TxDOT contract A00205768 bid tabulation
Bridge Replacement, FM 1835 (FM 1835 to @ DOUBLE MOUNTAIN FORK BRAZOS RIVER). Let by Texas DOT on September 5, 2025, Stonewall, Abilene District. 10 bids received; low bid $3,884,350 by Hodges and Son Construction Company, Inc., -53% against the engineer's estimate of $8,261,190.
- Owner
- Texas DOT
- Letting
- 05 SEP 2025
- Pay items
- 61
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hodges and Son Construction Company, Inc. | $3,884,350 | Low | -53% |
| 2 | L & N Bridge, LLC | $3,981,566 | +3.0% | -52% |
| 3 | Ragle Construction, Inc. | $4,267,209 | +10% | -48% |
| 4 | Urban Infraconstruction LLC | $4,626,000 | +19% | -44% |
| 5 | Coppell Construction Co., Inc. | $5,402,561 | +39% | -35% |
| 6 | Earth Builders, L.P. | $6,183,843 | +59% | -25% |
| 7 | James Construction Group, LLC | $7,085,132 | +82% | -14% |
| 8 | Altus Construction LLC | $7,280,123 | +87% | -12% |
| 9 | C. E. Barker, LTD. | $7,449,535 | +92% | -10% |
| 10 | Gilvin-Terrill, LTD. | $7,624,495 | +96% | -8.0% |
Engineer's estimate: $8,261,190.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Hodges and Son Construction Company, Inc. | 2. L & N Bridge, LLC | 3. Ragle Construction, Inc. | 4. Urban Infraconstruction LLC | 5. Coppell Construction Co., Inc. | 6. Earth Builders, L.P. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 3.70 | $12,000 | $6,800.00 | $7,800.00 | $76,750 | $124,320 | $14,000 | $50,000 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 371 | $30.00 | $10.00 | $7.00 | $11.00 | $45.00 | $20.00 | $15.00 |
| 3 | Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052) | SY | 1,279 | $14.25 | $25.00 | $11.50 | $13.00 | $10.00 | $13.00 | $25.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 726 | $20.00 | $30.00 | $25.00 | $137.00 | $7.00 | $28.00 | $30.00 |
| 5 | Embankment (final)(DC)(type A) (132-7002) | CY | 707 | $20.00 | $30.00 | $50.00 | $1.00 | $14.00 | $55.00 | $30.00 |
| 6 | Drill seed (temporary_cool) (164-7014) | SY | 4,780 | $1.00 | $1.00 | $0.61 | $0.01 | $1.50 | $0.70 | $1.10 |
| 7 | Hydro mulch seed (permanent_rural_sandy) (164-7017) | SY | 4,780 | $1.50 | $1.50 | $0.92 | $0.80 | $1.50 | $1.00 | $1.10 |
| 8 | Straw/hay mulch (164-7065) | SY | 4,780 | $0.25 | $1.00 | $0.60 | $0.80 | $1.50 | $0.60 | $1.70 |
| 9 | Vegetative watering (168-7001) | TGL | 240 | $35.00 | $1.00 | $80.00 | $40.00 | $23.00 | $20.00 | $40.00 |
| 10 | Cement (275-7001) | TON | 14 | $275.00 | $350.00 | $495.00 | $370.00 | $320.00 | $500.00 | $550.00 |
| 11 | Cement TRT (existing material)(6") (275-7002) | SY | 1,302 | $5.00 | $15.00 | $7.00 | $8.00 | $9.00 | $25.00 | $18.00 |
| 12 | Prime coat (MC-30) (310-7004) | GAL | 261 | $10.00 | $20.00 | $15.00 | $13.00 | $16.00 | $20.00 | $50.00 |
| 13 | D-GR HMA type-B PG64-22 (341-7001) | TON | 287 | $140.00 | $250.00 | $300.00 | $210.00 | $250.00 | $150.00 | $225.00 |
| 14 | D-GR HMA type D PG70-22 (341-7048) | TON | 144 | $140.00 | $250.00 | $350.00 | $275.00 | $250.00 | $400.00 | $250.00 |
| 15 | Tack coat (341-7082) | GAL | 130 | $5.00 | $10.00 | $15.00 | $13.00 | $120.00 | $15.00 | $50.00 |
| 16 | Cem stabil BKFL (400-7010) | CY | 196 | $300.00 | $300.00 | $250.00 | $145.00 | $240.00 | $340.00 | $400.00 |
| 17 | Drilled shaft (18 in) (416-7002) | LF | 120 | $400.00 | $135.00 | $75.00 | $90.00 | $332.00 | $145.00 | $200.00 |
| 18 | Drilled shaft (36 in) (416-7006) | LF | 825 | $460.00 | $285.00 | $475.00 | $270.00 | $364.00 | $320.00 | $400.00 |
| 19 | Class C concrete (abutment)(HPC) (420-7013) | CY | 57.20 | $3,500.00 | $1,400.00 | $1,200.00 | $1,075.00 | $1,200.00 | $1,200.00 | $2,500.00 |
| 20 | Class C concrete (cap)(HPC) (420-7023) | CY | 79.50 | $3,500.00 | $2,200.00 | $2,000.00 | $1,150.00 | $1,970.00 | $3,900.00 | $2,800.00 |
| 21 | Class C concrete (column)(HPC) (420-7039) | CY | 92 | $3,000.00 | $1,400.00 | $1,100.00 | $900.00 | $1,100.00 | $1,600.00 | $2,500.00 |
| 22 | Reinforced concrete slab (HPC) (422-7002) | SF | 22,680 | $35.00 | $30.50 | $30.00 | $26.00 | $25.00 | $33.00 | $45.00 |
| 23 | Approach slab (HPC) (422-7014) | CY | 54.60 | $1,250.00 | $1,000.00 | $850.00 | $675.00 | $900.00 | $885.00 | $1,500.00 |
| 24 | Prestressed concrete girder (TX46) (425-7004) | LF | 3,135 | $375.00 | $275.00 | $250.00 | $230.00 | $220.00 | $270.00 | $300.00 |
| 25 | Epoxy waterproof finish (type X) (427-7005) | SF | 2,690 | $25.00 | $15.00 | $6.00 | $10.00 | $4.00 | $12.00 | $16.00 |
| 26 | Riprap (concrete)(CL B)(5 in) (432-7008) | CY | 201 | $675.00 | $750.00 | $700.00 | $590.00 | $450.00 | $550.00 | $800.00 |
| 27 | Riprap (mow strip)(4 in) (432-7013) | CY | 72 | $1,200.00 | $700.00 | $750.00 | $590.00 | $508.00 | $700.00 | $800.00 |
| 28 | Rail (type T223)(HPC) (450-7009) | LF | 1,324 | $250.00 | $150.00 | $150.00 | $115.00 | $194.00 | $225.00 | $225.00 |
| 29 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 108 | $300.00 | $250.00 | $275.00 | $200.00 | $214.00 | $250.00 | $250.00 |
| 30 | Removing structure (bridge 500 - 999 FT length) (496-7011) | EACH | 1 | $1,500,000 | $200,000 | $180,000 | $925,000 | $393,581 | $400,000 | $1,000,000 |
| 31 | Mobilization (500-7001) | LS | 1 | $873,877 | $350,000 | $375,000 | $400,000 | $460,000 | $500,000 | $650,000 |
| 32 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $17,500 | $12,000 | $1,290.34 | $10,000 | $5,600.00 | $35,000 | $3,000.00 |
| 33 | Rock filter dams (install) (type 3) (506-7003) | LF | 195 | $75.00 | $1.00 | $96.00 | $90.00 | $120.00 | $90.00 | $100.00 |
| 34 | Rock filter dams (remove) (506-7011) | LF | 195 | $20.00 | $1.00 | $21.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 35 | Construction exits (install) (type 1) (506-7020) | SY | 325 | $38.00 | $1.00 | $23.00 | $38.00 | $40.00 | $38.00 | $45.00 |
| 36 | Construction exits (remove) (506-7024) | SY | 325 | $10.00 | $1.00 | $7.00 | $14.00 | $15.00 | $14.00 | $10.00 |
| 37 | Construction perimeter fence (506-7034) | LF | 300 | $5.00 | $2.00 | $10.00 | $6.00 | $5.50 | $6.00 | $8.00 |
| 38 | Temporary sediment control fence (install) (506-7039) | LF | 300 | $6.00 | $1.00 | $7.70 | $6.00 | $6.00 | $8.00 | $8.00 |
| 39 | Temporary sediment control fence (remove) (506-7041) | LF | 300 | $2.00 | $1.00 | $2.00 | $2.00 | $3.00 | $2.00 | $2.00 |
| 40 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 760 | $9.00 | $5.00 | $3.85 | $6.90 | $8.00 | $4.00 | $9.00 |
| 41 | Biodegradable erosion control logs (remove) (506-7046) | LF | 760 | $3.00 | $1.00 | $1.00 | $2.00 | $3.00 | $1.00 | $2.00 |
| 42 | Constructing detours (508-7001) | SY | 1,493 | $200.00 | $62.00 | $45.00 | $1.00 | $8.00 | $516.00 | $100.00 |
| 43 | Metal W-beam guard fence (timber post) (540-7001) | LF | 600 | $35.00 | $24.00 | $22.75 | $27.00 | $27.00 | $25.00 | $29.00 |
| 44 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,500.00 | $1,500.00 | $1,325.00 | $2,500.00 | $2,500.00 | $1,400.00 | $2,000.00 |
| 45 | Remove metal beam guard fence (542-7001) | LF | 400 | $3.70 | $1.00 | $6.00 | $2.00 | $2.00 | $10.00 | $5.00 |
| 46 | Remove terminal anchor section (542-7002) | EACH | 4 | $280.00 | $500.00 | $300.00 | $200.00 | $200.00 | $500.00 | $350.00 |
| 47 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,000.00 | $3,200.00 | $2,875.00 | $3,300.00 | $3,300.00 | $3,000.00 | $3,600.00 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 1 | $695.00 | $2,000.00 | $1,500.00 | $800.00 | $950.00 | $900.00 | $1,200.00 |
| 49 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $915.00 | $2,000.00 | $1,300.00 | $925.00 | $1,000.00 | $900.00 | $1,200.00 |
| 50 | Remove SM RD SN sup&AM (644-7073) | EACH | 3 | $66.00 | $50.00 | $200.00 | $100.00 | $150.00 | $250.00 | $200.00 |
| 51 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 28 | $15.00 | $20.00 | $18.00 | $20.00 | $20.00 | $18.00 | $25.00 |
| 52 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 8 | $60.00 | $30.00 | $25.00 | $35.00 | $35.00 | $25.00 | $35.00 |
| 53 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 1,976 | $0.08 | $2.50 | $1.20 | $2.50 | $0.50 | $0.25 | $0.30 |
| 54 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 250 | $0.16 | $3.00 | $1.20 | $2.50 | $0.50 | $0.53 | $0.70 |
| 55 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 988 | $0.16 | $3.00 | $1.20 | $2.50 | $0.50 | $0.26 | $0.30 |
| 56 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 2,720 | $0.50 | $3.00 | $1.00 | $3.00 | $1.50 | $1.20 | $1.40 |
| 57 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 345 | $0.50 | $3.00 | $1.00 | $3.00 | $2.00 | $1.60 | $2.00 |
| 58 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 1,360 | $0.50 | $3.00 | $1.00 | $3.00 | $1.50 | $1.20 | $1.50 |
| 59 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 34 | $5.10 | $20.00 | $16.50 | $20.00 | $15.00 | $10.00 | $12.00 |
| 60 | Pavement surface preparation for marking (6") (678-7002) | LF | 4,425 | $1.25 | $2.00 | $1.20 | $2.00 | $0.32 | $0.30 | $0.40 |
| 61 | Temporary construction access (4006-7001) | LS | 1 | $1,250,000 | $60,000 | $240,000 | $5,000.00 | $500,000 | $90,000 | $150,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.