| 1 | Preparing row (100-7002) | STA | 36.35 | $1,500.00 | $2,111.50 | $3,500.00 | $5,000.00 |
| 2 | Removing concrete (mowstrip) (104-7005) | LF | 175 | $21.50 | $22.53 | $15.00 | $18.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 71 | | $15.45 | $30.00 | $22.00 |
| 4 | Removing concrete (driveways) (104-7011) | SY | 268 | $25.00 | $15.45 | $30.00 | $17.50 |
| 5 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 90 | $25.00 | $89.95 | $50.00 | $60.00 |
| 6 | Backfill (type B) (134-7002) | STA | 98.80 | $100.00 | $127.08 | $300.00 | $195.00 |
| 7 | Blading (150-7001) | STA | 2.50 | $100.00 | $344.92 | $400.00 | $550.00 |
| 8 | Broadcast seed (temporary_warm) (164-7005) | SY | 12,703 | $1.50 | $0.10 | $0.11 | $0.13 |
| 9 | Broadcast seed (temporary_cool) (164-7006) | SY | 12,703 | $0.63 | $0.10 | $0.11 | $0.13 |
| 10 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073) | SY | 25,406 | $0.66 | $0.56 | $0.60 | $0.60 |
| 11 | Vegetative watering (168-7001) | TGL | 406.49 | $0.22 | $34.82 | $20.00 | $13.50 |
| 12 | SP mixes SP-C PG70-22 (344-7019) | TON | 13,408 | $140.00 | $116.90 | $151.00 | $150.00 |
| 13 | SP mixes SP-D sac-A PG76-22 (344-7064) | TON | 12,909 | $160.00 | $119.59 | $154.00 | $152.00 |
| 14 | Tack coat (344-7077) | GAL | 28,709 | $3.00 | $4.69 | $4.75 | $4.50 |
| 15 | Flexible pavement structure repair(4") (351-7003) | SY | 8,875 | $60.00 | $33.04 | $50.00 | $70.00 |
| 16 | Planing asphalt concrete pavement(2") (354-7051) | SY | 9,818 | $3.25 | $3.07 | $3.50 | $3.75 |
| 17 | Planing asphalt concrete pavement(4") (354-7053) | SY | 114,710 | $2.00 | $4.01 | $3.85 | $3.50 |
| 18 | Cut & restore asphalt paving (400-7008) | SY | 42 | $300.00 | $103.00 | $75.00 | $75.00 |
| 19 | Riprap (mow strip)(4 in) (432-7013) | CY | 59 | $850.00 | $772.50 | $675.00 | $615.00 |
| 20 | Riprap (stone protection)(18 in) (432-7043) | CY | 71 | | $220.42 | $225.00 | $195.00 |
| 21 | Bedding material (6 in) (432-7050) | CY | 24 | | $220.42 | $225.00 | $195.00 |
| 22 | RC pipe (CL III)(18 in) (464-7003) | LF | 242 | $60.00 | $61.80 | $65.00 | $60.00 |
| 23 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 10 | $930.00 | $927.00 | $950.00 | $1,200.00 |
| 24 | Removing structure (pipe) (496-7007) | LF | 192 | $20.00 | $12.36 | $15.00 | $10.00 |
| 25 | Mobilization (500-7001) | LS | 1 | $580,000 | $150,091 | $300,000 | $625,000 |
| 26 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $4,000.00 | $14,842 | $7,000.00 | $6,000.00 |
| 27 | Portable changeable message sign (503-7002) | EACH | 2 | $10,000 | $5,211.32 | $10,000 | $20,000 |
| 28 | TMA (stationary) (505-7001) | DAY | 62 | $185.00 | $422.56 | $250.00 | $250.00 |
| 29 | TMA (mobile operation) (505-7003) | DAY | 30 | $150.00 | $778.44 | $300.00 | $325.00 |
| 30 | Temporary sediment control fence (install) (506-7039) | LF | 75 | | $5.15 | $5.50 | $6.00 |
| 31 | Temporary sediment control fence (remove) (506-7041) | LF | 75 | | $1.03 | $1.00 | $2.50 |
| 32 | Driveways (concrete) (530-7006) | SY | 268 | $125.00 | $128.75 | $115.00 | $90.00 |
| 33 | Turnouts (ACP) (530-7018) | SY | 24 | | $443.68 | $95.00 | $210.00 |
| 34 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 17,025 | $0.28 | $0.46 | $0.70 | $0.70 |
| 35 | Metal W-beam guard fence (timber post) (540-7001) | LF | 562.50 | $24.00 | $20.60 | $23.00 | $24.00 |
| 36 | Downstream anchor terminal section (540-7015) | EACH | 4 | $1,500.00 | $1,107.25 | $1,400.00 | $1,400.00 |
| 37 | Metal beam guard fence (long span system) (540-7027) | EACH | 2 | $600.00 | $1,121.67 | $1,200.00 | $1,220.00 |
| 38 | Metal beam guard fence trans (31"-28")(25') (540-7031) | EACH | 2 | $900.00 | $772.50 | $715.00 | $720.00 |
| 39 | Remove metal beam guard fence (542-7001) | LF | 300 | $4.00 | $2.06 | $2.75 | $3.00 |
| 40 | Remove terminal anchor section (542-7002) | EACH | 2 | $100.00 | $206.00 | $220.00 | $220.00 |
| 41 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,000.00 | $2,945.80 | $3,200.00 | $3,200.00 |
| 42 | Guardrail end treatment (remove) (544-7003) | EACH | 1 | $212.00 | $206.00 | $220.00 | $220.00 |
| 43 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 30 | $307.00 | $323.42 | $345.00 | $365.00 |
| 44 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 1 | $343.00 | $372.86 | $400.00 | $390.00 |
| 45 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 2 | $722.00 | $871.38 | $930.00 | $850.00 |
| 46 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 1 | $1,200.00 | $694.22 | $750.00 | $875.00 |
| 47 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 3 | $1,100.00 | $875.50 | $935.00 | $985.00 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 7 | $1,030.00 | $915.67 | $980.00 | $715.00 |
| 49 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 3 | $1,000.00 | $1,009.40 | $1,080.00 | $1,120.00 |
| 50 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 2 | $1,060.00 | $1,163.90 | $1,250.00 | $1,310.00 |
| 51 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 49 | $750.00 | $479.98 | $515.00 | $645.00 |
| 52 | Remove SM RD SN sup&AM (644-7073) | EACH | 75 | $125.00 | $104.03 | $105.00 | $125.00 |
| 53 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 14 | $27.00 | $29.36 | $30.00 | $28.00 |
| 54 | Replace delineator assembly (D-DY)SZ 1(yflx)SRFHH (658-7231) | EACH | 30 | $150.00 | $281.19 | $255.00 | $260.00 |
| 55 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 7,885 | $0.45 | $0.21 | $0.22 | $0.25 |
| 56 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 31,541 | $0.28 | $0.21 | $0.22 | $0.25 |
| 57 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 6,378 | $0.40 | $0.21 | $0.22 | $0.25 |
| 58 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 31,541 | $0.28 | $0.21 | $0.22 | $0.25 |
| 59 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 7,885 | $2.25 | $2.26 | $1.50 | $0.55 |
| 60 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 31,541 | $2.25 | $2.19 | $1.50 | $0.45 |
| 61 | Work zone pavement marking removing (Y)6"(broken) (662-7098) | LF | 6,378 | $1.50 | $2.26 | $1.50 | $0.55 |
| 62 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 31,541 | $2.50 | $2.19 | $1.50 | $0.45 |
| 63 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 32,001 | $2.50 | $0.77 | $0.82 | $0.85 |
| 64 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 7,969 | $1.25 | $0.77 | $0.82 | $0.85 |
| 65 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 32,241 | $2.50 | $0.77 | $0.82 | $0.85 |
| 66 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 6,378 | $1.30 | $0.77 | $0.82 | $0.85 |
| 67 | All-wther PM type I (W) 8"(solid)(100MIL) (666-7425) | LF | 3,175 | $2.50 | $1.24 | $1.30 | $1.35 |
| 68 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 130 | | $10.30 | $11.00 | $11.00 |
| 69 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 814 | $15.00 | $12.72 | $13.50 | $13.75 |
| 70 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 38 | $225.00 | $221.45 | $240.00 | $235.00 |
| 71 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 12 | $250.00 | $262.65 | $280.00 | $280.00 |
| 72 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 4 | $700.00 | $721.00 | $770.00 | $550.00 |
| 73 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 6 | $100.00 | $77.25 | $82.50 | $85.00 |
| 74 | Prefabricated PM type C (Y)(24")(solid) (668-7127) | LF | 120 | $11.30 | $12.72 | $13.50 | $13.75 |
| 75 | Reflectorized pavement marker type I-C (672-7002) | EACH | 394 | $6.50 | $5.67 | $6.00 | $6.00 |
| 76 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 803 | $7.50 | $5.15 | $5.50 | $5.50 |