TxDOT contract A00196217 bid tabulation

Rehabilitate Existing Roadway, US 271 (BU 271H to 0.2 Mi. N. of SL 179). Let by Texas DOT on January 6, 2026, Camp, Atlanta District. 3 bids received; low bid $5,003,037 by RK Hall, LLC, -20% against the engineer's estimate of $6,281,877.

Owner
Texas DOT
Letting
06 JAN 2026
Pay items
76
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1RK Hall, LLC$5,003,037Low-20%
2East Texas Bridge, Inc.$6,139,577+23%-2.0%
3Longview Bridge and Road, LTD.$6,534,778+31%+4.0%
TxDOT contract A00196217: bids by rank

Engineer's estimate: $6,281,877.

Bid tabulation

LinePay itemUnitQuantityEstimate1. RK Hall, LLC2. East Texas Bridge, Inc.3. Longview Bridge and Road, LTD.
1Preparing row (100-7002)STA36.35$1,500.00$2,111.50$3,500.00$5,000.00
2Removing concrete (mowstrip) (104-7005)LF175$21.50$22.53$15.00$18.00
3Removing concrete (riprap) (104-7006)SY71$15.45$30.00$22.00
4Removing concrete (driveways) (104-7011)SY268$25.00$15.45$30.00$17.50
5Embankment (vehicle)(OC)(type C) (132-7017)CY90$25.00$89.95$50.00$60.00
6Backfill (type B) (134-7002)STA98.80$100.00$127.08$300.00$195.00
7Blading (150-7001)STA2.50$100.00$344.92$400.00$550.00
8Broadcast seed (temporary_warm) (164-7005)SY12,703$1.50$0.10$0.11$0.13
9Broadcast seed (temporary_cool) (164-7006)SY12,703$0.63$0.10$0.11$0.13
10Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073)SY25,406$0.66$0.56$0.60$0.60
11Vegetative watering (168-7001)TGL406.49$0.22$34.82$20.00$13.50
12SP mixes SP-C PG70-22 (344-7019)TON13,408$140.00$116.90$151.00$150.00
13SP mixes SP-D sac-A PG76-22 (344-7064)TON12,909$160.00$119.59$154.00$152.00
14Tack coat (344-7077)GAL28,709$3.00$4.69$4.75$4.50
15Flexible pavement structure repair(4") (351-7003)SY8,875$60.00$33.04$50.00$70.00
16Planing asphalt concrete pavement(2") (354-7051)SY9,818$3.25$3.07$3.50$3.75
17Planing asphalt concrete pavement(4") (354-7053)SY114,710$2.00$4.01$3.85$3.50
18Cut & restore asphalt paving (400-7008)SY42$300.00$103.00$75.00$75.00
19Riprap (mow strip)(4 in) (432-7013)CY59$850.00$772.50$675.00$615.00
20Riprap (stone protection)(18 in) (432-7043)CY71$220.42$225.00$195.00
21Bedding material (6 in) (432-7050)CY24$220.42$225.00$195.00
22RC pipe (CL III)(18 in) (464-7003)LF242$60.00$61.80$65.00$60.00
23Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH10$930.00$927.00$950.00$1,200.00
24Removing structure (pipe) (496-7007)LF192$20.00$12.36$15.00$10.00
25Mobilization (500-7001)LS1$580,000$150,091$300,000$625,000
26Barricades, signs and traffic handling (502-7001)MO6$4,000.00$14,842$7,000.00$6,000.00
27Portable changeable message sign (503-7002)EACH2$10,000$5,211.32$10,000$20,000
28TMA (stationary) (505-7001)DAY62$185.00$422.56$250.00$250.00
29TMA (mobile operation) (505-7003)DAY30$150.00$778.44$300.00$325.00
30Temporary sediment control fence (install) (506-7039)LF75$5.15$5.50$6.00
31Temporary sediment control fence (remove) (506-7041)LF75$1.03$1.00$2.50
32Driveways (concrete) (530-7006)SY268$125.00$128.75$115.00$90.00
33Turnouts (ACP) (530-7018)SY24$443.68$95.00$210.00
34Mill rumble strips (asphalt) (shoulder) (533-7001)LF17,025$0.28$0.46$0.70$0.70
35Metal W-beam guard fence (timber post) (540-7001)LF562.50$24.00$20.60$23.00$24.00
36Downstream anchor terminal section (540-7015)EACH4$1,500.00$1,107.25$1,400.00$1,400.00
37Metal beam guard fence (long span system) (540-7027)EACH2$600.00$1,121.67$1,200.00$1,220.00
38Metal beam guard fence trans (31"-28")(25') (540-7031)EACH2$900.00$772.50$715.00$720.00
39Remove metal beam guard fence (542-7001)LF300$4.00$2.06$2.75$3.00
40Remove terminal anchor section (542-7002)EACH2$100.00$206.00$220.00$220.00
41Guardrail end treatment (install) (544-7001)EACH4$3,000.00$2,945.80$3,200.00$3,200.00
42Guardrail end treatment (remove) (544-7003)EACH1$212.00$206.00$220.00$220.00
43Mailbox install-S (TWG-post) type 2 (560-7002)EACH30$307.00$323.42$345.00$365.00
44Mailbox install-D (TWG-post) type 2 (560-7003)EACH1$343.00$372.86$400.00$390.00
45Mailbox install-M (TWW-post) type 4 (560-7010)EACH2$722.00$871.38$930.00$850.00
46Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH1$1,200.00$694.22$750.00$875.00
47Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH3$1,100.00$875.50$935.00$985.00
48Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH7$1,030.00$915.67$980.00$715.00
49Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH3$1,000.00$1,009.40$1,080.00$1,120.00
50Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH2$1,060.00$1,163.90$1,250.00$1,310.00
51Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057)EACH49$750.00$479.98$515.00$645.00
52Remove SM RD SN sup&AM (644-7073)EACH75$125.00$104.03$105.00$125.00
53Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH14$27.00$29.36$30.00$28.00
54Replace delineator assembly (D-DY)SZ 1(yflx)SRFHH (658-7231)EACH30$150.00$281.19$255.00$260.00
55Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF7,885$0.45$0.21$0.22$0.25
56Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF31,541$0.28$0.21$0.22$0.25
57Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF6,378$0.40$0.21$0.22$0.25
58Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF31,541$0.28$0.21$0.22$0.25
59Work zone pavement marking removing (W)6"(broken) (662-7065)LF7,885$2.25$2.26$1.50$0.55
60Work zone pavement marking removing (W)6"(solid) (662-7068)LF31,541$2.25$2.19$1.50$0.45
61Work zone pavement marking removing (Y)6"(broken) (662-7098)LF6,378$1.50$2.26$1.50$0.55
62Work zone pavement marking removing (Y)6"(solid) (662-7100)LF31,541$2.50$2.19$1.50$0.45
63All-wther PM type I (W)6"(solid)(100MIL) (666-7309)LF32,001$2.50$0.77$0.82$0.85
64All-wther PM type I (W)6"(broken)(100MIL) (666-7310)LF7,969$1.25$0.77$0.82$0.85
65All-wther PM type I (Y)6"(solid)(100MIL) (666-7315)LF32,241$2.50$0.77$0.82$0.85
66All-wther PM type I (Y)6"(broken)(100MIL) (666-7316)LF6,378$1.30$0.77$0.82$0.85
67All-wther PM type I (W) 8"(solid)(100MIL) (666-7425)LF3,175$2.50$1.24$1.30$1.35
68PRFB rumble strip (BLK)(1')(centerline) (668-7002)LF130$10.30$11.00$11.00
69Prefabricated PM type C (W)(24")(solid) (668-7089)LF814$15.00$12.72$13.50$13.75
70Prefabricated PM type C (W)(arrow) (668-7091)EACH38$225.00$221.45$240.00$235.00
71Prefabricated PM type C (W)(word) (668-7103)EACH12$250.00$262.65$280.00$280.00
72Prefabricated PM type C (W)(RR crossing) (668-7108)EACH4$700.00$721.00$770.00$550.00
73Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH6$100.00$77.25$82.50$85.00
74Prefabricated PM type C (Y)(24")(solid) (668-7127)LF120$11.30$12.72$13.50$13.75
75Reflectorized pavement marker type I-C (672-7002)EACH394$6.50$5.67$6.00$6.00
76Reflectorized pavement marker type II-A-A (672-7004)EACH803$7.50$5.15$5.50$5.50
TxDOT contract A00196217: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of January 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy