TxDOT contract A00193354 bid tabulation

Widen Road - Add Lanes And Shoulders, FM 89 (1.219 MILES SOUTH OF ELM CREEK to ELM CREEK). Let by Texas DOT on March 4, 2026, Taylor, Abilene District. 5 bids received; low bid $6,284,525 by J. H. Strain & Sons, Inc., +0.7% against the engineer's estimate of $6,239,737.

Owner
Texas DOT
Letting
04 MAR 2026
Pay items
87
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1J. H. Strain & Sons, Inc.$6,284,525Low+1.0%
2Reece Albert, Inc.$6,362,078+1.0%+2.0%
3CK Newberry, LLC$6,941,806+10%+11%
4Gilvin-Terrill, LTD.$7,739,939+23%+24%
5A. L. Helmcamp, Inc.$7,942,078+26%+27%
TxDOT contract A00193354: bids by rank

Engineer's estimate: $6,239,737.

Bid tabulation

LinePay itemUnitQuantityEstimate1. J. H. Strain & Sons, Inc.2. Reece Albert, Inc.3. CK Newberry, LLC4. Gilvin-Terrill, LTD.5. A. L. Helmcamp, Inc.
1Removing concrete (riprap) (104-7006)SY3$30.00$225.00$154.69$500.00$25.00$250.00
2Removing concrete (driveways) (104-7011)SY1,478$30.00$15.00$11.60$35.00$25.00$40.00
3Excavation (roadway) (110-7001)CY16,872$15.00$12.75$10.96$22.00$25.00$16.00
4Embankment (final)(DC)(type A) (132-7002)CY7,624$20.00$14.00$4.40$15.00$25.00$22.00
5Broadcast seed (permanent_rural_clay) (164-7034)ACRE14.20$1,800.00$1,000.00$806.70$725.00$1,500.00$790.00
6Vegetative watering (168-7001)TGL919$10.00$50.00$47.85$25.00$42.00$40.00
7FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176)CY6,298$76.00$62.00$70.14$80.00$90.00$70.00
8Prime coat (MC-30) (310-7004)GAL5,038$5.00$7.00$5.88$8.00$10.00$8.00
9SP mixes SP-C sac-B PG70-22 (344-7021)TON18,991$120.00$120.96$142.78$128.00$140.00$150.00
10Tack coat (344-7077)GAL19,075$3.50$5.00$2.32$5.00$6.00$5.00
11Planing asphalt concrete pavement(0" to 2") (354-7032)SY15,806$3.00$2.25$5.23$3.00$2.00$7.00
12Planing asphalt concrete pavement(0" to 3") (354-7033)SY3,967$3.00$3.75$4.21$3.00$2.00$7.00
13Planing asphalt concrete pavement(3") (354-7052)SY3,890$3.75$4.05$3.00$2.00$7.00
14Cut & restoring pavement (400-7006)SY60$195.00$74.72$125.00$200.00$100.00
15Flowable backfill (401-7001)CY27$280.00$335.08$225.00$600.00$320.00
16Trench excavation protection (402-7001)LF80$120.00$1.34$50.00$50.00$55.00
17Class A concrete (plug) (420-7009)EACH2$4,500.00$680.81$5,000.00$3,000.00$2,600.00
18Class B concrete (miscellaneous) (420-7011)CY32$650.00$340.54$500.00$800.00$1,100.00
19Riprap (concrete)(5 in) (432-7002)CY123$250.00$775.00$1,706.95$625.00$700.00$900.00
20Riprap (mow strip)(4 in) (432-7013)CY194$725.00$641.09$650.00$700.00$900.00
21Riprap (stone protection)(18 in) (432-7043)CY198$200.00$595.77$225.00$500.00$275.00
22Retrofit rail (type T131RC) (451-7049)LF562$260.00$251.09$275.00$185.00$205.00
23CMP AR (gal steel des 4) (460-7019)LF16$475.00$210.00$184.22$325.00$500.00$265.00
24RC pipe (CL III)(24 in) (464-7005)LF1,608$130.00$135.00$100.28$125.00$135.00$125.00
25RC pipe (CL III)(30 in) (464-7007)LF1,002$120.00$195.00$114.14$150.00$170.00$170.00
26Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH2$2,200.00$1,319.59$5,500.00$2,500.00$2,200.00
27Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH50$2,677.00$2,650.00$1,575.89$3,000.00$2,750.00$2,300.00
28Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH2$5,550.00$1,824.14$5,500.00$3,000.00$2,500.00
29Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348)EACH34$4,000.00$6,200.00$3,749.64$3,500.00$3,500.00$4,300.00
30Set (type II) (des 4) (CMP) (4: 1) (C) (467-7436)EACH2$4,000.00$2,700.00$4,103.49$6,000.00$5,500.00$3,000.00
31Jack bor or tun pipe(30 in)(RC)(CL III) (476-7012)LF132$2,830.00$1,589.21$2,000.00$2,000.00$2,200.00
32Removing structure (set) (496-7004)EACH30$1,065.00$600.00$414.52$1,500.00$1,100.00$530.00
33Removing structure (pipe) (496-7007)LF750$50.00$15.00$13.80$50.00$50.00$25.00
34Mobilization (500-7001)LS1$545,000$285,000$421,213$650,000$770,000$750,000
35Barricades, signs and traffic handling (502-7001)MO13$15,000$10,000$3,642.18$20,000$21,000$29,800
36Portable changeable message sign (503-7002)EACH2$8,500.00$7,346.98$12,000$18,500$20,000
37TMA (stationary) (505-7001)DAY234$280.00$275.00$39.32$350.00$470.00$250.00
38TMA (mobile operation) (505-7003)DAY28$500.00$275.00$609.87$100.00$470.00$400.00
39Rock filter dams (install) (type 4) (506-7004)LF20$125.00$153.45$95.00$95.00$125.00
40Rock filter dams (remove) (506-7011)LF20$50.00$55.17$25.00$55.00$36.00
