| 1 | Preparing row (100-7002) | STA | 82 | $746.00 | $500.00 | $514.50 | $500.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 923 | $35.00 | $15.00 | $19.56 | $15.00 |
| 3 | Remove (14"-18") TRT/untrt base & asphalt pavement (105-7014) | SY | 65,243 | $14.00 | $9.00 | $8.13 | $10.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 19,546 | $12.50 | $15.00 | $15.24 | $21.00 |
| 5 | Embankment (final)(OC)(type A) (132-7001) | CY | 1,356 | $21.00 | $10.00 | $13.04 | $25.00 |
| 6 | Drill seed (permanent_rural_clay) (164-7042) | ACRE | 9.40 | $555.00 | $1,700.00 | $1,700.00 | $2,000.00 |
| 7 | Drill seed (temporary_warm) (164-7045) | ACRE | 9.40 | $640.00 | $1,100.00 | $1,100.00 | $1,100.00 |
| 8 | FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176) | CY | 30,171 | $75.00 | $65.00 | $63.08 | $86.00 |
| 9 | Geogrid base reinforcement (type 2) (250-7002) | SY | 65,243 | $2.00 | $1.80 | $1.17 | $2.25 |
| 10 | Prime coat (MC-30) (310-7004) | GAL | 13,049 | $4.10 | $5.00 | $4.69 | $5.50 |
| 11 | SP mixes SP-B sac-B PG70-22 (344-7005) | TON | 15,659 | $125.00 | $91.00 | $88.17 | $125.00 |
| 12 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 11,255 | $125.00 | $94.00 | $93.55 | $130.00 |
| 13 | Stone-MTRX-asphalt SMA-C sac-A PG76-22 (346-7001) | TON | 10,346 | $145.00 | $124.00 | $134.94 | $140.00 |
| 14 | Flexiblepavementstructurerepair(10.5") (351-7035) | SY | 2,209 | $76.80 | $83.00 | $67.24 | $125.00 |
| 15 | Planing asphalt concrete pavement (2.5") (354-7082) | SY | 3,888 | $6.10 | $4.00 | $3.18 | $5.00 |
| 16 | Flowable backfill (401-7001) | CY | 154 | $252.81 | $170.00 | $210.00 | $350.00 |
| 17 | Riprap (mow strip)(4 in) (432-7013) | CY | 60 | $800.00 | $600.00 | $640.00 | $550.00 |
| 18 | Concrete box culvert (5 FT X 2 FT) (462-7006) | LF | 6 | $1,000.00 | $4,100.00 | $1,720.00 | $575.00 |
| 19 | RC pipe (CL III)(36 in) (464-7009) | LF | 270 | $139.11 | $228.00 | $168.00 | $250.00 |
| 20 | Set (type I)(S= 5 FT)(HW= 4 FT)(4:1)(C) (467-7100) | EACH | 4 | $12,036 | $7,700.00 | $10,300 | $7,000.00 |
| 21 | Clean existing culverts (480-7001) | EACH | 6 | $2,600.00 | $4,000.00 | $1,250.00 | $2,000.00 |
| 22 | Removing structure (set) (496-7004) | EACH | 4 | $2,800.00 | $1,800.00 | $1,850.00 | $500.00 |
| 23 | Removing structure (headwall) (496-7006) | EACH | 2 | $2,000.00 | $1,400.00 | $875.00 | $1,000.00 |
| 24 | Removing structure (pipe) (496-7007) | LF | 180 | $25.00 | $14.00 | $6.50 | $10.00 |
| 25 | Mobilization (500-7001) | LS | 1 | $1,073,234 | $400,000 | $702,392 | $1,250,000 |
| 26 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $5,917.00 | $3,200.00 | $5,131.85 | $10,000 |
| 27 | Portable changeable message sign (503-7002) | EACH | 5 | $5,000.00 | $11,000 | $3,613.85 | $10,000 |
| 28 | TMA (stationary) (505-7001) | DAY | 62 | $225.00 | $200.00 | $103.25 | $300.00 |
| 29 | TMA (mobile operation) (505-7003) | DAY | 15 | $737.50 | $200.00 | $232.32 | $25.00 |
| 30 | Rock filter dams (install) (type 3) (506-7003) | LF | 129 | $109.00 | $85.00 | $85.00 | $85.00 |
| 31 | Rock filter dams (remove) (506-7011) | LF | 129 | $21.00 | $18.00 | $18.00 | $18.00 |
| 32 | Construction exits (install) (type 1) (506-7020) | SY | 223 | $33.75 | $44.00 | $44.00 | $44.00 |
| 33 | Construction exits (remove) (506-7024) | SY | 223 | $13.30 | $10.00 | $10.00 | $10.00 |
| 34 | Backhoe work (erosion & sediment control) (506-7030) | HR | 35 | $122.50 | $140.00 | $66.00 | $85.00 |
| 35 | Temporary sediment control fence (install) (506-7039) | LF | 1,374 | $5.40 | $5.00 | $5.00 | $5.00 |
| 36 | Temporary sediment control fence (remove) (506-7041) | LF | 1,374 | $1.70 | $1.50 | $1.50 | $1.50 |
| 37 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 6,810 | $50.00 | $21.00 | $20.00 | $75.00 |
| 38 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 6,270 | $10.00 | $4.00 | $7.50 | $4.50 |
| 39 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 6,810 | $14.00 | $14.00 | $11.50 | $35.00 |
| 40 | Driveways (concrete) (530-7006) | SY | 923 | $117.10 | $125.00 | $117.00 | $125.00 |
| 41 | Driveways (ACP) (530-7010) | SY | 1,347 | $45.00 | $54.00 | $41.00 | $65.00 |
| 42 | Driveways (surface treat) (530-7016) | SY | 363 | $27.50 | $54.00 | $34.56 | $70.00 |
| 43 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,025 | $27.40 | $28.00 | $25.93 | $35.00 |
| 44 | Downstream anchor terminal section (540-7015) | EACH | 6 | $1,448.00 | $1,800.00 | $1,735.00 | $2,000.00 |
