TxDOT contract A00134955 bid tabulation

Intersection Improvements With Right And/Or Left Turn Lanes, IH 45 (At SH 34 (Ennis Avenue) to .). Let by Texas DOT on March 4, 2025, Ellis, Dallas District. 4 bids received; low bid $8,081,166 by Grey Sky Construction LLC, +5.3% against the engineer's estimate of $7,675,828.

Owner
Texas DOT
Letting
04 MAR 2025
Pay items
151
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Grey Sky Construction LLC$8,081,166Low+5.0%
2Ed Bell Construction Company$8,474,890+5.0%+10%
3Xit Paving and Construction Inc.$8,740,412+8.0%+14%
4Ragle Construction, Inc.$9,175,772+14%+20%
TxDOT contract A00134955: bids by rank

Engineer's estimate: $7,675,828.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Grey Sky Construction LLC2. Ed Bell Construction Company3. Xit Paving and Construction Inc.4. Ragle Construction, Inc.
1Preparing row (100-7002)STA15.50$15,000$48,000$5,500.00$6,400.00$50,000
2Removing concrete (pavement) (104-7001)SY666$20.00$20.00$35.00$45.00$25.00
3Removing concrete (mowstrip) (104-7005)LF1,489$18.00$20.00$15.00$15.00$3.00
4Removing concrete (riprap) (104-7006)SY1,646$20.00$20.00$25.00$37.00$17.00
5Removing concrete (medians) (104-7008)SY218$50.00$50.00$55.00$25.00$27.00
6Removing concrete (driveways) (104-7011)SY338$25.00$20.00$35.00$23.00$19.00
7Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY211$35.00$20.00$30.00$29.00$17.00
8Removing concrete (curb) (104-7016)LF2,182$20.00$20.00$15.00$8.00$8.00
9Removing concrete (retaining walls) (104-7025)SY1,057$100.00$50.00$75.00$134.00$100.00
10Removing concrete (flume) (104-7041)SY782$50.00$50.00$30.00$17.00$20.00
11Remove (0"-7") TRT/untrt base & asphalt pavement (105-7047)SY666$20.00$20.00$40.00$17.00$12.00
12Excavation (roadway) (110-7001)CY15,232$30.00$20.00$20.00$26.00$50.00
13Embankment (final)(DC)(type C2) (132-7010)CY888$60.00$50.00$75.00$40.00$100.00
14Compost manuf topsoil (4") (161-7002)SY7,273$5.00$10.00$8.00$8.00$7.60
15Block sodding (162-7002)SY7,273$9.00$10.00$6.00$5.00$8.30
16Drill seed (temporary_warm_cool) (164-7015)SY6,126$1.50$1.00$0.25$0.50$0.35
17Vegetative watering (168-7001)TGL1,993$10.00$30.00$1.00$9.00$40.00
18FL BS (compacted in place)(type D GR 1-2) (8") (247-7079)SY4,935$24.00$26.00$28.00$43.00$21.00
19Prime coat(MC-30 or AE-P) (310-7013)GAL986$10.00$10.00$16.00$16.00$11.00
20SP mixes SP-B PG64-22 (344-7001)TON3,500$135.00$160.00$161.00$162.00$160.00
21SP mixes SP-C sac-B PG70-22 (344-7021)TON1,272$150.00$180.00$166.00$167.00$170.00
22Tack coat (344-7077)GAL1,584$4.00$10.00$1.50$2.00$8.50
23Planing asphalt concrete pavement(0" to 6") (354-7035)SY6,472$8.00$10.00$6.30$11.00$6.10
24Concrete pavement (CPCD) (9") (360-7019)SY4,232$110.00$125.00$125.00$130.00$90.00
25Trench excavation protection (402-7001)LF512$15.00$10.00$20.00$8.00$3.20
26Sheet piling (PZ - 22) (407-7001)SF240$200.00$85.00$144.00$113.00$140.00
27Soil nail anchors (410-7001)LF32,001$25.00$30.00$36.50$30.00$32.47
28Drilled shaft (traffic signal pole) (30 in) (416-7043)LF11$650.00$650.00$650.00$540.00$488.00
29Drilled shaft (traffic signal pole) (36 in) (416-7044)LF65$850.00$750.00$675.00$660.00$596.00
30Retaining wall (soil nail) (fascia) (423-7023)SF20,302$75.00$30.00$75.00$130.00$67.45
31Riprap (concrete)(5 in) (432-7002)CY315$650.00$550.00$1,100.00$800.00$755.00
32Riprap (concrete)(flume) (432-7012)CY138$800.00$650.00$1,250.00$1,000.00$615.00
33RC pipe (CL III)(18 in) (464-7003)LF293$90.00$185.00$175.00$217.00$111.00
34RC pipe (CL III)(24 in) (464-7005)LF206$120.00$250.00$200.00$276.00$133.00
35RC pipe (CL III)(30 in) (464-7007)LF46$150.00$300.00$300.00$386.00$162.00
36Inlet (complete)(pcu)(3FT)(none) (465-7029)EACH5$10,000$12,500$15,750$12,072$6,000.00
37Inlet (complete)(PSL)(RC)(3FTX3FT) (465-7070)EACH1$15,000$12,500$11,000$14,555$6,000.00
38Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126)EACH2$10,000$15,000$14,000$15,631$6,600.00
39Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158)EACH1$10,000$15,000$12,000$11,792$6,200.00
40Pipe (PVC) (schedule 40) (6 in) (481-7013)LF200$150.00$80.00$60.00$61.00$40.00
41Removing structure (inlet) (496-7002)EACH1$1,070.00$2,500.00$2,000.00$2,463.00$950.00
42Removing structure (pipe) (496-7007)LF46$30.00$50.00$60.00$80.00$24.00
43Mobilization (500-7001)LS1$699,000$770,000$846,000$390,000$910,000
44Barricades, signs and traffic handling (502-7001)MO14$15,000$8,500.00$31,500$6,000.00$67,000
45Portable changeable message sign (503-7001)DAY2$20,000$150.00$315.00$2,000.00$1,000.00
46TMA (stationary) (505-7001)DAY223$200.00$250.00$105.00$400.00$345.00
47TMA (mobile operation) (505-7003)DAY20$800.00$550.00$945.00$200.00$801.00
48Construction exits (install) (type 1) (506-7020)SY111$30.00$40.00$36.00$39.00$35.00
49Construction exits (remove) (506-7024)SY111$15.00$20.00$17.50$17.00$15.00
50Temporary sediment control fence (install) (506-7039)LF1,275$5.00$4.00$3.00$4.00$3.50
51Temporary SDMT cont fence (inlet protection) (506-7040)LF120$9.00$6.00$10.00$9.00$8.25
52Temporary sediment control fence (remove) (506-7041)LF1,395$2.00$2.00$2.00$1.00$1.20
53Biodegradable erosion control logs (install) (12") (506-7044)LF280$10.00$18.00$6.50$6.00$5.75
54Biodegradable erosion control logs (remove) (506-7046)LF280$5.00$9.00$3.00$1.00$1.20
55Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF1,780$70.00$100.00$40.00$30.00$24.00
56Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF80$85.00$100.00$80.00$30.00$24.00
57Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF1,280$25.00$20.00$10.00$20.00$11.00
58Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF160$25.00$20.00$20.00$20.00$11.00
59Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF1,780$25.00$30.00$20.00$25.00$13.00
60Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF80$25.00$30.00$40.00$25.00$13.00
61Concrete curb (type II) (529-7002)LF550$50.00$55.00$35.00$82.00$18.00
62Concrete curb (mono) (type II) (529-7007)LF2,681$25.00$14.00$7.00$10.00$7.00
63Driveways (concrete) (530-7006)SY309$125.00$100.00$150.00$178.00$94.00
64Concrete sidewalks (5") (531-7002)SY145$110.00$85.00$150.00$122.00$81.00
65Curb ramps (type 2) (531-7006)EACH4$4,500.00$3,250.00$3,000.00$3,985.00$2,200.00
66Concrete median (536-7002)SY52$110.00$250.00$200.00$158.00$110.00
67Concrete median (mono nose) (536-7006)SY6$350.00$250.00$600.00$1,668.00$250.00
68Metal W-beam guard fence (steel post) (540-7002)LF75$60.00$50.00$106.00$35.00$32.00
69Downstream anchor terminal section (540-7015)EACH1$1,500.00$1,850.00$2,650.00$1,439.00$1,300.00
70Remove metal beam guard fence (542-7001)LF75$10.00$3.00$10.60$4.00$4.00
71Remove downstream anchor terminal (542-7003)EACH1$500.00$500.00$530.00$1,107.00$250.00
72Pipe underdrains (type 8) (6") (556-7008)LF925$44.00$60.00$62.49$31.00$36.00
73Conduit (PVC) (schedule 40) (2") (618-7030)LF12$20.00$30.00$26.00$14.00$12.87
74Conduit (PVC) (schedule 40) (3") (618-7036)LF211$30.00$40.00$27.00$15.00$13.91
75Conduit (PVC) (schedule 40) (3") (bore) (618-7037)LF530$50.00$80.00$34.00$45.00$41.00
76Conduit (PVC) (schedule 40) (4") (618-7040)LF152$40.00$50.00$29.00$27.00$24.74
77Conduit (PVC) (schedule 40) (4") (bore) (618-7041)LF120$70.00$80.00$45.00$55.00$49.36
78Conduit (PVC) (schedule 80) (2") (618-7054)LF30$25.00$3.00$30.00$17.00$15.11
79Electrical conductor (no.12) insulated (620-7004)LF400$2.00$3.00$1.80$2.00$1.64
80Electrical conductor (no.8) insulated (620-7008)LF1,854$2.50$3.00$2.70$3.00$2.35
81Electrical conductor (no.6) bare (620-7009)LF1,069$3.00$3.00$2.80$3.00$2.67
82Electrical conductor (no.6) insulated (620-7010)LF24$3.00$3.00$4.50$3.00$2.81
83Ground box type C (162911)W/apron (624-7006)EACH9$2,000.00$1,500.00$2,300.00$1,572.00$1,420.00
84Ground box type D (162922)W/apron (624-7008)EACH1$2,500.00$1,500.00$2,400.00$1,788.00$1,615.00
85Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190)EACH1$13,000$12,500$11,000$14,337$12,950
86Aluminum signs (type A) (636-7001)SF163.50$34.50$40.00$34.98$42.00$38.11
87Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH6$700.00$1,500.00$673.10$797.00$711.00
88Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH5$800.00$1,500.00$842.70$902.00$738.00
89Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009)EACH2$1,500.00$1,500.00$709.14$880.00$755.00
90Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012)EACH5$800.00$1,500.00$863.90$1,007.00$818.00
91Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH2$1,500.00$1,500.00$1,192.50$1,279.00$1,089.00
92Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032)EACH2$2,000.00$1,500.00$1,478.70$1,589.00$1,144.00
93Install small roadside sign support and assembly TYS80(1)SB(U) (644-7042)EACH2$1,200.00$1,500.00$1,266.70$1,378.00$1,375.00
94In bridge MNT clearance sign assembly(type N) (644-7061)EACH4$2,000.00$5,000.00$4,134.00$4,373.00$3,950.00
95Install small roadside sign support and assembly (rail mount) (644-7063)EACH7$2,500.00$5,000.00$8,024.20$6,488.00$5,860.00
96Work zone pavement marking removing (W)6"(broken) (662-7065)LF683$3.00$1.00$1.59$2.00$1.50
97Work zone pavement marking removing (W)6"(solid) (662-7068)LF5,268$3.50$1.00$1.33$1.00$1.25
98Work zone pavement marking removing (W)12"(solid) (662-7075)LF226$4.00$5.00$3.18$3.00$3.00
99Work zone pavement marking removing (W)24"(solid) (662-7077)LF90$5.00$20.00$6.89$7.00$6.50
100Work zone pavement marking removing (W)(arrow) (662-7082)EACH6$150.00$250.00$201.40$210.00$190.00
101Work zone pavement marking removing (W)(double arrow) (662-7083)EACH7$250.00$500.00$371.00$387.00$350.00
102Work zone pavement marking removing (W)(TPL arrow) (662-7090)EACH3$300.00$500.00$609.50$637.00$575.00
103Work zone pavement marking removing (Y)6"(solid) (662-7100)LF3,630$3.50$1.00$1.33$1.00$1.25
104Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF184$1.50$1.00$2.12$2.00$2.00
105Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF110$2.00$6.00$3.18$3.00$3.00
106Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,558$2.00$6.00$2.12$2.00$2.00
107Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF407$3.00$20.00$6.89$7.00$6.50
108Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH14$200.00$250.00$212.00$221.00$200.00
109Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH6$300.00$500.00$397.50$415.00$375.00
110Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051)EACH4$300.00$250.00$397.50$415.00$375.00
111Reflectorized pavement marking type I(W)(lane drop arrow)(100MIL) (666-7060)EACH1$215.00$500.00$795.00$830.00$750.00
112Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH6$250.00$250.00$238.50$249.00$225.00
113Reflectorized pavement marking type I (Y)6"(DOT)(100MIL) (666-7111)LF23$2.00$1.00$2.12$2.00$2.00
114Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF46$10.00$20.00$6.89$7.00$6.50
115Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF524$1.25$1.00$1.06$1.00$1.00
116Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF4,084$1.50$1.00$0.90$1.00$0.85
117Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF3,287$1.50$1.00$0.90$1.00$0.85
118Reflectorized pavement marker type I-C (672-7002)EACH81$7.00$6.00$5.30$6.00$5.00
119Reflectorized pavement marker type II-A-A (672-7004)EACH12$7.00$6.00$5.30$6.00$5.00
120Reflectorized pavement marker type II-C-R (672-7006)EACH27$6.00$6.00$5.30$6.00$5.00
121Eliminating existing PM & markers (6") (677-7002)LF2,570$1.00$1.00$1.06$1.00$1.00
122Eliminating existing PM & markers (double arrow) (677-7010)EACH4$1.50$250.00$132.50$138.00$125.00
123Install highway traffic signal (isolated) (680-7002)EACH1$50,000$100,000$75,000$58,964$53,260
124Removing traffic signals (diamond) (680-7012)EACH1$25,000$60,000$16,000$13,628$12,310
125Temporary traffic signals (681-7001)EACH1$150,000$300,000$200,000$200,000$99,760
126Vehicle signal section (12")LED(green) (682-7001)EACH11$325.00$325.00$440.00$515.00$465.00
127Vehicle signal section (12")LED(green arrow) (682-7002)EACH4$325.00$325.00$440.00$524.00$473.00
128Vehicle signal section (12")LED(yel) (682-7003)EACH13$325.00$325.00$440.00$515.00$465.00
129Vehicle signal section (12")LED(yel arrow) (682-7004)EACH4$325.00$325.00$440.00$524.00$473.00
130Vehicle signal section (12")LED(red) (682-7005)EACH13$325.00$325.00$440.00$515.00$465.00
131Vehicle signal section (12")LED(red arrow) (682-7006)EACH4$325.00$325.00$440.00$524.00$473.00
132Pedestrian signal section (LED)(countdown) (682-7018)EACH8$1,350.00$8,500.00$760.00$1,009.00$911.00
133Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH13$250.00$250.00$260.00$298.00$269.00
134Backplate W/ref border(5 sec)(vent)aluminum (682-7044)EACH2$350.00$350.00$340.00$327.00$295.00
135Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF720$4.50$3.00$3.50$4.00$4.00
136Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF363$5.00$3.00$4.00$5.00$4.79
137Traffic signal CBL (type A)(14 AWG)(16 conductor) (684-7042)LF623$6.00$3.00$8.00$6.00$5.00
138Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046)LF1,146$6.00$3.00$9.50$6.00$5.50
139Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079)LF2,606$4.00$3.00$2.30$3.00$2.88
140Ins traffic signal PL AM(S)1 arm(32')lum (686-7035)EACH1$18,000$35,000$18,000$17,547$15,850
141Ins traffic signal PL AM(S)1 arm(40')lum (686-7043)EACH1$25,000$42,000$21,000$17,710$15,997
142Ins traffic signal PL AM(S)1 arm(44')lum (686-7047)EACH1$27,500$50,000$22,000$19,053$17,210
143Ins traffic signal PL AM(S)1 arm(48') (686-7049)EACH1$30,000$55,000$21,000$18,683$16,876
144Ins traffic signal PL AM(S)1 arm(48')lum (686-7051)EACH2$35,000$60,000$23,000$20,758$18,750
145Pedestrian pole assembly (687-7001)EACH1$5,000.00$2,880.00$4,000.00$5,037.00$4,550.00
146Pedestrian detect push button (APS) (688-7001)EACH8$1,650.00$6,500.00$1,500.00$1,627.00$1,469.49
147Pedestrian detector controller unit (688-7003)EACH1$6,500.00$6,500.00$5,500.00$5,037.00$4,550.00
148VIVDS temporary (6006-7006)EACH1$32,250$50,000$35,000$78,603$71,000
149Bbu system (external battery cabinet) (6007-7001)EACH1$9,100.00$8,500.00$10,000$12,145$10,970
150RVDS (presence detection only) (6008-7001)EACH2$7,500.00$20,000$15,000$11,049$9,980.00
151RVDS (presence and advance detection) (6008-7003)EACH4$8,150.00$20,000$24,000$17,138$15,480
TxDOT contract A00134955: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy