TxDOT contract A00213054 bid tabulation

CULVERT EXTENSION & CROSS DRAINAGE, BS0289C (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION). Let by Texas DOT on June 11, 2025, Collin, Dallas District. 6 bids received; low bid $170,348 by Quality Excavation, LLC, -17% against the engineer's estimate of $205,679.

Owner
Texas DOT
Letting
11 JUN 2025
Pay items
10
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Quality Excavation, LLC$170,348Low-17%
2Garret Shields Infrastructure$182,370+7.0%-11%
3Cross Plus Construction, LLC$183,594+8.0%-11%
4Xit Paving and Construction Inc.$199,910+17%-3.0%
5Jagoe-Public Company$257,390+51%+25%
6Palmer Hall Construction$391,080+130%+90%
TxDOT contract A00213054: bids by rank

Engineer's estimate: $205,679.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Quality Excavation, LLC2. Garret Shields Infrastructure3. Cross Plus Construction, LLC4. Xit Paving and Construction Inc.5. Jagoe-Public Company6. Palmer Hall Construction
1Cut & restoring pavement (400-7006)SY148$181.67$245.00$250.00$200.00$150.00$100.00$180.00
2Cem stabil BKFL (400-7010)CY148$280.00$135.00$250.00$259.00$150.00$50.00$105.00
3Trench excavation protection (402-7001)LF56$26.76$18.00$10.00$25.00$50.00$15.00$150.00
4Riprap (stone protection)(12 in) (432-7041)CY61$263.00$180.00$250.00$300.00$450.00$750.00$200.00
5RC pipe (CL III)(42 in) (464-7010)LF112$325.00$210.00$180.00$252.00$365.00$600.00$600.00
6Headwall (CH - PW - S) (diameter= 42 in) (466-7121)EACH2$20,000$20,500$15,000$7,200.00$19,000$28,000$30,000
7Removing structure (pipe) (496-7007)LF60$20.47$108.00$100.00$55.00$50.00$200.00$400.00
8Mobilization (500-7001)LS1$16,982$17,000$15,000$15,000$10,000$28,500$150,000
9Barricades, signs and traffic handling (502-7001)MO2$5,000.00$2,500.00$5,000.00$17,500$16,500$11,500$5,000.00
10TMA (stationary) (505-7001)DAY38$400.00$240.00$300.00$1.00$10.00$50.00$450.00
TxDOT contract A00213054: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of June 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy