TxDOT contract A00209819 bid tabulation

Preventive Maintenance, FM 110 (IH 35 to SH 123). Let by Texas DOT on March 5, 2026, Hays, Austin District. 7 bids received; low bid $1,570,963 by Dean Word Company, LTD., -37% against the engineer's estimate of $2,510,764.

Owner
Texas DOT
Letting
05 MAR 2026
Pay items
55
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Dean Word Company, LTD.$1,570,963Low-37%
2Bobcat Services, Inc.$1,673,884+7.0%-33%
3Hunter Industries, LTD.$1,732,548+10%-31%
4Allen Keller Company$1,813,065+15%-28%
5Clark Construction of Texas, Inc.$1,893,804+21%-25%
6Lone Star Paving Company$1,961,143+25%-22%
7Texas Materials Group, Inc.$2,082,765+33%-17%
TxDOT contract A00209819: bids by rank

Engineer's estimate: $2,510,764.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Dean Word Company, LTD.2. Bobcat Services, Inc.3. Hunter Industries, LTD.4. Allen Keller Company5. Clark Construction of Texas, Inc.6. Lone Star Paving Company
1Backfill (type A) (134-7001)STA42.20$175.00$118.00$313.10$95.00$158.07$739.11$260.50
2D-GR HMA type D sac-B PG76-22 (341-7058)TON5,270$125.00$76.50$70.90$79.24$79.24$98.75$104.00
3D-GR HMA type D PG76-22 (level-UP) (341-7059)TON526$125.00$22.00$82.00$79.24$79.24$83.53$111.00
4Tom-C PG76-22 sac-B (347-7002)TON5,413$135.00$91.00$102.80$101.50$113.22$120.21$115.00
5Flexible pavement structure repair(6") (351-7005)SY9,580$50.00$27.00$27.70$33.62$28.96$36.03$39.50
6Planing asphalt concrete pavement(2") (354-7051)SY95,770$1.75$1.25$1.50$1.28$0.64$1.21$1.95
7Cleaning and sealing existing joints (CL7) (438-7007)LF291$60.00$74.75$51.10$31.50$53.34$55.00$55.00
8Mobilization (500-7001)LS1$125,300$77,000$80,000$73,040$172,200$22,000$4,025.00
9Barricades, signs and traffic handling (502-7001)MO3$3,500.00$7,406.25$5,000.00$12,227$2,783.97$2,056.75$1,200.00
10Portable changeable message sign (503-7001)DAY86$125.00$101.25$156.40$51.77$59.60$85.62$10.00
11TMA (stationary) (505-7001)DAY66$267.51$1.00$365.00$51.77$254.58$85.62$10.00
12TMA (mobile operation) (505-7003)DAY6$270.00$126.50$365.00$207.07$1.21$85.62$10.00
13Biodegradable erosion control logs (install) (12") (506-7044)LF1,000$7.16$6.00$5.70$5.65$4.23$5.71$5.65
14Biodegradable erosion control logs (remove) (506-7046)LF1,000$2.84$1.00$1.01$1.00$1.62$1.14$1.00
15Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF5,388$1.48$0.25$0.25$0.25$0.39$0.24$0.25
16Work zone pavement marking non-removing (W)6"(DOT) (662-7006)LF249$0.92$0.25$0.25$0.25$0.58$0.24$0.25
17Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF23,926$0.57$0.25$0.16$0.16$0.34$0.24$0.16
18Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF4,468$1.00$0.34$0.34$0.34$0.39$0.30$0.34
19Work zone pavement marking non-removing (W)12"(solid) (662-7015)LF238$2.76$1.75$1.61$1.60$0.97$2.00$1.60
20Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF1,051$7.00$2.75$2.52$2.50$1.70$4.00$2.50
21Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH27$107.77$65.50$61.52$61.00$36.85$75.00$61.00
22Work zone pavement marking non-removing (W)(double arrow) (662-7019)EACH1$153.50$75.25$70.60$70.00$63.04$100.00$70.00
23Work zone pavement marking non-removing (W)(uturn arrow) (662-7027)EACH1$268.20$75.25$70.60$70.00$96.99$100.00$70.00
24Work zone pavement marking non-removing(W)(word) (662-7030)EACH24$122.59$75.25$70.60$70.00$38.80$75.00$70.00
