TxDOT contract A00215390 bid tabulation
Surfacing/Roadway Restoration, US 59 (SH 155 to Marion C/L). Let by Texas DOT on January 6, 2026, Cass, Atlanta District. 5 bids received; low bid $7,736,641 by Silver Creek Construction, Inc., -3.3% against the engineer's estimate of $8,004,038.
- Owner
- Texas DOT
- Letting
- 06 JAN 2026
- Pay items
- 32
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Silver Creek Construction, Inc. | $7,736,641 | Low | -3.0% |
| 2 | Winding Road Construction, Inc. | $8,878,711 | +15% | +11% |
| 3 | O. Trevino Construction, LLC | $9,567,578 | +24% | +20% |
| 4 | Grey Sky Construction LLC | $10,009,620 | +29% | +25% |
| 5 | East Texas Bridge, Inc. | $11,398,521 | +47% | +42% |
Engineer's estimate: $8,004,038.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Silver Creek Construction, Inc. | 2. Winding Road Construction, Inc. | 3. O. Trevino Construction, LLC | 4. Grey Sky Construction LLC | 5. East Texas Bridge, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Full - depth repair CRCP (13") (361-7058) | SY | 30,909 | $212.00 | $193.00 | $229.00 | $235.00 | $250.00 | $310.00 |
| 2 | Flowable backfill (401-7001) | CY | 30 | $440.00 | $300.00 | $500.00 | $160.00 | $350.00 | $500.00 |
| 3 | Mobilization (500-7001) | LS | 1 | $400,000 | $773,000 | $680,520 | $949,100 | $900,000 | $800,000 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 14 | $4,000.00 | $10,000 | $2,500.00 | $19,000 | $12,500 | $8,000.00 |
| 5 | Portable changeable message sign (503-7002) | EACH | 2 | $8,500.00 | $20,000 | $10,000 | $25,000 | $20,000 | $25,000 |
| 6 | TMA (stationary) (505-7001) | DAY | 156 | $75.00 | $200.00 | $1,677.00 | $600.00 | $250.00 | $200.00 |
| 7 | TMA (mobile operation) (505-7003) | DAY | 24 | $100.00 | $550.00 | $1,677.00 | $650.00 | $550.00 | $100.00 |
| 8 | Mill rumble strips (concrete) (shoulder) (533-7003) | LF | 2,000 | $0.75 | $6.00 | $12.50 | $5.39 | $20.00 | $1.00 |
| 9 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 158,401 | $0.85 | $0.57 | $0.63 | $0.59 | $0.65 | $0.85 |
| 10 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 19,790 | $0.85 | $0.60 | $0.66 | $0.62 | $0.65 | $0.85 |
| 11 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 161,131 | $0.85 | $0.57 | $0.63 | $0.59 | $0.65 | $0.85 |
| 12 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 5,320 | $0.85 | $0.60 | $0.66 | $0.62 | $0.65 | $0.85 |
| 13 | All-wther PM type I (W) 8"(solid)(100MIL) (666-7425) | LF | 6,090 | $1.25 | $0.90 | $0.99 | $0.94 | $6.00 | $2.00 |
| 14 | All-wther PM type I (BLK)6"(shadow)100MIL (666-7430) | LF | 19,800 | $1.25 | $0.65 | $0.72 | $0.68 | $1.00 | $0.85 |
| 15 | Prefabricated PM type C (W)(12")(solid) (668-7087) | LF | 193 | $28.00 | $8.75 | $9.63 | $9.11 | $6.00 | $10.00 |
| 16 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 41 | $17.00 | $13.95 | $15.35 | $14.53 | $20.00 | $16.00 |
| 17 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 7 | $150.00 | $240.00 | $264.00 | $249.94 | $250.00 | $240.00 |
| 18 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 2 | $155.00 | $295.00 | $324.50 | $307.22 | $250.00 | $270.00 |
| 19 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 273 | $53.00 | $50.00 | $55.00 | $52.07 | $150.00 | $38.00 |
| 20 | Reflectorized pavement marker type I-C (672-7002) | EACH | 299 | $6.50 | $4.00 | $4.40 | $4.17 | $6.00 | $6.00 |
| 21 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,271 | $6.50 | $4.00 | $4.40 | $4.17 | $6.00 | $6.00 |
| 22 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,081 | $6.50 | $4.00 | $4.40 | $4.17 | $6.00 | $6.00 |
| 23 | Eliminating existing PM & markers (6") (677-7002) | LF | 344,655 | $0.60 | $0.45 | $0.50 | $0.47 | $0.65 | $0.57 |
| 24 | Eliminating existing PM & markers (8") (677-7004) | LF | 11,590 | $1.00 | $0.70 | $0.77 | $0.73 | $2.00 | $0.70 |
| 25 | Eliminating existing PM & markers (12") (677-7006) | LF | 193 | $1.50 | $3.00 | $3.30 | $3.12 | $4.00 | $3.00 |
| 26 | Eliminating existing PM & markers (24") (677-7008) | LF | 41 | $2.50 | $6.00 | $6.60 | $6.25 | $20.00 | $4.00 |
| 27 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 7 | $75.00 | $40.00 | $44.00 | $41.66 | $250.00 | $120.00 |
| 28 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $75.00 | $50.00 | $55.00 | $52.07 | $250.00 | $120.00 |
| 29 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 273 | $3.00 | $20.00 | $22.00 | $20.83 | $150.00 | $25.00 |
| 30 | Pavement surface preparation for marking (6") (678-7002) | LF | 344,655 | $0.05 | $0.01 | $0.02 | $0.02 | $0.65 | $0.06 |
| 31 | Pavement surface preparation for marking (8") (678-7004) | LF | 11,590 | $0.10 | $0.01 | $0.02 | $0.02 | $2.00 | $0.06 |
| 32 | Spalling repair (hydraulic cement) (720-7001) | CF | 2,165 | $160.00 | $154.75 | $119.00 | $220.00 | $85.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.