| 45 | Remove metal beam guard fence (542-7001) | LF | 1,025 | $2.75 | $2.00 | $1.90 | $2.00 |
| 46 | Remove downstream anchor terminal (542-7003) | EACH | 6 | $253.20 | $300.00 | $275.00 | $400.00 |
| 47 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,353.50 | $3,700.00 | $3,555.00 | $4,000.00 |
| 48 | Guardrail end treatment (remove) (544-7003) | EACH | 6 | $281.00 | $250.00 | $250.00 | $400.00 |
| 49 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 17 | $1,200.00 | $900.00 | $1,200.00 | $425.00 |
| 50 | Crash cushion attenuator (remove) (545-7004) | EACH | 23 | $700.00 | $800.00 | $750.00 | $325.00 |
| 51 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 23 | $7,000.00 | $5,400.00 | $8,400.00 | $11,000 |
| 52 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 6 | $300.00 | $300.00 | $275.00 | $300.00 |
| 53 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 5 | $352.50 | $300.00 | $300.00 | $300.00 |
| 54 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 1 | $798.00 | $1,000.00 | $950.00 | $1,000.00 |
| 55 | Relocate existing mailbox (560-7012) | EACH | 17 | $334.00 | $50.00 | $579.67 | $200.00 |
| 56 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 28 | $715.50 | $900.00 | $850.00 | $850.00 |
| 57 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 9 | $1,039.60 | $1,100.00 | $1,050.00 | $1,050.00 |
| 58 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $1,056.90 | $1,500.00 | $1,450.00 | $1,450.00 |
| 59 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 30 | $23.59 | $80.00 | $75.00 | $80.00 |
| 60 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 28 | $121.00 | $125.00 | $125.00 | $125.00 |
| 61 | Remove delin & object marker assms (658-7078) | EACH | 70 | $29.65 | $6.00 | $5.00 | $5.00 |
| 62 | Work zone pavement marking removing (traffic BTN) type W (662-7057) | EACH | 8,158 | $4.50 | $0.90 | $0.85 | $4.00 |
| 63 | Work zone pavement marking removing (traffic BTN) type Y (662-7059) | EACH | 8,164 | $6.00 | $0.90 | $0.85 | $4.00 |
| 64 | Work zone pavement marking removing (W)(double arrow) (662-7083) | EACH | 1 | $480.25 | $350.00 | $325.00 | $100.00 |
| 65 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,964 | $0.67 | $2.00 | $1.60 | $1.00 |
| 66 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,140 | $2.00 | $1.20 | $1.10 | $1.00 |
| 67 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 30 | $20.00 | $17.00 | $16.00 | $11.00 |
| 68 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 18 | $190.00 | $160.00 | $150.00 | $175.00 |
| 69 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 8 | $258.75 | $270.00 | $250.00 | $180.00 |
| 70 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 7 | $48.90 | $27.00 | $25.00 | $45.00 |
| 71 | Pavement sler 6" (666-7347) | LF | 45,058 | $0.33 | $0.40 | $0.38 | $0.25 |
| 72 | Pavement sler 8" (666-7348) | LF | 1,140 | $0.80 | $0.60 | $0.52 | $0.50 |
| 73 | Pavement sler 24" (666-7352) | LF | 30 | $3.82 | $11.00 | $10.00 | $2.00 |
| 74 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 5,808 | $0.90 | $1.17 | $1.10 | $0.60 |
| 75 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 16,358 | $0.75 | $0.89 | $0.84 | $0.55 |
| 76 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 4,250 | $0.75 | $1.17 | $1.10 | $0.60 |
| 77 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 18,000 | $0.50 | $0.89 | $0.84 | $0.55 |
| 78 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,700 | $4.16 | $8.00 | $7.50 | $4.00 |
| 79 | Traffic button type W (672-7007) | EACH | 1,630 | $4.00 | $5.00 | $4.50 | $4.00 |
| 80 | Traffic button type Y (672-7008) | EACH | 1,630 | $1.97 | $5.00 | $4.50 | $4.00 |
| 81 | Eliminating existing PM & markers (4") (677-7001) | LF | 35,100 | $0.50 | $0.27 | $0.25 | $0.75 |
| 82 | Eliminating existing PM & markers (8") (677-7004) | LF | 830 | $0.95 | $0.37 | $0.35 | $0.75 |
| 83 | Eliminating existing PM & markers (24") (677-7008) | LF | 65 | $35.00 | $16.00 | $15.00 | $3.00 |
| 84 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 6 | $40.00 | $80.00 | $75.00 | $55.00 |
| 85 | Eliminating existing PM & markers (word) (677-7015) | EACH | 4 | $40.00 | $80.00 | $75.00 | $60.00 |
| 86 | Temporary traffic signals (681-7001) | EACH | 1 | $22,000 | $40,000 | $13,600 | $100,000 |
| 87 | Bonding course (3007-7001) | GAL | 24,644 | $4.40 | $2.00 | $3.40 | $4.00 |
| 88 | TMSP radar speed control monitor (6025-7001) | EACH | 2 | $10,000 | $6,500.00 | $5,162.65 | $5,000.00 |