41Temporary sediment control fence (install) (506-7039)LF4,025$6.50$5.00$5.08$7.00$5.00$4.50
42Temporary sediment control fence (remove) (506-7041)LF4,025$2.00$1.50$0.53$2.00$1.50$1.00
43Biodegradable erosion control logs (install) (12") (506-7044)LF960$10.00$7.50$6.14$10.00$7.00$6.00
44Biodegradable erosion control logs (remove) (506-7046)LF960$2.80$2.00$1.60$2.00$1.00$1.00
45Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF1,080$120.00$116.64$115.00$80.00$95.00
46Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF1,080$18.00$4.32$10.00$10.00$40.00
47Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037)LF1,080$25.00$15.82$20.00$20.00$40.00
48Intersections (concrete) (530-7001)SY1,101$125.00$167.00$137.23$80.00$150.00$215.00
49Intersections (ACP) (530-7002)SY134$30.00$45.00$113.79$25.00$50.00$100.00
50Driveways (concrete) (530-7006)SY263$100.00$167.00$153.45$120.00$150.00$190.00
51Driveways (base) (530-7015)SY5,505$25.00$15.00$33.44$25.00$40.00$40.00
52Mill rumble strips (asphalt) (shoulder) (533-7001)LF34,111$0.25$0.25$0.24$0.25$0.60$0.56
53Mill rumble strips (asphalt) (centerline) (533-7002)LF1,075$0.28$0.27$0.25$0.60$0.56
54Metal W-beam guard fence (timber post) (540-7001)LF1,487.50$31.00$29.38$30.00$24.00$30.00
55Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$4,760.00$4,541.04$5,000.00$1,900.00$1,600.00
56Remove metal beam guard fence (542-7001)LF2,200$2.20$2.14$2.00$3.50$3.50
57Guardrail end treatment (install) (544-7001)EACH10$3,920.00$3,739.68$4,000.00$3,100.00$3,000.00
58Guardrail end treatment (remove) (544-7003)EACH10$28.00$26.71$25.00$275.00$600.00
59Crash cushion attenuator (move & reset) (545-7002)EACH1$2,250.00$1,705.33$2,000.00$825.00$1,000.00
60Crash cushion attenuator (stockpile) (545-7003)EACH1$1,700.00$1,705.33$1,500.00$825.00$1,000.00
61Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH1$13,500$2,945.33$15,000$5,825.00$9,000.00
62Mailbox install-S (TWG-post) type 2 (560-7002)EACH37$350.00$320.00$270.33$250.00$250.00$260.00
63Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH30$800.00$745.00$709.47$1,000.00$950.00$1,000.00
64Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH7$975.00$940.00$895.39$1,000.00$950.00$1,000.00
65Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH1$1,100.00$958.43$1,000.00$950.00$1,000.00
66Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035)EACH1$1,300.00$1,233.03$1,000.00$950.00$1,000.00
67Remove SM RD SN sup&AM (644-7073)EACH30$115.00$110.00$93.00$100.00$100.00$110.00
68Install delineator assembly (D-SW)SZ 2(WC)GND (658-7009)EACH58$55.00$55.00$48.08$80.00$80.00$85.00
69Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH33$51.00$48.08$80.00$40.00$45.00
70Install object marker assembly (OM-2Y)(WC)GND (658-7056)EACH4$150.00$61.00$57.70$80.00$80.00$85.00
71Work zone pavement marking removing (W)(arrow) (662-7082)EACH4$200.00$160.27$175.00$75.00$80.00
72Work zone pavement marking removing (Y)6"(solid) (662-7100)LF56,174$1.00$0.20$0.62$0.25$0.50$0.55
73Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH2,395$2.00$2.25$2.52$1.00$1.00$0.75
74Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF952$1.35$1.60$1.25$0.95$1.00
75Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF34,507$1.30$0.57$0.59$0.50$0.60$0.64
76Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF6,909$1.30$0.57$0.60$0.50$0.61$0.65
77Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF36,579$1.30$0.57$0.59$0.50$0.60$0.64
78Prefabricated PM type C (W)(24")(solid) (668-7089)LF178$25.00$22.50$15.39$20.00$17.50$19.00
79Prefabricated PM type C (W)(arrow) (668-7091)EACH52$270.00$255.00$229.72$225.00$200.00$220.00
80Prefabricated PM type C (W)(word) (668-7103)EACH4$255.00$459.45$225.00$240.00$250.00
81Reflectorized pavement marker type I-C (672-7002)EACH37$5.65$8.55$5.00$5.50$6.00
82Reflectorized pavement marker type II-A-A (672-7004)EACH1,027$7.00$5.65$6.14$5.00$5.50$6.00
83Eliminating existing PM & markers (4") (677-7001)LF34,612$1.00$0.30$0.37$0.25$0.64$0.65
84Eliminating existing PM & markers (24") (677-7008)LF640$3.40$3.21$3.00$4.00$4.50
85Eliminating existing PM & markers (arrow) (677-7009)EACH6$115.00$106.85$100.00$80.00$85.00
86Eliminating existing PM & markers (TPL arrow) (677-7011)EACH3$1,650.00$106.85$125.00$80.00$85.00
87Ditch cleaning and reshaping (foot) (760-7001)LF123$40.00$4.76$40.00$100.00$75.00
TxDOT contract A00193354: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy