Bridge Replacement, S BELTLINE RD (BELT LINE ROAD AT GOFF BRANCH to .). Let by Texas DOT on May 2, 2025, Dallas, Dallas District. 6 bids received; low bid $8,168,666 by Highway 19 Construction LLC, +6.2% against the engineer's estimate of $7,689,301.
- Owner
- Texas DOT
- Letting
- 02 MAY 2025
- Pay items
- 131
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Highway 19 Construction LLC | $8,168,666 | Low | +6.0% |
| 2 | Grey Sky Construction LLC | $8,484,379 | +4.0% | +10% |
| 3 | Ibctx, LLC | $8,962,082 | +10% | +17% |
| 4 | Altus Construction LLC | $9,104,007 | +11% | +18% |
| 5 | Ragle Construction, Inc. | $10,351,512 | +27% | +35% |
| 6 | Urban Infraconstruction LLC | $10,850,854 | +33% | +41% |
Engineer's estimate: $7,689,301.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Highway 19 Construction LLC | 2. Grey Sky Construction LLC | 3. Ibctx, LLC | 4. Altus Construction LLC | 5. Ragle Construction, Inc. | 6. Urban Infraconstruction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 21.58 | $12,000 | $5,000.00 | $35,000 | $16,000 | $41,765 | $50,000 | $15,000 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 4,456 | $25.00 | $55.00 | $20.00 | $30.00 | $21.19 | $13.00 | $20.00 |
| 3 | Removing concrete (medians) (104-7008) | SY | 105 | $55.00 | $25.00 | $20.00 | $30.00 | $33.91 | $20.00 | $55.00 |
| 4 | Removing concrete (pavers) (104-7010) | SY | 212 | $25.00 | $20.00 | $35.00 | $10.34 | $19.00 | $65.00 | |
| 5 | Removing concrete (curb) (104-7016) | LF | 1,554 | $20.00 | $10.00 | $20.00 | $18.00 | $12.29 | $8.00 | $15.00 |
| 6 | Removing concrete (appr slab) (104-7030) | SY | 360 | $185.00 | $55.00 | $100.00 | $20.00 | $317.88 | $32.00 | $35.00 |
| 7 | Removing concrete (rail W/ metal element) (104-7037) | LF | 48 | $100.00 | $50.00 | $50.00 | $42.38 | $52.00 | $55.00 | |
| 8 | Remove (10"-14") TRT/untrt base & asphalt pavement (105-7010) | SY | 1,134 | $15.00 | $20.00 | $17.00 | $13.94 | $17.30 | $25.00 | |
| 9 | Excavation (roadway) (110-7001) | CY | 74 | $35.00 | $50.00 | $20.00 | $88.00 | $20.17 | $1,000.00 | $190.00 |
| 10 | Embankment (final)(DC)(type C) (132-7006) | CY | 1,960 | $40.00 | $35.00 | $40.00 | $85.00 | $23.16 | $40.00 | $95.00 |
| 11 | Compost manuf topsoil (4") (161-7002) | SY | 9,155 | $5.00 | $3.00 | $6.00 | $2.00 | $2.87 | $1.00 | $8.00 |
| 12 | Block sodding (162-7002) | SY | 9,155 | $11.00 | $5.00 | $6.00 | $9.00 | $6.87 | $8.20 | $7.00 |
| 13 | Drill seed (temporary_warm_cool) (164-7015) | SY | 6,438 | $0.50 | $0.45 | $0.50 | $0.50 | $0.25 | $0.42 | $1.00 |
| 14 | Vegetative watering (168-7001) | TGL | 2,320 | $36.00 | $10.00 | $20.00 | $1.00 | $31.01 | $20.00 | $60.00 |
| 15 | FL BS (compacted in place)(type D GR 1-2) (8") (247-7079) | SY | 1,084 | $35.00 | $25.00 | $25.00 | $25.43 | $26.00 | $55.00 | |
| 16 | Lime (com or QK)(slurry) (260-7005) | TON | 103 | $400.00 | $450.00 | $400.00 | $440.00 | $297.59 | $315.00 | $375.00 |
| 17 | Lime TRT (existing material)(6") (260-7006) | SY | 1,084 | $11.00 | $12.00 | $20.00 | $9.92 | $11.00 | $18.00 | |
| 18 | Lime TRT (existing material)(8") (260-7007) | SY | 4,920 | $15.00 | $11.00 | $12.00 | $11.00 | $5.51 | $7.00 | $15.00 |
| 19 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 217 | $50.00 | $10.00 | $12.00 | $6.19 | $13.00 | $25.00 | |
| 20 | SP mixes SP-B PG64-22 (344-7001) | TON | 224 | $300.00 | $200.00 | $190.00 | $114.44 | $233.00 | $195.00 | |
| 21 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 112 | $320.00 | $250.00 | $225.00 | $116.13 | $180.00 | $205.00 | |
| 22 | Tack coat (344-7077) | GAL | 65 | $5.00 | $10.00 | $28.00 | $3.80 | $20.00 | $2.00 | |
| 23 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 225 | $25.00 | $20.00 | $17.00 | $6.50 | $4.50 | $20.00 | |
| 24 | Planing asphalt concrete pavement(4") (354-7053) | SY | 2,362 | $17.00 | $20.00 | $6.00 | $6.50 | $10.00 | $15.00 | |
| 25 | Concrete pavement (CRCP) (9") (360-7003) | SY | 4,247 | $140.00 | $117.00 | $100.00 | $176.00 | $155.37 | $94.00 | $135.00 |
| 26 | Struct excavation (400-7001) | CY | 4,472 | $25.00 | $50.00 | $20.00 | $29.67 | $32.00 | $35.00 | |
| 27 | Cem stabil BKFL (400-7010) | CY | 1,333 | $240.00 | $350.00 | $250.00 | $240.00 | $139.51 | $132.00 | $210.00 |
| 28 | Trench excavation protection (402-7001) | LF | 161 | $10.00 | $10.00 | $20.00 | $13.56 | $0.01 | $15.00 | |
| 29 | Temporary special shoring (403-7001) | SF | 11,273 | $35.00 | $65.00 | $55.00 | $45.00 | $180.84 | $122.00 | $45.00 |
| 30 | Drilled shaft (18 in) (416-7002) | LF | 128 | $200.00 | $200.00 | $200.00 | $160.20 | $120.00 | $195.00 | |
| 31 | Drilled shaft (24 in) (416-7004) | LF | 1,188 | $145.00 | $299.00 | $250.00 | $340.00 | $131.99 | $143.00 | $200.00 |
| 32 | Drilled shaft (36 in) (416-7006) | LF | 256 | $416.00 | $350.00 | $375.00 | $214.24 | $213.00 | $295.00 | |
| 33 | Class C concrete (abutment)(HPC) (420-7013) | CY | 100.70 | $1,700.00 | $1,500.00 | $2,000.00 | $2,500.00 | $1,706.35 | $1,050.00 | $3,000.00 |
| 34 | Class C concrete (cap)(HPC) (420-7023) | CY | 38.20 | $1,500.00 | $1,700.00 | $2,000.00 | $3,000.00 | $1,903.43 | $2,100.00 | $6,000.00 |
| 35 | Reinforced concrete slab (HPC) (422-7002) | SF | 4,500 | $29.00 | $20.00 | $45.00 | $63.46 | $34.00 | $35.00 | |
| 36 | Approach slab (HPC) (422-7014) | CY | 212 | $810.00 | $850.00 | $2,000.00 | $1,200.00 | $738.45 | $657.00 | $1,235.00 |
| 37 | Bridge median (HPC) (422-7021) | SF | 360 | $20.00 | $180.00 | $20.00 | $35.00 | $11.02 | $20.00 | $25.00 |
| 38 | Bridge sidewalk(HPC) (422-7022) | SF | 1,020 | $20.00 | $85.00 | $20.00 | $35.00 | $50.20 | $16.50 | $25.00 |
| 39 | Slab span (HPC) (422-7024) | CY | 236 | $1,600.00 | $1,900.00 | $2,000.00 | $3,000.00 | $1,491.79 | $2,300.00 | $7,000.00 |
| 40 | Prestressed concrete girder (TX54) (425-7005) | LF | 622.50 | $353.00 | $225.00 | $340.00 | $319.43 | $275.00 | $390.00 | |
| 41 | Riprap (mow strip)(4 in) (432-7013) | CY | 89 | $750.00 | $550.00 | $550.00 | $900.00 | $448.96 | $706.00 | $1,142.00 |
| 42 | Riprap (stone protection)(12 in) (432-7041) | CY | 970 | $185.00 | $180.00 | $150.00 | $185.00 | $145.54 | $183.00 | $168.16 |
| 43 | Riprap (stone protection)(24 in) (432-7045) | CY | 138 | $250.00 | $250.00 | $200.00 | $209.10 | $194.00 | $187.00 | |
| 44 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 420 | $25.00 | $55.00 | $20.00 | $45.00 | $16.95 | $20.00 | $37.00 |
| 45 | Rail (type T223)(HPC) (450-7009) | LF | 322 | $150.00 | $250.00 | $195.00 | $181.77 | $146.00 | $365.00 | |
| 46 | Rail (type C223)(HPC) (450-7035) | LF | 144 | $200.00 | $230.00 | $250.00 | $225.00 | $181.77 | $216.00 | $500.00 |
| 47 | Type A joint (454-7001) | LF | 150 | $47.50 | $180.00 | $100.00 | $40.00 | $211.92 | $67.00 | $300.00 |
| 48 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 72 | $180.00 | $100.00 | $350.00 | $280.57 | $223.00 | $395.00 | |
| 49 | Concrete box culvert (9 FT X 7 FT) (462-7029) | LF | 322 | $900.00 | $1,500.00 | $1,650.00 | $787.72 | $1,120.00 | $3,500.00 | |
| 50 | RC pipe (CL III)(15 in) (464-7002) | LF | 52 | $80.00 | $85.00 | $485.00 | $55.54 | $150.00 | $275.00 | |
| 51 | RC pipe (CL III)(18 in) (464-7003) | LF | 20 | $120.00 | $95.00 | $95.00 | $900.00 | $58.39 | $200.00 | $305.00 |
| 52 | RC pipe (CL III)(24 in) (464-7005) | LF | 5 | $140.00 | $100.00 | $105.00 | $725.00 | $84.02 | $500.00 | $762.00 |
| 53 | Inlet (complete)(pco)(5FT)(none) (465-7021) | EACH | 6 | $6,460.00 | $9,500.00 | $12,500 | $8,600.00 | $7,704.50 | $6,000.00 | $9,100.00 |
| 54 | Wingwall (FW - 0) (HW=16 FT) (466-7158) | EACH | 1 | $71,000 | $100,000 | $50,000 | $72,992 | $50,000 | $93,500 | |
| 55 | Wingwall (PW - 1) (HW=11 FT) (466-7181) | EACH | 1 | $75,000 | $85,000 | $45,000 | $67,815 | $50,000 | $65,000 | |
| 56 | Adjusting manholes (479-7001) | EACH | 2 | $3,000.00 | $1,000.00 | $2,000.00 | $2,000.00 | $2,398.12 | $1,700.00 | $6,100.00 |
| 57 | Adjusting inlets (479-7002) | EACH | 1 | $1,500.00 | $5,000.00 | $2,500.00 | $5,200.00 | $1,695.38 | $1,500.00 | $4,500.00 |
| 58 | Adjusting manholes (water valve box) (479-7007) | EACH | 1 | $1,500.00 | $500.00 | $1,000.00 | $1,250.00 | $847.69 | $3,500.00 | $3,800.00 |
| 59 | Removing structure (inlet) (496-7002) | EACH | 6 | $1,300.00 | $1,000.00 | $3,000.00 | $2,900.00 | $1,059.61 | $1,000.00 | $3,800.00 |
| 60 | Removing structure (wingwall) (496-7005) | EACH | 2 | $1,000.00 | $3,000.00 | $5,000.00 | $2,119.23 | $4,230.00 | $6,000.00 | |
| 61 | Removing structure (pipe) (496-7007) | LF | 48 | $50.00 | $50.00 | $30.00 | $26.62 | $31.00 | $150.00 | |
| 62 | Removing structure (box culvert) (496-7008) | LF | 507 | $100.00 | $100.00 | $200.00 | $89.01 | $322.00 | $150.00 | |
| 63 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 1 | $70,000 | $100,000 | $65,000 | $200,000 | $33,908 | $350,000 | $115,000 |
| 64 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $150,000 | $200,000 | $125,000 | $79,732 | $420,000 | $8,100.00 | |
| 65 | Mobilization (500-7001) | LS | 1 | $636,561 | $600,000 | $800,000 | $896,000 | $905,844 | $1,000,000 | $1,100,000 |
| 66 | Barricades, signs and traffic handling (502-7001) | MO | 30 | $20,000 | $10,000 | $8,500.00 | $10,000 | $9,889.73 | $45,250 | $8,426.74 |
| 67 | Portable changeable message sign (503-7002) | EACH | 2 | $18,000 | $15,000 | $20,000 | $32,500 | $8,148.12 | $25,000 | $61,573 |
| 68 | TMA (mobile operation) (505-7003) | DAY | 6 | $400.00 | $1,000.00 | $550.00 | $250.00 | $211.92 | $677.00 | $173.48 |
| 69 | Rock filter dams (install) (type 1) (506-7001) | LF | 81 | $55.00 | $30.00 | $30.00 | $33.91 | $43.00 | $72.45 | |
| 70 | Rock filter dams (install) (type 3) (506-7003) | LF | 97 | $95.00 | $180.00 | $50.00 | $80.00 | $78.59 | $104.00 | $141.04 |
| 71 | Rock filter dams (remove) (506-7011) | LF | 178 | $25.00 | $20.00 | $20.00 | $14.00 | $14.44 | $24.00 | $54.98 |
| 72 | Construction exits (install) (type 1) (506-7020) | SY | 936 | $35.00 | $35.00 | $50.00 | $40.00 | $28.82 | $35.00 | $70.80 |
| 73 | Construction exits (remove) (506-7024) | SY | 936 | $15.00 | $10.00 | $20.00 | $15.00 | $10.73 | $10.00 | $52.53 |
| 74 | Temporary sediment control fence (install) (506-7039) | LF | 2,455 | $6.00 | $4.00 | $4.00 | $8.00 | $3.87 | $3.60 | $7.27 |
| 75 | Temporary sediment control fence (remove) (506-7041) | LF | 2,455 | $2.00 | $1.00 | $2.00 | $4.00 | $1.17 | $1.25 | $2.75 |
| 76 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 120 | $10.00 | $10.00 | $18.00 | $12.00 | $6.40 | $5.00 | $17.71 |
| 77 | Biodegradable erosion control logs (remove) (506-7046) | LF | 120 | $2.00 | $2.00 | $9.00 | $6.00 | $1.70 | $1.25 | $8.55 |
| 78 | Constructing detours (508-7001) | SY | 1,789 | $150.00 | $110.00 | $50.00 | $135.00 | $108.65 | $200.00 | $182.85 |
| 79 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 570 | $60.00 | $100.00 | $100.00 | $70.00 | $10.99 | $28.00 | $83.67 |
| 80 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 820 | $60.00 | $100.00 | $100.00 | $70.00 | $42.38 | $39.00 | $99.35 |
| 81 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 100 | $100.00 | $100.00 | $100.00 | $70.00 | $73.66 | $41.00 | $92.02 |
| 82 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 570 | $13.00 | $25.00 | $20.00 | $20.00 | $13.99 | $11.00 | $21.10 |
| 83 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 1,260 | $15.00 | $25.00 | $20.00 | $20.00 | $12.72 | $11.00 | $33.24 |
| 84 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 120 | $25.00 | $25.00 | $20.00 | $20.00 | $12.45 | $11.50 | $33.25 |
| 85 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 570 | $15.00 | $25.00 | $20.00 | $30.00 | $17.83 | $11.70 | $20.77 |
| 86 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 820 | $20.00 | $25.00 | $20.00 | $30.00 | $16.95 | $14.00 | $21.74 |
| 87 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 100 | $30.00 | $25.00 | $20.00 | $30.00 | $17.23 | $16.00 | $21.75 |
| 88 | Portable concrete traffic barrier(fur & install)(F-shape)(type T) (512-7066) | LF | 60 | $100.00 | $150.00 | $100.00 | $100.00 | $50.01 | $111.00 | $143.53 |
| 89 | Portable concrete traffic barrier(move)(F-shape)(type T) (512-7067) | LF | 60 | $50.00 | $30.00 | $20.00 | $50.00 | $11.87 | $16.00 | $21.07 |
| 90 | Portable concrete traffic barrier(remove)(F-shape)(type T) (512-7069) | LF | 60 | $50.00 | $50.00 | $20.00 | $100.00 | $11.87 | $18.00 | $20.74 |
| 91 | Concrete curb (mono) (type II) (529-7007) | LF | 1,019 | $75.00 | $25.00 | $20.00 | $22.00 | $16.95 | $14.00 | $8.20 |
| 92 | Concrete curb (doweled) (529-7012) | LF | 2,605 | $70.00 | $35.00 | $45.00 | $37.00 | $56.29 | $25.00 | $13.55 |
| 93 | Concrete curb (special) (529-7027) | LF | 938 | $65.00 | $100.00 | $43.00 | $127.15 | $27.00 | $15.30 | |
| 94 | Driveways (concrete) (530-7006) | SY | 209 | $165.00 | $120.00 | $120.00 | $145.00 | $101.72 | $107.00 | $487.99 |
| 95 | Concrete sidewalks (4") (531-7001) | SY | 276 | $150.00 | $85.00 | $65.00 | $115.00 | $76.29 | $75.00 | $120.37 |
| 96 | Concrete median (536-7002) | SY | 615 | $150.00 | $180.00 | $150.00 | $155.00 | $67.16 | $76.00 | $118.10 |
| 97 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,175 | $30.00 | $30.00 | $30.00 | $30.00 | $24.32 | $24.00 | $32.37 |
| 98 | Metal beam guard fence trans (TL2) (540-7006) | EACH | 6 | $1,800.00 | $2,800.00 | $1,850.00 | $1,200.00 | $1,271.54 | $1,300.00 | $1,954.68 |
| 99 | Downstream anchor terminal section (540-7015) | EACH | 2 | $2,850.00 | $1,850.00 | $1,500.00 | $1,271.54 | $1,400.00 | $2,260.10 | |
| 100 | Remove metal beam guard fence (542-7001) | LF | 62 | $10.00 | $3.00 | $10.00 | $2.73 | $2.50 | $12.22 | |
| 101 | Guardrail end treatment (install) (544-7001) | EACH | 8 | $3,300.00 | $3,850.00 | $3,850.00 | $3,500.00 | $2,824.12 | $3,100.00 | $806.31 |
| 102 | Relocate existing mailbox (560-7012) | EACH | 1 | $350.00 | $350.00 | $1,100.00 | $800.00 | $303.05 | $325.00 | $610.84 |
| 103 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 8 | $850.00 | $1,100.00 | $1,100.00 | $1,000.00 | $611.41 | $725.00 | $806.31 |
| 104 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 19 | $50.00 | $35.00 | $100.00 | $30.00 | $31.92 | $25.00 | $34.21 |
| 105 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 8 | $25.00 | $55.00 | $100.00 | $30.00 | $22.76 | $23.00 | $14.66 |
| 106 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 523 | $1.50 | $4.00 | $3.00 | $2.00 | $1.53 | $3.00 | $3.67 |
| 107 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 9,243 | $2.00 | $1.15 | $3.00 | $2.00 | $1.17 | $1.15 | $1.50 |
| 108 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 178 | $2.80 | $3.00 | $6.00 | $3.00 | $2.25 | $3.00 | $3.00 |
| 109 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 16,177 | $2.00 | $1.15 | $3.00 | $2.00 | $1.32 | $1.15 | $1.40 |
| 110 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 400 | $2.20 | $1.35 | $6.00 | $2.00 | $1.10 | $1.35 | $1.65 |
| 111 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 43 | $10.00 | $15.00 | $20.00 | $11.00 | $7.63 | $15.00 | $18.00 |
| 112 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 4 | $200.00 | $1,000.00 | $250.00 | $375.00 | $169.54 | $200.00 | $245.00 |
| 113 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 4 | $240.00 | $1,000.00 | $250.00 | $500.00 | $197.94 | $325.00 | $400.00 |
| 114 | Pavement sler 6" (666-7347) | LF | 4,544 | $0.70 | $0.45 | $3.00 | $0.50 | $0.39 | $0.45 | $0.55 |
| 115 | Pavement sler 8" (666-7348) | LF | 400 | $1.00 | $1.00 | $6.00 | $0.50 | $0.53 | $1.00 | $1.25 |
| 116 | Pavement sler 24" (666-7352) | LF | 43 | $3.50 | $3.00 | $20.00 | $3.00 | $2.10 | $3.00 | $3.50 |
| 117 | Pavement sler (arrow) (666-7353) | EACH | 4 | $55.00 | $75.00 | $250.00 | $45.00 | $33.91 | $75.00 | $92.00 |
| 118 | Pavement sler (word) (666-7354) | EACH | 4 | $65.00 | $95.00 | $250.00 | $55.00 | $38.15 | $95.00 | $115.00 |
| 119 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 2,894 | $1.00 | $2.00 | $3.00 | $2.00 | $0.72 | $2.00 | $2.00 |
| 120 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 878 | $1.75 | $3.00 | $1.50 | $0.68 | $1.75 | $2.00 | |
| 121 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 2,428 | $175.00 | $3.00 | $1.50 | $0.66 | $1.75 | $2.00 | |
| 122 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 10 | $6.00 | $6.00 | $15.00 | $4.66 | $6.00 | $7.00 | |
| 123 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 188 | $10.00 | $6.00 | $6.00 | $15.00 | $4.66 | $6.00 | $7.00 |
| 124 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,337 | $1.30 | $3.00 | $1.00 | $2.00 | $0.64 | $3.00 | $3.00 |
| 125 | Eliminating existing PM & markers (8") (677-7004) | LF | 200 | $2.70 | $6.00 | $6.00 | $2.00 | $0.85 | $6.00 | $7.00 |
| 126 | Pavement surface preparation for marking (6") (678-7002) | LF | 4,544 | $0.50 | $0.40 | $1.00 | $0.25 | $0.17 | $0.40 | $0.50 |
| 127 | Pavement surface preparation for marking (8") (678-7004) | LF | 400 | $1.00 | $0.75 | $1.00 | $0.50 | $0.25 | $0.75 | $1.00 |
| 128 | Pavement surface preparation for marking (24") (678-7008) | LF | 43 | $2.00 | $2.50 | $10.00 | $4.00 | $0.87 | $2.50 | $3.00 |
| 129 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 4 | $50.00 | $675.00 | $150.00 | $40.00 | $17.80 | $65.00 | $80.00 |
| 130 | Pavement surface preparation for marking (word) (678-7016) | EACH | 4 | $65.00 | $150.00 | $150.00 | $40.00 | $22.89 | $75.00 | $90.00 |
| 131 | Post and cable fence (removal) (772-7001) | LF | 1,152 | $15.00 | $10.00 | $8.00 | $5.09 | $2.60 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.