TxDOT contract A00213810 bid tabulation
Intersection Improvements With Right And/Or Left Turn Lanes, SH 302 (AT MARIAN DRIVE (NOTREES) to .). Let by Texas DOT on May 7, 2026, Ector, Odessa District. 3 bids received; low bid $1,275,100 by Ragle Construction, Inc., -1.9% against the engineer's estimate of $1,299,947.
- Owner
- Texas DOT
- Letting
- 07 MAY 2026
- Pay items
- 58
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ragle Construction, Inc. | $1,275,100 | Low | -2.0% |
| 2 | Reece Albert, Inc. | $1,351,118 | +6.0% | +4.0% |
| 3 | Jones Bros. Dirt & Paving Contractors, Inc. | $2,077,778 | +63% | +60% |
Engineer's estimate: $1,299,947.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Ragle Construction, Inc. | 2. Reece Albert, Inc. | 3. Jones Bros. Dirt & Paving Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Excavation (roadway) (110-7001) | CY | 250 | $40.00 | $100.00 | $15.41 | $92.98 |
| 2 | Subgr widen (OC) (112-7001) | STA | 18 | $780.00 | $1,500.00 | $3,154.15 | $3,500.00 |
| 3 | Embankment (final)(OC)(type B) (132-7003) | CY | 250 | $35.00 | $100.00 | $9.13 | $72.65 |
| 4 | Backfill (type B) (134-7002) | STA | 18 | $196.82 | $500.00 | $208.13 | $1,017.33 |
| 5 | Blading (150-7002) | HR | 20 | $147.00 | $160.00 | $615.31 | $450.00 |
| 6 | Proof rolling (216-7001) | HR | 20 | $129.48 | $136.00 | $124.55 | $175.00 |
| 7 | FL BS (compacted in place)(type A GR 4) (8") (247-7069) | SY | 1,940 | $30.00 | $11.00 | $21.89 | $39.94 |
| 8 | Prime coat (AE-P) (310-7001) | GAL | 388 | $5.20 | $7.10 | $7.73 | $14.29 |
| 9 | Fog seal (CSS-1H) (315-7004) | GAL | 369 | $6.00 | $8.50 | $7.59 | $14.68 |
| 10 | SP mixes SP-B sac-B PG70-22 (344-7005) | TON | 1,121 | $200.00 | $130.00 | $180.95 | $228.00 |
| 11 | Tack coat (344-7077) | GAL | 388 | $3.04 | $7.10 | $2.67 | $14.29 |
| 12 | Tom-C PG76-22 sac-A (347-7001) | TON | 874 | $300.00 | $170.00 | $228.03 | $252.00 |
| 13 | Flowable backfill (401-7001) | CY | 2 | $1,500.00 | $700.00 | $822.01 | $3,000.00 |
| 14 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 80 | $450.00 | $550.00 | $289.26 | $660.00 |
| 15 | Riprap (concrete)(CL B) (432-7005) | CY | 3 | $396.95 | $1,500.00 | $2,475.82 | $2,640.00 |
| 16 | CMP (aluminum 24") (460-7032) | LF | 8 | $500.00 | $227.00 | $751.30 | $600.50 |
| 17 | Set (type II) (24 in) (CMP) (6: 1) (C) (467-7323) | EACH | 1 | $2,250.00 | $3,500.00 | $9,762.70 | $18,000 |
| 18 | Clean existing culverts (480-7001) | EACH | 1 | $2,466.00 | $2,500.00 | $7,531.80 | $4,200.60 |
| 19 | Mobilization (500-7001) | LS | 1 | $118,179 | $130,000 | $107,640 | $208,558 |
| 20 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $25,000 | $24,500 | $5,050.63 | $50,000 |
| 21 | Portable changeable message sign (503-7002) | EACH | 4 | $20,000 | $6,100.00 | $6,721.14 | $23,125 |
| 22 | TMA (stationary) (505-7001) | DAY | 46 | $347.00 | $287.00 | $292.36 | $175.00 |
| 23 | TMA (mobile operation) (505-7003) | DAY | 15 | $900.00 | $250.00 | $741.39 | $1,075.00 |
| 24 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 210 | $14.00 | $9.00 | $8.17 | $28.00 |
| 25 | Biodegradable erosion control logs (remove) (506-7046) | LF | 210 | $4.00 | $4.00 | $3.07 | $18.00 |
| 26 | Portable concrete traffic barrier (furn & inst)(TL-3 LPCB) (512-7093) | LF | 2,000 | $50.00 | $150.00 | $150.89 | $240.00 |
| 27 | Portable concrete traffic barrier (remove) (TL-3 LPCB) (512-7097) | LF | 2,000 | $30.00 | $13.00 | $21.47 | $24.00 |
| 28 | Driveways (ACP) (530-7010) | SY | 285 | $102.00 | $124.00 | $222.61 | $87.37 |
| 29 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 3,600 | $0.20 | $0.42 | $1.47 | $1.80 |
| 30 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 2,800 | $0.23 | $0.54 | $1.47 | $2.40 |
| 31 | In RD IL (type SA) 50T-12 (400W EQ) LED (610-7200) | EACH | 8 | $7,000.00 | $8,500.00 | $6,658.54 | $10,200 |
| 32 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 1,990 | $11.69 | $7.00 | $17.47 | $8.40 |
| 33 | Electrical conductor (no.6) bare (620-7009) | LF | 2,115 | $1.47 | $2.50 | $1.91 | $3.00 |
| 34 | Electrical conductor (no.6) insulated (620-7010) | LF | 4,230 | $2.50 | $2.75 | $2.13 | $3.30 |
| 35 | Ground box type A (122311)W/apron (624-7002) | EACH | 1 | $2,048.44 | $2,250.00 | $1,315.34 | $2,700.00 |
| 36 | Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048) | EACH | 1 | $11,100 | $14,000 | $8,186.73 | $16,800 |
| 37 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $703.57 | $1,600.00 | $1,746.51 | $1,920.00 |
| 38 | Remove SM RD SN sup&AM (644-7073) | EACH | 2 | $113.38 | $150.00 | $127.52 | $241.87 |
| 39 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 2 | $120.00 | $150.00 | $163.74 | $180.00 |
| 40 | Remove delin & object marker assms (658-7078) | EACH | 2 | $135.00 | $100.00 | $109.16 | $241.87 |
| 41 | Install OM SM RD sign (1-OM-con)R (658-7080) | EACH | 2 | $30.00 | $50.00 | $54.58 | $60.00 |
| 42 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 5,000 | $0.48 | $0.45 | $1.53 | $1.68 |
| 43 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 5,000 | $0.38 | $0.45 | $1.53 | $1.68 |
| 44 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 150 | $1.00 | $1.77 | $3.07 | $6.00 |
| 45 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 275 | $1.44 | $1.84 | $3.31 | $6.00 |
| 46 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 700 | $0.96 | $2.00 | $1.64 | $1.80 |
| 47 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 1,000 | $1.00 | $1.00 | $1.64 | $1.80 |
| 48 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 3,700 | $1.31 | $1.00 | $1.64 | $1.80 |
| 49 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 6,000 | $1.50 | $1.00 | $1.64 | $1.80 |
| 50 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 40 | $16.08 | $15.00 | $21.83 | $24.00 |
| 51 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 2 | $213.43 | $180.00 | $327.47 | $360.00 |
| 52 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 2 | $264.05 | $240.00 | $436.63 | $480.00 |
| 53 | Reflectorized pavement marker type I-C (672-7002) | EACH | 70 | $5.54 | $5.00 | $7.64 | $8.40 |
| 54 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 60 | $4.28 | $5.00 | $7.64 | $8.40 |
| 55 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 70 | $4.39 | $5.00 | $7.64 | $8.40 |
| 56 | Eliminating existing PM & markers (4") (677-7001) | LF | 2,000 | $0.65 | $3.00 | $3.27 | $4.50 |
| 57 | Bonding course (3007-7001) | GAL | 1,588 | $3.21 | $5.80 | $2.68 | $7.19 |
| 58 | TMSP radar speed control monitor (6025-7001) | EACH | 2 | $12,350 | $17,500 | $1,721.51 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.