TxDOT contract A00209803 bid tabulation
Preventive Maintenance, SH 29 (0.7 MI E of PR 4 to 0.46 MI W of RM 3509). Let by Texas DOT on February 4, 2026, Burnet, Austin District. 6 bids received; low bid $2,897,632 by Lone Star Paving Company, -9.8% against the engineer's estimate of $3,213,452.
- Owner
- Texas DOT
- Letting
- 04 FEB 2026
- Pay items
- 55
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Lone Star Paving Company | $2,897,632 | Low | -10% |
| 2 | Allen Keller Company | $2,975,898 | +3.0% | -7.0% |
| 3 | Texas Materials Group, Inc. | $3,146,609 | +9.0% | -2.0% |
| 4 | Big Creek Construction, LTD. | $3,508,087 | +21% | +9.0% |
| 5 | Hunter Industries, LTD. | $3,564,626 | +23% | +11% |
| 6 | Clark Construction of Texas, Inc. | $3,573,183 | +23% | +11% |
Engineer's estimate: $3,213,452.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Lone Star Paving Company | 2. Allen Keller Company | 3. Texas Materials Group, Inc. | 4. Big Creek Construction, LTD. | 5. Hunter Industries, LTD. | 6. Clark Construction of Texas, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type A) (134-7001) | STA | 372 | $172.50 | $135.00 | $59.80 | $185.00 | $150.00 | $143.00 | $0.01 |
| 2 | D-GR HMA type D PG76-22 (level-UP) (341-7059) | TON | 1,697 | $110.00 | $94.50 | $96.96 | $98.00 | $140.00 | $104.50 | $130.44 |
| 3 | Tom-C PG76-22 sac-B (347-7002) | TON | 14,061 | $100.00 | $110.50 | $102.80 | $103.00 | $115.00 | $124.30 | $129.98 |
| 4 | Flexible pavement structure repair(4") (351-7003) | SY | 24,910 | $28.00 | $25.75 | $20.54 | $28.00 | $26.00 | $28.66 | $30.75 |
| 5 | Planing asphalt concrete pavement(0" to 1" micro) (354-7045) | SY | 16,828 | $2.25 | $1.65 | $0.72 | $1.50 | $1.10 | $0.67 | $2.24 |
| 6 | Planing asphalt concrete pavement (0"- 1" edge mill) (354-7049) | SY | 34,816 | $1.20 | $0.15 | $0.72 | $1.50 | $3.25 | $0.64 | $1.56 |
| 7 | Mobilization (500-7001) | LS | 1 | $153,000 | $11,800 | $282,700 | $50,000 | $200,000 | $230,190 | $188,000 |
| 8 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $7,500.00 | $760.00 | $3,592.35 | $9,500.00 | $3,000.00 | $6,642.10 | $2,165.00 |
| 9 | Portable changeable message sign (503-7001) | DAY | 132 | $80.00 | $10.00 | $96.93 | $95.00 | $90.00 | $86.69 | $85.98 |
| 10 | TMA (stationary) (505-7001) | DAY | 151 | $220.00 | $10.00 | $236.55 | $215.00 | $180.00 | $152.99 | $85.98 |
| 11 | TMA (mobile operation) (505-7003) | DAY | 49 | $225.00 | $10.00 | $688.09 | $25.00 | $900.00 | $458.96 | $85.98 |
| 12 | Temporary sediment control fence (install) (506-7039) | LF | 400 | $4.15 | $7.00 | $4.76 | $10.00 | $7.50 | $7.00 | $7.00 |
| 13 | Temporary sediment control fence (remove) (506-7041) | LF | 400 | $1.20 | $3.00 | $1.53 | $5.00 | $3.25 | $3.00 | $3.00 |
| 14 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 500 | $5.30 | $8.00 | $4.02 | $5.00 | $8.50 | $8.00 | $8.00 |
| 15 | Biodegradable erosion control logs (remove) (506-7046) | LF | 500 | $1.50 | $2.00 | $1.23 | $2.50 | $2.25 | $2.00 | $2.00 |
| 16 | Intrsct, drvways, & turnout (ACP) (530-7022) | SY | 3,139 | $30.00 | $19.15 | $6.78 | $29.20 | $25.00 | $35.20 | $10.77 |
| 17 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 19,420 | $0.40 | $0.15 | $0.14 | $0.15 | $0.17 | $0.15 | $0.15 |
| 18 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 70,154 | $0.25 | $0.13 | $0.12 | $0.13 | $0.15 | $0.13 | $0.13 |
| 19 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 120 | $0.40 | $0.36 | $0.40 | $0.45 | $0.40 | $0.40 | |
| 20 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 117 | $4.00 | $3.00 | $2.70 | $3.00 | $3.15 | $3.00 | $3.00 |
| 21 | Work zone pavement marking non-removing (Y)4"(solid) (662-7035) | LF | 4,467 | $0.12 | $0.11 | $0.12 | $0.14 | $0.12 | $0.12 | |
| 22 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 2,520 | $0.15 | $0.14 | $0.15 | $0.17 | $0.15 | $0.15 | |
| 23 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 78,047 | $0.35 | $0.13 | $0.12 | $0.13 | $0.15 | $0.13 | $0.13 |
