TxDOT contract A00206664 bid tabulation

Hazard Elimination & Safety, FM 900 (2.75 Mi S of FM 69 to US 67). Let by Texas DOT on January 6, 2026, Hopkins, Paris District. 8 bids received; low bid $2,863,925 by Garret Shields Infrastructure, -20% against the engineer's estimate of $3,572,316.

Owner
Texas DOT
Letting
06 JAN 2026
Pay items
90
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Garret Shields Infrastructure$2,863,925Low-20%
2Sammy Gist Enterprises, Inc.$3,086,235+8.0%-14%
3D. L. Lennon Incorporated - Contractor$3,303,501+15%-8.0%
4Highway 19 Construction LLC$3,337,201+17%-7.0%
5A. K. Gillis & Sons, LLC$3,428,766+20%-4.0%
6STX Civil$3,430,168+20%-4.0%
7CDM Holdings$3,549,874+24%-1.0%
8Scout 5 Construction LLC$4,536,596+58%+27%
TxDOT contract A00206664: bids by rank

Engineer's estimate: $3,572,316.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Garret Shields Infrastructure2. Sammy Gist Enterprises, Inc.3. D. L. Lennon Incorporated - Contractor4. Highway 19 Construction LLC5. A. K. Gillis & Sons, LLC6. STX Civil
1Preparing row (100-7002)STA294$1,200.00$500.00$400.00$307.00$250.00$452.00$290.00
2Subgr widen (OC) (112-7001)STA294$350.00$400.00$300.00$224.00$350.00$300.00$450.00
3Embankment (vehicle)(OC)(type B) (132-7015)CY200$70.00$40.00$40.00$36.00$50.00$50.00$21.00
4Backfill (type B) (134-7002)STA294$290.00$100.00$200.00$268.00$350.00$300.00$250.00
5Backfill (type A)(vehicle) (134-7005)CY28$50.00$100.00$100.00$150.00$50.00$50.00$40.00
6Road grader work (ord comp) (152-7001)STA294$330.00$200.00$273.00$304.00$350.00$300.00$225.00
7Broadcast seed (temporary_warm) (164-7005)SY49,044$0.16$0.10$0.18$0.13$0.25$0.15$0.15
8Broadcast seed (temporary_cool) (164-7006)SY49,044$0.16$0.10$0.20$0.13$0.30$0.15$0.15
9Straw/hay mulch seed(permanent_rural_sand) (164-7025)SY98,088$0.28$0.10$0.33$0.26$0.45$0.30$0.31
10Vegetative watering (168-7001)TGL589$24.00$25.00$0.00$65.00$10.00$5.00$1.00
11FL BS (compacted in place)(type A GR 4) (6") (247-7046)SY24,522$21.00$5.50$20.00$18.38$14.00$25.86$15.00
12Cement (275-7001)TON149$230.00$300.00$305.00$265.00$250.00$230.00$275.00
13Cement TRT (new base)(6") (275-7010)SY24,522$2.95$5.00$2.85$8.00$11.00$3.15$4.25
14Asphalt (RC-250) (316-7016)GAL6,867$5.38$6.00$5.25$7.50$5.99$5.89$5.00
15Asphalt (AC-20-5TR or AC-20XP) (316-7067)GAL58,425$4.90$7.00$3.50$4.36$4.61$4.51$5.50
16Aggregate (type-PB, GR-4)(sac-A) (316-7136)CY1,210$200.00$150.00$204.00$195.00$161.00$217.32$300.00
17Aggregate (type-B, GR-5)(sac-B) (316-7175)CY176$145.00$80.00$156.00$135.00$180.00$148.76$170.00
18Flexible pavement structure repair(7") (351-7006)SY60$87.00$150.00$250.00$200.00$95.00$100.00$100.00
19Cut & restore asphalt paving (400-7008)SY27$242.00$200.00$220.00$100.00$350.00$100.00$250.00
20Cut and restore pavement (flex base) (400-7009)SY84$202.00$100.00$100.00$100.00$350.00$100.00$90.00
21Temporary special shoring (403-7001)SF1,302$30.00$40.00$44.00$78.00$55.00$5.00$10.00
22Riprap (mow strip)(4 in) (432-7013)CY111$570.00$600.00$649.00$725.00$550.00$725.00$790.00
23Riprap (stone protection)(12 in) (432-7041)CY145$250.00$250.00$247.50$320.00$180.00$343.90$172.00
24Riprap (stone protection)(18 in) (432-7043)CY247$250.00$250.00$275.00$315.00$180.00$343.90$172.00
25Cleaning and sealing existing joints (CL7) (438-7007)LF207$53.00$40.00$61.60$65.00$75.00$56.00$75.00
26Concrete box culvert (5 FT X 3 FT)(extend) (462-7062)LF21$1,050.00$800.00$990.00$1,000.00$700.00$1,000.00$1,000.00
27Concrete box culvert (6 FT X 6 FT)(extend) (462-7069)LF8$1,260.00$1,000.00$1,210.00$1,150.00$1,000.00$1,150.00$1,400.00
28Concrete box culvert (7 FT X 3 FT)(extend) (462-7070)LF4$1,300.00$1,000.00$2,200.00$1,100.00$800.00$1,100.00$1,700.00
29Concrete box culvert (7 FT X 6 FT)(extend) (462-7073)LF18$1,500.00$1,200.00$1,650.00$1,200.00$1,000.00$1,200.00$1,900.00
30RC pipe (CL III)(12 in) (464-7001)LF46$50.00$50.00$66.00$50.00$50.00$50.00$65.00
31RC pipe (CL III)(18 in) (464-7003)LF206$55.00$80.00$71.50$55.00$55.00$55.00$70.00
32RC pipe (CL III)(24 in) (464-7005)LF150$80.00$120.00$110.00$90.00$92.00$90.00$90.00
33RC pipe (CL III)(36 in) (464-7009)LF28$182.85$150.00$165.00$175.00$186.00$175.00$180.00
34RC pipe (CL III)(42 in) (464-7010)LF52$250.00$300.00$270.00$300.00$322.00$300.00$300.00
35Headwall (CH - PW - 0) (diameter= 30 in) (466-7103)EACH2$9,736.00$6,000.00$9,460.00$8,500.00$4,500.00$8,500.00$11,000
36Headwall (CH - PW - 0) (diameter= 42 in) (466-7106)EACH3$13,137$8,000.00$13,750$9,500.00$12,000$9,500.00$13,000
37Headwall (CH - PW - 0) (diameter= 48 in) (466-7107)EACH2$15,000$10,000$14,300$12,500$12,000$12,500$15,000
38Wingwall (FW - 0) (HW=4 FT) (466-7146)EACH3$12,500$8,000.00$13,200$14,500$12,000$14,500$10,000
39Wingwall (FW - 0) (HW=7 FT) (466-7149)EACH2$16,000$20,000$20,350$16,500$21,000$16,500$14,000
40Wingwall (FW - S) (HW=7 FT) (466-7163)EACH2$17,500$20,000$21,175$13,000$21,000$13,000$16,000
41Set (type II) (12 in) (RCP) (6: 1) (P) (467-7292)EACH4$800.00$800.00$935.00$600.00$550.00$600.00$1,830.00
42Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306)EACH8$800.00$1,200.00$880.00$700.00$685.00$700.00$2,000.00
43Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH38$800.00$1,400.00$968.00$800.00$800.00$800.00$2,500.00
44Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH17$1,250.00$1,500.00$1,320.00$1,100.00$1,100.00$1,100.00$2,550.00
45Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH12$1,680.00$2,000.00$1,980.00$1,400.00$1,300.00$1,400.00$2,800.00
46Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH2$2,872.02$2,500.00$2,420.00$3,000.00$2,700.00$3,000.00$4,700.00
47Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368)EACH2$8,000.00$4,000.00$8,250.00$5,000.00$4,500.00$5,000.00$7,350.00
48Set (type II) (42 in) (RCP) (4: 1) (C) (467-7378)EACH1$6,000.00$6,000.00$6,600.00$8,000.00$9,100.00$8,000.00$9,900.00
49Set (type II) (42 in) (RCP) (6: 1) (P) (467-7380)EACH3$9,200.00$8,000.00$10,450$10,000$10,400$10,000$13,600
50Removing & RE - lay pipe (24 in) (472-7006)LF8$72.50$200.00$55.00$35.00$100.00$35.00$60.00
51Clean existing culverts (480-7001)EACH10$550.00$1,000.00$500.00$1,200.00$2,500.00$1,200.00$3,500.00
52Removing structure (set) (496-7004)EACH4$425.00$500.00$385.00$125.00$500.00$125.00$640.00
53Removing structure (wingwall) (496-7005)EACH7$1,500.00$1,000.00$1,650.00$1,000.00$1,000.00$1,000.00$2,550.00
54Removing structure (pipe) (496-7007)LF434$12.00$10.00$27.50$10.00$50.00$10.00$21.00
55Mobilization (500-7001)LS1$324,756$250,000$175,000$203,000$350,000$342,389$270,000
56Barricades, signs and traffic handling (502-7001)MO10$6,200.00$5,000.00$3,000.00$8,581.00$5,000.00$8,000.00$1,400.00
57Portable changeable message sign (503-7002)EACH2$12,000$1,000.00$15,000$14,000$10,000$19,500$12,500
58TMA (stationary) (505-7001)DAY60$180.00$300.00$225.00$200.00$500.00$150.00$145.00
59TMA (mobile operation) (505-7002)HR40$85.00$50.00$65.00$200.00$100.00$225.00$45.00
60Rock filter dams (install) (type 2) (506-7002)LF1,320$60.00$20.00$46.20$48.00$45.00$70.00$65.00
61Rock filter dams (remove) (506-7011)LF1,320$14.00$5.00$13.20$11.00$10.00$10.00$10.00
62Temporary sediment control fence (install) (506-7039)LF1,260$5.50$6.00$4.62$5.00$3.00$5.00$4.00
63Temporary sediment control fence (remove) (506-7041)LF1,260$2.50$1.00$1.32$0.35$1.00$1.00$1.00
64Intersections (ACP) (530-7002)SY198$60.00$120.00$60.00$104.00$95.00$70.75$100.00
65Driveways (ACP) (530-7010)SY99$55.00$120.00$60.00$118.00$95.00$70.75$100.00
66Driveways (base) (530-7015)SY617$37.50$40.00$35.00$39.00$35.00$47.88$35.00
67Turnouts (ACP) (530-7018)SY391$80.00$120.00$75.00$97.00$85.00$82.20$100.00
68Metal W-beam guard fence (steel post) (540-7002)LF750$31.00$40.00$26.95$24.50$25.00$23.55$28.00
69Metal beam guard fence trans (anchor plate) (540-7029)EACH12$1,050.00$1,200.00$973.50$885.00$750.00$790.00$935.00
70Remove metal beam guard fence (542-7001)LF750$3.00$5.00$2.20$2.00$3.00$2.55$3.00
71Guardrail end treatment (install) (544-7001)EACH12$2,900.00$3,500.00$3,036.00$2,760.00$3,100.00$3,069.00$3,650.00
72Guardrail end treatment (remove) (544-7003)EACH12$380.00$500.00$220.00$200.00$250.00$255.00$300.00
73Mailbox install-S (WC-post) type 3 (560-7004)EACH12$249.00$500.00$214.50$145.00$250.00$195.00$400.00
74Mailbox install-D (WC-post) type 3 (560-7005)EACH2$293.00$500.00$236.50$190.00$200.00$215.00$480.00
75Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH71$650.00$800.00$665.50$650.00$610.00$605.00$815.00
76Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH3$850.00$800.00$781.00$825.00$750.00$710.00$1,000.00
77Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH3$1,000.00$1,000.00$1,094.50$1,250.00$980.00$995.00$1,175.00
78Remove SM RD SN sup&AM (644-7073)EACH78$115.00$100.00$86.90$125.00$100.00$79.00$118.00
79Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH36$32.00$20.00$34.10$31.00$35.00$25.00$35.00
80Install object marker assembly (OM-2Y)(WC)GND (658-7056)EACH50$82.50$40.00$86.90$185.00$55.00$55.00$45.00
81Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF87,764$0.25$0.30$0.44$0.40$0.40$0.23$0.47
82Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF7,360$0.26$0.30$0.44$0.40$0.40$0.24$0.47
83Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF49,919$0.28$0.30$0.44$0.40$0.40$0.23$0.47
84Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH4,707$2.50$1.10$0.85$3.00$1.00$2.45$0.50
85Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF196$10.00$12.50$11.00$10.00$10.00$7.00$11.87
86Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081)EACH2$550.00$350.00$770.00$700.00$700.00$300.00$830.64
87Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF87,764$0.95$0.80$0.99$0.90$0.90$0.68$1.07
88Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF49,919$0.95$0.85$0.99$0.90$0.90$0.69$1.07
89Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274)LF7,360$0.95$1.00$0.99$0.90$0.90$0.70$1.07
90Reflectorized pavement marker type II-A-A (672-7004)EACH992$5.75$1.10$5.50$5.00$5.00$3.70$5.93
TxDOT contract A00206664: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of January 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy