TxDOT contract A00178488 bid tabulation
Surfacing/Roadway Restoration, US 87 (Barons Creek to Old Mason Road). Let by Texas DOT on July 2, 2025, Gillespie, Austin District. 7 bids received; low bid $9,157,488 by Texas Materials Group, Inc., +0.3% against the engineer's estimate of $9,134,181.
- Owner
- Texas DOT
- Letting
- 02 JUL 2025
- Pay items
- 53
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Materials Group, Inc. | $9,157,488 | Low | 0.0% |
| 2 | Hunter Industries, LTD. | $9,159,903 | 0.0% | 0.0% |
| 3 | Acme Bridge Company, Inc. | $9,191,852 | 0.0% | +1.0% |
| 4 | Allen Keller Company | $9,354,353 | +2.0% | +2.0% |
| 5 | CK Newberry, LLC | $9,549,214 | +4.0% | +5.0% |
| 6 | Dean Word Company, LTD. | $9,999,850 | +9.0% | +9.0% |
| 7 | Clark Construction of Texas, Inc. | $10,584,876 | +16% | +16% |
Engineer's estimate: $9,134,181.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Materials Group, Inc. | 2. Hunter Industries, LTD. | 3. Acme Bridge Company, Inc. | 4. Allen Keller Company | 5. CK Newberry, LLC | 6. Dean Word Company, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 500 | $200.00 | $250.00 | $365.20 | $188.00 | $192.14 | $500.00 | $263.00 |
| 2 | Embankment (final)(OC)(type B) (132-7003) | CY | 300 | $60.00 | $60.00 | $22.00 | $45.20 | $15.00 | $125.00 | $232.00 |
| 3 | Backfill (type A) (134-7001) | STA | 500 | $195.00 | $100.00 | $137.50 | $169.00 | $125.38 | $275.00 | $167.80 |
| 4 | Cement (290-7001) | TON | 734 | $275.00 | $224.00 | $212.85 | $260.00 | $239.77 | $215.00 | $248.50 |
| 5 | Emulsion (standard yield) (290-7002) | GAL | 635,096 | $2.50 | $2.10 | $2.53 | $2.70 | $2.62 | $2.50 | $2.30 |
| 6 | Emul TRT (existing matrl)(8") (290-7011) | SY | 244,762 | $3.25 | $4.30 | $4.85 | $3.49 | $4.15 | $3.50 | $5.00 |
| 7 | Asphalt (RC-250) (316-7016) | GAL | 61,191 | $5.00 | $4.65 | $4.95 | $4.56 | $5.30 | $5.00 | $4.70 |
| 8 | Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071) | GAL | 93,009 | $5.00 | $4.50 | $4.29 | $4.68 | $4.02 | $3.25 | $3.80 |
| 9 | Aggregate (type-PD, GR-4)(sac-B) (316-7224) | CY | 2,040 | $95.00 | $135.00 | $116.16 | $185.00 | $186.75 | $125.00 | $126.00 |
| 10 | Aggregate (type-D, GR-5) (316-7252) | CY | 1,883 | $120.00 | $184.00 | $93.47 | $144.00 | $161.78 | $200.00 | $119.30 |
| 11 | SP mixes SP-C sac-B PG76-22 (344-7031) | TON | 26,924 | $116.00 | $106.00 | $105.60 | $108.00 | $107.69 | $110.00 | $130.60 |
| 12 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 87,019 | $2.50 | $2.00 | $1.87 | $1.63 | $0.88 | $1.25 | $2.30 |
| 13 | Planing asphalt concrete pavement (0"-2" edge mill) (354-7088) | SY | 13,908 | $1.50 | $3.50 | $1.98 | $2.85 | $2.60 | $5.00 | $3.70 |
| 14 | Mobilization (500-7001) | LS | 1 | $678,828 | $900,000 | $734,322 | $825,000 | $886,000 | $925,000 | $665,000 |
| 15 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $8,500.00 | $16,200 | $4,133.18 | $11,500 | $24,757 | $25,000 | $16,000 |
| 16 | Portable changeable message sign (503-7001) | DAY | 192 | $130.00 | $70.00 | $152.20 | $109.00 | $96.71 | $200.00 | $105.40 |
| 17 | TMA (stationary) (505-7001) | DAY | 300 | $295.00 | $200.00 | $253.67 | $144.00 | $29.65 | $325.00 | $369.40 |
| 18 | TMA (mobile operation) (505-7003) | DAY | 43 | $300.00 | $525.00 | $507.34 | $543.00 | $457.92 | $325.00 | $761.90 |
| 19 | Temporary sediment control fence (install) (506-7039) | LF | 300 | $6.00 | $5.50 | $5.50 | $5.70 | $5.03 | $5.50 | $5.90 |
| 20 | Temporary sediment control fence (remove) (506-7041) | LF | 300 | $2.00 | $2.50 | $2.50 | $2.60 | $2.29 | $2.50 | $2.70 |
| 21 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 300 | $9.00 | $6.00 | $6.00 | $6.20 | $5.50 | $6.00 | $6.40 |
| 22 | Biodegradable erosion control logs (remove) (506-7046) | LF | 300 | $4.00 | $2.50 | $2.50 | $2.60 | $2.29 | $2.50 | $2.70 |
| 23 | One-way traffic control (port traffic signal) (510-7003) | MO | 11 | $4,500.00 | $4,000.00 | $14,475 | $5,200.00 | $2,976.48 | $3,250.00 | $4,456.00 |