25Work zone pavement marking non-removing(W)18"(yld tri) (662-7031)EACH3$58.25$8.25$7.84$7.77$27.16$15.00$7.77
26Work zone pavement marking non-removing(W)36"(yld tri) (662-7032)EACH5$19.50$17.25$16.14$16.00$29.10$25.00$16.00
27Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF738$0.68$0.25$0.25$0.25$0.44$0.24$0.25
28Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF13,008$0.64$0.25$0.25$0.25$0.34$0.24$0.25
29Work zone pavement marking non-removing (Y)24"(solid) (662-7042)LF40$4.29$2.75$2.52$2.50$2.91$4.00$2.50
30Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH10,000$1.60$1.00$0.44$1.40$3.07$0.01$0.50
31Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH10,000$1.60$1.00$0.46$1.40$3.18$0.01$0.50
32Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008)LF249$1.32$0.75$0.71$0.70$0.97$1.00$0.70
33Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF4,468$1.50$0.75$0.71$0.70$0.78$1.00$0.70
34Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029)LF238$4.18$3.00$2.77$2.75$3.88$3.25$2.75
35Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035)LF1,051$12.00$5.50$5.24$5.20$6.21$6.50$5.20
36Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041)EACH27$200.00$133.25$125.06$124.00$140.63$175.00$124.00
37Reflectorized pavement marking type I(W)(double arrow)(090MIL) (666-7044)EACH1$213.61$172.00$161.37$160.00$174.57$250.00$160.00
38Reflectorized pavement marking type I(W)(uturn arrow)(090MIL) (666-7050)EACH1$324.00$172.00$161.37$160.00$193.98$250.00$160.00
39Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065)EACH24$298.20$152.50$143.21$142.00$160.02$200.00$142.00
40Ref pavement marking type I(W)18"(yld tri)(090MIL) (666-7086)EACH3$39.00$17.25$16.14$16.00$38.80$25.00$16.00
41Ref pavement marking type I(W)36"(yld tri)(090MIL) (666-7089)EACH5$54.73$36.50$34.29$34.00$48.49$35.00$34.00
42Reflectorized pavement marking type I (W)(bike arrow)(090MIL) (666-7092)EACH20$175.00$82.75$77.66$77.00$106.69$125.00$77.00
43Reflectorized pavement marking type I(W)(bike syml)(090MIL) (666-7098)EACH20$215.00$82.75$77.66$77.00$218.21$200.00$77.00
44Reflectorized pavement marking type I (Y)24"(solid)(090MIL) (666-7122)LF40$10.26$5.50$5.24$5.20$7.27$6.50$5.20
45Reflectorized pavement marking type II (W) (bike arrow) (666-7203)EACH20$185.00$36.50$34.29$34.00$9.70$35.00$34.00
46Reflectorized pavement marking type II (W) (bike symbol) (666-7205)EACH20$184.00$36.50$34.29$34.00$19.39$35.00$34.00
47Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265)LF23,926$1.00$1.25$1.16$1.15$0.68$0.80$1.15
48Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269)LF13,008$1.00$1.25$1.16$1.15$0.68$0.80$1.15
49Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273)LF738$1.00$1.25$1.16$1.15$0.70$0.80$1.15
50Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407)LF5,388$0.80$0.52$0.52$0.52$0.70$0.60$0.52
51Reflectorized pavement marker type I-C (672-7002)EACH414$4.00$5.50$5.24$5.20$3.44$3.50$5.20
52Reflectorized pavement marker type II-A-A (672-7004)EACH140$4.00$5.50$5.24$5.20$3.78$3.50$5.20
53Reflectorized pavement marker type II-C-R (672-7006)EACH142$4.00$5.50$5.24$5.20$3.78$3.50$5.20
54Eliminating existing PM & markers (4") (677-7001)LF983$1.75$0.77$0.78$0.77$0.96$1.00$0.77
55Bonding course (3007-7001)GAL8,621$3.50$3.00$2.75$2.76$3.26$3.88$2.95
TxDOT contract A00209819: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy