TxDOT contract A00185001 bid tabulation
Construct Pedestrian Infrastructure, BS 19J (College St to St. Thomas Drive). Let by Texas DOT on June 5, 2025, Henderson, Tyler District. 12 bids received; low bid $1,484,624 by Scout 5 Construction LLC, -27% against the engineer's estimate of $2,039,102.
- Owner
- Texas DOT
- Letting
- 05 JUN 2025
- Pay items
- 64
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scout 5 Construction LLC | $1,484,624 | Low | -27% |
| 2 | 3LW Civil LLC | $1,759,800 | +19% | -14% |
| 3 | Ti-Zack Concrete, LLC | $1,842,869 | +24% | -10% |
| 4 | Highway 19 Construction LLC | $1,862,120 | +25% | -9.0% |
| 5 | STX Civil | $1,866,173 | +26% | -8.0% |
| 6 | Cross Plus Construction, LLC | $1,897,551 | +28% | -7.0% |
| 7 | Garret Shields Infrastructure | $2,168,442 | +46% | +6.0% |
| 8 | GHB Equipment Company, L.L.C. | $2,226,747 | +50% | +9.0% |
| 9 | Xit Paving and Construction Inc. | $2,726,107 | +84% | +34% |
| 10 | Tight Line Construction, LLC | $2,881,739 | +94% | +41% |
| 11 | Grey Sky Construction LLC | $2,960,820 | +99% | +45% |
| 12 | O. Trevino Construction, LLC | $3,886,103 | +162% | +91% |
Engineer's estimate: $2,039,102.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Scout 5 Construction LLC | 2. 3LW Civil LLC | 3. Ti-Zack Concrete, LLC | 4. Highway 19 Construction LLC | 5. STX Civil | 6. Cross Plus Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Tree protection (install) (100-7013) | EACH | 5 | $100.00 | $500.00 | $0.01 | $1.10 | $1,000.00 | $225.00 | $500.00 |
| 2 | Tree protection (remove) (100-7015) | EACH | 5 | $100.00 | $100.00 | $0.01 | $1.10 | $100.00 | $80.00 | $100.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 571 | $35.00 | $150.00 | $25.00 | $31.62 | $25.00 | $16.00 | $25.00 |
| 4 | Removing concrete (driveways) (104-7011) | SY | 3,186 | $20.00 | $60.00 | $25.00 | $18.89 | $25.00 | $18.50 | $20.00 |
| 5 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 80 | $30.00 | $100.00 | $25.00 | $22.57 | $25.00 | $17.00 | $20.00 |
| 6 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 3,202 | $20.00 | $78.00 | $17.00 | $9.40 | $10.00 | $9.00 | $10.00 |
| 7 | Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046) | SY | 1,418 | $15.00 | $20.00 | $0.01 | $16.98 | $15.00 | $25.00 | $21.00 |
| 8 | Furn & place topsoil (4") (160-7002) | SY | 2,534 | $5.00 | $5.70 | $4.25 | $4.75 | $2.00 | $21.00 | $8.00 |
| 9 | Block sodding (162-7002) | SY | 2,534 | $7.00 | $23.60 | $6.64 | $6.00 | $5.00 | $9.50 | $8.00 |
| 10 | Vegetative watering (168-7001) | TGL | 27.90 | $50.00 | $20.00 | $0.01 | $1.10 | $100.00 | $56.00 | $1.00 |
| 11 | Rdside amenity (wheel stop) (194-7007) | EACH | 24 | $200.00 | $250.00 | $250.00 | $330.00 | $100.00 | $168.00 | $125.00 |
| 12 | Class C concrete (miscellaneous) (420-7067) | CY | 11 | $1,000.00 | $358.00 | $625.00 | $827.56 | $1,000.00 | $902.00 | $750.00 |
| 13 | Riprap (concrete)(6 in) (432-7003) | CY | 27.30 | $1,250.00 | $338.00 | $673.24 | $827.56 | $750.00 | $725.00 | $900.00 |
| 14 | Grate & frame (471-7003) | EACH | 45 | $2,500.00 | $1,000.00 | $2,750.00 | $1,100.00 | $3,462.00 | $1,550.00 | $2,250.00 |
| 15 | Adjusting manholes (479-7001) | EACH | 8 | $2,000.00 | $1,600.00 | $1,450.00 | $752.40 | $1,000.00 | $1,400.00 | $500.00 |
| 16 | Adjusting manholes (utility box) (479-7004) | EACH | 23 | $1,000.00 | $1,300.00 | $750.00 | $1,046.82 | $350.00 | $730.00 | $500.00 |
| 17 | Remove STR (bollard) (496-7028) | EACH | 2 | $500.00 | $500.00 | $250.00 | $300.96 | $10.00 | $400.00 | $200.00 |
| 18 | Mobilization (500-7001) | LS | 1 | $181,150 | $130,000 | $100,000 | $175,973 | $200,000 | $150,000 | $200,000 |
| 19 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $5,000.00 | $0.01 | $9,863.95 | $2,750.00 | $1,100.00 | $2,250.00 | $5,000.00 |
| 20 | Portable changeable message sign (503-7001) | DAY | 298 | $155.00 | $0.01 | $0.01 | $1.10 | $100.00 | $1.00 | $25.00 |
| 21 | TMA (stationary) (505-7001) | DAY | 149 | $200.00 | $0.01 | $0.01 | $1.10 | $500.00 | $1.00 | $100.00 |
| 22 | TMA (mobile operation) (505-7003) | DAY | 2 | $250.00 | $0.01 | $0.01 | $1.10 | $1,000.00 | $1.00 | $200.00 |
| 23 | Sandbags for erosion control (506-7035) | EACH | 42 | $9.00 | $5.00 | $0.01 | $1.10 | $5.00 | $1.00 | $8.00 |
| 24 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 2,000 | $7.00 | $5.00 | $0.01 | $0.11 | $5.00 | $0.10 | $12.00 |
| 25 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,000 | $2.00 | $2.00 | $0.01 | $0.11 | $1.00 | $0.10 | $2.00 |
| 26 | Landscape pavers (528-7001) | SY | 418 | $130.00 | $80.00 | $139.62 | $100.00 | $180.00 | $35.00 | $156.00 |
| 27 | Concrete curb (type II) (529-7002) | LF | 996 | $40.00 | $4.90 | $42.00 | $48.51 | $35.00 | $45.50 | $25.00 |
| 28 | Concrete curb & gutter (type I) (529-7008) | LF | 127 | $40.00 | $21.38 | $47.47 | $48.51 | $55.00 | $50.00 | $25.00 |
| 29 | Concrete curb & gutter (type II) (529-7009) | LF | 2,464 | $45.00 | $18.18 | $47.47 | $48.51 | $45.00 | $60.00 | $25.00 |
| 30 | Concrete curb & gutter (armor curb) (529-7018) | LF | 70 | $450.00 | $8.40 | $273.10 | $229.92 | $200.00 | $336.00 | $250.00 |
| 31 | Driveways (concrete) (530-7006) | SY | 4,086 | $100.00 | $42.21 | $102.34 | $118.35 | $110.00 | $115.00 | $125.00 |
| 32 | Driveways (ACP) (530-7010) | SY | 572 | $110.00 | $100.00 | $103.00 | $80.00 | $75.00 | $85.00 | $105.00 |
| 33 | Concrete sidewalks (4") (531-7001) | SY | 3,365 | $100.00 | $34.70 | $82.00 | $102.61 | $58.00 | $90.00 | $100.00 |
| 34 | Curb ramps (type 1) (531-7015) | SY | 81 | $165.00 | $55.56 | $134.97 | $135.14 | $110.00 | $191.00 | $100.00 |
| 35 | Curb ramps (type 2) (531-7016) | SY | 27 | $165.00 | $57.92 | $134.97 | $135.14 | $130.00 | $213.00 | $188.00 |
| 36 | Curb ramps (type 3) (531-7017) | SY | 227 | $165.00 | $55.16 | $138.97 | $135.14 | $150.00 | $191.00 | $100.00 |
| 37 | Curb ramps (type 6) (531-7019) | SY | 71 | $165.00 | $55.20 | $134.97 | $135.14 | $150.00 | $191.00 | $165.00 |
| 38 | Curb ramps (type 7) (531-7020) | SY | 38 | $165.00 | $56.46 | $134.97 | $135.14 | $110.00 | $213.00 | $165.00 |
| 39 | Curb ramps (type 10) (531-7021) | SY | 35 | $165.00 | $55.86 | $134.97 | $135.14 | $110.00 | $213.00 | $156.00 |
| 40 | Concrete sidewalks (special) (531-7025) | SY | 451 | $225.00 | $43.44 | $178.43 | $260.38 | $180.00 | $213.00 | $125.00 |
| 41 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 4 | $600.00 | $250.00 | $402.00 | $450.00 | $450.00 | $375.00 | $400.00 |
| 42 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 31 | $30.00 | $70.00 | $17.92 | $38.50 | $35.00 | $40.00 | $40.00 |
| 43 | Electrical conductor (no.6) bare (620-7009) | LF | 61 | $3.00 | $10.00 | $8.16 | $5.50 | $5.00 | $6.00 | $4.00 |
| 44 | Ground box type D (162922) (624-7007) | EACH | 3 | $1,500.00 | $3,450.00 | $933.83 | $1,897.50 | $1,725.00 | $1,950.00 | $990.00 |
| 45 | Remove ground box (624-7013) | EACH | 1 | $250.00 | $1,000.00 | $250.00 | $550.00 | $500.00 | $560.00 | $210.00 |
| 46 | Aluminum signs (type A) (636-7001) | SF | 22 | $80.00 | $25.90 | $35.00 | $33.00 | $30.00 | $75.00 | $35.00 |
| 47 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 15 | $800.00 | $60.00 | $810.00 | $495.00 | $1,000.00 | $835.00 | $500.00 |
| 48 | Remove SM RD SN sup&AM (644-7073) | EACH | 24 | $150.00 | $50.00 | $126.00 | $55.00 | $100.00 | $152.00 | $50.00 |
| 49 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 345 | $1.00 | $10.00 | $5.50 | $5.50 | $5.00 | $6.50 | $5.00 |
| 50 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 1,573 | $10.00 | $10.00 | $5.50 | $5.50 | $5.00 | $6.50 | $5.00 |
| 51 | Pavement sler 6" (666-7347) | LF | 163 | $1.00 | $10.00 | $1.10 | $5.50 | $5.00 | $6.50 | $5.00 |
| 52 | Pavement sler 24" (666-7352) | LF | 30 | $5.00 | $10.00 | $2.20 | $5.50 | $5.00 | $6.50 | $5.00 |
| 53 | Pavement sler (arrow) (666-7353) | EACH | 6 | $60.00 | $400.00 | $165.00 | $220.00 | $200.00 | $250.00 | $200.00 |
| 54 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 6 | $200.00 | $400.00 | $330.00 | $220.00 | $200.00 | $350.00 | $200.00 |
| 55 | Eliminating existing PM & markers (4") (677-7001) | LF | 255 | $1.00 | $4.00 | $0.83 | $2.20 | $2.00 | $4.50 | $2.00 |
| 56 | Eliminating existing PM & markers (12") (677-7006) | LF | 95 | $2.00 | $10.00 | $3.30 | $5.50 | $5.00 | $6.50 | $5.00 |
| 57 | Eliminating existing PM & markers (24") (677-7008) | LF | 588 | $5.00 | $10.00 | $4.40 | $5.50 | $5.00 | $7.50 | $5.00 |
| 58 | Vehicle signal section (12")(LED)(yel)(solar) (682-7036) | EACH | 4 | $300.00 | $700.00 | $300.00 | $385.00 | $350.00 | $395.00 | $400.00 |
| 59 | Traffic signal CBL (type A)(14 AWG)(2 conductor) (684-7028) | LF | 113 | $5.00 | $7.00 | $4.21 | $3.85 | $3.50 | $4.00 | $4.00 |
| 60 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 2 | $10,000 | $12,000 | $6,600.00 | $9,500.00 | $9,500.00 | $12,900 | $9,500.00 |
| 61 | Pedestrian pole assembly (687-7001) | EACH | 1 | $3,500.00 | $11,500 | $1,163.50 | $6,325.00 | $5,750.00 | $5,950.00 | $6,000.00 |
| 62 | Pedestrian detect push button (standard) (688-7002) | EACH | 4 | $1,100.00 | $1,918.00 | $2,497.63 | $1,054.90 | $959.00 | $980.00 | $1,000.00 |
| 63 | Removal of pedestrian push buttons (690-7030) | EACH | 2 | $75.00 | $470.00 | $250.00 | $258.50 | $235.00 | $392.00 | $1,000.00 |
| 64 | Retrofit det warn surface (surface applied) (5031-7001) | SF | 45 | $100.00 | $300.00 | $50.00 | $33.75 | $50.00 | $235.00 | $55.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 5, 2025. Compiled by Mirage Metrics.