TxDOT contract A00193947 bid tabulation
Install Raised Median, BI 45G (SS 469 to SH 34). Let by Texas DOT on January 6, 2026, Ellis, Dallas District. 9 bids received; low bid $1,134,486 by Garret Shields Infrastructure, -26% against the engineer's estimate of $1,534,029.
- Owner
- Texas DOT
- Letting
- 06 JAN 2026
- Pay items
- 41
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Garret Shields Infrastructure | $1,134,486 | Low | -26% |
| 2 | Ed Bell Construction Company | $1,187,000 | +5.0% | -23% |
| 3 | Professional Traffic Control LLC | $1,226,265 | +8.0% | -20% |
| 4 | Ragle Construction, Inc. | $1,244,413 | +10% | -19% |
| 5 | Ti-Zack Concrete, LLC | $1,282,830 | +13% | -16% |
| 6 | STX Civil | $1,308,028 | +15% | -15% |
| 7 | Axis Contracting, Inc. | $1,446,457 | +27% | -6.0% |
| 8 | Grey Sky Construction LLC | $1,624,575 | +43% | +6.0% |
| 9 | Highway 19 Construction LLC | $1,845,089 | +63% | +20% |
Engineer's estimate: $1,534,029.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Garret Shields Infrastructure | 2. Ed Bell Construction Company | 3. Professional Traffic Control LLC | 4. Ragle Construction, Inc. | 5. Ti-Zack Concrete, LLC | 6. STX Civil |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pavement) (104-7001) | SY | 2,008 | $39.00 | $30.00 | $20.00 | $13.00 | $11.60 | $23.84 | $35.00 |
| 2 | Remove (5") TRT/untrt base & asphalt pavement (105-7025) | SY | 3,985 | $11.00 | $15.00 | $17.50 | $8.00 | $7.28 | $16.02 | $15.00 |
| 3 | Remove (10") TRT/untrt base & asphalt pavement (105-7030) | SY | 1,915 | $20.00 | $20.00 | $27.50 | $10.00 | $30.50 | $25.00 | $20.00 |
| 4 | Embankment (final)(OC)(type C) (132-7005) | CY | 1,454 | $58.00 | $40.00 | $63.00 | $40.00 | $41.00 | $32.93 | $25.00 |
| 5 | Compost manuf topsoil (4") (161-7002) | SY | 2,878 | $4.50 | $5.00 | $10.50 | $4.00 | $13.00 | $2.77 | $6.00 |
| 6 | Block sodding (162-7002) | SY | 2,878 | $7.75 | $8.00 | $10.50 | $10.00 | $15.70 | $6.60 | $7.00 |
| 7 | Vegetative watering (168-7001) | TGL | 429 | $40.00 | $100.00 | $5.25 | $30.00 | $5.00 | $11.00 | $1.00 |
| 8 | Riprap (concrete)(CL A) (432-7004) | CY | 72 | $755.00 | $600.00 | $1,050.00 | $750.00 | $625.00 | $1,130.17 | $900.00 |
| 9 | Adjusting manholes (479-7001) | EACH | 2 | $2,600.00 | $2,000.00 | $4,200.00 | $2,200.00 | $1,175.00 | $3,990.00 | $1,600.00 |
| 10 | Mobilization (500-7001) | LS | 1 | $140,000 | $100,000 | $120,590 | $50,000 | $124,000 | $161,391 | $154,000 |
| 11 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $15,000 | $5,000.00 | $30,000 | $5,000.00 | $41,000 | $3,850.00 | $7,500.00 |
| 12 | Portable changeable message sign (503-7002) | EACH | 2 | $15,000 | $1,000.00 | $6,000.00 | $1,000.00 | $3,975.00 | $1.10 | $8,000.00 |
| 13 | TMA (stationary) (505-7001) | DAY | 60 | $300.00 | $300.00 | $176.40 | $500.00 | $346.00 | $1.10 | $245.00 |
| 14 | TMA (mobile operation) (505-7002) | HR | 24 | $100.00 | $50.00 | $105.00 | $200.00 | $67.50 | $1.10 | $60.00 |
| 15 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 330 | $7.25 | $6.00 | $9.00 | $12.00 | $6.50 | $0.11 | $10.00 |
| 16 | Biodegradable erosion control logs (remove) (506-7046) | LF | 330 | $3.00 | $1.00 | $4.50 | $8.00 | $1.25 | $0.11 | $1.00 |
| 17 | Colored textured concrete (4") (527-7001) | SY | 1,694 | $162.00 | $120.00 | $100.00 | $145.00 | $90.00 | $138.98 | $165.00 |
| 18 | Concrete curb (doweled) (529-7012) | LF | 13,908 | $37.00 | $25.00 | $20.00 | $32.00 | $30.25 | $32.99 | $28.00 |
| 19 | Concrete median (mono nose) (536-7006) | SY | 137 | $295.00 | $120.00 | $200.00 | $240.00 | $167.80 | $146.54 | $250.00 |
| 20 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 3,990 | $2.10 | $1.25 | $1.07 | $2.54 | $1.00 | $1.10 | $1.50 |
| 21 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 14,732 | $1.50 | $1.00 | $0.91 | $1.50 | $0.85 | $0.94 | $1.00 |
| 22 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 3,698 | $1.20 | $0.95 | $0.80 | $1.90 | $0.75 | $0.83 | $0.85 |
| 23 | Reflectorized pavement marking type I (W)18"(solid)(100MIL) (666-7033) | LF | 108 | $7.00 | $6.88 | $5.86 | $4.95 | $5.50 | $6.05 | $6.50 |
| 24 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 258 | $10.00 | $9.00 | $7.72 | $5.95 | $7.25 | $7.98 | $7.50 |
| 25 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 32 | $205.00 | $168.00 | $143.78 | $195.00 | $135.00 | $148.50 | $140.00 |
| 26 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 32 | $230.00 | $190.00 | $165.08 | $225.00 | $135.00 | $170.50 | $165.00 |
| 27 | Pavement sler 6" (666-7347) | LF | 23,716 | $0.30 | $0.20 | $0.16 | $0.95 | $0.15 | $0.17 | $0.30 |
| 28 | Pavement sler 8" (666-7348) | LF | 3,698 | $0.40 | $0.20 | $0.16 | $1.25 | $0.15 | $0.17 | $0.30 |
| 29 | Pavement sler 18" (666-7351) | LF | 108 | $2.00 | $12.00 | $1.07 | $1.45 | $1.00 | $1.10 | $1.25 |
| 30 | Pavement sler 24" (666-7352) | LF | 258 | $2.50 | $2.50 | $2.13 | $1.95 | $2.00 | $2.20 | $2.50 |
| 31 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 3,990 | $0.85 | $0.60 | $0.52 | $1.25 | $0.49 | $0.54 | $0.60 |
| 32 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 4,994 | $1.05 | $0.60 | $0.52 | $1.30 | $0.49 | $0.21 | $0.60 |
| 33 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 14,732 | $0.75 | $0.60 | $0.52 | $0.95 | $0.49 | $0.21 | $0.60 |
| 34 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 379 | $7.00 | $5.50 | $4.79 | $4.00 | $4.50 | $4.95 | $5.50 |
| 35 | Eliminating existing PM & markers (4") (677-7001) | LF | 33,563 | $0.60 | $0.50 | $0.46 | $0.95 | $0.43 | $0.47 | $0.50 |
| 36 | Eliminating existing PM & markers (8") (677-7004) | LF | 330 | $1.80 | $1.00 | $0.92 | $2.20 | $0.86 | $0.95 | $1.00 |
| 37 | Eliminating existing PM & markers (12") (677-7006) | LF | 270 | $2.00 | $2.00 | $1.60 | $3.20 | $1.50 | $1.65 | $1.75 |
| 38 | Eliminating existing PM & markers (18") (677-7007) | LF | 120 | $2.25 | $12.50 | $1.86 | $11.50 | $1.75 | $1.93 | $2.00 |
| 39 | Eliminating existing PM & markers (24") (677-7008) | LF | 256 | $3.00 | $4.00 | $3.20 | $4.00 | $3.00 | $3.30 | $3.50 |
| 40 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 31 | $80.00 | $50.00 | $42.60 | $59.00 | $40.00 | $44.00 | $50.00 |
| 41 | Eliminating existing PM & markers (word) (677-7015) | EACH | 3 | $100.00 | $450.00 | $53.25 | $54.25 | $50.00 | $55.00 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.