| 24 | Work zone pavement marking non-removing (Y)24"(solid) (662-7042) | LF | 340 | $2.50 | $2.24 | $2.50 | $2.75 | $2.50 | $2.50 | |
| 25 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 5,826 | $1.25 | $0.50 | $3.04 | $1.03 | $2.00 | $1.60 | $0.52 |
| 26 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 4,736 | $0.65 | $0.50 | $3.07 | $1.03 | $2.00 | $1.60 | $0.52 |
| 27 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 120 | $1.00 | $0.90 | $1.00 | $1.10 | $1.00 | $1.00 | |
| 28 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 112 | $7.50 | $6.73 | $7.50 | $8.00 | $7.50 | $7.50 | |
| 29 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 177 | $7.50 | $11.00 | $9.87 | $11.00 | $12.00 | $11.00 | $11.00 |
| 30 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 9 | $120.00 | $107.73 | $120.00 | $130.00 | $120.00 | $120.00 | |
| 31 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 1 | $140.00 | $125.69 | $140.00 | $150.00 | $140.00 | $140.00 | |
| 32 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 1 | $390.00 | $350.13 | $390.00 | $415.00 | $390.00 | $390.00 | |
| 33 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 17 | $40.00 | $40.00 | $35.91 | $40.00 | $45.00 | $40.00 | $40.00 |
| 34 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 340 | $10.00 | $8.98 | $10.00 | $11.00 | $10.00 | $10.00 | |
| 35 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 1 | $250.00 | $224.44 | $250.00 | $275.00 | $250.00 | $250.00 | |
| 36 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 19,420 | $0.25 | $0.21 | $0.19 | $0.21 | $0.25 | $0.21 | $0.21 |
| 37 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 70,154 | $0.20 | $0.19 | $0.17 | $0.19 | $0.22 | $0.19 | $0.19 |
| 38 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 120 | $0.51 | $0.46 | $0.51 | $0.60 | $0.51 | $0.51 | |
| 39 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 117 | $4.50 | $1.85 | $1.66 | $1.85 | $2.00 | $1.85 | $1.85 |
| 40 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 9 | $45.00 | $40.40 | $45.00 | $55.00 | $45.00 | $45.00 | |
| 41 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 1 | $55.00 | $49.38 | $55.00 | $65.00 | $55.00 | $55.00 | |
| 42 | Reflectorized pavement marking type II (W) 36" (yld tri) (666-7201) | EACH | 17 | $35.00 | $15.00 | $13.47 | $15.00 | $17.00 | $15.00 | $15.00 |
| 43 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 2,520 | $0.21 | $0.19 | $0.21 | $0.25 | $0.21 | $0.21 | |
| 44 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 78,047 | $0.20 | $0.19 | $0.17 | $0.19 | $0.22 | $0.19 | $0.19 |
| 45 | Reflectorized pavement marking type II (Y) 24" (solid) (666-7217) | LF | 340 | $1.85 | $1.66 | $1.85 | $2.00 | $1.85 | $1.85 | |
| 46 | Reflectorized pavement marking type II (Y) (med nose) (666-7220) | EACH | 1 | $135.00 | $121.20 | $135.00 | $135.00 | $135.00 | $135.00 | |
| 47 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 70,154 | $0.75 | $0.77 | $0.69 | $0.77 | $0.85 | $0.77 | $0.77 |
| 48 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 82,514 | $0.75 | $0.77 | $0.69 | $0.77 | $0.85 | $0.77 | $0.77 |
| 49 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 2,520 | $0.80 | $0.72 | $0.80 | $0.90 | $0.80 | $0.80 | |
| 50 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 19,420 | $0.50 | $0.50 | $0.45 | $0.50 | $0.55 | $0.50 | $0.50 |
| 51 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 6,442 | $4.25 | $4.00 | $3.59 | $4.00 | $4.50 | $4.00 | $4.00 |
| 52 | PRFB rumble strip (BLK)(1')(edgeline) (668-7137) | LF | 13,651 | $4.25 | $4.00 | $3.59 | $4.00 | $4.50 | $4.00 | $4.00 |
| 53 | Reflectorized pavement marker type I-C (672-7002) | EACH | 978 | $3.90 | $8.00 | $7.18 | $8.00 | $9.00 | $8.00 | $8.00 |
| 54 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,271 | $4.15 | $4.00 | $3.59 | $4.00 | $4.25 | $4.00 | $4.00 |
| 55 | Bonding course (3007-7001) | GAL | 24,593 | $3.50 | $3.00 | $3.46 | $5.00 | $3.25 | $3.19 | $3.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.