Intersection Improvement, SH 17 (At County Road 131 to .). Let by Texas DOT on February 4, 2026, Reeves, Odessa District. 4 bids received; low bid $1,752,100 by A. L. Helmcamp, Inc., +1.4% against the engineer's estimate of $1,728,243.
- Owner
- Texas DOT
- Letting
- 04 FEB 2026
- Pay items
- 57
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A. L. Helmcamp, Inc. | $1,752,100 | Low | +1.0% |
| 2 | CK Newberry, LLC | $1,839,247 | +5.0% | +6.0% |
| 3 | Ragle Construction, Inc. | $2,278,381 | +30% | +32% |
| 4 | Jones Bros. Dirt & Paving Contractors, Inc. | $3,083,366 | +76% | +78% |
Engineer's estimate: $1,728,243.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. A. L. Helmcamp, Inc. | 2. CK Newberry, LLC | 3. Ragle Construction, Inc. | 4. Jones Bros. Dirt & Paving Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 424 | $27.00 | $45.00 | $25.00 | $14.00 | $9.81 |
| 2 | Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052) | SY | 1,418 | $15.00 | $30.00 | $15.00 | $21.00 | $32.07 |
| 3 | Excavation (roadway) (110-7001) | CY | 1,883 | $30.00 | $12.00 | $25.00 | $50.00 | $54.92 |
| 4 | Embankment (final)(DC)(type B) (132-7004) | CY | 779 | $27.00 | $32.00 | $20.00 | $40.00 | $51.22 |
| 5 | Backfill (type B) (134-7002) | STA | 61.79 | $356.00 | $300.00 | $215.00 | $500.00 | $953.65 |
| 6 | Blading (150-7002) | HR | 20 | $127.00 | $250.00 | $300.00 | $183.00 | $431.60 |
| 7 | Proof rolling (216-7001) | HR | 20 | $115.00 | $150.00 | $190.00 | $150.00 | $169.07 |
| 8 | FL BS (compacted in place)(type A GR 4) (10") (247-7092) | SY | 6,619 | $25.00 | $21.00 | $25.00 | $26.00 | $47.76 |
| 9 | Prime coat (AE-P) (310-7001) | GAL | 1,325 | $5.20 | $6.00 | $7.50 | $7.90 | $12.25 |
| 10 | Asphalt (AC-20-5TR) (316-7007) | GAL | 5,030 | $5.00 | $4.75 | $5.50 | $10.00 | $7.82 |
| 11 | Aggregate (type-PB, GR-3)(sac-A) (316-7134) | CY | 56 | $275.00 | $350.00 | $280.00 | $150.00 | $491.57 |
| 12 | Aggregate (type-PB, GR-4)(sac-A) (316-7136) | CY | 76 | $240.00 | $350.00 | $230.00 | $150.00 | $386.68 |
| 13 | Stone-MTRX-asphalt smar-F sac-A (346-7023) | TON | 0 | $178.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | Flexible pavement structure repair(6") (351-7005) | SY | 400 | $100.00 | $140.00 | $150.00 | $120.00 | $165.65 |
| 15 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 128 | $425.00 | $560.00 | $550.00 | $500.00 | $575.00 |
| 16 | Riprap (concrete)(4 in) (432-7001) | CY | 5.60 | $758.00 | $2,000.00 | $2,500.00 | $1,500.00 | $2,300.00 |
| 17 | Mobilization (500-7001) | LS | 1 | $120,000 | $155,000 | $180,000 | $220,000 | $497,960 |
| 18 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $25,000 | $29,300 | $12,500 | $74,200 | $75,000 |
| 19 | TMA (stationary) (505-7001) | DAY | 88 | $260.00 | $240.00 | $400.00 | $346.00 | $187.50 |
| 20 | TMA (mobile operation) (505-7003) | DAY | 2 | $350.00 | $240.00 | $30.00 | $685.00 | $1,312.50 |
| 21 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 6,205 | $10.00 | $8.50 | $10.00 | $9.45 | $11.58 |
| 22 | Biodegradable erosion control logs (remove) (506-7046) | LF | 6,205 | $2.80 | $1.00 | $3.00 | $2.00 | $2.78 |
| 23 | One-way traffic control (pilot car) (510-7002) | HR | 20 | $120.00 | $200.00 | $150.00 | $69.00 | $148.26 |
| 24 | Driveways (concrete) (530-7006) | SY | 549 | $140.00 | $140.00 | $150.00 | $110.00 | $345.00 |
| 25 | In RD IL (type AL) 40T-10 (250W EQ) LED (610-7142) | EACH | 16 | $9,860.00 | $9,000.00 | $10,000 | $8,250.00 | $9,487.50 |
| 26 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 2,875 | $15.70 | $10.00 | $10.00 | $9.00 | $10.35 |
| 27 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 255 | $36.00 | $23.00 | $20.00 | $20.00 | $23.00 |
| 28 | Electrical conductor (no.6) bare (620-7009) | LF | 3,223 | $2.00 | $3.00 | $3.00 | $2.50 | $2.88 |
| 29 | Electrical conductor (no.6) insulated (620-7010) | LF | 6,980 | $2.50 | $3.10 | $3.00 | $2.75 | $3.16 |
| 30 | Ground box type A (122311)W/apron (624-7002) | EACH | 4 | $1,703.00 | $2,500.00 | $2,500.00 | $2,250.00 | $2,587.50 |
| 31 | Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048) | EACH | 1 | $9,000.00 | $13,000 | $12,000 | $11,500 | $13,225 |
| 32 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 12 | $900.00 | $800.00 | $1,500.00 | $1,250.00 | $880.90 |
| 33 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 2 | $1,300.00 | $830.00 | $1,500.00 | $1,375.00 | $967.15 |
| 34 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $1,000.00 | $940.00 | $1,500.00 | $1,450.00 | $1,135.05 |
| 35 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 2 | $1,350.00 | $1,000.00 | $2,000.00 | $1,700.00 | $1,521.45 |
| 36 | Remove SM RD SN sup&AM (644-7073) | EACH | 6 | $150.00 | $120.00 | $200.00 | $150.00 | $390.45 |
| 37 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 402 | $4.90 | $4.50 | $6.00 | $5.00 | $5.75 |
| 38 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 14,250 | $1.00 | $0.75 | $1.00 | $0.75 | $0.86 |
| 39 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 296 | $10.10 | $8.00 | $15.00 | $12.00 | $13.80 |
| 40 | Work zone pavement marking removing (Y)6"(broken) (662-7098) | LF | 410 | $1.65 | $0.75 | $2.00 | $1.25 | $1.44 |
| 41 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 15,890 | $1.05 | $0.75 | $1.00 | $0.75 | $0.86 |
| 42 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 300 | $1.40 | $1.30 | $2.00 | $1.50 | $5.44 |
| 43 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 200 | $1.30 | $1.30 | $2.00 | $1.50 | $7.91 |
| 44 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 217 | $1.50 | $2.70 | $2.00 | $1.25 | $1.44 |
| 45 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,250 | $1.11 | $1.70 | $2.00 | $1.25 | $1.44 |
| 46 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 8,634 | $0.80 | $1.20 | $2.00 | $1.30 | $1.50 |
| 47 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 10,126 | $1.30 | $1.20 | $2.00 | $1.30 | $1.50 |
| 48 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 710 | $0.80 | $2.30 | $2.00 | $1.30 | $1.50 |
| 49 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 44 | $16.00 | $24.00 | $20.00 | $15.00 | $17.25 |
| 50 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 4 | $300.00 | $350.00 | $500.00 | $300.00 | $345.00 |
| 51 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 4 | $400.00 | $390.00 | $500.00 | $400.00 | $460.00 |
| 52 | Reflectorized pavement marker type I-C (672-7002) | EACH | 64 | $4.00 | $6.00 | $10.00 | $5.00 | $5.75 |
| 53 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 649 | $4.00 | $4.50 | $10.00 | $5.00 | $5.75 |
| 54 | Eliminating existing PM & markers (4") (677-7001) | LF | 8,458 | $0.75 | $1.00 | $5.00 | $1.00 | $5.36 |
| 55 | Tree trimming / brush removal (752-7001) | MI | 0.58 | $60,000 | $18,000 | $6,000.00 | $5,000.00 | $14,458 |
| 56 | Solar powered LED roadside sign (6002-7001) | EACH | 2 | $6,000.00 | $5,500.00 | $15,000 | $11,500 | $13,225 |
| 57 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 2,063 | $178.00 | $178.00 | $200.00 | $190.00 | $203.16 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.