $24,000 | $47,000 | $39,673 | |
| 102 | Wingwall (SW - 0) (HW=6 FT) (466-7205) | EACH | 2 | $15,150 | $31,300 | $17,000 | $19,140 | $18,000 | $32,000 | $19,621 |
| 103 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 5 | $712.00 | $1,100.00 | $715.00 | $960.00 | $578.00 | $2,100.00 | $1,398.13 |
| 104 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 2 | $1,325.00 | $1,350.00 | $860.00 | $1,215.00 | $686.00 | $2,300.00 | $1,544.16 |
| 105 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 162 | $2,200.00 | $1,115.00 | $860.00 | $1,025.00 | $686.00 | $2,300.00 | $1,514.86 |
| 106 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 16 | $1,205.00 | $1,400.00 | $1,150.00 | $1,340.00 | $938.00 | $2,300.00 | $2,245.09 |
| 107 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 1 | $1,800.00 | $1,300.00 | $1,645.00 | $1,300.00 | $2,500.00 | $2,409.79 | |
| 108 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 32 | $1,818.06 | $1,550.00 | $1,300.00 | $1,465.00 | $1,300.00 | $2,500.00 | $2,009.40 |
| 109 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 4 | $2,100.00 | $2,100.00 | $2,100.00 | $1,820.00 | $2,053.00 | $2,700.00 | $2,739.18 |
| 110 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 11 | $4,500.00 | $3,200.00 | $3,600.00 | $2,900.00 | $3,500.00 | $3,700.00 | $3,710.87 |
| 111 | Removing structure (inlet) (496-7002) | EACH | 2 | $800.00 | $600.00 | $642.00 | $1,000.00 | $1,400.00 | $797.90 | |
| 112 | Removing structure (set) (496-7004) | EACH | 1 | $800.00 | $300.00 | $642.00 | $500.00 | $900.00 | $724.55 | |
| 113 | Removing structure (pipe) (496-7007) | LF | 1,508 | $51.04 | $16.00 | $20.00 | $22.00 | $50.00 | $27.00 | $12.31 |
| 114 | Removing structure (box culvert) (496-7008) | LF | 1,297 | $200.00 | $30.00 | $40.00 | $43.00 | $100.00 | $220.00 | $49.79 |
| 115 | Removing structure (bridge 1000 FT or greater) (496-7012) | EACH | 1 | $110,000 | $200,000 | $400,000 | $150,000 | $340,000 | $365,342 | |
| 116 | Remove STR (driveway culvert) (496-7038) | EACH | 96 | $600.00 | $525.00 | $350.00 | $500.00 | $500.00 | $710.00 | $1,015.77 |
| 117 | Mobilization (500-7001) | LS | 1 | $7,468,904 | $7,000,000 | $5,700,000 | $9,000,000 | $10,100,000 | $9,900,000 | $10,500,000 |
| 118 | Barricades, signs and traffic handling (502-7001) | MO | 41 | $7,000.00 | $5,500.00 | $6,000.00 | $4,000.00 | $5,000.00 | $15,000 | $10,913 |
| 119 | Portable changeable message sign (503-7001) | DAY | 300 | $100.00 | $115.00 | $125.00 | $135.00 | $100.00 | $120.00 | $71.84 |
| 120 | TMA (stationary) (505-7001) | DAY | 2,030 | $195.00 | $130.00 | $25.00 | $200.00 | $25.00 | $245.00 | $132.97 |
| 121 | TMA (mobile operation) (505-7003) | DAY | 220 | $237.00 | $200.00 | $200.00 | $200.00 | $500.00 | $730.00 | $665.87 |
| 122 | Rock filter dams (install) (type 2) (506-7002) | LF | 4,270 | $45.00 | $40.00 | $39.00 | $29.00 | $36.00 | $30.00 | $36.00 |
| 123 | Rock filter dams (install) (type 3) (506-7003) | LF | 480 | $62.25 | $50.00 | $50.00 | $30.00 | $45.00 | $32.00 | $45.00 |
| 124 | Rock filter dams (remove) (506-7011) | LF | 4,750 | $13.00 | $8.25 | $8.00 | $11.00 | $7.50 | $11.00 | $7.50 |
| 125 | Construction exits (install) (type 1) (506-7020) | SY | 4,008 | $48.00 | $44.00 | $20.00 | $32.00 | $15.00 | $30.00 | $40.00 |
| 126 | Construction exits (remove) (506-7024) | SY | 4,008 | $11.00 | $5.50 | $5.50 | $11.00 | $5.00 | $11.00 | $5.00 |
| 127 | Excavation (erosion & sediment control, in vehicle) (506-7027) | CY | 5,120 | $37.50 | $19.70 | $12.00 | $19.75 | $20.00 | $12.00 | $20.00 |
| 128 | Embankment (erosion & sediment control, in vehicle) (506-7028) | CY | 5,120 | $50.00 | $22.25 | $15.00 | $19.75 | $20.00 | $12.00 | $20.00 |
| 129 | Earthwork (erosion & sediment control, in vehicle) (506-7029) | CY | 3,000 | $43.18 | $20.00 | $12.00 | $19.50 | $20.00 | $12.00 | $25.89 |
| 130 | Backhoe work (erosion & sediment control) (506-7030) | HR | 300 | $55.88 | $50.00 | $85.00 | $170.00 | $100.00 | $193.00 | $58.31 |
| 131 | Bulldozer work (erosion & sediment control) (506-7033) | HR | 200 | $100.00 | $95.00 | $100.00 | $92.00 | $100.00 | $138.00 | $162.46 |
| 132 | Temporary sediment control fence (install) (506-7039) | LF | 6,744 | $3.50 | $4.30 | $4.25 | $4.20 | $4.00 | $4.00 | $3.89 |
| 133 | Temporary sediment control fence (remove) (506-7041) | LF | 6,744 | $1.20 | $0.50 | $0.30 | $1.00 | $0.25 | $0.65 | $0.25 |
| 134 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 180 | $1.25 | $5.00 | $5.00 | $4.40 | $5.00 | $5.00 | $4.50 |
| 135 | Biodegradable erosion control logs (remove) (506-7046) | LF | 180 | $1.60 | $1.00 | $0.70 | $1.40 | $1.00 | $1.30 | $0.65 |
| 136 | Trackhoe work (erosion & sediment control) (506-7051) | HR | 300 | $98.00 | $120.00 | $100.00 | $170.00 | $100.00 | $216.00 | $146.51 |
| 137 | Constructing detours (508-7001) | SY | 51,810 | $137.00 | $115.00 | $130.00 | $123.00 | $136.00 | $129.00 | $112.24 |
| 138 | Portable concrete traffic barrier (des source)(F-shape)(type 1) (512-7017) | LF | 2,290 | $49.00 | $11.00 | $30.00 | $12.50 | $25.00 | $10.00 | $21.24 |
| 139 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 5,720 | $9.50 | $17.00 | $8.00 | $5.50 | $10.00 | $9.00 | $8.19 |
| 140 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 2,290 | $10.00 | $18.00 | $6.25 | $25.00 | $9.00 | $16.45 | |
| 141 | Concrete curb (type II) (529-7002) | LF | 1,108 | $30.00 | $9.00 | $17.00 | $35.00 | $12.00 | $22.19 | |
| 142 | Driveways (concrete) (hes) (530-7007) | SY | 2,611 | $130.00 | $130.00 | $105.00 | $144.00 | $110.00 | $128.00 | $133.53 |
| 143 | Driveways (ACP) (530-7010) | SY | 13,014 | $80.00 | $35.00 | $38.00 | $32.86 | $65.00 | $88.00 | $72.19 |
| 144 | Concrete sidewalks (4") (531-7001) | SY | 1,574 | $75.00 | $72.00 | $66.00 | $75.00 | $48.00 | $55.45 | |
| 145 | Curb ramps (type 1) (531-7005) | EACH | 3 | $2,300.00 | $2,500.00 | $5,325.00 | $1,800.00 | $2,750.00 | $2,587.51 | |
| 146 | Curb ramps (type 22) (531-7014) | EACH | 2 | $3,100.00 | $4,000.00 | $5,565.00 | $3,500.00 | $4,100.00 | $3,143.40 | |
| 147 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 124,850 | $0.21 | $0.27 | $0.27 | $0.15 | $0.25 | $0.20 | $0.06 |
| 148 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 7,800 | $0.27 | $0.27 | $1.00 | $0.25 | $0.20 | $0.31 | |
| 149 | Mill rumble strips (concrete) (shoulder) (533-7003) | LF | 3,500 | $1.10 | $1.10 | $1.00 | $1.00 | $1.20 | $0.75 | |
| 150 | Mill rumble strips (concrete) (centerline) (533-7004) | LF | 4,000 | $1.10 | $1.10 | $0.20 | $1.00 | $1.20 | $0.66 | |
| 151 | Concrete directional island (536-7004) | SY | 479 | $180.00 | $70.00 | $125.00 | $112.00 | $180.00 | $76.00 | $128.04 |
| 152 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,288 | $30.50 | $30.25 | $28.00 | $29.00 | $30.00 | $31.00 | $26.00 |
| 153 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 9 | $2,365.00 | $2,300.00 | $2,475.00 | $2,200.00 | $2,250.00 | $2,100.00 | |
| 154 | Remove metal beam guard fence (542-7001) | LF | 683 | $2.20 | $2.20 | $2.20 | $3.00 | $4.00 | $2.00 | |
| 155 | Guardrail end treatment (install) (544-7001) | EACH | 14 | $3,200.00 | $3,410.00 | $3,250.00 | $3,300.00 | $2,950.00 | $2,960.00 | $3,000.00 |
| 156 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $220.00 | $220.00 | $220.00 | $250.00 | $260.00 | $200.00 | |
| 157 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 27 | $1,100.00 | $2,200.00 | $1,650.00 | $1,650.00 | $1,000.00 | $1,200.00 | $1,500.00 |
| 158 | Crash cushion attenuator (remove) (545-7004) | EACH | 7 | $900.00 | $880.00 | $900.00 | $880.00 | $1,000.00 | $900.00 | $800.00 |
| 159 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 1 | $28,000 | $27,500 | $28,000 | $28,500 | $30,000 | $26,000 | $25,900 |
| 160 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 7 | $7,600.00 | $9,240.00 | $9,100.00 | $9,250.00 | $7,500.00 | $7,700.00 | $8,400.00 |
| 161 | Pipe underdrains (type 8) (6") (556-7008) | LF | 53,870 | $33.50 | $31.50 | $28.00 | $34.00 | $45.00 | $38.00 | $52.17 |
| 162 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 3 | $605.00 | $820.00 | $830.00 | $550.00 | $500.00 | $310.00 | $775.00 |
| 163 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 50 | $330.00 | $365.00 | $350.00 | $275.00 | $300.00 | $260.00 | $325.00 |
| 164 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 13 | $365.00 | $415.00 | $425.00 | $300.00 | $350.00 | $290.00 | $395.00 |
| 165 | In RD IL (type SA) 20T-8 (150W EQ) LED (610-7036) | EACH | 5 | $3,540.00 | $3,450.00 | $3,540.00 | $3,215.00 | $3,400.00 | $3,215.00 | |
| 166 | In RD IL(type SA)15T-4(150W EQ)LED (610-7239) | EACH | 16 | $3,550.00 | $3,450.00 | $3,550.00 | $3,225.00 | $3,400.00 | $3,225.00 | |
| 167 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 1,555 | $9.70 | $9.40 | $9.65 | $9.00 | $10.00 | $8.75 | |
| 168 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 690 | $21.20 | $20.60 | $21.20 | $20.00 | $21.00 | $19.25 | |
| 169 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 150 | $19.00 | $18.25 | $18.70 | $17.00 | $18.00 | $17.00 | |
| 170 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 135 | $27.00 | $26.25 | $26.95 | $25.00 | $26.00 | $24.50 | |
| 171 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 65 | $23.00 | $22.50 | $23.00 | $21.00 | $23.00 | $21.00 | |
| 172 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 295 | $34.00 | $33.00 | $34.00 | $31.00 | $33.00 | $31.00 | |
| 173 | Electrical conductor (no.8) bare (620-7007) | LF | 2,280 | $2.50 | $2.45 | $2.50 | $2.00 | $2.40 | $2.25 | |
| 174 | Electrical conductor (no.8) insulated (620-7008) | LF | 5,350 | $2.75 | $2.70 | $2.75 | $2.50 | $2.70 | $2.50 | |
| 175 | Electrical conductor (no.6) bare (620-7009) | LF | 605 | $3.30 | $3.25 | $3.30 | $3.00 | $3.20 | $3.00 | |
| 176 | Electrical conductor (no.4) bare (620-7011) | LF | 30 | $4.20 | $4.05 | $4.15 | $3.75 | $4.00 | $3.75 | |
