TxDOT contract A00206930 bid tabulation

Preventive Maintenance, SL 322 (IH 20 to US 83). Let by Texas DOT on February 5, 2026, Taylor, Abilene District. 6 bids received; low bid $8,968,076 by J. H. Strain & Sons, Inc., -11% against the engineer's estimate of $10,040,719.

Owner
Texas DOT
Letting
05 FEB 2026
Pay items
69
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1J. H. Strain & Sons, Inc.$8,968,076Low-11%
2CK Newberry, LLC$9,274,102+3.0%-8.0%
3RK Hall, LLC$10,097,096+13%+1.0%
4Foutsco Paving Company, LLC$10,107,055+13%+1.0%
5A. L. Helmcamp, Inc.$11,572,487+29%+15%
6Reece Albert, Inc.$11,613,776+30%+16%
TxDOT contract A00206930: bids by rank

Engineer's estimate: $10,040,719.

Bid tabulation

LinePay itemUnitQuantityEstimate1. J. H. Strain & Sons, Inc.2. CK Newberry, LLC3. RK Hall, LLC4. Foutsco Paving Company, LLC5. A. L. Helmcamp, Inc.6. Reece Albert, Inc.
1Removing concrete (mowstrip) (104-7003)SY107$17.00$45.00$50.00$44.94$35.00$65.00$44.29
2Removing concrete (curb & gutter) (104-7017)LF4,038$10.00$11.50$10.00$5.81$20.00$28.00$11.07
3Embankment (final)(OC)(type A) (132-7001)CY651$80.00$40.00$25.00$101.12$55.00$90.00$105.91
4Backfill (type A) (134-7001)STA707$225.00$175.00$150.00$207.04$150.00$300.00$271.16
5SP mixes SP-C sac-B PG70-22 (344-7021)TON50,151$110.55$108.51$105.00$118.88$125.75$145.00$147.65
6Tack coat (344-7077)GAL37,868$3.20$4.00$2.25$4.64$6.00$4.50$2.34
7Flexible pavement structure repair(4") (351-7003)SY10,520$40.66$30.00$37.00$40.37$36.00$56.00$46.78
8Flexible pavement structure repair(6") (351-7005)SY3,645$52.00$44.00$58.00$55.79$56.00$94.00$73.23
9Planing asphalt concrete pavement (0" to 2-1/2") (354-7083)SY90,166$3.00$1.50$2.25$4.35$1.00$1.75$4.82
10Riprap (mow strip)(4 in) (432-7013)CY593$584.00$635.00$625.00$646.01$560.00$600.00$636.64
11Cleaning and sealing existing joints (CL3) (438-7004)LF275$54.56$51.50$45.00$54.60$25.00$45.00$47.61
12Cleaning and sealing existing joints (CL7) (438-7007)LF1,861$45.00$46.00$30.00$67.20$40.00$31.00$32.11
13Retrofit rail (add HSS) (451-7052)LF4,253$145.00$115.00$115.00$109.20$105.00$110.00$116.26
14Mobilization (500-7001)LS1$827,319$495,000$900,000$527,797$625,000$700,000$432,000
15Barricades, signs and traffic handling (502-7001)MO7$30,000$11,000$20,000$26,346$60,000$7,400.00$12,600
16Portable changeable message sign (503-7002)EACH4$15,000$7,000.00$10,000$14,831$5,000.00$15,000$10,905
17TMA (stationary) (505-7001)DAY199$236.00$150.00$25.00$221.00$1.00$200.00$288.32
18TMA (mobile operation) (505-7003)DAY30$247.00$300.00$25.00$307.00$1.00$150.00$667.10
19Biodegradable erosion control logs (install) (12") (506-7044)LF17,800$5.47$5.25$5.00$5.24$0.50$5.30$4.98
20Biodegradable erosion control logs (remove) (506-7046)LF17,800$1.34$1.20$1.00$1.05$0.25$1.00$1.11
21Intersections (ACP) (type 1) (530-7003)SY698$65.00$37.00$25.00$45.78$25.00$50.00$37.67
22Driveways (ACP) (type 1) (530-7011)SY567$35.00$37.00$30.00$49.89$40.00$61.00$41.91
23Driveways (base) (530-7015)SY234$38.00$25.00$35.00$40.88$40.00$50.00$44.36
24Mill rumble strips (asphalt) (shoulder) (533-7001)LF115,079$0.20$0.18$0.15$0.17$0.15$0.25$0.18
25Metal W-beam guard fence (timber post) (540-7001)LF7,787.50$26.00$27.78$26.00$22.05$26.00$22.00$27.96
26Metal beam guard fence trans (thrie-beam) (540-7005)EACH26$2,228.00$2,640.00$2,400.00$1,601.25$2,450.00$1,900.00$2,657.30
27Downstream anchor terminal section (540-7015)EACH13$1,167.00$1,725.00$1,600.00$1,233.75$1,450.00$1,300.00$1,732.78
28Metal beam guard fence trans (non - sym) (540-7016)EACH12$792.00$1,285.00$1,200.00$840.00$1,450.00$850.00$1,289.90
29Connector plate for thrie beam (540-7030)EACH38$471.00$115.00$100.00$966.00$785.00$1,000.00$110.72
30Remove metal beam guard fence (542-7001)LF8,425$3.00$2.20$2.00$2.10$2.00$2.20$2.21
31Remove downstream anchor terminal (542-7003)EACH16$270.00$250.00$250.00$210.00$100.00$220.00$249.12
32RM metal beam guard fence trans (thrie-beam) (542-7004)EACH26$344.00$250.00$250.00$893.83$100.00$500.00$249.12
33RM metal beam guard fence trans (TL-2) (542-7006)EACH14$340.00$250.00$250.00$210.00$175.00$220.00$249.12
34Guardrail end treatment (install) (544-7001)EACH27$3,100.00$3,910.00$3,500.00$3,045.00$3,450.00$3,100.00$3,930.59
35Guardrail end treatment (remove) (544-7003)EACH28$280.00$250.00$250.00$210.00$200.00$220.00$249.12
36Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH1$1,200.00$1,100.00$1,100.00$1,027.95$2,000.00$1,000.00$1,162.57
37Remove SM RD SN sup&AM (644-7073)EACH1$204.00$250.00$500.00$115.50$300.00$120.00$249.12
38Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014)EACH139$30.00$66.00$60.00$46.20$25.00$46.00$66.43
39Install delineator assembly (D-SW)SZ 1(BRF)GF2(BR) (658-7020)EACH159$30.00$66.00$60.00$46.20$25.00$46.00$66.43
40Install delineator assembly (D-SY)SZ 1(BRF)CTB (BR) (658-7033)EACH88$30.00$66.00$60.00$46.20$25.00$46.00$66.43
41Install delineator assembly (D-SY)SZ 1(BRF)GF2(BR) (658-7038)EACH54$30.00$66.00$60.00$46.20$25.00$46.00$66.43
42Inst delineator assembly (D-SW)SZ 1(WFLX)GNDLL(BR) (658-7109)EACH399$91.00$54.00$150.00$50.40$48.00$78.00$166.08
43Inst delineator assembly (D-SY)SZ 1(yflx)GNDLL(BR) (658-7122)EACH268$91.00$54.00$150.00$50.40$48.00$78.00$166.08
44Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH7,415$1.30$1.50$1.00$2.45$0.10$1.00$1.87
45Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH4$15.00$25.00$1.00$3.53$5.00$1.00$1.85
46Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF204$5.00$2.20$1.00$0.63$1.00$1.05$0.66
47Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF14,999$1.00$1.05$0.75$0.68$0.78$0.85$0.72
48Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF2,292$3.60$4.68$4.00$4.31$2.40$2.50$4.54
49Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF343$7.50$13.20$8.00$8.61$6.75$7.10$9.08
50Reflectorized pavement marking type II (W) 6" (broken) (666-7172)LF17,690$0.23$0.18$0.15$0.16$0.14$0.18$0.17
51Reflectorized pavement marking type II (W) 6" (DOT) (666-7173)LF204$5.00$1.10$0.15$0.16$0.25$0.26$0.17
52Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF91,361$0.20$0.18$0.15$0.16$0.13$0.18$0.17
53Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF14,999$0.48$0.50$0.20$0.20$0.17$0.18$0.21
54Reflectorized pavement marking type II (W) 12" (DOT) (666-7180)LF231$5.00$2.20$0.25$0.26$1.00$1.05$0.28
55Reflectorized pavement marking type II (W) 12" (solid) (666-7182)LF2,292$1.66$1.92$0.25$0.26$0.50$0.53$0.28
56Reflectorized pavement marking type II (W) 24" (solid) (666-7184)LF343$3.00$4.40$4.00$4.20$0.72$0.76$4.43
57Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF92,245$0.25$0.18$0.15$0.16$0.17$0.18$0.17
58Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF17,690$0.70$0.57$0.60$0.59$0.50$0.53$0.62
59Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF92,361$0.80$0.57$0.60$0.59$0.50$0.53$0.62
60Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF92,245$0.90$0.57$0.60$0.59$0.50$0.53$0.62
61Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424)LF231$5.00$5.50$2.50$2.63$2.50$2.80$2.77
62PRFB rumble strip (BLK)(4')(transverse) (668-7001)LF320$10.00$16.50$15.00$15.75$4.00$4.20$16.61
63Prefabricated PM type C (W)(24")(solid) (668-7089)LF37$30.00$18.70$15.00$15.75$14.00$15.00$16.61
64Prefabricated PM type C (W)(arrow) (668-7091)EACH4$500.00$242.00$225.00$236.25$190.00$200.00$249.12
65Prefabricated PM type C (W)(number) (668-7102)EACH2$500.00$242.00$250.00$262.50$200.00$220.00$276.80
66Prefabricated PM type C (W)(word) (668-7103)EACH10$500.00$358.00$325.00$341.25$255.00$270.00$359.84
67Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH3$500.00$17.00$50.00$52.50$50.00$53.00$55.36
68Reflectorized pavement marker type II-A-A (672-7004)EACH4$60.00$11.00$10.00$10.50$4.00$5.00$11.07
69Reflectorized pavement marker type II-C-R (672-7006)EACH1,926$4.50$5.50$4.50$4.73$3.50$4.00$4.98
TxDOT contract A00206930: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of February 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy