TxDOT contract A00188227 bid tabulation
Resurface Roadway, SH 123 (Hays/Guadalupe County Line to FM 758). Let by Texas DOT on February 5, 2026, Guadalupe, San Antonio District. 7 bids received; low bid $4,323,419 by Clark Construction of Texas, Inc., -13% against the engineer's estimate of $4,974,110.
- Owner
- Texas DOT
- Letting
- 05 FEB 2026
- Pay items
- 78
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Clark Construction of Texas, Inc. | $4,323,419 | Low | -13% |
| 2 | Hunter Industries, LTD. | $4,433,884 | +3.0% | -11% |
| 3 | Lone Star Paving Company | $4,536,034 | +5.0% | -9.0% |
| 4 | Dean Word Company, LTD. | $4,571,938 | +6.0% | -8.0% |
| 5 | Texas Materials Group, Inc. | $4,575,196 | +6.0% | -8.0% |
| 6 | Bobcat Services, Inc. | $4,799,863 | +11% | -4.0% |
| 7 | Allen Keller Company | $5,564,516 | +29% | +12% |
Engineer's estimate: $4,974,110.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Clark Construction of Texas, Inc. | 2. Hunter Industries, LTD. | 3. Lone Star Paving Company | 4. Dean Word Company, LTD. | 5. Texas Materials Group, Inc. | 6. Bobcat Services, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7004) | CY | 414 | $195.00 | $35.00 | $148.40 | $73.00 | $80.60 | $120.00 | $104.60 |
| 2 | D-GR HMA type D PG76-22 (level-UP) (341-7059) | TON | 4,436 | $78.00 | $96.87 | $75.41 | $96.00 | $96.80 | $95.00 | $84.96 |
| 3 | SP mixes SP-C sac-B PG76-22 (344-7031) | TON | 25,980 | $87.00 | $92.08 | $75.36 | $84.30 | $80.00 | $83.00 | $87.15 |
| 4 | Flexible pavement structure repair(8") (351-7007) | SY | 4,281 | $52.00 | $49.41 | $41.58 | $48.00 | $59.50 | $51.00 | $44.13 |
| 5 | Planing asphalt concrete pavement(2") (354-7051) | SY | 225,915 | $1.50 | $0.88 | $1.06 | $1.50 | $1.20 | $1.50 | $1.05 |
| 6 | Riprap (concrete)(4 in) (432-7001) | CY | 92 | $641.00 | $600.00 | $892.00 | $518.00 | $572.40 | $800.00 | $1,005.06 |
| 7 | Riprap (mow strip)(5 in) (432-7014) | CY | 409 | $396.00 | $615.00 | $550.00 | $512.00 | $628.60 | $650.00 | $543.21 |
| 8 | Cleaning and sealing existing joints (438-7001) | LF | 434 | $36.00 | $50.00 | $52.00 | $38.00 | $51.60 | $40.00 | $46.90 |
| 9 | Mobilization (500-7001) | LS | 1 | $449,452 | $62,000 | $250,565 | $174,000 | $315,000 | $145,000 | $283,197 |
| 10 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $5,900.00 | $1,732.00 | $9,961.52 | $1,700.00 | $20,500 | $8,000.00 | $14,369 |
| 11 | Portable changeable message sign (503-7002) | EACH | 2 | $6,623.13 | $1,167.01 | $4,221.81 | $10,063 | $12,550 | $3,500.00 | $4,580.47 |
| 12 | TMA (stationary) (505-7001) | DAY | 62 | $180.00 | $90.00 | $84.44 | $300.00 | $468.20 | $10.00 | $312.00 |
| 13 | TMA (mobile operation) (505-7003) | DAY | 149 | $106.06 | $90.00 | $225.16 | $300.00 | $10.00 | $10.00 | $312.00 |
| 14 | Temporary sediment control fence (install) (506-7039) | LF | 1,000 | $3.00 | $3.50 | $3.64 | $3.00 | $1.00 | $5.00 | $3.03 |
| 15 | Temporary sediment control fence (remove) (506-7041) | LF | 1,000 | $1.00 | $0.50 | $0.52 | $1.50 | $1.00 | $1.00 | $1.52 |
| 16 | One-way traffic control (pilot car) (510-7002) | HR | 344 | $80.50 | $100.00 | $77.00 | $100.00 | $10.00 | $75.00 | $57.41 |
| 17 | Metal W-beam guard fence (timber post) (540-7001) | LF | 4,962.50 | $25.00 | $28.50 | $25.27 | $22.00 | $24.20 | $22.00 | $23.07 |
| 18 | Metal W-beam guard fence (steel post) (540-7002) | LF | 300 | $33.00 | $38.00 | $87.84 | $30.00 | $33.10 | $30.00 | $25.64 |
| 19 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $1,990.00 | $2,500.00 | $2,499.55 | $1,830.00 | $2,019.40 | $2,100.00 | $2,083.50 |
| 20 | Short radius (28") (540-7013) | LF | 137.50 | $45.00 | $38.00 | $53.93 | $40.00 | $44.20 | $40.00 | $36.21 |
| 21 | Downstream anchor terminal section (540-7015) | EACH | 3 | $1,287.00 | $1,200.00 | $1,822.84 | $1,260.00 | $1,396.00 | $1,260.00 | $1,213.20 |