| 24 | Turnouts (surface treat) (530-7019) | SY | 1,450 | $95.00 | $93.25 | $29.70 | $4.15 | $33.84 | $40.00 | $93.60 |
| 25 | Metal W-beam guard fence adjustment (540-7009) | LF | 7,250 | $12.00 | $16.00 | $17.06 | $8.70 | $14.65 | $17.00 | $17.00 |
| 26 | Metal thrie-beam guard fence adjustment (540-7010) | LF | 200 | $17.50 | $40.55 | $43.24 | $22.10 | $37.13 | $42.00 | $43.00 |
| 27 | Terminal anchor section adjustment (540-7011) | EACH | 30 | $100.00 | $585.00 | $623.78 | $269.00 | $535.77 | $600.00 | $525.20 |
| 28 | Transition adjustment (540-7012) | EACH | 30 | $400.00 | $1,060.00 | $1,130.28 | $558.00 | $970.79 | $1,100.00 | $1,087.50 |
| 29 | Work zone pavement marking non-removing (W)4"(broken) (662-7001) | LF | 2,041 | $0.50 | $0.70 | $0.25 | $0.77 | $0.64 | $0.50 | $0.30 |
| 30 | Work zone pavement marking non-removing (W)4"(solid) (662-7004) | LF | 98,928 | $0.50 | $0.70 | $0.25 | $0.77 | $0.64 | $0.40 | $0.30 |
| 31 | Work zone pavement marking non-removing (Y)4"(broken) (662-7033) | LF | 5,466 | $0.50 | $0.70 | $0.25 | $0.77 | $0.64 | $0.50 | $0.30 |
| 32 | Work zone pavement marking non-removing (Y)4"(solid) (662-7035) | LF | 70,023 | $0.50 | $0.70 | $0.25 | $0.77 | $0.64 | $0.40 | $0.30 |
| 33 | Work zone pavement marking removing (W)4"(broken) (662-7061) | LF | 2,041 | $1.60 | $0.75 | $0.70 | $0.77 | $0.69 | $0.75 | $1.00 |
| 34 | Work zone pavement marking removing (W)4"(solid) (662-7064) | LF | 98,928 | $0.50 | $0.75 | $0.61 | $0.77 | $0.69 | $0.75 | $1.00 |
| 35 | Work zone pavement marking removing (Y)4"(broken) (662-7095) | LF | 5,466 | $2.00 | $0.75 | $0.70 | $0.77 | $0.69 | $0.75 | $1.00 |
| 36 | Work zone pavement marking removing (Y)4"(solid) (662-7097) | LF | 70,023 | $0.50 | $0.75 | $0.61 | $0.77 | $0.69 | $0.75 | $1.00 |
| 37 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 2,505 | $2.50 | $1.80 | $1.63 | $1.40 | $2.90 | $1.00 | $1.60 |
| 38 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 5,013 | $1.80 | $1.80 | $1.63 | $1.40 | $2.45 | $1.00 | $1.50 |
| 39 | Reflectorized pavement marking type I (W)4"(lane drop)(100MIL) (666-7006) | LF | 2 | $0.51 | $770.00 | $0.57 | $0.47 | $800.00 | $817.00 | |
| 40 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 300 | $2.00 | $1.76 | $2.20 | $1.83 | $2.00 | $1.90 | |
| 41 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 2,041 | $0.72 | $0.25 | $0.29 | $0.27 | $0.23 | $0.30 | $0.30 |
| 42 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 300 | $2.00 | $0.29 | $2.20 | $1.83 | $0.30 | $0.30 | |
| 43 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 98,928 | $0.40 | $0.25 | $0.29 | $0.27 | $0.23 | $0.30 | $0.30 |
| 44 | Reflectorized pavement marking type II (W) (LN reduct arrow) (666-7192) | EACH | 2 | $475.00 | $250.00 | $522.00 | $435.02 | $250.00 | $265.20 | |
| 45 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 5,466 | $1.02 | $0.25 | $0.29 | $0.27 | $0.23 | $0.30 | $0.30 |
| 46 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 70,023 | $0.40 | $0.25 | $0.29 | $0.27 | $0.23 | $0.30 | $0.30 |
| 47 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 98,928 | $1.05 | $0.80 | $1.06 | $0.88 | $0.73 | $1.10 | $1.20 |
| 48 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 70,023 | $1.05 | $0.80 | $1.11 | $0.88 | $0.73 | $1.20 | $1.20 |
| 49 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 5,466 | $1.16 | $0.80 | $1.60 | $0.88 | $0.73 | $1.60 | $1.70 |
| 50 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 2,041 | $1.81 | $0.56 | $0.77 | $0.61 | $0.52 | $0.80 | $0.80 |
| 51 | Reflectorized pavement marker type I-C (672-7002) | EACH | 104 | $7.73 | $10.50 | $4.30 | $11.50 | $9.61 | $4.50 | $4.70 |
| 52 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,148 | $6.50 | $8.55 | $4.30 | $9.40 | $7.83 | $4.50 | $4.70 |
| 53 | Residential driveway temporary signal system (6089-7001) | MO | 11 | $10,000 | $1,200.00 | $7,963.65 | $8,110.00 | $4,870.61 | $3,200.00 | $5,999.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2025. Compiled by Mirage Metrics.