| 177 | Electrical conductor (no.4) insulated (620-7012) | LF | 55 | $4.75 | $4.55 | $4.70 | $4.25 | $4.50 | $4.25 | |
| 178 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 820 | $3.60 | $3.50 | $3.60 | $3.25 | $3.50 | $3.25 | |
| 179 | Ground box type A (122311)W/apron (624-7002) | EACH | 3 | $1,300.00 | $1,260.00 | $1,300.00 | $1,175.00 | $1,250.00 | $1,175.00 | |
| 180 | Ground box type D (162922)W/apron (624-7008) | EACH | 5 | $1,540.00 | $1,500.00 | $1,540.00 | $1,400.00 | $1,480.00 | $1,400.00 | |
| 181 | Elc SRV type A 120/240 060(NS)SS(E)SP(O) (628-7009) | EACH | 2 | $7,850.00 | $7,650.00 | $7,850.00 | $7,125.00 | $7,500.00 | $7,125.00 | |
| 182 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $7,600.00 | $7,400.00 | $7,590.00 | $6,900.00 | $7,300.00 | $6,900.00 | |
| 183 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 57 | $760.00 | $685.00 | $680.00 | $720.00 | $738.00 | $650.00 | $635.00 |
| 184 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 135 | $750.00 | $885.00 | $800.00 | $825.00 | $893.00 | $760.00 | $745.00 |
| 185 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $1,220.00 | $1,050.00 | $1,100.00 | $910.00 | $927.00 | $1,050.00 | $1,020.00 |
| 186 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 4 | $755.00 | $885.00 | $770.00 | $797.00 | $840.00 | $825.00 | |
| 187 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 9 | $1,000.00 | $970.00 | $955.00 | $900.00 | $897.00 | $900.00 | $890.00 |
| 188 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 4 | $1,270.00 | $1,350.00 | $1,210.00 | $997.00 | $1,280.00 | $1,255.00 | |
| 189 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $585.00 | $660.00 | $275.00 | $475.00 | $640.00 | $615.00 | |
| 190 | Remove SM RD SN sup&AM (644-7073) | EACH | 123 | $120.00 | $95.00 | $100.00 | $110.00 | $50.00 | $90.00 | $89.00 |
| 191 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 33 | $21.00 | $22.00 | $32.00 | $16.50 | $20.00 | $21.00 | $15.00 |
| 192 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 12 | $31.00 | $28.00 | $36.00 | $27.50 | $25.00 | $26.00 | $25.00 |
| 193 | Install delineator assembly (D-DY)SZ 1(yflx)GND (658-7050) | EACH | 28 | $67.00 | $80.00 | $65.00 | $82.50 | $45.00 | $46.00 | $55.00 |
| 194 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 19 | $90.00 | $86.00 | $60.00 | $77.00 | $60.00 | $61.00 | $55.00 |
| 195 | Install OM SM RD sign (1-OM-con)Y (658-7079) | EACH | 4 | $180.00 | $27.00 | $55.00 | $63.00 | $121.00 | $25.00 | |
| 196 | Install OM SM RD sign (1-OM-con)R (658-7080) | EACH | 51 | $84.00 | $180.00 | $27.00 | $56.00 | $63.00 | $181.00 | $25.00 |
| 197 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 28 | $49.00 | $45.00 | $27.00 | $13.20 | $63.00 | $26.00 | $25.00 |
| 198 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 4,407 | $0.55 | $0.55 | $0.55 | $0.55 | $0.35 | $0.52 | $0.50 |
| 199 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 120,302 | $0.55 | $0.28 | $0.27 | $0.28 | $0.60 | $0.26 | $0.25 |
| 200 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 975 | $1.10 | $1.10 | $1.10 | $0.35 | $1.05 | $1.00 | |
| 201 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 291 | $4.40 | $4.30 | $4.40 | $5.00 | $4.10 | $4.00 | |
| 202 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 4 | $110.00 | $110.00 | $110.00 | $100.00 | $101.00 | $100.00 | |
| 203 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 4 | $110.00 | $110.00 | $110.00 | $100.00 | $101.00 | $100.00 | |
| 204 | Work zone pavement marking non-removing (Y)6"(DOT) (662-7037) | LF | 42 | $2.20 | $2.15 | $2.20 | $0.14 | $2.10 | $2.00 | |
| 205 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 117,824 | $0.56 | $0.28 | $0.27 | $0.28 | $0.35 | $0.26 | $0.25 |
| 206 | Work zone pavement marking removing (reflectorized) type I-C (662-7049) | EACH | 663 | $5.00 | $4.85 | $4.95 | $4.00 | $4.60 | $4.50 | |
| 207 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 377 | $5.00 | $4.85 | $4.95 | $4.00 | $4.60 | $4.50 | |
| 208 | Work zone pavement marking removing (traffic BTN) type W (662-7057) | EACH | 1,443 | $4.20 | $4.00 | $4.15 | $2.00 | $4.00 | $3.75 | |
| 209 | Work zone pavement marking removing (traffic BTN) type Y (662-7059) | EACH | 1,077 | $4.20 | $4.00 | $4.15 | $2.00 | $4.00 | $3.75 | |
| 210 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 10,744 | $1.30 | $1.40 | $1.35 | $2.00 | $0.90 | $1.30 | $1.25 |
| 211 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 34,359 | $1.30 | $1.40 | $1.35 | $2.00 | $0.90 | $1.30 | $1.25 |
| 212 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 8,772 | $2.30 | $1.75 | $1.50 | $2.20 | $2.00 | $1.05 | $1.50 |
| 213 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 4,596 | $1.75 | $1.50 | $2.20 | $2.00 | $1.05 | $1.50 | |
| 214 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 1,619 | $1.25 | $1.30 | $1.30 | $1.32 | $1.25 | $1.25 | $1.20 |
| 215 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 30,658 | $0.75 | $1.30 | $1.30 | $1.32 | $1.00 | $1.25 | $1.20 |
| 216 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 371 | $2.37 | $4.40 | $4.30 | $4.40 | $3.25 | $4.10 | $4.00 |
| 217 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 741 | $5.00 | $7.00 | $6.70 | $6.90 | $6.50 | $6.30 | $6.25 |
| 218 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 49 | $4.50 | $4.30 | $4.40 | $3.25 | $4.10 | $4.00 | |
| 219 | Pavement sler 6" (666-7347) | LF | 17,582 | $0.35 | $0.33 | $0.35 | $0.30 | $0.32 | $0.30 | |
| 220 | Pavement sler 8" (666-7348) | LF | 2,211 | $0.60 | $0.54 | $0.55 | $0.40 | $0.52 | $0.50 | |
| 221 | Pavement sler 12" (666-7350) | LF | 199 | $2.20 | $2.15 | $2.20 | $1.50 | $2.10 | $2.00 | |
| 222 | Pavement sler 24" (666-7352) | LF | 372 | $3.30 | $3.22 | $3.30 | $3.00 | $3.10 | $3.00 | |
| 223 | Pavement sler (arrow) (666-7353) | EACH | 12 | $110.00 | $110.00 | $110.00 | $50.00 | $101.00 | $100.00 | |
| 224 | Pavement sler (word) (666-7354) | EACH | 7 | $165.00 | $165.00 | $165.00 | $50.00 | $152.00 | $150.00 | |
| 225 | Pavement sler (yld tri) (666-7365) | EACH | 8 | $55.00 | $55.00 | $55.00 | $15.00 | $52.00 | $50.00 | |
| 226 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 18,261 | $0.47 | $0.83 | $0.80 | $1.00 | $0.65 | $0.80 | $0.75 |
| 227 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 83,148 | $0.46 | $0.83 | $0.80 | $0.85 | $0.61 | $0.80 | $0.75 |
| 228 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 3,078 | $0.83 | $0.80 | $0.85 | $0.65 | $0.80 | $0.75 | |
| 229 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 87,164 | $0.47 | $0.83 | $0.80 | $0.85 | $0.61 | $0.80 | $0.75 |
| 230 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 85 | $225.00 | $230.00 | $225.00 | $230.00 | $275.00 | $212.00 | $210.00 |
| 231 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 3 | $315.00 | $305.00 | $315.00 | $400.00 | $290.00 | $285.00 | |
| 232 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 71 | $260.00 | $260.00 | $255.00 | $260.00 | $325.00 | $240.00 | $235.00 |
| 233 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 34 | $41.50 | $66.00 | $65.00 | $66.00 | $35.00 | $62.00 | $60.00 |
| 234 | Prefabricated PM type C (Y)(med nose) (668-7129) | EACH | 2 | $550.00 | $535.00 | $550.00 | $350.00 | $505.00 | $500.00 | |
| 235 | Reflectorized pavement marker type I-C (672-7002) | EACH | 540 | $4.10 | $5.50 | $5.35 | $5.50 | $4.50 | $5.10 | $5.00 |
| 236 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 845 | $3.96 | $5.50 | $5.35 | $5.50 | $4.50 | $5.10 | $5.00 |
| 237 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,926 | $4.15 | $5.50 | $5.35 | $5.50 | $4.50 | $5.10 | $5.00 |
| 238 | Eliminating existing PM & markers (4") (677-7001) | LF | 92,888 | $0.85 | $0.53 | $0.51 | $0.55 | $0.62 | $0.50 | $0.48 |
| 239 | Eliminating existing PM & markers (8") (677-7004) | LF | 680 | $1.10 | $1.10 | $1.10 | $1.00 | $1.05 | $1.00 | |
| 240 | Eliminating existing PM & markers (24") (677-7008) | LF | 177 | $2.75 | $2.70 | $2.75 | $12.00 | $2.55 | $2.50 | |
| 241 | Pavement surface preparation for marking (6") (678-7002) | LF | 17,582 | $0.11 | $0.11 | $0.11 | $0.30 | $0.11 | $0.10 | |
| 242 | Pavement surface preparation for marking (8") (678-7004) | LF | 2,211 | $0.22 | $0.22 | $0.22 | $0.40 | $0.21 | $0.20 | |
| 243 | Pavement surface preparation for marking (12") (678-7006) | LF | 199 | $1.10 | $1.10 | $1.10 | $2.00 | $1.05 | $1.00 | |
| 244 | Pavement surface preparation for marking (24") (678-7008) | LF | 372 | $1.10 | $1.10 | $1.10 | $4.00 | $1.05 | $1.00 | |
| 245 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 12 | $55.00 | $54.00 | $55.00 | $50.00 | $51.00 | $50.00 | |
| 246 | Pavement surface preparation for marking (word) (678-7016) | EACH | 7 | $55.00 | $54.00 | $55.00 | $50.00 | $51.00 | $50.00 | |
| 247 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 8 | $55.00 | $54.00 | $55.00 | $10.00 | $51.00 | $50.00 | |
| 248 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $31,075 | $30,250 | $31,100 | $28,250 | $30,000 | $28,250 | |
| 249 | Removing traffic signals (680-7004) | EACH | 1 | $6,410.00 | $6,250.00 | $6,400.00 | $5,825.00 | $6,200.00 | $5,825.00 | |
| 250 | Temporary traffic signals (681-7001) | EACH | 1 | $126,500 | $123,500 | $126,500 | $115,000 | $121,000 | $115,000 | |
| 251 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 8 | $300.00 | $290.00 | $300.00 | $270.00 | $290.00 | $269.67 | |
| 252 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 2 | $305.00 | $295.00 | $300.00 | $275.00 | $290.00 | $275.00 | |
| 253 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 8 | $295.00 | $290.00 | $300.00 | $269.00 | $290.00 | $269.00 | |
| 254 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $305.00 | $295.00 | $300.00 | $275.00 | $290.00 | $275.00 | |
| 255 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 8 | $275.00 | $290.00 | $300.00 | $269.00 | $290.00 | $269.00 | |
| 256 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 2 | $300.00 | $295.00 | $300.00 | $275.00 | $290.00 | $275.00 | |
| 257 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $595.00 | $580.00 | $600.00 | $540.00 | $570.00 | $540.00 | |
| 258 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 2 | $255.00 | $250.00 | $255.00 | $232.00 | $245.00 | $232.00 | |
| 259 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 8 | $187.00 | $185.00 | $190.00 | $190.00 | $180.00 | $170.00 | |
| 260 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 1,555 | $2.20 | $2.15 | $2.20 | $2.00 | $2.20 | $2.00 | |
| 261 | Traffic signal CBL (type A)(12 AWG)(4 conductor) (684-7009) | LF | 1,595 | $3.60 | $3.50 | $3.60 | $3.25 | $3.50 | $3.25 | |
| 262 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 1,520 | $4.50 | $4.30 | $4.40 | $4.00 | $4.30 | $4.00 | |
| 263 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 2 | $14,800 | $14,400 | $14,795 | $13,450 | $14,500 | $13,450 | |
| 264 | Ins traffic signal PL AM(S)1 arm(55') (686-7057) | EACH | 1 | $36,300 | $35,300 | $36,300 | $32,970 | $35,000 | $32,970 | |
| 265 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 1 | $38,800 | $37,750 | $38,775 | $35,250 | $38,000 | $35,250 | |
| 266 | Pedestrian pole assembly (687-7001) | EACH | 6 | $3,165.00 | $3,080.00 | $3,200.00 | $2,875.00 | $3,100.00 | $2,875.00 | |
| 267 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $820.00 | $800.00 | $820.00 | $745.00 | $790.00 | $745.00 | |
| 268 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $3,100.00 | $3,000.00 | $3,100.00 | $2,800.00 | $3,000.00 | $2,800.00 | |
| 269 | Full - width mowing (730-7019) | CYC | 14 | $6,300.00 | $8,250.00 | $3,000.00 | $5,300.00 | $5,000.00 | $8,100.00 | $2,500.00 |
| 270 | Litter removal (734-7002) | CYC | 14 | $4,100.00 | $5,500.00 | $2,500.00 | $3,600.00 | $1,000.00 | $4,200.00 | $910.01 |
| 271 | Tip testing(drilled shaft) (4003-7001) | EACH | 6 | $6,600.00 | $6,500.00 | $5,500.00 | $5,000.00 | $8,800.00 | $6,000.00 | |
| 272 | Install FTB (5002-7001) | LF | 200 | $50.00 | $50.00 | $27.50 | $45.00 | $61.00 | $43.63 | |
| 273 | Remove FTB (5002-7002) | LF | 200 | $10.00 | $10.00 | $11.00 | $10.00 | $8.00 | $3.77 | |
| 274 | Amphibian/reptile exclusion fence inst (5003-7001) | LF | 2,715 | $4.50 | $4.50 | $5.75 | $4.00 | $4.50 | $4.00 | |
| 275 | Amphibian/reptile exclusion fence rem (5003-7002) | LF | 2,715 | $1.10 | $1.00 | $1.40 | $1.00 | $1.00 | $1.00 | |
| 276 | Retrofit det warn surface (surface applied) (5031-7001) | SF | 131 | $55.00 | $55.00 | $71.00 | $25.00 | $56.00 | $46.92 | |
| 277 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $7,650.00 | $7,450.00 | $7,650.00 | $6,950.00 | $7,350.00 | $6,950.00 | |
| 278 | VDS prosr sys (6017-7001) | EACH | 1 | $11,750 | $11,500 | $11,720 | $10,655 | $12,000 | $10,655 | |
| 279 | VIVDS cam assy var LNS (6017-7003) | EACH | 2 | $6,405.00 | $6,230.00 | $6,500.00 | $5,820.00 | $6,200.00 | $5,820.00 | |
| 280 | HVDS W/var LNS (6017-7008) | EACH | 2 | $6,525.00 | $6,350.00 | $6,525.00 | $5,930.00 | $6,300.00 | $5,930.00 | |
| 281 | VDS CNTRL software (6017-7009) | EACH | 1 | $450.00 | $435.00 | $450.00 | $405.00 | $430.00 | $405.00 | |
| 282 | VDS cabling (6017-7012) | LF | 1,055 | $3.90 | $3.75 | $3.85 | $3.50 | $4.00 | $3.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.