| 22 | Metal beam guard fence trans (31"-28") (540-7028) | EACH | 5 | $473.00 | $500.00 | $2,115.29 | $1,580.00 | $1,746.90 | $1,575.00 | $1,146.49 |
| 23 | Remove metal beam guard fence (542-7001) | LF | 5,525 | $5.13 | $3.00 | $2.89 | $2.30 | $2.60 | $2.35 | $6.06 |
| 24 | Remove terminal anchor section (542-7002) | EACH | 4 | $300.00 | $225.00 | $160.34 | $200.00 | $222.30 | $200.00 | $569.74 |
| 25 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $327.00 | $500.00 | $192.64 | $200.00 | $222.30 | $200.00 | $313.63 |
| 26 | Guardrail end treatment (remove) (544-7003) | EACH | 38 | $306.00 | $250.00 | $230.98 | $226.00 | $250.10 | $225.00 | $419.68 |
| 27 | Gdrail end TRT(inst)(wood post)(type III) (544-7006) | EACH | 37 | $3,255.00 | $3,200.00 | $3,537.34 | $3,370.00 | $3,723.30 | $3,350.00 | $3,401.10 |
| 28 | Remove electrical services (628-7002) | EACH | 2 | $1,536.00 | $583.51 | $2,090.43 | $765.00 | $1,787.20 | $1,610.00 | $1,624.08 |
| 29 | Aluminum signs (type A) (636-7001) | SF | 27 | $37.00 | $25.00 | $26.00 | $30.00 | $27.80 | $25.00 | $30.30 |
| 30 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 64 | $731.00 | $650.00 | $624.01 | $680.00 | $666.90 | $600.00 | $701.95 |
| 31 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 28 | $794.00 | $750.00 | $728.01 | $780.00 | $778.00 | $700.00 | $802.95 |
| 32 | Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005) | EACH | 7 | $800.00 | $810.00 | $806.01 | $830.00 | $861.40 | $775.00 | $858.50 |
| 33 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 6 | $858.00 | $885.00 | $780.01 | $830.00 | $833.60 | $750.00 | $934.25 |
| 34 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 3 | $1,096.00 | $785.00 | $936.01 | $805.00 | $1,000.30 | $900.00 | $833.25 |
| 35 | Install small roadside sign support and assembly TYS80(1)SA(T-2EXT) (644-7029) | EACH | 1 | $1,236.00 | $885.00 | $1,014.01 | $905.00 | $1,083.60 | $975.00 | $934.25 |
| 36 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $1,163.00 | $940.00 | $1,014.01 | $956.00 | $1,083.60 | $975.00 | $1,010.00 |
| 37 | Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035) | EACH | 3 | $1,302.00 | $1,095.00 | $1,040.01 | $1,107.00 | $1,111.40 | $1,000.00 | $1,136.25 |
| 38 | Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049) | EACH | 1 | $1,960.00 | $1,980.00 | $1,456.02 | $2,013.00 | $1,556.00 | $1,400.00 | $2,474.50 |
| 39 | Install small roadside sign support and assembly (inst sign only) (644-7064) | EACH | 3 | $333.00 | $145.00 | $156.00 | $150.00 | $166.70 | $150.00 | $151.50 |
| 40 | Remove SM RD SN sup&AM (644-7073) | EACH | 111 | $113.00 | $95.00 | $104.00 | $100.00 | $111.10 | $100.00 | $111.10 |
| 41 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 3 | $53.00 | $30.00 | $26.00 | $35.00 | $27.80 | $25.00 | $50.50 |
| 42 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2(BI) (658-7002) | EACH | 142 | $38.00 | $30.00 | $31.20 | $35.00 | $33.30 | $30.00 | $25.78 |
| 43 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 55 | $24.00 | $25.00 | $26.00 | $25.00 | $27.80 | $25.00 | $15.82 |
| 44 | Install object marker assembly (OM-2Z)(WFLX)GNDHH (658-7249) | EACH | 10 | $114.00 | $190.00 | $130.00 | $200.00 | $138.90 | $125.00 | $211.73 |
| 45 | Install object marker assembly (OM-2Z)(WFLX)SRFHH (658-7257) | EACH | 30 | $60.00 | $190.00 | $130.00 | $200.00 | $138.90 | $125.00 | $211.75 |
| 46 | Install object marker assembly (OM-2Z)(WFLX)SRFHH(BI) (658-7261) | EACH | 5 | $400.00 | $190.00 | $130.00 | $200.00 | $138.90 | $125.00 | $211.80 |
| 47 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 99 | $11.00 | $65.00 | $10.40 | $70.00 | $11.10 | $10.00 | $18.22 |
| 48 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 17 | $11.00 | $65.00 | $10.40 | $70.00 | $11.10 | $10.00 | $18.20 |
| 49 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 2,783 | $0.84 | $0.53 | $1.72 | $0.75 | $2.30 | $1.00 | $0.45 |
| 50 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 5,718 | $1.39 | $0.53 | $1.72 | $0.75 | $2.00 | $1.00 | $0.47 |
| 51 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 39 | $1.19 | $1.00 | $1.56 | $1.00 | $1.10 | $1.00 | $1.01 |
| 52 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 5,175 | $1.00 | $1.00 | $0.88 | $1.00 | $0.90 | $0.80 | $1.01 |
| 53 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 449 | $5.34 | $8.00 | $8.32 | $8.00 | $6.70 | $6.00 | $8.08 |
| 54 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 20 | $136.00 | $150.00 | $135.20 | $150.00 | $164.50 | $148.00 | $176.75 |
| 55 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 20 | $186.00 | $175.00 | $161.20 | $176.00 | $166.70 | $150.00 | $202.00 |
| 56 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 5 | $60.00 | $35.00 | $58.24 | $35.00 | $44.50 | $40.00 | $35.35 |
| 57 | Reflectorized pavement marking type I (Y)6"(DOT)(100MIL) (666-7111) | LF | 30 | $1.30 | $1.00 | $1.56 | $1.00 | $1.10 | $1.00 | $1.01 |
| 58 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 6 | $357.00 | $375.00 | $364.01 | $378.00 | $361.20 | $325.00 | $378.75 |
| 59 | Pavement sler 6" (666-7347) | LF | 175,833 | $0.20 | $0.20 | $0.18 | $0.20 | $0.16 | $0.14 | $0.20 |
| 60 | Pavement sler 8" (666-7348) | LF | 5,175 | $0.30 | $0.25 | $0.31 | $0.25 | $0.20 | $0.18 | $0.25 |
| 61 | Pavement sler 24" (666-7352) | LF | 449 | $2.45 | $2.00 | $3.12 | $2.00 | $0.80 | $0.70 | $2.02 |
| 62 | Pavement sler (arrow) (666-7353) | EACH | 20 | $74.00 | $75.00 | $104.00 | $76.00 | $11.10 | $10.00 | $75.75 |
| 63 | Pavement sler (word) (666-7354) | EACH | 20 | $84.00 | $75.00 | $130.00 | $76.00 | $11.10 | $10.00 | $75.75 |
| 64 | Pavement sler (med nose) (666-7355) | EACH | 6 | $134.00 | $100.00 | $260.00 | $100.00 | $44.50 | $40.00 | $101.00 |
| 65 | Pavement sler (yld tri) (666-7365) | EACH | 5 | $10.00 | $15.00 | $36.40 | $15.00 | $111.10 | $30.00 | $15.15 |
| 66 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 8,410 | $0.60 | $0.52 | $0.57 | $0.50 | $0.60 | $0.55 | $0.57 |
| 67 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 74,250 | $0.61 | $0.52 | $0.57 | $0.50 | $0.60 | $0.55 | $0.57 |
| 68 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 4,080 | $0.52 | $0.52 | $0.57 | $0.50 | $0.60 | $0.55 | $0.57 |
| 69 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 89,024 | $0.51 | $0.52 | $0.57 | $0.50 | $0.60 | $0.55 | $0.57 |
| 70 | Reflectorized pavement marker type I-C (672-7002) | EACH | 691 | $4.95 | $3.75 | $4.16 | $3.80 | $4.00 | $3.65 | $4.29 |
| 71 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 2,708 | $4.80 | $3.75 | $4.16 | $3.80 | $3.90 | $3.65 | $4.29 |
| 72 | Remove RDSD flash beacon assembly (685-7003) | EACH | 2 | $756.00 | $583.51 | $2,459.63 | $2,013.00 | $2,102.80 | $1,900.00 | $1,912.94 |
| 73 | Litter removal (734-7002) | CYC | 14 | $5,000.00 | $1.18 | $2,000.00 | $50.00 | $877.90 | $1,200.00 | $1,935.81 |
| 74 | Litter removal (spot) (734-7003) | ACRE | 129 | $10.00 | $4.55 | $110.00 | $50.00 | $10.20 | $85.00 | $37.79 |
| 75 | Debris removal (CNTR medians/mainlanes) (735-7014) | CYC | 14 | $75.00 | $1.18 | $2,200.00 | $50.00 | $580.60 | $1,200.00 | $1,865.24 |
| 76 | Debris removal (spot debris) (735-7072) | MI | 7.10 | $2,500.00 | $82.20 | $1,400.00 | $50.00 | $175.90 | $1,200.00 | $1,725.23 |
| 77 | Underseal course (3006-7001) | GAL | 52,577 | $4.00 | $0.02 | $3.89 | $3.20 | $0.01 | $3.35 | $3.21 |
| 78 | Bonding course (3007-7001) | GAL | 856 | $1.32 | $3.93 | $2.85 | $3.20 | $3.70 | $3.35 | $2.86 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.