TxDOT contract A00187842 bid tabulation
Highway Improvement, FM 1208 (FM1212 to MIDLAND C/L). Let by Texas DOT on April 8, 2026, Martin, Odessa District. 5 bids received; low bid $9,373,792 by Jones Bros. Dirt & Paving Contractors, Inc., -5.6% against the engineer's estimate of $9,927,435.
- Owner
- Texas DOT
- Letting
- 08 APR 2026
- Pay items
- 65
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jones Bros. Dirt & Paving Contractors, Inc. | $9,373,792 | Low | -6.0% |
| 2 | RK Hall, LLC | $10,238,364 | +9.0% | +3.0% |
| 3 | Reece Albert, Inc. | $11,381,091 | +21% | +15% |
| 4 | Ragle Construction, Inc. | $12,578,785 | +34% | +27% |
| 5 | Gilvin-Terrill, LTD. | $13,757,545 | +47% | +39% |
Engineer's estimate: $9,927,435.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jones Bros. Dirt & Paving Contractors, Inc. | 2. RK Hall, LLC | 3. Reece Albert, Inc. | 4. Ragle Construction, Inc. | 5. Gilvin-Terrill, LTD. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 799 | $25.00 | $35.00 | $46.12 | $46.10 | $14.00 | $55.00 |
| 2 | Remove (4") TRT/untrt base & asphalt pavement (105-7024) | SY | 66,758 | $8.00 | $3.85 | $4.03 | $6.96 | $3.00 | $3.00 |
| 3 | Subgr widen (OC) (112-7001) | STA | 246 | $500.00 | $1,073.00 | $1,149.91 | $839.45 | $1,620.00 | $3,000.00 |
| 4 | Backfill (type B) (134-7002) | STA | 266 | $215.00 | $188.00 | $119.12 | $272.09 | $264.00 | $500.00 |
| 5 | Blading (150-7002) | HR | 175 | $200.00 | $375.00 | $175.04 | $193.73 | $10.00 | $500.00 |
| 6 | Proof rolling (216-7001) | HR | 200 | $150.00 | $150.00 | $151.18 | $179.87 | $10.00 | $500.00 |
| 7 | FL BS (compacted in place)(type A GR 4) (6") (247-7046) | SY | 60,114 | $15.00 | $9.23 | $14.60 | $14.16 | $10.25 | $8.50 |
| 8 | Prime coat (AE-P) (310-7001) | GAL | 25,720 | $4.50 | $4.65 | $6.29 | $4.23 | $6.00 | $0.72 |
| 9 | Asphalt (AC-20-5TR) (316-7007) | GAL | 48,495 | $5.00 | $3.50 | $4.29 | $4.79 | $5.00 | $5.05 |
| 10 | Aggregate (type-PB, GR-4)(sac-A) (316-7136) | CY | 1,164 | $180.00 | $72.00 | $186.59 | $254.06 | $150.00 | $250.00 |
| 11 | D-GR HMA type-C sac-B PG64-22 (341-7017) | TON | 216 | $110.00 | $204.00 | $179.00 | $187.87 | $190.00 | $378.00 |
| 12 | Tack coat (341-7082) | GAL | 10,211 | $4.75 | $3.59 | $8.04 | $3.96 | $6.10 | $8.00 |
| 13 | SP mixes SP-B sac-B PG70-22 (344-7005) | TON | 35,092 | $100.00 | $112.00 | $108.80 | $130.28 | $140.00 | $140.00 |
| 14 | Stone-MTRX-asphalt smar-F sac-A (346-7023) | TON | 0 | $140.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 15 | Flexible pavement structure repair(6") (351-7005) | SY | 2,516 | $100.00 | $101.00 | $57.88 | $69.29 | $85.00 | $90.00 |
| 16 | Plane & text asphalt concrete pavement (0" to 5.5") (354-7101) | SY | 2,070 | $6.00 | $13.21 | $5.96 | $8.45 | $6.00 | $15.00 |
| 17 | Cem stabil BKFL (400-7010) | CY | 166 | $190.00 | $236.50 | $270.09 | $217.76 | $152.00 | $250.00 |
| 18 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 120 | $450.00 | $412.50 | $397.50 | $445.19 | $375.00 | $315.00 |
| 19 | Riprap (concrete)(4 in) (432-7001) | CY | 9 | $560.00 | $1,045.00 | $2,640.56 | $818.13 | $1,005.50 | $950.00 |
| 20 | RC pipe (CL III)(18 in) (464-7003) | LF | 463 | $150.00 | $143.40 | $125.47 | $110.91 | $91.00 | $65.00 |
| 21 | RC pipe (CL III)(24 in) (464-7005) | LF | 19 | $160.00 | $240.32 | $190.73 | $229.98 | $142.00 | $155.00 |
| 22 | RC pipe (CL III)(30 in) (464-7007) | LF | 112 | $150.00 | $205.05 | $165.71 | $253.55 | $166.00 | $200.00 |
| 23 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 20 | $2,600.00 | $2,079.76 | $1,456.17 | $1,973.41 | $1,421.00 | $1,000.00 |
| 24 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 2 | $2,310.00 | $2,334.03 | $1,729.99 | $2,601.29 | $2,023.10 | $2,500.00 |
| 25 | Set (type II) (30 in) (RCP) (6: 1) (C) (467-7347) | EACH | 4 | $4,600.00 | $4,517.39 | $3,910.88 | $4,720.85 | $5,175.00 | $3,500.00 |
| 26 | Clean existing culverts (480-7001) | EACH | 1 | $5,500.00 | $4,372.80 | $2,389.52 | $1,783.00 | $2,480.00 | |
| 27 | Removing structure (pipe) (496-7007) | LF | 538 | $27.00 | $38.11 | $30.78 | $36.06 | $25.00 | $90.21 |
| 28 | Mobilization (500-7001) | LS | 1 | $556,884 | $310,000 | $596,974 | $450,619 | $1,200,000 | $1,300,000 |
| 29 | Barricades, signs and traffic handling (502-7001) | MO | 13 | $23,000 | $15,000 | $25,000 | $8,001.51 | $62,250 | $10,000 |
| 30 | Portable changeable message sign (503-7002) | EACH | 4 | $10,000 | $19,250 | $14,000 | $10,610 | $9,000.00 | $18,500 |
| 31 | TMA (stationary) (505-7001) | DAY | 183 | $200.00 | $137.50 | $236.70 | $298.31 | $286.50 | $400.00 |
| 32 | TMA (mobile operation) (505-7003) | DAY | 56 | $300.00 | $935.00 | $396.78 | $643.26 | $625.00 | $400.00 |
| 33 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 720 | $10.00 | $14.50 | $7.39 | $7.16 | $10.00 | $13.00 |
| 34 | Biodegradable erosion control logs (remove) (506-7046) | LF | 720 | $2.00 | $5.50 | $1.79 | $1.76 | $3.00 | $2.00 |
| 35 | Concrete curb (type I) (529-7001) | LF | 280 | $45.00 | $55.00 | $76.61 | $43.09 | $24.00 | $85.00 |
| 36 | Driveways (concrete) (530-7006) | SY | 1,057 | $115.00 | $150.00 | $181.71 | $158.45 | $116.00 | $235.00 |
| 37 | Driveways (ACP) (530-7010) | SY | 7,439 | $75.00 | $52.50 | $44.43 | $69.89 | $50.00 | $100.00 |
| 38 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 52,552 | $0.25 | $0.20 | $0.25 | $0.15 | $0.08 | $0.15 |
| 39 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 26,276 | $0.25 | $0.25 | $0.28 | $0.15 | $0.10 | $0.15 |
| 40 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 2 | $200.00 | $468.60 | $233.20 | $505.74 | $426.00 | $220.00 |
| 41 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 2 | $320.00 | $511.50 | $254.40 | $552.04 | $465.00 | $240.00 |
| 42 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 12 | $620.00 | $1,094.50 | $699.60 | $1,181.25 | $995.00 | $660.00 |
| 43 | In RD IL (type SA) 50T-10 (400W EQ) LED (610-7198) | EACH | 12 | $9,400.00 | $8,250.00 | $7,950.00 | $8,903.88 | $7,500.00 | $5,770.00 |
| 44 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 3,071 | $10.00 | $11.00 | $10.60 | $11.87 | $10.00 | $26.08 |
| 45 | Electrical conductor (no.6) bare (620-7009) | LF | 3,296 | $2.50 | $2.75 | $2.65 | $2.97 | $2.50 | $1.71 |
| 46 | Electrical conductor (no.6) insulated (620-7010) | LF | 6,592 | $2.75 | $2.75 | $2.65 | $2.97 | $2.50 | $2.43 |
| 47 | Ground box type A (122311)W/apron (624-7002) | EACH | 2 | $2,100.00 | $1,925.00 | $1,855.00 | $2,077.57 | $1,750.00 | $1,280.00 |
| 48 | Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048) | EACH | 2 | $13,500 | $11,000 | $10,600 | $11,872 | $10,000 | $5,850.00 |
| 49 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 31 | $795.00 | $754.60 | $980.50 | $814.41 | $686.00 | $925.00 |
| 50 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 7 | $1,400.00 | $1,123.10 | $1,272.00 | $1,212.12 | $1,021.00 | $1,200.00 |
| 51 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 1 | $1,425.60 | $1,272.00 | $1,538.58 | $1,296.00 | $1,200.00 | |
| 52 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 5 | $700.00 | $726.00 | $503.50 | $783.54 | $660.00 | $475.00 |
| 53 | Remove SM RD SN sup&AM (644-7073) | EACH | 23 | $130.00 | $175.00 | $106.00 | $178.54 | $140.00 | $100.00 |
| 54 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 26 | $90.00 | $89.10 | $90.10 | $96.16 | $81.00 | $85.00 |
| 55 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 5 | $6.00 | $14.30 | $21.20 | $15.43 | $13.00 | $20.00 |
| 56 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 24,045 | $0.50 | $1.50 | $3.00 | $2.96 | $1.00 | $2.00 |
| 57 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 53,152 | $0.40 | $0.61 | $0.71 | $0.80 | $0.67 | $0.67 |
| 58 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 5,966 | $0.42 | $0.64 | $0.74 | $0.83 | $0.70 | $0.70 |
| 59 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 8,022 | $0.45 | $0.64 | $0.74 | $0.83 | $0.70 | $0.70 |
| 60 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 116 | $8.00 | $13.20 | $16.96 | $18.99 | $16.00 | $16.00 |
| 61 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 398 | $5.00 | $4.40 | $8.48 | $9.50 | $8.00 | $8.00 |
| 62 | Eliminating existing PM & markers (4") (677-7001) | LF | 59,400 | $0.80 | $0.72 | $0.88 | $1.06 | $0.60 | $1.21 |
| 63 | Ditch cleaning and reshaping (foot) (760-7001) | LF | 250 | $15.00 | $44.00 | $21.74 | $55.58 | $11.00 | $50.00 |
| 64 | Bonding course (3007-7001) | GAL | 10,211 | $4.90 | $2.61 | $5.54 | $3.82 | $5.75 | $5.50 |
| 65 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 10,528 | $140.00 | $144.00 | $155.68 | $191.54 | $210.00 | $257.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.