TxDOT contract A00196643 bid tabulation
Rehabilitate Existing Roadway, FM 1882 (SS 450 to BI 20). Let by Texas DOT on April 7, 2026, Ector, Odessa District. 3 bids received; low bid $10,253,366 by Jones Bros. Dirt & Paving Contractors, Inc., +32% against the engineer's estimate of $7,771,645.
- Owner
- Texas DOT
- Letting
- 07 APR 2026
- Pay items
- 59
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jones Bros. Dirt & Paving Contractors, Inc. | $10,253,366 | Low | +32% |
| 2 | Ragle Construction, Inc. | $10,852,667 | +6.0% | +40% |
| 3 | Reece Albert, Inc. | $11,147,743 | +9.0% | +43% |
Engineer's estimate: $7,771,645.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jones Bros. Dirt & Paving Contractors, Inc. | 2. Ragle Construction, Inc. | 3. Reece Albert, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 25 | $40.00 | $59.40 | $34.00 | $128.43 |
| 2 | Remove (9") TRT/untrt base & asphalt pavement (105-7029) | SY | 101,162 | $7.00 | $9.50 | $7.50 | $7.60 |
| 3 | Blading (150-7002) | HR | 30 | $342.00 | $450.00 | $158.50 | $917.23 |
| 4 | Proof rolling (216-7001) | HR | 30 | $155.00 | $175.00 | $135.50 | $178.65 |
| 5 | Rework BS metal (type D)(10")(ord comp) (251-7077) | SY | 101,162 | $1.00 | $0.68 | $2.00 | $0.73 |
| 6 | Prime coat (AE-P) (310-7001) | GAL | 20,234 | $4.50 | $4.82 | $6.25 | $6.65 |
| 7 | Fog seal (CSS-1H) (315-7004) | GAL | 20,234 | $5.00 | $4.11 | $5.50 | $5.35 |
| 8 | SP mixes SP-B sac-B PG70-22 (344-7005) | TON | 44,514 | $91.00 | $128.00 | $133.00 | $147.72 |
| 9 | Tom-C PG76-22 sac-A (347-7001) | TON | 5,820 | $140.00 | $183.00 | $150.00 | $244.72 |
| 10 | Tack coat (347-7011) | GAL | 25,293 | $4.00 | $4.11 | $6.00 | $2.79 |
| 11 | Flexible pavement structure repair(9") (351-7008) | SY | 100 | $104.50 | $375.00 | $200.00 | $195.53 |
| 12 | Planing asphalt concrete pavement (1" to 2") (354-7076) | SY | 516 | $3.00 | $15.25 | $9.00 | $10.53 |
| 13 | Class C concrete (rail foundation) (420-7052) | CY | 3.10 | $500.00 | $4,400.00 | $1,250.00 | $4,423.09 |
| 14 | Retrofit rail (type C1W) (451-7030) | LF | 128 | $320.00 | $440.00 | $461.00 | $442.31 |
| 15 | Adjusting manholes (479-7001) | EACH | 3 | $2,500.00 | $5,445.00 | $2,110.00 | $4,982.92 |
| 16 | Mobilization (500-7001) | LS | 1 | $441,036 | $335,000 | $1,000,000 | $384,238 |
| 17 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $20,000 | $45,000 | $58,000 | $18,716 |
| 18 | Portable changeable message sign (503-7002) | EACH | 2 | $13,000 | $19,250 | $15,500 | $10,716 |
| 19 | TMA (stationary) (505-7001) | DAY | 172 | $225.00 | $137.50 | $287.00 | $367.75 |
| 20 | TMA (mobile operation) (505-7003) | DAY | 68 | $400.00 | $935.00 | $625.00 | $854.14 |
| 21 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 167 | $14.00 | $28.00 | $9.00 | $19.26 |
| 22 | Biodegradable erosion control logs (remove) (506-7046) | LF | 167 | $2.50 | $12.00 | $3.00 | $13.61 |
| 23 | Driveways (concrete) (530-7006) | SY | 25 | $110.00 | $192.50 | $225.00 | $261.51 |
| 24 | Driveways (ACP) (530-7010) | SY | 25 | $60.00 | $750.00 | $235.00 | $300.70 |
| 25 | Aluminum signs (type A) (636-7001) | SF | 783 | $46.00 | $90.75 | $46.00 | $91.23 |
| 26 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 58 | $750.00 | $734.80 | $668.00 | $1,050.48 |
| 27 | Remove SM RD SN sup&AM (644-7073) | EACH | 54 | $130.00 | $410.00 | $150.00 | $160.34 |
| 28 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 382 | $8.00 | $3.30 | $7.50 | $3.32 |
| 29 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 179,732 | $0.27 | $0.18 | $0.42 | $0.18 |
| 30 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 8,987 | $0.50 | $2.50 | $1.00 | $2.12 |
| 31 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 4,829 | $0.90 | $0.64 | $0.77 | $0.64 |
| 32 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 3,071 | $0.90 | $0.68 | $0.76 | $0.69 |
| 33 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 20,527 | $1.40 | $0.64 | $0.76 | $0.64 |
| 34 | Prefabricated PM type C (W)(8")(solid) (668-7084) | LF | 2,876 | $11.00 | $2.75 | $1.00 | $2.76 |
| 35 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 2,958 | $16.00 | $12.10 | $14.00 | $12.16 |
| 36 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 45 | $250.00 | $231.00 | $225.00 | $232.21 |
| 37 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 19 | $280.00 | $275.00 | $325.00 | $276.44 |
| 38 | Prefabricated PM type C (W)(18")(yld tri) (668-7110) | EACH | 38 | $24.00 | $19.80 | $50.00 | $19.90 |
| 39 | Reflectorized pavement marker type I-C (672-7002) | EACH | 386 | $5.85 | $3.85 | $5.00 | $3.87 |
| 40 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 206 | $4.60 | $3.85 | $5.00 | $3.87 |
| 41 | Eliminating existing PM & markers (4") (677-7001) | LF | 31,303 | $0.80 | $0.72 | $0.75 | $0.72 |
| 42 | Eliminating existing PM & markers (24") (677-7008) | LF | 2,958 | $7.00 | $2.20 | $2.50 | $2.21 |
| 43 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 45 | $80.00 | $38.50 | $100.00 | $38.70 |
| 44 | Eliminating existing PM & markers (word) (677-7015) | EACH | 19 | $80.00 | $38.50 | $150.00 | $38.70 |
| 45 | Install highway traffic signal (upgrade) (680-7011) | EACH | 9 | $25,300 | $12,000 | $25,433 | |
| 46 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 21 | $660.00 | $425.00 | $663.46 | |
| 47 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 27 | $660.00 | $425.00 | $663.46 | |
| 48 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 21 | $660.00 | $425.00 | $663.46 | |
| 49 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 54 | $660.00 | $425.00 | $663.46 | |
| 50 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 21 | $660.00 | $425.00 | $663.46 | |
| 51 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 28 | $660.00 | $425.00 | $663.46 | |
| 52 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 21 | $247.50 | $235.00 | $248.80 | |
| 53 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 27 | $275.00 | $250.00 | $276.44 | |
| 54 | Pedestrian detect push button (APS) (688-7001) | EACH | 38 | $1,100.00 | $1,000.00 | $1,105.77 | |
| 55 | Pedestrian detector controller unit (688-7003) | EACH | 6 | $5,500.00 | $4,500.00 | $5,528.86 | |
| 56 | Install bbu system (690-7131) | EACH | 9 | $12,100 | $9,500.00 | $12,163 | |
| 57 | Drain inlet cleaning (764-7001) | EACH | 11 | $287.50 | $2,750.00 | $1,300.00 | $2,211.54 |
| 58 | Bonding course (3007-7001) | GAL | 10,116 | $3.00 | $2.61 | $6.50 | $2.81 |
| 59 | Video imaging and radar detector (6017-7015) | EACH | 19 | $12,100 | $12,000 | $12,163 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.